M E M O R I A L & M U S E U M

Page 2: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

146

Page 3: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

147

Page 4: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

148

Page 5: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

149

Credit: NOAA, September 23, 2001

Page 6: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

150

TOWER 1

NOVEMBER, 2014

Completed

TOWER 1

JUNE, 2006

Final Design Unveiled

TOWER 1

APRIL, 2006

Construction Start

TOWER 3

SEPTEMBER, 2006

Design Unveiled

TOWER 3

FEBRUARY, 2008

Construction Start

TOWER 3

SEPTEMBER, 2014

Construction Resumes

TOWER 7

NOVEMBER, 2002

Design Unveiled

TOWER 7

2002

Construction Start

TOWER 7

MAY, 2006

Completed

9/11 MEMORIAL &

MUSEUM

DECEMBER, 2004

Design Unveiled

9/11 MEMORIAL &

MUSEUM

MARCH, 2006

Construction Start

9/11 MEMORIAL &

MUSEUM

MAY, 2014

Completed

Page 7: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

The New 7 World Trade Center is

the first building to be rebuilt after

9/11.

The new tower is taller than its

predecessor and outfitted with a

host of life-safety and environmental

features never before incorporated

into a commercial skyscraper.

The first 10 floors house an

electrical substation servicing the

entire lower Manhattan area, on top

of which there are 42 office levels

totaling 1.7 million SF of space.

The project has been awarded

LEED Gold status.

151

SEVEN WORLD TRADE CENTER

Page 8: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

152

Page 9: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

LONDON BRIDGE TOWER, “SHARD”

Page 10: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,
Page 11: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

155

Page 12: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

156

Page 13: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

WSP Building Structures provided structural

engineering services for One World Trade

Center, the tallest building in the Western

Hemisphere.

The tower is one of four planned buildings as

part of the World Trade Center Reconstruction

in Lower Manhattan, New York City.

The overall height of the tower reaches 1776

feet as a tribute to the “freedoms” emanating

from the Declaration of Independence adopted

in 1776.

The 1WTC program includes 3.0M square feet

of new construction above ground and 500,000

square feet of new subterranean levels.

ONE WORLD TRADE CENTER

157

Page 14: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

158

Ht. 1368’-0”

Ht. 1776’-0”

Spire

MEP, Restaurant & Ob.

Deck Ht. 1107’-8”

Office Floors

MEP

Basement

Ht. 186’-8”

Ht. -70’-0”

Ht. 0’-0”

Ht. 66’-8” Lobby

Page 15: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

The tower structure is comprised of a “hybrid”

system combining a robust concrete core with a

perimeter ductile steel moment frame.

The reinforced concrete core wall system at the

center of the tower acts as the main spine of

the tower providing support for gravitational

loads and resistance to wind and seismic

forces.

Along the height of the tower, the tapering

multifaceted geometry creates unique structural

conditions which necessitated the design and

fabrication of special nodal elements using

relatively large plating with significant capacity

for load transfer.

159

ONE WORLD TRADE CENTER STRUCTURAL DESIGN

Page 16: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

160

+ =

Concrete

Core Perimeter Steel

Moment Frame Hybrid Lateral Force

Resisting System

Page 17: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

161

Page 18: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

The collapse of the Twin Towers created a major debate in engineering communities worldwide for mitigation strategies to be implemented for future high-rise buildings.

The design team, faced with numerous and unique challenges, paramount among them being security related issues, was charged with the design of 1WTC and expected to meet or exceed future codes and standards that had not yet been published.

The unique site conditions with existing infrastructure also added additional challenges for the design and construction team.

ONE WORLD TRADE CENTER INNOVATIVE TECHNIQUES

162

Page 19: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

The design and construction of this

project is the result of a relentless

collaborative effort between

numerous design and construction

teams over a period of several

years.

Diligent management of site and

building stakeholders, each with

unique priorities and schedules,

required strict attention to detail as

well as open, effective

communication by WSP Building

Structures.

To ensure successful completion of

1WTC, WSP Building Structures

provided innovative structural

and managerial solutions.

163

ONE WORLD TRADE CENTER RISK

MANAGEMENT PROGRAM

Page 20: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

3 World Trade Center is a bold

design by Pritzker Prize winning

architect Richard Rogers.

Rising 83-stories, 3 WTC will include

2.8 million SF of office space spread

across 53 floors and five trading

floors.

Office levels will range from 29,000

to 44,000 SF, and trading floors will

include 68,000 SF of space.

3 WTC will have five levels of retail

at and below grade.

164

THREE WORLD TRADE CENTER

Page 21: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

165

TWO WORLD TRADE CENTER

Page 22: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

Born in tragedy, the WTC Memorial and

Museum emerges as an expression of

unity and a physical representation of our

nation’s most noble values.

It is a grotto to remember all those lost on

Sept. 11, 2001, and a place to pay tribute

to our heroes.

WSP is the Structural Engineer of Record

for the entire WTC Memorial Complex

site, which is delineated by a landscaped

plaza containing the Memorial reflecting

pools, the Museum and the core and shell

of the Central Chiller Plant.

166

WORLD TRADE CENTER MEMORIAL & MUSEUM

Page 23: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

Born in tragedy, the WTC Memorial and

Museum emerges as an expression of

unity and a physical representation of our

nation’s most noble values.

It is a grotto to remember all those lost on

Sept. 11, 2001, and a place to pay tribute

to our heroes.

WSP is the Structural Engineer of Record

for the entire WTC Memorial Complex

site, which is delineated by a landscaped

plaza containing the Memorial reflecting

pools, the Museum and the core and shell

of the Central Chiller Plant.

167

WORLD TRADE CENTER MEMORIAL & MUSEUM

STRUCTURAL DESIGN

Page 24: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

Several innovative techniques were used

to design and build the Memorial and

Museum.

Among them was the creation of an 80

foot long self-supporting corridor/ tunnel

to relieve the load on the structure below

as well as the “socketing” of the up to 170

foot long shear walls into the bedrock to

resist the earth pressures.

Another original technique was the use of

fiber reinforced polymers for local

reinforcing of the blast walls.

168

WORLD TRADE CENTER MEMORIAL & MUSEUM

INNOVATIVE TECHNIQUES

Page 25: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

169

Page 26: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

From the start, the owners and the project

team were focused on maintaining a

development program that would be

environmentally responsible.

As part of this effort the project was

designed using a minimum of 20% coal

fly ash in the concrete design mix.

The reinforcing steel contains a minimum

of 33% recycled content; likewise the use

of framework and bracing followed

sustainable guidelines.

All products were acquired from within a

500 mile radius of the site. The

manufacture of the concrete was

performed within a 500 miles as well.

The project is designed to achieve

a LEED Gold rating.

170

WORLD TRADE CENTER MEMORIAL & MUSEUM SOCIAL

ECONOMIC & SUSTAINABILITY CONSIDERATIONS

Page 27: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

The interplay of seven simultaneous

projects and numerous project teams as

well as the pervasive spirit of cooperation

evidenced in this endeavor has not gone

unnoticed.

Few projects in modern history have been

as subject to the attention and scrutiny of

the public as the WTC site has,

particularly the Memorial.

Yet the intensity of emotions connected

with the WTC and its destiny has resulted

in something extraordinary.

As much as the Memorial is about loss, it

is equally about the power of hope.

171

WORLD TRADE CENTER MEMORIAL & MUSEUM

COMPLEXITY & PUBLIC IMPACT

Page 28: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

172

Page 29: OUR ROLE IN THE REBIRTH OF NYC - WSPcdn.wspgroup.com/ybgltv/investor-day-2015-david-cooper...150 TOWER 1 NOVEMBER, 2014 Completed TOWER 1 JUNE, 2006 Final Design Unveiled TOWER 1 APRIL,

QUESTION

PERIOD