Problem

They want to choose the best location, costs of materials and shipping arrangements by using linear programming.

To maximize profit

Three scenarios

Mexico Thailand United States

DataType A B Capital Type A B Capital Type A B Capital

Labor Cost 2.5 3 4,000 Labor Cost 1 .75 1,500 Labor Cost .9 1 1,500

MaterialCost

2 1 2,500 MaterialCost

2 2.5 4,000 MaterialCost

3 1 3,600

ShippingCost

.75 1.25 1,500 ShippingCost

4 1 4,800 ShippingCost

.2 3 3,000

Plant in US                                 Plant in Thailand                     Plant in Mexico

US produced : $ 53 for A and $ 56 for BThailand produced: $45 for A and $50 for BMexico produced: $50 for A and $52 for B

MexicoTypes A B Capital $ ConstraintsLabor Cost .9 1 1,500 .9x+1y≤1500Material Cost

3 1 3,600 3x+1y ≤3600

Shipping cost

.2 3 3,000 .2x+3y≤3000

Total Capital 8,100 x > 0 and y > 0

Calculations

Example .9x+1y≤1500 1y = 1500 - .9 Y = 1500 - .9

3x+1y ≤3600 = y =3600 -3x

.2x+3y≤3000 = y = 3600 – 3x

Point of intersection Example 1000-(0.2/3)x = 1500 – 0.9x

.83x = 1000 = 1500

.83x = 500

= 602x

Substitute 1500-.9(602) = 959 (602,959)

1500-0.9x = 3600-3x1000x

1500-.9(1000) = 60 (1000,600)

Profit

79968 – 8100 = -132 not profit

81200- 8100 = 1100

Mexico produced: $50 for A and $52 for B

P = 50x + 52y

P = 50(602) + 50(959) = 79968

P = 50(1000) + 52(600) = 81200

Thailand

Type A B Capital $ ConstraintsLabor Cost 1 .75 1,500 1 x + .75 y ≤ 1500

Material Cost 2 2.75 4,000 2 x + 2.5 y ≤ 4000

Shipping cost 4 1 4800 4 x + 1 y ≤ 4800Total Capital 10300 x > 0 and y > 0

Y = 2000 – (3/4)x Y = 1600 – 0.8x Y = 4800 – 4x

Points of intersection and profit 1600 - .8x = 2000 – (3/4)

754 = x

1600 - .8(754) = 996 (754,996)

2000 – (4/3)x = 4800-4x 1096

2000 – (4/3) 9(1076 = 565 = y

(1096,565)

Thailand produced: $45 for A and $50 for B

P = 45x + 50y P = 45(754) + 50(996) = 83730

83730 – 10300 = 73430

P = 45x + 50y P = 45(1096) + 50(565) = 77570

77570 – 10300 = 67270

United StatesType A B Capital $ Constraints

Labor Cost 2.5 3 4,000 2.5x + 3y ≤4000

Material Cost 2 1 2,500 2x + 1y ≤ 2500

Shipping cost .75 1.25 1,500 .75x + 1.25y ≤1500

Total Capital 8,000 x > 0 and y > 0

Y = 1333 – (2.5/3)x Y = 2500 – (2/1)x Y 1200 – (.75/1.25)x

Points of Intersection and profit 1333 – (2.5/3)x = 2500 – (2/1)x

1060

1333 – (2.5/3) (1060) = 449

(1167,449)

1200-(.75/1.25)x = 1333-(2.5/3) 578

S 1200-(.75/1.25)(578 = 853 (278,853)

Profit US produced : $ 53 for A and $ 56 for

B P = 53x + 56y P = 53(1167) + 56(449) = 86995 86995 – 8000 = 78995 profit

P = 53(578) + 56(853) = 78402 78402 – 8000 = 70402 profit

Which one is the best?

Thailand

Type A B Capital $ ConstraintsLabor Cost 1 .75 1,500 1 x + .75 y ≤ 1500

Material Cost 2 2.75 4,000 2 x + 2.5 y ≤ 4000

Shipping cost 4 1 4800 4 x + 1 y ≤ 4800Total Capital 10300 x > 0 and y > 0

Why? Thailand produced: $45 for A and $50 for B

P = 45x + 50y

Mexico > P = 50x + 52y

US >P = 53x + 56y