Transcript of Our Addition Process
Good Homes & Additions
adds a family room
and master bathroom
to our homeDecember 3, 2010 –
January 28, 2011
BEFORE
Day 1
Officially underway!
Taking off the deck
Digging the hole
Our dirt piles
The foundation
Day 2
Special delivery
The cinder block arrives
More piles in the yard
Day 3
The mason gets to work on the crawl space
Day 4
The foundation/crawl space walls are complete.
Day 5
One less pile of dirt in our yard
The cement mixer arrives.
A floor for the crawl space…
and basement access
Stone for under the eventual patio
Day 6
Our steel beam
Lumber for framing is delivered
Ruts in our yard
Day 7
We have a floor!
Getting the back wall ready
Setting the wall in place
Day 8
The shower arrives
The view from the front
All the walls are up!
The bathroom-to-be
Day 9
Roof trusses arrive
The house is wrapped and the roof is started.
Interior view
Day 10
The windows arrive...
and are installed.
Turning a window into a door
Day 11
Pipes and wires
Day 12
Shingles on the roof
Roughing in the HVAC
Day 13
The fireplace is in place.
The “dog house” and vent
Day 14
Getting the future doorway ready
Day 15
Insulation installation
Day 16
Running wires for the speakers
Siding delivery
Day 17
The drywall arrives
A tight fit!
The siding gets started
Day 18
Here comes the door
Day 19
More siding going up
Drywall being hung
Day 20
Day 21
Blowing insulation into the ceilings
More siding
The beginning of the drywall finishing
Day 22
More work on the drywall
Finishing the siding
More HVAC installation
Day 23
And still more drywall finishing
The new furnace
and air conditioner
Shutters on the front
Day 24
Even more drywall work
Day 25
Finished and ready for paint!
Day 26
Before the French doors
How they kept the house clean!
New French doors
Window sills
Bathroom - clean and ready for paint
Day 27
Insulating the crawl space ceiling
Working on the trim
Trim for the doors
Trim for the windows
Day 28
Doors in place
All trimmed and ready for paint
Day 29
Plastic over the windows…
and doorway
A coat of primer and painted doors
Gutters going up
Day 30
“Thyme” in the bathroom
The hardwood gets acclimated
Downspout
Day 31
“Mild Wind” in the family roomand stained boards for the step
Granite fireplace surround is installed
Ready to install the vinyl
The new bathroom floor
Day 32
Getting started on the hardwood
Day 33
Family room floor is almost done
Day 34
Steps are built
Baseboard is up
Plumbing is working
Exterior light installed
Day 35
Carpet is patched
The little things
Mantel in a box
Day 36
Laying out the mantel
More little details
Final HVAC
Day 37
“Mocha” on the mantel
Final coat of paint andglass doors uncovered
Clean shower
Freshly painted walls and baseboard
Day 38
Finishing touches
The closet shelving
Mantel up and fireplace working
Day 39
The TV is hung
Final plumbing
Day 40
Insulating the walls of the crawl space
Inspection completeTime to decorate!
Furniture in place
Epilogue
Curtains!
The perfect chair
Our music corner