![Page 1: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/1.jpg)
P. ShanahanNov 15, 2003Page 1
MINOS WBS 2.3: Electronics, DAQ and Database
• Status
• Accomplishments since May. 2003 review
• Near Detector Electronics production
• Costs
Peter Shanahan
Department of Energy
Review of the NuMI Project
MINOS Parallel Session
Nov. 15, 2003
![Page 2: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/2.jpg)
P. ShanahanNov 15, 2003Page 2Overview of 2.3 Status
• Schedule Status (BCWP/Total Budget): • 96.7% complete
• Electronics, DAQ, and Database• Steady progress on Data Acquisition, Detector Control System,
and Database
• Thorough workout at CALDET
• Near Detector Electronics• Near Detector – Assembly of all items wrapping up
* Exceptions: MINDER crate, minor clock components
• Checkout in Progress
![Page 3: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/3.jpg)
P. ShanahanNov 15, 2003Page 3WBS 2.3 Accomplishments Since
May 2003 Review
• MINOS WBS Milestones:• WBS 2.3.1.0.MS.7 Complete shipping for CALDET
* completed on time, 7/10/03
• WBS 2.3.0.MS.2 Near Electronics Ready for Installation * completed 1 month early, 9/15/03 – includes equipment in use at CALDET
• Successful calibration run with Near Detector (ND) Electronics at CALDET• First time DAQ used 2 ND readout crates
• Tested Spill Mode of ND FEE, and other features for 1st time
• Assembly and checkout well along on all major components• Exception: Problem with MINDER (“Front End”) Crate
production
![Page 4: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/4.jpg)
P. ShanahanNov 15, 2003Page 4Upcoming Schedule Milestones
WBS Task Schedule Float
2.3.0.MS.4 Electronics Production Complete – Near 03/02/2004 248d
2.3.1.0.MS.8 Begin Near FE Electronics Installation 05/10/2004 190d
Grain of salt for Floats:
-2.3.0.MS.4 is last card completed – doesn’t distinguish 50% done from 99% done
-2.3.1.0.MS.8 allows for commissioning detector planes with electronics long after they go in
![Page 5: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/5.jpg)
P. ShanahanNov 15, 2003Page 5DAQ Progress and Status
• CALDET Run• Major effort for DAQ group• Experience being fed-back into planning for Near Detector
Commissioning.
• Far Detector• Data taking since 2001• Operations mode since August, 2003
• Near Detector• DAQ Workshop at RAL Scheduled for December to plan for
intallation
• FNAL Control room has been commissioned• Shifts taken for CALDET at CERN and FARDET
![Page 6: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/6.jpg)
P. ShanahanNov 15, 2003Page 6Near Detector Electronics
MASTERModule
MINDERCrate
Trigger/Keeper
MINDERmodules
MA
ST
ER
Crate
Control
Read-Out Channel 0
Read-Out Channel 1
Read-Out Channel 2
Read-Out Channel 3
Read-Out Channel 4
Read-Out Channel 5
Read-Out Channel 6
Read-Out Channel 7
1818181818181818
MASTER MODULEVME Read-Out Board
Front End Crate
KE
EP
ER
68
Rea
d-O
ut B
uffe
r
VME Computer
Located Near MUX BoxEach Crate Hosts 16 MINDERs
Located in Front End VME Crate
VMEBackplane
Located in Front End VME Crate
Trig
ger
VM
E In
terf
ace
Each MINDER Module supports16 Channels, or 1/4 PMT
Each MASTER supports8 MINDERs, or 2 PMTs
VME Clock Fanout
RF ClockNUMI Interface
Tim
ing
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
GRD991101
To Other Crates
Component Count (not counting ~10% spares, light injection):
9328 MENUS
583 MINDERS
81 MASTERS
![Page 7: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/7.jpg)
P. ShanahanNov 15, 2003Page 7Near Detector Electronics Status
• Schedule Status (BCWP/Total Budget):• 93% September 03 (85% March 03)
• Highlights• Met CALDET schedule
• MENU production and checkout nearly complete
• MASTER, KEEPER, MINDER production 98% complete* Checkout held up on MINDERs for feedback from CALDET
• Issues• MINDER (Front End) Crates
* Poor mechanical structure in 1st articles
* Apparent resolution failed to translate into production quality.
* End of CALDET travel will allow more focus on this problem
![Page 8: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/8.jpg)
P. ShanahanNov 15, 2003Page 8Near Detector Electronics Status
ComponentNeeded for
Detector
Number to Produce
**REQUIRED**
Assembled Tested GOOD % DONEAt CALDET (all to be returned)
Items to Produce:MASTER 80 89 89 19 21 19MINDER 578 641 625 190 30 127MENU 9,248 10,260 10,196 9,948 97 2,032KEEPER 44 49 49 24 49 13MTM 44 49 49 49 100 10VTM 9 13 0 0 0 3Master Clock Controller 1 3 3 3 100 2Master Clock Fanout 5 9 9 9 100 2PMT Cable Assemblies 194 211 100 100 47 31MINDER AUX Boards 776 813 126 126 15 131MASTER AUX Boards 80 84 84 84 100 18PIN Diode AUX Boards 0 8 1 1 13 1GPS Fanout Ch (1 per VTM) 9 13 0 0 0 0
Items to Purchase:QIEs 9,248 10,260 10,260 10,260 100 2,032MASTER Crates 9 13 13 13 100 2MASTER Power Supplies 9 11 11 11 100 3MINDER Crates 44 52 10 0 0 8MINDER Power Supplies 44 52 52 51 98 9MINDER Power Harness 44 57 9 9 16 9MASTER-MINDER Cables 578 612 612 612 100 127MASTER-KEEPER Cables 44 47 47 47 100 13MCF-MTM Cables 44 47 0 0 0 10MTM-MINDER Cables 578 612 612 612 100 100GPS Fanout Cables 9 12 0 0 0 0MCF-VTM Cables 9 12 0 0 0 3
![Page 9: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/9.jpg)
P. ShanahanNov 15, 2003Page 9MENUs
• Earlier production problems resolved
• Checkout help from IIT undergrads
• High pass rate on checkout
MENU Module Production ProgressAssembly and Checkout
Though Friday, October 17, 2003 C. Nelson
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
110003
/28
/20
03
4/4
/20
03
4/1
1/2
00
3
4/1
8/2
00
3
4/2
5/2
00
3
5/2
/20
03
5/9
/20
03
5/1
6/2
00
3
5/2
3/2
00
3
5/3
0/2
00
3
6/6
/20
03
6/1
3/2
00
3
6/2
0/2
00
3
6/2
7/2
00
3
7/4
/20
03
7/1
1/2
00
3
7/1
8/2
00
3
7/2
5/2
00
3
8/1
/20
03
8/8
/20
03
8/1
5/2
00
3
8/2
2/2
00
3
8/2
9/2
00
3
9/5
/20
03
9/1
2/2
00
3
9/1
9/2
00
3
9/2
6/2
00
3
10
/3/2
00
3
10
/10
/20
03
10
/17
/20
03
10
/24
/20
03
10
/31
/20
03
11
/7/2
00
3
11
/14
/20
03
Date (Fridays)
Nu
mb
er o
f M
EN
U M
od
ule
s
Total Assembler Deliveries
Total Good MENUs Checked Out
Expected Assembler Deliveries (500/Week)
Expected Good MENUs Checked Out
![Page 10: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/10.jpg)
P. ShanahanNov 15, 2003Page 10CALDET
• Sept.-Oct. 2003• 1 side of each channel read-out with Near Detector Electronics
• Tested SPILL mode (continuous data taking for 10s)
• Thorough test of system at 15% level
• Provided much feedback for diagnostics and firmware
Time of Flight
Cerenkov
,e,p
Steel/Scintillator
0.5-9 GeV/c
![Page 11: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/11.jpg)
P. ShanahanNov 15, 2003Page 112003 CALDET Run
• Preliminary look at electrons in detector• Compare sum of energy
for Near Det and Far Det electronics, event-by-event
• With preliminary calibrations, ND and FD agree to <2%
• Expect improvements with full analysis
P (GeV/c)
P (GeV/c)
F
D-N
D/0
.5(F
D+
ND
)
FD
-ND
/0.5
(FD
+N
D)
FD-ND/0.5(FD+ND)
Known miscalibrated channel causes this shift
![Page 12: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/12.jpg)
P. ShanahanNov 15, 2003Page 12Cost Variance in WBS 2.3
• WBS 2.3.1 has $384 K favorable cost variance• $994 K in May 2003 review was known to be largely artificial
* Due to statusing of production orders when placed
• Possible true favorable cost variances• Estimated ~$140K on parts and assembly in May 2003 review
* Now appears ~$100K.
• MENU Checkout * Faster, with less project labor than anticipated
* Used existing components for much of teststand systems in budget.
* Possible $100+K favorable variance
![Page 13: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/13.jpg)
P. ShanahanNov 15, 2003Page 13Budget Overruns
• Travel for FNAL engineers and physicists to CALDET: ~$20k
• Tech and Engineer Labor• Clock system – possible c. $50k overrun
• Checkout of rest of system – implementing lessons learned from CALDET (may still be within budget)
• Other MINOR overruns
• We expect that these will be offset by true underruns.
![Page 14: P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May. 2003 review Near Detector Electronics production.](https://reader036.fdocuments.net/reader036/viewer/2022082613/5697bfd11a28abf838caaf7b/html5/thumbnails/14.jpg)
P. ShanahanNov 15, 2003Page 14Summary
• Great progress in WBS 2.3 since May 2003 Review• Near Detector Front End Electronics reaching end of assembly
• NDFEE checkout well along
• CALDET RUN:* ND DAQ given thorough workout at CALDET
* 1st Test of beam mode for NDFEE Data taking
* Quality of data appears much better than 2003
• Overall budget appears sufficient• Need to clean up individual cost accounts for over- and under-
runs