AnokaHwy47.com Visit the project website to learn more, sign up for updates, and find opportunities to provide input. Overview In 2017, residents expressed concerns during open houses for the Highway 47/BNSF Railway Crossing Study. In response to those concerns, the City began a study in partnership with MnDOT to develop a Highway 47 Corridor Plan for the segment of St. Francis Boulevard between the Anoka County Fairgrounds and Bunker Lake Boulevard. Highway 47 corridor improvements will focus on: Improved safety Vehicle access to neighborhoods Pedestrian and bicycle accommodations Plan Objectives 2020 2017-19 2024 + 2021 2022 2023 WE ARE HERE Construction Project Timeline Assemble Funding Package Final Design Preliminary Engineering Study & Concept Development Right-of-Way Acquisition Contacts Ross Tillman, Project Manager Bolton & Menk, Inc. [email protected] 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka [email protected] 763-576-2785 We Need Your Input! Meeting To-Do List Review information Talk with project staff Provide your input www.AnokaHwy47.com Refine concept Review input from this meeting Apply for funding Next Steps

Transcript of Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc....

Page 1: Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc. ross.tillman@bolton-menk.com 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka

AnokaHwy47.com

Visit the project website to learn more, sign up for updates, and find opportunities to provide input.

OverviewIn 2017, residents expressed concerns during open houses for the Highway 47/BNSF Railway Crossing Study. In response to those concerns, the City began a study in partnership with MnDOT to develop a Highway 47 Corridor Plan for the segment of St. Francis Boulevard between the Anoka County Fairgrounds and Bunker Lake Boulevard.

Highway 47 corridor improvements will focus on: • Improved safety • Vehicle access to neighborhoods • Pedestrian and bicycle accommodations

Plan Objectives

20202017-19 2024 +2021 2022 2023

WE ARE HERE

Construction

Project Timeline

Assemble Funding Package

Final DesignPreliminary Engineering

Study & Concept Development

Right-of-Way Acquisition

Contacts

Ross Tillman, Project ManagerBolton & Menk, [email protected] ext. 2974

Ben Nelson, Project ManagerCity of [email protected]

We Need Your Input!

Meeting To-Do List

Review information

Talk with project staff

Provide your inputwww.AnokaHwy47.com

Refine concept

Review input from this meeting

Apply for funding

Next Steps

Page 2: Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc. ross.tillman@bolton-menk.com 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka

AnokaHwy47.com

Rum River SouthCounty Park

Anoka CountyFair Grounds

Bunker Lake Blvd

E M

iner

al P

ond

Dr

Coolidge St

Wilson St

Dunham Dr

McCann Ave

McKinley St

Garfield St W

Pleasant Ave

Martin St

Rum

Rive

r

BNSF Railroad

Fairgrounds Parking

GreenhavenGolf Course

Railroad Crossing Project

High Crash Rate(higher than state-wide average)

2 min

60before making a risky move into traffic or taking a different route

2 min

3 out of 5 intersections within the corridor see wait times up to

A d

river

will

wai

t

Sidestreet Backups & Delayed Access

to Highway 47

improvements will reduce crashes

and provide more reliable access to

the highway

CorridorNeeds

Congestion builds behind left-turning vehicle at the McKinley Street intersection

Lack of flexibility for turns. Property access adds to congestion and safety issues

Residents experience delayed access.

2 minutes

Provide safe pedestrain & bicyclist routes

Provide safe driveway access

Accommodate future growth

Improve intersection operations & safety

CongestionTraffic Backups &

Highway 47

IssuesCorridor

Crash rate more than 3x average.Severe crashes are a concern.

47

116

1 min

1 min

2 min

2 min

seconds

Backups lengthsduring peak travel

times and when trains block crossing.

AnokaHwy47.com

HHiigg

hhwwaa

yy 4477

CCoo

rrrriidd

oorr

Traffic & Safety

Page 3: Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc. ross.tillman@bolton-menk.com 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka

AnokaHwy47.comNeighborhood Access

Highw

ay 47 Corridor Plan

City of A

noka, Minnesota

Blank

January 2020

161 AM

337 PM

16 AM

15 PM

12 AM

5 PM

22 AM

25 PM

52 AM

49 PM

Volume entering & exiting side streets during AM/PM peak hours

XX AM

XX PM

Private driveway

XX AM

XX PM

XX AM

XX PM

Low volume intersection

Higher volume intersection

Key to Symbols

Coolidge Coolidge St St

McKinley

McKinley StSt

Garfield St Garfield St WW

Wilson St

Wilson St

Bunker Lake Blvd

Bunker Lake Blvd

Dunham Dr

Dunham Dr

McCann Ave

McCann Ave

E Mineral Pond BlvdE Mineral Pond Blvd

47

116

Anoka CountyFairgrounds

St Francis Blvd NW

St Francis Blvd NW

48% of AM peak traffic

91% of PM peak trafficuse a

non-preferred route

and

18,500 vehicles

travel on St. Francis Boulevard

per day

31 driveways have direct access

to Highway 47

Page 4: Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc. ross.tillman@bolton-menk.com 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka

AnokaHwy47.comRoadway Concept

McKinley Street Intersection

TH 47 IMPROVEMENTSMCKINLEY & TH 47 INTERSECTION | PROPOSED CHANGES

47

Right-of-way Limits

TH 47 IMPROVEMENTSMCKINLEY & TH 47 INTERSECTION | EXISTING CONDITIONS

47

Existing

Installation of a traffic signal at McKinley Street is pending formal MnDOT approval.

Page 5: Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc. ross.tillman@bolton-menk.com 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka

AnokaHwy47.comMcKinley Street Intersection Temporary Signal

Potential for a temporary traffic signal to be installed at the McKinley Street intersection during Highway 10 construction. Pending further analysis and MnDOT approval.

Page 6: Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc. ross.tillman@bolton-menk.com 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka

AnokaHwy47.comProvide Your FeedbackHow do you think the project will impact your quality of life?

Safety

Vehicle Accessto Neighborhoods

Pedestrian & Bicycle Accommodations

Impa

ct to

:Im

pact

to:

Impa

ct to

:

Provide your response by placing a dot within a box on the scale.

Mostly negative Neutral Mostly

positiveSomewhat

negativeSomewhat

positive

Mostly negative Neutral Mostly

positiveSomewhat

negativeSomewhat

positive

Mostly negative Neutral Mostly

positiveSomewhat

negativeSomewhat

positive

Page 7: Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc. ross.tillman@bolton-menk.com 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka

AnokaHwy47.comNearby ProjectsCu

tter

’s G

rove

Ave

Thur

ston

Ave

Green Haven Golf Course& Event Center

Mississippi River

Rum

Rive

r

evA

ht4

evA

ht7

Fairo

ak A

ve

BNSF Railway

Bunker Lake Blvd 116

10

169

W Main St

Clay St

Pleasant St

10

ANOKA

* All dates subject to change.

47

Highway 47 and County Rd 116/Bunker Lake Blvd intersec�on improvements2021 (led by Anoka County)

Highway 47/169 resurfacing2021 (led by MnDOT)

7th Ave reconstruc�on2021 (led by Anoka County)

Highway 10 Rum River bridge replacement and intersec�on improvements2022-23 (led by MnDOT)

Fairoak/Thurston/W Main Street interchange construc�on2022-23 (led by City of Anoka)

Hwy 47 BNSF Railroad grade separa�onTBD (led by MnDOT)

Cutt

er’s

Gro

ve A

veTh

urst

on Ave

Green Haven Golf Course& Event Center

Mississippi River

Rum

Rive

r

evA

ht4

evA

ht7

Fairo

ak A

ve

BNSF Railway

Bunker Lake Blvd 116

10

169

W Main St

Clay St

Pleasant St

10

ANOKA

* All dates subject to change.

47

Highway 47 and County Rd 116/Bunker Lake Blvd intersec�on improvements2021 (led by Anoka County)

Highway 47/169 resurfacing2021 (led by MnDOT)

7th Ave reconstruc�on2021 (led by Anoka County)

Highway 10 Rum River bridge replacement and intersec�on improvements2022-23 (led by MnDOT)

Fairoak/Thurston/W Main Street interchange construc�on2022-23 (led by City of Anoka)

Hwy 47 BNSF Railroad grade separa�onTBD (led by MnDOT)

*All dates subject to change.

KEY TO PROJECTS

Hwy 47 Corridor Study

Page 8: Overview w - clients.bolton-menk.com · Ross Tillman, Project Manager Bolton & Menk, Inc. ross.tillman@bolton-menk.com 952-890-0509 ext. 2974 Ben Nelson, Project Manager City of Anoka

AnokaHwy47.comRailroad Crossing

Highway 47 Railroad Grade Separation ProjectTrunk Highway 47 Railroad Grade Separation Project

Minnesota’s Most Dangerous CrossingADDRESSING SAFETY AT FERRY STREETThe primary need identified at this crossing is to improve safety for motorists, pedestrians, bicyclists, and trains.

Local citizens, the Federal Rail Administration, MnDOT, and BNSF Railway staff have identified the Highway 47 (Ferry Street) - BNSF Railroad crossing as the highest priority railroad project in the state for public safety.

1. Improve Railroad Crossing Safety2. Reduce Railroad Operations Disruptions3. Minimize Filling in the Floodplain4. Facilitate Public Discussion5. Eliminate Motorist Delay due to Trains6. Reduce Environmental Impacts from

Contaminated Sites7. Protect the Local Water Table8. Minimize Park/Fairground Land Takings9. Minimize Public/Private Access Closures10. Reduce Construction Duration and Detours11. Decrease Right-of-Way Takings12. Preserve and Protect Historic Property

PRIORITIZING CRITERIAWhen evaluating options to improve the crossing, the project team considered and prioritized the following criteria:

DESIGNBENEFITS

Crossing Safety Railroad Operations Water & SoilsThe design reduces motorist delay and improves safety at the crossing.

The project will have little effect on railway operations.

The water table will not be disturbed. Minimizes disturbance of contaminated soils.

The overpass has fewer environmental impacts and is more cost effective than an underpass.

The bridge will have two travel lanes, a multi-use trail, and will be designed to allow for future expansion.

Traffic will no longer be stopped because of trains.

A long bridge has a lower estimated cost.

Estimated Cost:$57 million

STUDY RECOMMENDATION: LONG OVERPASS BRIDGE

Reduced visibility

Driveway entrances too close to crossing

Traffic stopped 40 to 80 times per day with backups extending to Hwy 10

4 fatalities from train-vehicle collision in 2003

17 rear end crashes within 150 ft of crossing (2010-2014)

18,500vehicles/day

40-80train crossings/day

Every 18-36 mina train crosses (on average)

Graphic shown is conceptual and will change as the design is further refined.

Looking south on Highway 47 (Ferry Street)

mndot.gov/metro/projects/hwy47rr-anoka

Realigned Highway 47 Alternative

Minnesota’s Most Dangerous Crossing

For more information: mndot.gov/metro/projects/hwy47rr-anoka