P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

16
P-25 Project Bartholomew County

Transcript of P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Page 1: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

P-25 ProjectBartholomew County

Page 2: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Bartholomew County Radio Up-grades Cost

Page 3: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Radio Equipment Upgrade

Page 4: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.
Page 5: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Mutual Aid Zones

Page 6: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Mutual Aid Zone-Bartholomew County

Seek additional training-from IPSC◦ How to use the system for the units NORTH and West while P-25 system

is being built.

Page 7: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Bartholomew County P-25 Project1. Set a Plan

Implementation of P-25 status – March 2015.

Set benchmarks and timelines-set- February 2015?

Set scheduled meetings – monitor progress.

Discuss and determine how cost can be reduced?

Page 8: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

P-25 Bartholomew County

1. Step one- Inventory radios

P-25 IDs will not be issued until inventory is completed.

Purpose is to eliminate any duplicate IDs that have been issued.

Send to Director of Emergency Operations Center and they will be forwarded to IPSC.

Page 9: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Inventory- Example

Page 10: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

P-25 Project Bartholomew County

2. Step Two- Design Templates

Determine how many templates your agency will need?

CPD/Sheriff –work together to design a standard?

CFD/Co Fire – work together to design a standard?(example where Mutual Aid Channels are located more uniformed)

Page 11: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

P-25 Bartholomew County

Determining who will design Templates?

*Option #1- pay vendor to design the Templates with the guarantee they will work correctly.

*Option #2 – Have the trained officers develop Templates- very time consuming and no guarantee they will work- this may take an extended amount of time and requires a lot of patience. IF this does not work, then it is possible a vendor will have to build them anyway.

Page 12: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Starter Code Plugs

Page 13: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

P-25 Project Bartholomew County

Determine who will Flash the radios?

Option #1- have trained personnel flash Templates in radios. Saves $50.00 per radio.

- Key information1. Batteries must be fully charged.2. Computer must not go into sleep mode.

3. If any of the above occurs radio cost approx. $300.004. Flashing takes approximately 30-60 mins. Per radio

Option #2- have vendor flash Templates in radios at $50.00 per radio.

Page 14: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Example of Cost

County Fire Radio’s

1. Flash 300 radio’s- X $50.00 = $15,000.00

2. 4 Templates = $1800.00 2 for hand held 2500 and 5000 radio’s 2 for mobile radio’s in vehicles Template cost $450.00 each/10 depts. split cost $185.00

* It is possible that a hand held may need to be re-tuned approximate cost $75.00

per radio.

Page 15: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

P-25 Project Bartholomew County

Points of Consideration.

1. Bartholomew County has approximately 900 radio’s Total Flashing cost $45,000.00.

2. Consider allowing vendor to build Templates-

3. Seek inter-local agreements if decision is made to allow officers to Flash the radio’s for other agencies.

4. Set a timeline to have radios programmed in January 2015.

5. Get STARTED NOW!!!

****900 Radio’s divided by 8 = 112.5 days

Page 16: P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.

Next Meeting

Set Date for Next Meeting

1. Agencies provide updates.

2. OCI Technicians – discuss updated equipment/status

3. Have all inventories completed.

4. Determine the design of the Templates?/How many per agency?

5. Determine who will build the Templates?

6. Determine who will Flash the radio’s?