Structural Essentials in Essential Structures for (NOT-SO) Non-Structural Systems
OSHPD UPDATES
Joe La Brie, SE, President
Sep 15, 2014
Introduction
President of MakeItRight, Inc., Structural Engineering Design Professionals
in Arcadia, California. (makeitright.net)Managing Partner of Dynamic Certification Laboratory (DCL)--State of the
Art Shake Table Laboratory. (shaketest.com)Immediate Past President of Structural Engineers Association ofSouthern CaliforniaImmediate Past Chair and Continuing Consultant to Committees of the
California Hospital Building Safety BoardDeveloper of Field Inspection App for Iphone and Android: rapportapp.com
Sep 15, 2014
Presentation Outline
• Introduction• Current Conditions• Background / History• Standards• Enforcement• Best Practice• Certification• Q&A Discussion
Sep 15, 2014
Current Conditions
• In a Round Table Discussion with OSHPD Director onApril 22, 2014 we learned:– The Majority of Work in Progress at OSHPD are Projects
with Construction Value < $ 200,000– Only a Couple of Large Projects under Construction
• Sutter: CPMC San Francisco• Kaiser: San Diego• Stanford: Palo Alto
– Marked Decline in Work Volumes Attributed to:• General Economic Conditions• Healthcare Reform• Seismic Compliance Delays
Sep 15, 2014 6
30-Year ProbabilitiesMagnitude
6.7 7.5Northern
Area 93% 15%
SouthernArea 97% 37%
Slide Courtesyof Chris Tokas,SE, OSHPD
Design Demands
Background / History
Sep 15, 2014
1976 UBC
(k) Essential Facilities. Essential facilities are those structures orbuildings which must be safe and usable for emergency purposes afteran earthquake in order to preserve the health and safety of the generalpublic. Such facilities shall include …
…The design and detailing of equipment which must remainin place and be functional following a majorearthquake shall be based upon the requirements of Section 2312(g) [Lateral Force on Elements of Structures] and Table No. 23-J.
Good idea but doesanyone really care?
Background / History
Sep 15, 2014
2000 IBC1708.5 Mechanical and electrical equipment. Eachmanufacturer of designated seismic system components shalltest or analyze the component and its mounting system oranchorage and shall submit a certificate of compliance… Theevidence of compliance shall be by actual test on a shaketable, by three-dimensional shock tests, by an analyticalmethod using dynamic characteristics and forces, by theuse of experience data (i.e., historical data demonstratingacceptable seismic performance), or by a more rigorousanalysis providing for equivalent safety.
Maybe we do care?
Background / History
Sep 15, 2014
2006 IBC / 2007 CBC1708.5 Seismic qualification of mechanical and electrical equipment.The registered design professional in responsible charge shall state theapplicable seismic qualification requirements for designated seismicsystems on the construction documents…
…Qualification shall be by an actual test on a shake table, by three-dimensional shock tests, by an analytical method using dynamiccharacteristics and forces, by the use of experience data (i.e.,historical data demonstrating acceptable seismic performance) or bya more rigorous analysis providing for equivalent safety.
Yes, we care. So nowwhat?
Background / History
Sep 15, 2014
What Changed?
• IBC vs CBC: Some Noteworthy Difference inRequirements for SSC.
• Enforcement has been the Source of PERCEIVEDCHANGE.
• On January 1, 2008 OSHPD began to enforce therequirement for SSC as prescribed in the 2007 CBC.
• Even today, many jurisdictions still do not enforce thispart of the building code.
Enforcement
Sep 15, 2014
• Validate the Structural Integrity andFunctionality of the Equipment.
• Validate the Seismic Anchorage andRestraint of the Equipment
Best Practice
Sep 15, 2014
Structure, Components, Supports and Attachments
Best PracticeSlide Courtesy ofChris Tokas, SE,OSHPD
Sep 15, 2014
Design Demands
AFLX
(f )
fFLX
AFLX
(f )
fFLX3
210 f
FLX
AFLX
fFLX
ARIG
23
16.70.1 f0
Horz.
33.3
ARIG
AFLX
5% Damping Horizontal RRS
Vertical RRS
Spe
ctra
lRes
pons
eA
ccel
erat
ion,
A(g
's)
Frequency, f (Hz)
Vert.
15 fFLX
AFLX
AFLX
23
Courtesy of Chris Tokas, SE, OSHPD
Who needs toknow this stuff?
Best Practice
Sep 15, 2014
Gather the Critical Information
• Essential Site / Building Information
• Essential “Building Systems / EquipmentComponents” Information
Best Practice
Sep 15, 2014
Essential “Site / Building” Information
• Site Class• Spectral Accelerations• Risk (Occupancy) Category• Seismic Design Category• Permanent or Temporary Installation• General Structural System• Support Compatibility• Installation Location in the Building
Best Practice
Sep 15, 2014
Risk (Occupancy) Category
• Essential Buildings: IV– I-2 Occupancies (Hospitals)– Fire, Rescue ambulance, Police Stations– Designated Earthquake Shelters, Emergency Preparedness,
communications and operations centers.– Structures Containing Toxic Materials– Aviation Control Towers, Buildings having National Defense
Functions– Water Storage and Pump Structures for Fire Suppression
Best Practice
Sep 15, 2014
Essential “Building Systems / Equipment Components”
• Component Importance Factor• Designated Seismic Systems• Amplification Factor ap• Response Modification Factor Rp• Exemptions to design requirements of ASCE 7-10,
Chapter 13• Manufacturer Special Seismic Certification• Manufacturer OSHPD Pre-Approvals (Voluntary
Programs)• Manufacturer Product Data Information (Cut Sheets)
Best Practice
Sep 15, 2014
• Manufacturer’s Certification by Analysis, ShakeTable Testing or Experience Data. (NOTSpecial Seismic Certification)
• Manufacturer Installation Drawings• Support Conditions (Flexible / Rigid, Floor,
Overhead, Wall Mounted)• Specialty Support Documentation (Vibration
Isolation)
Essential “Building Systems / Equipment Components”Best Practice
Sep 15, 2014
Designated Seismic Systems• The seismic force-resisting system and those
architectural, electrical, and mechanical systemsor their components that require design inaccordance with ASCE 7-10, Chapter 13 and forwhich the component Importance Factor isgreater than 1.0.
• Equipment that is part of the Designated SeismicSystem must remain Operable following anEarthquake
Best Practice
Sep 15, 2014
Component Importance Factor (Ip)
• All components shall be assigned an Ip value.
• Ip = 1.0 except where…– The component is required to function for life-safety
purposes. (Fire Alarm and Fire Sprinkler Systems). Ip=1.5– The component contains hazardous materials. (Fuel
Tanks etc). Ip=1.5– The component is in or attached to an Risk Category IV
Structure. Ip=1.5
Best Practice
Sep 15, 2014
Certification Methods
• Project Specific Special Seismic Certification andSeismic Restraint Calculations.• Applicable to the Site and Project Conditions
Only.
• Pre-Approved Special Seismic Certification(OSHPD OSP Program) and Anchorage (OPMProgram• Applicable to Multiple Sites where Site
Conditions and Product Construction areAcceptable
Sep 15, 2014
Site / Project Specific Certification
• The Design Professionals of Record for theproject are responsible to VALIDATE theapplication of a Special Seismic Certificationfor their specific project. Must includespecific information from shake table testing.
• The Design Professionals of Record areresponsible to VALIDATE EquipmentAnchorage
Certification Methods
Sep 15, 2014
Certification Methods
Code Compliance is notVoluntary…
SHPDpecial seismic certreapproval
OSP
SHPDreapprovedetails
OPD
OSHPD Pre-ApprovalPrograms are Voluntary.
OPL
SHPDreapprovedabs
OPM
SHPDreapprovedAnufacturers Anchorage
Sep 15, 2014
• First OPL was issued on August 12, 2014• First OPL was issued to• Currently 9 OPLs on file with OSHPD.
OSHPD OPL PreapprovalCertification Methods
Sep 15, 2014
Certification Methods
• First OPA was issued in November of 1987.• First OPM was issued in December of 2013.
– Compliant with 2013 CBC Criteria
OSHPD OPM Preapproval
Sep 15, 2014
Certification Methods
• OPM Program Replaced theOPA program in March 2013
• OPM Program used Primarilyby the Medical EquipmentIndustry
OSHPD OPM Preapproval
Sep 15, 2014
Certification MethodsOSHPD OPM Preapproval
• Except forDistributiveSystems, theMechanical andElectricalIndustries havenot Used theOPM Program.
Sep 15, 2014
Certification Methods
• In the last 18 months, there are about 100 OPMApplications Submitted
• About One Third of the Submittals have ReceivedOPM Approval
OSHPD OPM Preapproval
Sep 15, 2014
• At its Highest, There were over 2,500 OPAs Approved• Many Manufacturers have Declined to Continue
Certification MethodsOSHPD OPM Preapproval
Sep 15, 2014
• First OSP was issued in June of 2009.• Currently >400 OSPs on file with OSHPD. OSP
Requirements have been posted for download.• Shake Table Testing is Essential and must be in
accordance with ICC AC-156 Standard.• PIN 55
OSHPD OSP PreapprovalCertification Methods
Sep 15, 2014
Certification Methods
• Program allows Certification of an entire productline by testing smallest and largest.
• Two tests are required for every ActiveComponent and EVERY variation of :– Manufacturer of Components– Mounting Configuration (Wall, Floor, Overhead,
Flexible, Rigid)– Materials (Stainless Steel, Carbon Steel)
OSHPD OSP Preapproval
Sep 15, 2014
Certification Methods
• Testing Laboratory shall have ISO 17025Accreditation or…
• Testing shall be under the Responsible Chargeof a California Licensed Engineer (Mechanical,Electrical, Civil, Structural)
• Test Reports shall be prepared by a CaliforniaLicensed ENGINEER (Mechanical, Electrical,Civil, Structural)
• Test Reports shall be reviewed and accepted bya California Licensed Structural Engineer.
OSHPD OSP Preapproval
Sep 15, 2014
Certification Methods
• Emergency and Standby Power Systems• Elevator Equipment• Components with Hazardous Contents• Smoke Control Fans• Exhaust Fans• Switchgear• Motor Control Centers
OSHPD OSP Preapproval
Sep 15, 2014
• X-Ray Machines• CT Scanners• Air Conditioning Units• Air Handling Units• Chillers• Cooling Towers• Motorized Surgical Lights• Motorized Surgical Tables
Certification MethodsOSHPD OSP Preapproval
Sep 15, 2014
• Transformers• Electrical Substations• UPS and Batteries• Distribution Panels• Control Panels
Certification MethodsOSHPD OSP Preapproval
Sep 15, 2014
Certification Methods
OSHPD OSP Preapproval• The Program Evolves
– BAC Series 3000:2009
– OSP-0002 / 6 Pages
– BAC Series 3000Update: 2013
– OSP-0024 / 24 Pages
Sep 15, 2014
Certification Methods
Specifying Equipment with OSP Pre-Approvaldoes not relieve the Engineers of Record ofResponsibilities to Verify Applicability andCompatibility of the Certifications and Tests.
OSHPD OSP Preapproval