OSD Design

4
On-site Detention (ODS) Pond Design: Design ARI 10 years: Development Impervious Area Pervious Area Total CA I Q Status C A C A (mm/ hr) (L/s) Pre- 0 0 0. 55 43896.2 5 24142. 94 247.4 4 1660.7 52 Development Post- 0. 93 18227.9 8 0. 54 25668.2 7 30812. 86 247.4 4 2119.5 65 Development Design ARI 50 years: Development Impervious Area Pervious Area Total CA I Q Status C A C A (mm/ hr) (L/s) Pre- 0 0 0. 55 43896.2 5 24142. 94 299.2 8 2008.6 89 Development Post- 0. 93 18227.9 8 0. 54 25668.2 7 30812. 86 299.2 8 2563.6 25 Development a b PSD 10690. 38 140802 87 1538. 48 td L Impervious Area Pervious Area Total Qd Pervious Area (m 2 ) 25668. 27 Impervious Area (m 2 ) 18227. 98 t c (min) 10 t cs (min) 10

description

osd

Transcript of OSD Design

Pervious Area (m2)25668.27

Impervious Area (m2) 18227.98

tc (min)10

tcs (min)10

On-site Detention (ODS) Pond Design:Design ARI 10 years:

DevelopmentImpervious AreaPervious AreaTotal CAIQ

StatusCACA(mm/hr)(L/s)

Pre-000.5543896.2524142.94247.441660.752

Development

Post-0.9318227.980.5425668.2730812.86247.442119.565

Development

Design ARI 50 years:

DevelopmentImpervious AreaPervious AreaTotal CAIQ

StatusCACA(mm/hr)(L/s)

Pre-000.5543896.2524142.94299.282008.689

Development

Post-0.9318227.980.5425668.2730812.86299.282563.625

Development

abPSD

10690.38140802871538.48

tdLImpervious AreaPervious AreaTotalQd

(mins)(mm/hr)CACACA(L/s)

5315.410.918227.9825668.270.7836426.433194.015

10247.440.918227.9825668.270.6733602.922311.489

15200.880.918227.9825668.270.5931549.461761.868

20169.170.918227.9825668.270.5430266.051423.39

30130.360.918227.9825668.270.4628212.591022.426

tdQdPSDcdSSR

(mins)(L/s)(L/s)(m3)

53194.0151538.481048.546158.5844596.0652

102311.4891538.48934.9136219.132694.4658

151761.8681538.48806.6209287.4909600.9809

201423.391538.48678.3174355.8555467.0603

301022.4261538.48416.4067495.4108199.0961

From the previous table, a maximum SSR of 694.4658 m3 occurs at duration of 10 minutes. Therefore:Required SSR = 694.4658 m3Proposes OSD Area = 27 x 26 = 702 m2Primary Outlet Size:

= 0.63 m2

= 0.89 m = 890 mmSecondary Outlet Size:

Broad-crested weir is sized for the estimated major system ARI flow from the site for tcs 20 minutes for 50 years ARIDevelopmentImpervious AreaPervious AreaTotal CA50I20Q

StatusCACA(mm/hr)(L/s)

Post-0.9318227.980.5425668.2730812.862011721.761

Development

= 20.4 mCacw = 1.45

A freeboard of 150mm is provided

Therefore, the dimensions for secondary outlet weir are:

21 m (wide) x 0.15 m (high)Emergency Outlet:

Emergency spillways is provided to safely pass a major design storm through the basin