Overall Equipment Effectiveness OEE(ඔ.ඔ .ඔ) Nalin Udugampola Production Manager CBL Foods international(pvt)ltd

description

OEE -It is an indicator used to know where are we & where to go in terms of productivity

Transcript of Overall equipment effectiveness oee sinhala 2

Page 1: Overall equipment effectiveness oee sinhala 2

Overall Equipment Effectiveness OEE(ඔ. ඉ .ඉ)

Nalin UdugampolaProduction ManagerCBL Foods international(pvt)ltd

Page 2: Overall equipment effectiveness oee sinhala 2

OEE• නිෂ්පා�දන ක්‍රි�යා�වලියේ ඵලදා�යිතා�වය මැ�නීමැටහා� වර්ධනයකර ගැ�නීමැට ගත

හැ�ක්‍රි වඩා�ත්ම සුදුසු දර්ශකයාක්‍රි.• නිෂ්පා�දානක්‍රි�ය�වලිය

– යාන්ත� සුත� වල ක්‍රි�යා�ක�රිත්වයා හැ� යාන්ත� සුත� භා�විත� කරනආක�රයා– Founder: Seiichi Nakajima 1960

• .

ඵලදා�යිතා�ව ය අඩුවීමැට

බලපා�න ප්‍! රධ�න සා�ධක හාදුන�

ගැ�නීමැ

නිර්න�යා ක

තුනකට යේවන්

කරග�නීම

ඕ ඉ ඉ

Where are we now & how to improve

Page 3: Overall equipment effectiveness oee sinhala 2

අපාටඇතිව�සි• ඉලක්කයාක්ලබා� දිම හැ� සෑ*ම යේදන�යේ+ම අවධා�නයා

නිෂ්පා�දනකටයුතු සෑදහැ� පාහැසුයේවන් යේයා�මුකර ගතහැ�ක්‍රිවීම.

• සෑ�ගවුණුග�ටළු මතුක්‍රිරීම.• ද�නුම වර්ධානයාක්‍රිරීම.• අකණ්ඩාව දියුණුවන පාරිසෑරයාක්නිර්ම�නයා වීම

• ආතතියාක්‍රින් යේත�රව ව�ඩා ක්‍රිරීමට සුදුසු පාරිසෑරයාක් නිර්ම�නයාක්‍රිරීම..

• . අඩු පිරිව�යා ව�ඩි ල�භා යේ;වකයාන්ට ව�ඩි ප්‍= රතිල�භා

Page 4: Overall equipment effectiveness oee sinhala 2

9 Losses- ඵලද�යිත�වයා අඩුවන අව;ථා�.

1. Start up loss : Time taken to produce the first product from the time that machine is activated.

2. Set up & adjustment loss: idling time erupted to the obtain the required specification of the relevant product

3. Brake down time: Idling time caused by the failure of a machine/Machines

Page 5: Overall equipment effectiveness oee sinhala 2

9 Losses - ඵලද�යිත�වයා අඩුවන අව;ථා�.

4. Change over loss: Time loss happened due to the stopping of production for the change over.

5. Labour/Material shortage: It is the shortage of out put to the production target, expressed as a time value.

6. Minor stoppages: It is the sum of total time that stop the production for less than 5 minutes

7. Cleaning time : It is the time that the production can’t be planned due to the cleaning requirement of the process.

Page 6: Overall equipment effectiveness oee sinhala 2

9 losses - ඵලද�යිත�වයා අඩුවන අව;ථා�.

8. Speed loss: It is the shortage of out put compared to the machine capacity, expressed as a time value.

9. Defect & rework loss: It is the total amount of nonconforming out put, expressed as a time value.

Page 7: Overall equipment effectiveness oee sinhala 2

9 Losses-grouped into 3

AVAILABILITY1. Start up loss2. Set up & adjustment

loss3. Change over loss4. Breakdown loss5. Cleaning loss6. Material s & labour

shortage 7. Minor stoppages

PERFORMANCE 8.Speed loss

QUALITY 9. Defect &

rework loss

Page 8: Overall equipment effectiveness oee sinhala 2

9 Losses

Page 9: Overall equipment effectiveness oee sinhala 2

PLANNED TIME

OPERATING TIME IDLE TIME

NET OPERATING TIME IDLE TIMESPEED LOSS

VALUE ADDED OPERATING TIME IDLE TIMESPEED LOSS

DEFECT & REWORK

LOSS

Page 10: Overall equipment effectiveness oee sinhala 2

How to calculate OEEOEE % = Availability % *Performance %*Quality %

Page 11: Overall equipment effectiveness oee sinhala 2

How to calculate-Availability

Availability % = (Operating time /planned time)*100

Operating time = Planned time –Idle time

Idle time Start up loss Labor & material shortage Set up & adjustment loss Minor stoppagesChange over time Cleaning timeBreak down time

Page 12: Overall equipment effectiveness oee sinhala 2

How to calculate –Performance & Quality

Performance % =( actual rate/ Rated capacity)*100

Actual rate = Total out put/operating time

Quality % = (Good out put/Total out put)*100

Good out put = Total out put –Defect & rework

Page 13: Overall equipment effectiveness oee sinhala 2

Example

Planned time = 12hoursCapacity =100kg/hrTotal Out put = 900kgDefect & rework = 10kgBrake down =0.5 hoursStart up time = 0.5 hrsChange over time = .5hrsSet up adjustment time = 0Minor stoppages = 0.5hrsCleaning time = 0Material/labour shortage=

0

• Availability% =

• Actual rate =

• Performance %=

• Good out put =

• Quality % =

• OEE=

((12-2)/12)*100= 83.3%

900kg/10hrs=90kg/hr

(90/100)*100=90%

900-10=890kg

(890/900)*100=98.8%

83.3%*90%*98.8%=74.16%

Page 14: Overall equipment effectiveness oee sinhala 2

Next step

OEE

3 Factors (Availability/Performance/Quality)

9Losses

How to reduce losses

Improve OEE

Package

Page 15: Overall equipment effectiveness oee sinhala 2

Summary & questions

• What is OEE• Benefit of OEE• How to calculate OEE• 9 losses• Next step

Page 16: Overall equipment effectiveness oee sinhala 2

THANK YOU !