Overhaul Report Form by, J. a. Bessie @2008

14
DIESEL ENGINE OVERHAUL REPORT MV / MT. Place : Date : Voyage No. : Main Eng./ Aux Eng. No. : 1 2 3 Maker / Type : _____________________ Engine No. : __________________ Running Hours (H) : 1). Since new : ……………….H 2). Since last Overhauled Piston / Cylinder No : 1 : ………… / .............. H 2 : ………… / ............... H 3 : ………. / …………. H 4 : ………… / ............... H 5 : ............... / ………….H 6 : ………... / ………… H 7 : ………… / ………… H 8 : …………. / …………. H Reported by, 1 Perawatan dan perbaikan Mesin , Contoh form laporan Overhaul Mesin File J. A. Bessie, Materi pelajaran ATT di BP3IP, Jakarta @2012

description

att

Transcript of Overhaul Report Form by, J. a. Bessie @2008

OVERHAUL RECORD

DIESEL ENGINE OVERHAUL REPORTMV / MT. Place :

Date :

Voyage No. :

Main Eng./ Aux Eng. No. : 1 FORMCHECKBOX

2 FORMCHECKBOX 3 FORMCHECKBOX Maker / Type : Engine No. : Running Hours (H) :1). Since new : .H 2). Since last Overhauled Piston / Cylinder No : 1 : / .............. H 2 : / ............... H 3 : . / . H

4 : / ............... H 5 : ............... / .H 6 : ... / H 7 : / H 8 : . / . HReported by,

( ) Chief EngineerMV / MT.

Piston crown Top clearancePlace / Date:

Inspected by:

Standard clearance:

Max. permissible clearance:

Signature:

Unit : mm

Cyl No.

Pos1

2

3

4

5

6

7

8

FA

MV / MT.

main bearing clearancePlace / Date:

Inspected by:

Standard clearance:

Max. permissible clearance :

Signature:

Unit : mm

Cyl No.

Pos1

2

3

4

5

6

7

8

Front endAft endThrust

Center

MV / MT.

Side clearance of crank web & thrust padPlace / Date:

Inspected by:

Standard clearance:

Max. permissible clearance :

Signature:

Unit : mm

Cyl No.

Pos1

2

3

4

5

6

7

8

F

A

C

MV / MT.

turbo charger clearancePlace / Date:

Inspected by:

Standard clearance:

Max. permissible clearance :

Signature:

Unit : mm

RMLNKDesignR2R1Measurement

R2R1

MV / MT.

crank pin clearancePlace / Date:

:Inspected by:

Standard clearance:

Max. permissible clearance :

Signature:

Unit : 1/100mmCyl No.

Pos

1

2

3

4

5

6

7

8

F

A

Cyl No.

Pos1

2

3

4

5

6

7

8

F1

A1

MV / MT.

cross head clearancePlace / Date:

Inspected by:

Standard clearance:

Max. permissible clearance :

Signature:

Unit : 1/100mm

Cyl No.

Pos1

2

3

4

5

6

7

8

F1

A1

F2

A2

MV / MT. cylinder liner inside diameterPlace / Date:

Inspected by:

Standard Diameter:

Max. permissible Diameter:

Signature:

Cyl. No.

P. No.

Pos

D1

D2

D3

D4D5D6D7D81

X

Y

2

X

Y

3

X

Y

4

X

Y

5

X

Y

6

X

Y

7

X

Y

MV / MT

piston ring gapPlace / Date:

Inspected by:

Standard ring Gap:

Max. permissible ring Gap :

Signature:

Pst. No.

Pos.

Pos

D1

D2

D3

B1

B2

B3

B4

1

X

Y

2

X

Y

3

X

Y

4

X

Y

5

X

Y

6

X

Y

7

X

Y

MV / MT.

piston ring clearancePlace / Date:

Inspected by:

Standard clearance:

Max. permissible clearance :

Signature:

Pst. No.

Pos

1

2

3

4

5

6

7

8

C1 P-S/F-A C2 P-S/F-AC3 P-S/F-AC4 P-S/F-A

1Perawatan dan perbaikan Mesin , Contoh form laporan Overhaul Mesin File J. A. Bessie, Materi pelajaran ATT di BP3IP, Jakarta @2012