Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

10
Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region

Transcript of Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

Page 1: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

Outputs from the 2nd CB Technical Working GroupMr. Carlo Tereo de Landerset

Abruzzo Region

Page 2: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

TERRITORIAL CONTEXT

Page 3: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

WHICH ROLE FOR ABRUZZO REGION WITHIN EA SEA WAY PROJECT???

• TO BUILD A Physical Infrastructures. W.P. 6.3.2 Pilot «improve connections between ports and railway/bus hubs» by the way of Testing ICT solution and pilot intervention through light infrastructure

• TO ARRANGE THE DEFINING OF THE ROAD MAPS AND ACTION PLAN IN INFOMOBILITY SERVICE STRUCTURE.

• TO PROMOTE THE SUSTAINABILITY OF THE OUTPUT FROM AN INSTITUTIONAL POINT OF VIEW.

• TO GUARANTEE AN EFFECTIVENESS CONTRIBUTION FOR THE SEEKING UP OF THE FORTHCOMING ADRIATIC IONIAN AREA.

Page 4: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

Abruzzo Region Main: TASK: WP 6.3.1 IDEA UNDER

DEVELOPMENT

The pilot project aims to facilitate the sharing of information

between the passenger operators and their end-users. The

investment is targeting the improvement of the info mobility -

services to provide to passengers going to Croatia and tourists

visiting Abruzzo landscape, travelling by boat and then by bus train,

bike. “Easy Passengers” should be generate a large CONTRIBUTE

FOR THE ICT BUILDING PLATFORM OF THE PROJECT TOO.

Page 5: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

WHICH ROLE FOR ABRUZZO REGION WITHIN EA SEA WAY PROJECT???

1.TO ARRANGE THE DEFINING OF THE ROAD MAPS AND ACTION PLAN IN

INFOMOBILITY SERVICE STRUCTURE/system.

Page 6: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

WHICH ROLE FOR ABRUZZO REGION WITHIN EA SEA WAY PROJECT???

2 . TO PROMOTE THE SUSTAINABILITY OF THE OUTPUT FROM AN INSTITUTIONAL POINT OF

VIEW.

Page 7: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

WHICH ROLE FOR ABRUZZO REGION WITHIN EA SEA WAY PROJECT???

3. TO GUARANTEE AN EFFECTIVENESS CONTRIBUTION

FOR THE SEEKING UP OF THE FORTHCOMING ADRIATIC IONIAN

AREA.

Page 8: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

WHICH OUTPUT FROM THE 2° TECHNICAL WORKING GROUP - Need and Priorities arising for Cross Boarder Board

1. Which level of service: basic/traditional; more developed (internal mobility/shuttle service, info-mobility, etc.); defining of common standard.

2. Regional info-mobility system: developing a replicable ICT structure shareable with the partners involved in pilot action.

Page 9: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

1.

Next step for Infomobility System in charge Abruzzo Region:

1. Defining ICT structure for Infomobility System2. DataBase Building, with information and services3. Software Compilation Process and Validation4. Defining an efficient update protocol of information and services5. Signing of a collaborative and operative agreement together Tourist DMC, Transport Public Companies and with engaged local stakeholder

IPA Adriatic CBC ProgrammeEurope Adriatic SEA WAY

Page 10: Outputs from the 2nd CB Technical Working Group Mr. Carlo Tereo de Landerset Abruzzo Region.

Thank you a lot FB 10 Abruzzo Region

Carlo Tereo de Landerset