Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

15
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

description

Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005. The MuCool Test Area (MTA). Experimental Hall. Helium gas buffer. Refrigerator. Gas Room. Compressor. Hydrogen Vacuum buffer. Xfmer Location. Nitrogen dewar. Cryogenic Effort Is On-going - PowerPoint PPT Presentation

Transcript of Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Page 1: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Overview of On-going Cryogenic Work

At the MTA

Barry NorrisAD/Cryo

February 14, 2005

Page 2: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

The MuCool Test Area (MTA)

Compressor

Refrigerator

Helium gasbuffer

Nitrogen dewar

Experimental Hall

HydrogenVacuum buffer

XfmerLocation

GasRoom

Page 3: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Cryogenic Effort Is On-going within Three Different Areas

Support of Solenoid Move to MTA

Overall Refrigerator and Compressor Complex

Support of Continued Future Testing of KEK and Forced Flow Absorber Work

Page 4: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Cryogenic Effort #1Support of Solenoid Move to MTA

Mechanical effort underway…

Piping installed for helium and nitrogen vents

Helium transfer line taken from Lab G and modified to make more optimal use of helium

Working with Al Moretti to understand transfer line positioning and

shielding requirements

Page 5: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Electrical effort underway…

Layout of cable runs, instrumentation on-going

Implementing Class 1, Division 2 requirements into installation

Relay rack installed and wired at MTA Using PLC and Internet Rack Monitor

…ability to monitor all solenoid cryogenics from ACNET

Page 6: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Top View of Experimental Hall

Top View ofOpen Air Pit

Solenoid

Page 7: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005
Page 8: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Cryogenic Effort # 2

Overall Refrigerator and Compressor Complex

Page 9: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

400 Hp Screw Compressors in Original Fermilab PS4 Site

Page 10: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005
Page 11: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Present Status

Completed Mechanical Piping Drawing Mid-December 2004

Fermilab Contracts sending out Bid Requests This Week

Bids Required Back by February 28th, 2005

Page 12: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Bottom Line on Refrigerator Complex

In March or Early April we anticipate the beginning of piping install…90 day contract

anticipated

Following contractor work: 3-4 month controls installation

Refrigerators and Compressors could be fully operational by Oct 2005

Page 13: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Transfer Line Connection from Refrigerator Hall

Farmed out to Fermilab Particle Physics Divison (PPD)

Goal for completion for installation stage is Oct 2005

Until this connection becomes fully functional, we will operate with dewar fed system

Page 14: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

Cryogenic Effort #3 KEK and Forced Flow

In regards to KEK…

79 foot long transfer line for hydrogen test caused excess usage of helium as well as

instabilities…we will shorten transfer line and validate instrumentation…hope to incorporate

this into mechanical efforts of Solenoid

Need to consider KEK cryostat itself and desire to re-instrument…KEK needs to take lead in

this as well as resolve heater questions

Page 15: Overview of On-going  Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005

In regards to Forced Flow Cryostat…

Original 3D model exists for Cryostat

Bates “Sample” Hydrogen Loop

Project Completion On-Hold …Lack of Engineering Priority

(Refer Details to Christine Darve talk)