our proj Ects. Petroleum industry sPecialists -...

of 12/12
Global Expertise. Local Delivery. OUR PROJECTS. PETROLEUM INDUSTRY SPECIALISTS
  • date post

    31-Jan-2018
  • Category

    Documents

  • view

    214
  • download

    1

Embed Size (px)

Transcript of our proj Ects. Petroleum industry sPecialists -...

  • Global Expertise. Local Delivery.

    our projEcts.

    Petroleum industry sPecialists

  • stantec has designed tank and fueling systems for rental car facilities, major utility companies, and thousands of retail and commercial fueling facilities.

    We are recognized as an industry leader in fueling systems design. the fueling systems engineering team is composed of engineers and specialists with a depth of experience in above and underground fuel systems, secondary containment systems, monitoring systems, Hazardous Materials Management plans (HMMp), spill prevention control and countermeasure plans (spcc) ,and air pollution control district requirements.

    our projects include prototypical tank installation drawings and standards, above and underground tank installation design, and piping and fuel system upgrades, including thousands of EVr upgrades. stantec has designed, permitted, and provided construction observation services for hundreds of retail service stations, fuel tank engineering projects for fleet operations centers and switching facilities, consolidated rental car facilities, standby generator sites, and bulk facilities.

    stantecs range of services includes site surveys, permit drawings, planning approvals, preparing construction documents and specifications, assistance in bidding, pre-construction meetings, coordination with client managers, intermediate site visits, construction administration, and fuel system testing.

    the design of fueling systems poses its own set of challenges including zoning concerns, environmental compliance, and equipment constraints. stantecs ability to deal effectively with these challenges is the result of many years of experience and the successful completion of project after project.

    FuELinG systEM DEsiGn

  • rEprEsEntatiVEprojEcts anD proGraMs

    sHELL oiL coMpany

    EVr / isD programcurrently, stantec is providing services for shells EVr phase ii program for 200 sites throughout california. We provide underground storage tank expertise, design, and permitting services.

    More than 1,000 diverse projects throughout california and the pacific northwest over the last 25 years. We have provided services over the years in all areas of facilities design including underground storage tanks, lines, dispensers and fuel monitoring systems, architectural design of canopies, food marts, and car washes. stantec actively participates in all phases of architectural and engineering project development including preliminary research, all phases of permitting, development of construction drawings, and specifications. stantec also provides assistance in bidding and construction administration services.

    cHEVron

    EVr / isD programstantec is managing the EVr / isD program in california, providing underground storage tank petroleum systems expertise, design, and permitting.

    Design of prototypical service station facilities for use on nationwide development program.stantec has worked with chevron since 1983, completing thousands of diverse projects. We provided architectural and engineering services on the design of prototypical foodmart, quick lube, and carwash facilities for implementation nationwide. in addition, stantec designed development drawings, specifications, and installation standards for chevrons complete underground storage tank program. We are also standardizing chevrons aviation fuel standards for international implementation.

    conocopHiLLips

    EVr phase iistantec is providing EVr phase ii services for conocophillips in northern and southern california.

    re-image programconocophillips has been a loyal client for many years. We recently completed over 300 re-image projects in northern and southern california.

    stantec has completed aDa surveys for conocophillips.

    Bp arco

    EVr phase iistantec is providing EVr phase ii services for ampm franchisees in the west.

    More than 400 projects in california and other western states over the last 17 years.projects range from rebuild of service station facilities, replacement of underground fuel tanks and dispensers, to complete remodel of site and building. stantec is responsible for preliminary design, securing planning approvals, and preparing construction.

  • county oF sonoMa arcHitEcturE DiVisionnew Fleet Fueling & cnG Facility for the county of sonoma administration centersanta rosa, california

    project included new underground fueling tanks, cnG fueling system, piping, dispenser, card-lock system, fuel canopy, utility storage building, and associated site improvements.

    stand-by Generator, tank removal/replacements at Various sonoma county Locations For both these projects stantec was retained by the sonoma county architects office to be the architect/engineer of record. stantec provided comprehensive services from programming through permitting, construction documents, bid, and contract administration services.

    rEDWooD oiL coMpany

    installation of new commercial card-Lock Fueling FacilityHealdsburg, california

    project included underground fuel tanks, associated piping, dispensers, canopy, storm water treatment, and associated site improvements.

    stantecs scope of services included assisting the owner in evaluation of the existing site, city planning approvals, site survey, grading and drainage plans and all associated fuel system drawings, obtaining all required permits, and assisting the client with bid and construction phases.

    stantec has completed more than 80 projects for redwood oil over the last ten years.

    city oF san paBLo

    new police Department Fueling Facilityproject included installation of a new underground storage tank with piping, dispensers, monitoring equipment fuel canopy, parking lot for 20 cars, and associated site improvements.

    contra costa county arcHitEcturE DiVisionFuel tank replacements and upgrades at 13 Fire stations throughout contra costa county.project included installation of above ground storage tanks with piping, dispensers, and associated site improvements for fleet fueling. Design included emergency stand-by power to the fueling facility.

    stantec was hired by the contra costa county architecture Division to provide full engineering services including evaluation of existing facilities, recommendations for upgrade, design, permitting, bid, and construction phase services.

  • cHEVron

    prototype Development, Fueling system Design, and Multi-site programsunited states, caribbean, and Kazakhstan

    stantec has been providing downstream retail design and permitting services since 1983, completing thousands of diverse projects including:Architecturalandengineeringservicesonthe

    design of prototypical foodmart, quick lube, and carwash facilities for implementation nationwide

    Design,constructiondocumentdevelopment,specifications, and installation standards for chevrons complete underground storage tank program

    StandardizationofChevronsaviationfuelstandards for international implementation

    EVR/ISDprogrammanagementinCalifornia,providing underground storage tank petroleum systems expertise, design, and permitting

    Constructiondocumentsandcoordinationofimage refresh program for several hundred sites throughout the western us, Hawaii, and Florida

    ManagementoftheHallmark21re-imageprogram, a four-year program to upgrade the appearance of all corporate-owned chevron service stations. over 750 stations nationwide were converted

    Re-brandingof150ARCOandMobilservicestations in nevada to chevron service stations

    Developmentoflandscapingguidelines,including regional plant material selections, for nationwide implementation

    Re-imagingof50ExtraMilestationsinWashington, and 311 stations in california

    FEaturED projEcts

  • 7-ELEVEn

    Multiple West coast Locations

    stantec has completed more than 600 projects for 7-Eleven throughout the Western united states in the last seven years, including more than 50 ground-up facilities.

    stantec developed 7-Elevens Master architect program and has completed a range of

    projects including new convenience store and fueling facility design, retail re-imaging, Epa Environmental compliance and petroleum upgrades, and complete remodels of sites and buildings. our team has completed 400 convenience store remodels in california to incorporate their new interior image.

  • saFEWay FuELinG

    Multiple Locations

    stantec provides site specific design for safeway fueling sites in arizona, alaska, california, colorado, oregon, and Washington.

    using the prototype design we developed for safeway, our firm provides site specific modifications and permitting for multiple sites in the western us.

    northern california region (petaluma office)24 Fuel centers throughout northern california

    seattle region (Kirkland office)12 Fuel centers in Washington3 Fuel centers in alaskaFuel system installation inspections

    portland region (Kirkland office)22 Fuel centersFuel system installation inspections

  • at&t FuELinG systEMs DEsiGnMultiple Locations in california

    stantec has been the primary design consultant for at&ts fuel tank design program.

    since 1992, stantec has prepared the corporate real Estate Fuel tank standards for all central office and Foc facilities. We developed standard drawings of underground storage tank continuous monitoring systems for california and updated and maintained standard drawings for fueling systems for both above ground and underground tanks.

    over the past 12 years, we have completed more than 300 fuel system design projects. comprehensive services include site evaluation,

    design, permitting, bid coordination, and construction observation services.

    stantec actively advises at&t on code and equipment changes and updates the standards as codes change and new equipment becomes available. We also conduct engineering drawing reviews to ensure conformance to at&t standards.

    since 1997, stantec has prepared Hazardous Materials inventories for approximately 1,000 at&t facilities in california and nevada, maintaining these on an annual basis. We also provide Hazardous Materials inventory reporting for at&t communications in 13 states. in addition, we maintain underground storage tank monitoring and response plans, and above ground tank spcc plans.

  • partiaL cLiEnt Listautomotivecobblestone auto spaGoodyear tire & rubberjiffy LubeLuxor cab companyoil can Henrysoil changersoil stoppavilion car Wash

    automotive retailersautonationcapitol VolvoHouse of importsLexus of cerritosMercedes of south Baynewport auto centernissan of El Montepeyton cramer acuraroseville Mazda subarusilveira pontiac GMcsmythe European

    Mercedessouth Bay Volvostevens creek Volvotoyota of cerritosValencia BMWVolvo of cerritos

    car rental companiesalamoavisBudget

    DollarEnterpriseHertznationalthrifty

    convenience stores7-Eleven stores, inc.circle K corporationQuik stop Marketsstop & Go Marketsusa petroleumutiLitiEsat&tcharter

    communicationsGtE northwest, inc.pacific BellsBcu.s. West Wireless

    corporateBechtel corporationBrindersoncisco systemsthe coca-cola

    companycomerica BankExtra space storageGreat americaHewlett-packardindependent

    Development co.intel corporation

    Kaplan, inc.Madison industriesMiller/Zellomega Environmentaloperating Engineers

    credit unionpasadena city collegepublic storagepuyallup internationalshurgard storageunited artists

    oil companiesaMocoandretti petroleumBp arcochevronconocophillipsExxonMobilFina oil & chemical

    companyGolden Gate petroleumintra oil companyMarathon oil companyMission trail oil

    companyolympian oil companypEMEXpetrocard systems, inc.redwood oil companyshell oil companystar Enterprisessuperamericatesorotime oil company

    tosco corporationultramar Diamond

    shamrockunocal corporationValero

    Hotel/Motelcomfort innHoliday innsuper 8 Lodge

    Governmenta.c. transitarmy corps of Engineerscal transcity of Bellevue, Wacity of Lodi, cacity of novato, cacity of oakland, cacity of palo alto, cacity of petaluma, cacity of santa ana, cacounty of sonoma, caKing county, WanaVFacEnGcoMnsa Mare island, caport of tacoma, Waseatac Fire Departmenttravis aFB, caunited states coast

    Guard

    restaurantsapplebeesarbysBaskin robbins/Dunkin

    DonutsBoston MarketBuffalo Wild Wingschick-Fil-ajack in the BoxKFc/taco BellLong john silversMcDonalds

    corporationnative new yorkerpanera Breadpapa Murphyssonoma Valley Bagel

    retailalbertsonsautoZonecsK auto (Kragen)cVsEckerd DrugsEddie BaueriKEaHMs HostHollywood VideoKrogerraleysrite aidsafewaytescoWalgreens

  • stantEc oFFicE Locations

  • canadacalgary, albertaEdmonton, albertaLethbridge, albertaMedicine Hat, albertared Deer, albertaabbotsford, British columbiaKamloops, British columbiaKelowna, British columbiasurrey, British columbiaVancouver, British columbiaVictoria, British columbiaWinnipeg, ManitobaFredericton, new Brunswickyellowknife, northwest territoriesHalifax, nova scotiasydney, nova scotiaGuelph, ontarioHamilton, ontarioKitchener, ontarioLondon, ontarionorth Bay, ontarioottawa, ontariosudbury, ontariotoronto Metro area, ontarioWindsor, ontarioregina, saskatchewansaskatoon, saskatchewan

    us Westphoenix, arizonatempe, arizonatucson, arizonaBakersfield, californiaFresno, californiairvine, californiaLakewood, californiaLos angeles, californiaLos Gatos, californiaModesto, californiaMoreno Valley, californiapalm Desert, californiapetaluma, californiaredlands, californiasacramento, californiasan Diego, californiasan Francisco, californiasan Luis obispo, californiathousand oaks, californiaWalnut creek, californiaDenver, coloradoFort collins, coloradoLas Vegas, nevadareno, nevadaponca city, oklahomaportland, oregonarlington, texasDallas/Fort Worth, texasHouston, texasMidland, texassalt Lake city, utahredmond, Washingtonseattle, Washington

    us EastBirmingham, alabamaHamden, connecticutHartford, connecticutsarasota, Floridast. cloud, Floridatampa, Floridaatlanta, GeorgiaMacon, Georgiachicago, illinoisspringfield, illinoisindianapolis, indianajeffersonville, indianaLexington, KentuckyLouisville, Kentuckyportland, Mainepresque isle, Mainescarborough, Mainetopsham, MaineBoston, Massachusettsnorthampton, MassachusettsWestford, Massachusettsann arbor, MichiganDetroit, MichiganLansing, MichiganMinneapolis, Minnesotast. Louis, MissouriManchester, new HampshireMount Laurel, new jerseyrochelle park, new jerseytoms river, new jerseytrenton, new jerseyalbany, new yorkBinghamton, new york

    Buffalo, new yorkHauppauge, new yorknewburgh, new yorknew york, new yorkrochester, new yorkcharlotte, north carolinaraleigh, north carolinaWinston-salem, north carolinaakron, ohiocincinnati, ohiocolumbus, ohioLogan, ohiosylvania, ohiotoledo, ohioKennett square, pennsylvaniaphiladelphia, pennsylvaniapittsburgh, pennsylvaniacharleston, south carolinaGeorgetown, south carolinachattanooga, tennesseenashville, tennesseenorth springfield, Vermontsouth Burlington, VermontLeesburg, Virginiarichmond, VirginiaBuckhannon, West Virginiacharleston, West Virginia

    internationalGuaynabo, puerto ricopanama city, panamast. Michael, Barbados

  • one team. infinite solutions.

    cM

    -ca

    -irV-2009jan

    28-p1V1

    to learn how stantec can work together with your team to develop innovative, integrated, and sustainable solutions, please contact:

    roy pedroPrincipal

    (916) 824-0910 [email protected]