Page 1: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

PPUBLICUBLIC H HEARINGEARING O ONN C CONDITIONALONDITIONAL GGRANTSRANTS & C & CAPITALAPITAL E EXPENDITUREXPENDITURE

PRESENTATION BY MEC GRACE PAMPIRI

1

Page 2: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

1. Introduction

The presentation will highlight the following items: Trends on grant allocation, transfers and expenditure. We will

also briefly highlight some achievements recorded. Assessment of the Department’s monitoring capacity including

capacity constraints. Compliance with monthly reporting.

2

Page 3: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

1. Trends in allocation, transfers and actual expenditure1.1. Allocation In the Financial year 2009/10 the Department received an allocation of

R52,872 Million and a rollover of R1,974 Million. The Total allocation for 2009/10 is R54,846 Million which was allocated

according to grant priorities:◦ Capacity Building in Community libraries (Staffing and training)◦ Infrastructure

Capital Projects Upgrading and maintenance of library buildings Furniture, security and vehicles

◦ Information and communication Technologies (ICT) - Public Internet access and computer equipment

◦ Books and other library materials◦ Promoting the Culture of reading – Mobile library buses and reading

awareness and library promotion programmes including literacy programmes

3

Page 4: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

Grant Priority Allocation Expenditure Commitments Total exp.

% Spent

Capacity building

(staffing and training)

R16,6 M 14,5 0 14,5 87%

Infrastructure•Capital (transferred to local Municipalities)•Upgrades •Other incl Furniture, Security, Vehicles

R20,9 M

R7,5 M

R8,9 M

R4,5 M

7,5

4,8 1,5

7,5

6,3

100%

71%

Information & Communication Technologies (ICT) – Public Internet Access and equipment

R2,3 M R2,4 0 R2,4 104%

Promoting culture of reading R4,9 M R0,4M R3,2 R3,6 73%

Library materials: Books, toys, etc

R8 M R8 M R8 M 100%

TOTAL (Including admin) R54,8M R41,1M R4,7M R45,8 84%

4

Page 5: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

1.2. ACHIEVEMENTS

Infrastructure – (Conditional Grant)◦ Ipelegeng Community Library (Mamusa Local Municipality), R2m allocated for

construction of the Community Library. Contractor has been appointed and due to delays with compliance to submit required documentation as in the project is behind scheduled. By April 12 Contractor has submitted letter of commitment to submit all required documents

◦ Utlwanang Community Library (Lekwa-Teemane Local Municipality): R2,5m allocated. The tender Evaluation done in March 2010 and delays by municipality to Adjudicate tender has delayed appointment of Consultants.

◦ Lebaleng Community Library (Maquassi-Hills Local Municipality): R3,250 allocate to municipality for design and construction of community library. Tender for appointment of consultants closed in February 2010 and municipality has finalize appointment of Consultants.

5

Page 6: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

Achievements conti……Infrastructure- (voted funds)

◦ Dertig Community Library ( Moretele LM): R3m allocated for the 1st year for planning and design phase.

◦ Letsopa Community Library (Tswaing LM): R900,000.00 allocated for planning and design phase. Tender Evaluation for appointment of Consultants completed, adjudication delayed by municipality strike.

◦ Boikhutso Community Library ( Ditsobotla LM) Tender adjudication for appointment of consultants to be finalised in the 4th week April 2010.

◦ Mogwase Community Library (Moses Kotane LM). R950,000.00 allocated for design and planning phase. Process of advertisement of tenders to be finalised in May 2010.

6

Page 7: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

ACHIEVEMENTS cont….

Extension of Coligny library (Ditsobotla LM) was completed as well as the maintenance of Wedela, Alabama and Welverdiend Community Libraries.

Extension of Koster Library in Ketleng-Rivier Municipality was disrupted by heavy rains and it due for completion at the end of April 2010

Mobile library service – is fully functional and it reached 15 villages every month.

Public Internet access – is now fully functional in 16 community libraries. 140 computers purchased for community libraries.

7

Page 8: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

ACHIEVEMENTS cont… Capacity building in community libraries – Training on

Project management, Computer Literacy, Disaster Management and Preservation Training, Advanced Toy Library Training and Story telling workshop were attended by 198 community library staff.

Stores – 53899 books were purchased and distributed to community libraries.

8

Page 9: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

9

2. Assessment of the Department’s

monitoring capacity Expenditure on the grant excluding commitments amounts to

R41,1 M which is 75%. We underspent by 25%.

Reasons for under spending: Infrastructure– Appointment of Building Contractors for

the upgrading of 7 libraries will be completed in April 2010. The work of Project Managers overlaps over two financial years 2009/10-2010/11.

Vehicles and security for community libraries – Appointment of service providers will be finalized in April 2010

Mobile library buses– the service provider will only complete and deliver the two buses in June 2010

Page 10: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

Capacity challenges in the Department: There is insufficient capacity in Supply Chain Management

Unit which results in tender process delays. The department has already appointed better functional

tender committees which started operating in February 2010

10

Page 11: P UBLIC H EARING O N C ONDITIONAL G RANTS & C APITAL E XPENDITURE PRESENTATION BY MEC GRACE PAMPIRI 1.

3. Compliance to reporting requirements The Department has submitted all monthly and other reports

to the Department of Arts & Culture.

The Department is still struggling to get monthly expenditure

reports from local municipalities for funds transferred for

Capital Projects.

The intervention meeting with local municipalities receiving

grant for capital projects scheduled for 2nd week in May 2010

will assist to unblock delays with implementation of capital

projects.