Organisation Structure - Final

69
Project Management Doc No: 252/120/PO/101/00 Effective Date: 31/07/2010 Version : 1.0 Page 1 of 69 Organization Structure Revision: 00 Arch Pharmalabs Ltd. © 2008 ZensarTechnologies Ltd. Page 1 of 69 SAP-2010-252

description

SAP

Transcript of Organisation Structure - Final

Page 1: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 1 of 41

Organization Structure

Revision: 00

Arch Pharmalabs Ltd.

© 2008 ZensarTechnologies Ltd. Page 1 of 41 SAP-2010-252

Page 2: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 2 of 41

Approval

ARCH PHARMALABS LIMITED

ACTIVITY NAME TITLESIGNATURE /

DATE

PREPARED BY: Mr. Kalpesh Shah DGM- SAP

REVIEWED BY:Mr. Govind Joshi

GM – Internal Audit and IT Controls

APPROVED BY:Mr. Paresh Jain

VP - Internal Audit and IT Controls

AUTHORIZED BY:Dr. Satish Surve

AVP - QA & RA

© 2008 ZensarTechnologies Ltd. Page 2 of 41 SAP-2010-252

Page 3: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 3 of 41

Table of Contents:1. FINANCIAL ACCOUNTING...................................................................................4

1.1 Company Code.............................................................................................................41.2 Credit Controlling Area...................................................................................................41.3 Fiscal Year...................................................................................................................51.4 Posting Period Variant....................................................................................................51.5 Company Code Currency.................................................................................................61.6 Chart of Accounts..........................................................................................................61.7 Business Place..............................................................................................................71.8 Section Code................................................................................................................8

2. CONTROLLING..............................................................................................9

2.1. Controlling Area..................................................................................................92.2. Operating Concern...............................................................................................92.3. Financial Management Area....................................................................................92.4. Profit Centre Accounting......................................................................................10

3. MATERIALS MANAGEMENT...............................................................................15

3.1 Plant 153.2 Storage Locations........................................................................................................163.3 Purchase Organizations.................................................................................................293.4 Purchase Groups..........................................................................................................30

4.SALES & DISTRIBUTION...................................................................................32

4.1 Sales Organisation.......................................................................................................324.2 Distribution Channels...................................................................................................324.3 Division....................................................................................................................334.4 Sales Area.................................................................................................................334.5 Shipping Point............................................................................................................364.6 Sales Office...............................................................................................................37

5. PLANT MAINTENANCE....................................................................................39

Planning Plants and Maintenance Plants.................................................................................39

© 2008 ZensarTechnologies Ltd. Page 3 of 41 SAP-2010-252

Page 4: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 4 of 41

© 2008 ZensarTechnologies Ltd. Page 4 of 41 SAP-2010-252

Page 5: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 5 of 41

1. Financial Accounting

This chapter covers the requirements and the customisation details of the Financial Accounting Enterprise Structure. This includes configuration for setting up the enterprise structure and assigning organizational units to the structure defined.

1.1 Company Code

Company Code is the Organizational Unit of Financial Accounting for which a complete self-contained set of accounts can be drawn up for purposes of external reporting.

This includes recording of all relevant transactions and generating all supporting documents required for financial statements.

At each Company Code level Balance Sheet and Profit and Loss Account and all financial statements can be generated. Statements Required for Legal Reporting can be generated / balanced at Company Code level.

At each country level, Financial Reports need to be generated, when defining company codes, Country specific Company Codes need to be generated.

SL No

Company Code ID

Company Code Description Country

1 1000 Arch Pharmalabs Pvt. Ltd. Mumbai – India

2 3000 Avon Organics Ltd Mumbai – India

1.2 Credit Controlling Area

Credit Controlling Area is a Financial Accounting organizational unit to monitor the Credit Limit to Customers.

This organizational unit is either a single company code or, if credit control is performed across several company codes, multiple company codes. Credit information can be made available per customer within a credit control area.

© 2008 ZensarTechnologies Ltd. Page 5 of 41 SAP-2010-252

Page 6: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 6 of 41

SL No

Company Code ID

Company Code Description Area Description

1 1000 Arch Pharmalabs Pvt. Ltd. Credit Control Area – Arch

2 3000 Avon Organics Ltd Credit Control Area – Avon

1.3 Fiscal Year

Fiscal year represented to maintain the Accounting period as per the Financial Year of Organization. The financial period usually 12 months, for which the company produces financial statements and takes inventory, profit and loss, etc. A fiscal year need not correspond to the calendar year.

SAP support the Fiscal Year Calendar Year dependent or other than Calendar year also. In addition to the normal 12 Calendar month, SAP support additional 4 months to support and post the Book Closure, Audit and Year end entries.Fiscal Year Variant “V3 – Fiscal Year, 4 Special Period” can be used.

SL No

Company Code ID

Company Code Description Fiscal Year Variant

1 1000 Arch Pharmalabs Pvt. Ltd.V3 – Fiscal Year, 4 Special Period

2 3000 Avon Organics LtdV3 – Fiscal Year, 4 Special Period

1.4 Posting Period Variant

The Financial Year of the organization is being splitted into different posting periods based on the Fiscal Year Variant. The transactions are being accumulated for reporting purposes each period wise. The transactions postings are controlled through Posting Period Variant. The Posting Period Variant maintained to allow the users, which period they can post the transaction and to which accounts. The following Posting Period Variants are required to control the posting period.

No Posting Period Variant

Company Code Description Posting Period Variant

1 1000 Arch Pharmalabs Pvt. Ltd. April to March

2 3000 Avon Organics Ltd April to March

© 2008 ZensarTechnologies Ltd. Page 6 of 41 SAP-2010-252

Page 7: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 7 of 41

1.5 Company Code Currency

Arch will use Indian Rupees (INR) as the base currency. The Company will define all other currencies in relation to the Indian Rupees.

Sl. No.

Company Code Currency

1 1000 Arch Pharmalabs Ltd. INR

2 3000 Avon Organics Ltd. INR

1.6 Chart of Accounts

Chart of Account contains list of General Ledger Accounts. A classification scheme consisting of a group of general ledger (G/L) accounts. A chart of accounts provides a framework for the recording of values to ensure an orderly rendering of accounting data. The G/L accounts it contains are used by one or more company codes.

For each G/L account, the chart of accounts contains the account number, the account name, and technical information.A chart of accounts must be assigned to each company code. This chart of accounts is the operative chart of accounts and is used in both financial accounting and cost accounting.

Chart of Account “1000 –Arch Group- Chart of Account” is to be defined to meet the requirements of Arch Pharmalabs Ltd. and Avon Organics Ltd. The same Chart of Account will be used for both the company codes i.e. 1000- Arch Pharmalabs Ltd. and 3000 – Avon Organics Ltd.

Company Code Chart of

Accounts

Chart of Accounts

Description

1000- Arch Pharmalabs Limited1000

Arch Group Chart of

Accounts3000- Avon Organics Limited

© 2008 ZensarTechnologies Ltd. Page 7 of 41 SAP-2010-252

Page 8: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 8 of 41

1.7 Business Place

Business place is being used to identify and track the sales tax / VAT (Value Added Tax) and TDS, paid to vendor through their invoice and collected from the customers. Based on the business place accumulation can be made and necessary statutory returns can be filed.

Business Place Description Location

1100 Head Office Mumbai1101 Arch Pharmalabs ltd - Tarapur factory Tarapur1102 Arch Pharmalabs ltd - Badlapur Unit Badlapur1103 Arch Pharmalabs ltd - Taloja G - 6 Unit Taloja1104 Arch Pharmalabs ltd - Taloja R & D Unit Taloja1105 Arch Pharmalabs Ltd- Tarapur, Plot- E-64 & E-82 Tarapur1106 Arch Pharmalabs ltd - Dombivali unit Dombivali1107 Arch Pharmalabs ltd - Turbhe R & D Unit Turbhe1151 Logical Port- Mumbai Mumbai1152 Logical Port- Chennai Chennai1153 Logical Port- Kandla Kandla1161 Arch Pharmalabs Ltd- Tarapur, Plot- E-80 & E-81 Tarapur1171 Arch Pharmalabs ltd - Tarapur WH Tarapur1172 Arch Pharmalabs ltd – Bhiwandi Bhiwandi1173 Arch Pharmalabs ltd - Bhiwandi Godown Bhiwandi1201 Arch Pharmalabs ltd - Merven Unit Hyderabad1202 Arch Pharmalabs ltd - Siddipet Unit Hyderabad1203 Arch Pharmalabs ltd - Sibra Unit Hyderabad1204 Arch Pharmalabs ltd - RO- Hyderabad Hyderabad1271 Arch Pharmalabs ltd - Hyderabad WH Hyderabad1272 Arch Pharmalabs ltd - Sibra WH Hyderabad

1301Vitalife Laboratories (A divison of Arch Pharmalabs Ltd) Gurgaon

1371 Arch Pharmalabs ltd - Vitalife Godown1 Gurgaon1372 Arch Pharmalabs ltd - Vitalife Godown2 Gurgaon1471 Arch Pharmalabs ltd - Vadodara Godown Vadodara1571 Arch Pharmalabs ltd - Vitalife Bhiwadi Godown Bhiwadi

Business Place Description Location

© 2008 ZensarTechnologies Ltd. Page 8 of 41 SAP-2010-252

Page 9: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 9 of 41

3101 Avon Organics Limited - Solapur unit Solapur3200 Head Office Hyderabad3201 Avon Organics Limited - Sadasivpet unit Hyderabad3251 Logical Port- Mumbai Mumbai3252 Logical Port- Chennai Chennai3253 Logical Port- Kandla Kandla3401 Avon Organics Limited - Vadodara unit Vadodara3171 Avon Organics Limited - Bhiwandi Ware House Bhiwandi

1.8 Section Code

Section code is being used to identify and file the tax deducted at source (TDS), returns, as per the organization requirements.

SL No Section Code Location TAN No Jurisdiction / Range

1 1100 All Location MUMA19603D Maharashtra2 1200 SIBRA HYDA10181D Hyderabad3 1210 Siddipet HYDA09690C Hyderabad4 1220 Merven HYDM00772C Hyderabad5 1301 Vitalife RTKV01571D Gurgoan6 3100 Biotech Division PNEA12700C Maharashtra7 3200 Diketene Division HYDA01216F Hyderabad

© 2008 ZensarTechnologies Ltd. Page 9 of 41 SAP-2010-252

Page 10: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 10 of 41

2. Controlling

2.1. Controlling Area

Controlling Areas is an organizational unit within a Organization. Controlling Areas is being used to represent a closed system for cost accounting purposes. Controlling Areas is used for internal reporting purposes. Multiple Company Codes can be used same Controlling Area, to have a uniform Costing Systems in place. All the company codes in the controlling area must use one Chart of Accounts and Fiscal Year Variant.

Controlling Area “1000- Arch - Standard Hierarchy” are to be used for all Company Codes

Company Code Controlling

Area

Controlling Area name

1000- Arch Pharmalabs Limited 1000 Arch Group

3000- Avon Organics Limited

2.2. Operating Concern

Operating Concern will be used to analyze reports in Profitability Segments. It can be analyzed how costs and revenues are organized. One or more controlling areas are assigned to an operating concern.

Company Code Operating

Concern

Name of Operating

Concern

1000- Arch Pharmalabs Limited 1000 Arch Operating Concern

3000- Avon Organics Limited

2.3. Financial Management Area

The Funds Management Area is the organizational unit within an organization, used to represent a closed system for funds management, budgeting, and budget execution. The Funds Management Area also contains attributes or settings that impact master data and/or transactions within the FM Area. FM Area is linked to Company Code and Controlling area, which will enable integration with

© 2008 ZensarTechnologies Ltd. Page 10 of 41 SAP-2010-252

Page 11: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 11 of 41

all other organizational units within an enterprise. Funds Management within an Enterprise is controlled through Master Data called (a) Funds Centers and (b) Commitment Items.

Funds Center represents the organizational areas of responsibility for budgetary monitoring and reporting. It is linked to Cost Center. Funds Center identifies where in the organization revenue, expense, and budget are managed, reported, and controlled. Budget is assigned to Funds Centers and postings can be controlled against this budget based on the linking of other organizational objects. Funds Center usually represents the lowest levels of the organization where management responsibility exists.

Commitment Item represents budget classification. It is used to reflect the type of revenue and expenditure being budgeted and also to detail balances in FM. Commitment Items are linked to revenue and expense general ledger accounts, as well as primary and secondary cost elements. Additionally, Commitment Items may be created for specific budgetary and carry forward needs. Commitment Item identifies the business transaction for which budget is consumed.

Essentially commitment items will get mapped to General Ledger Account(s) or group of GL Accounts based on nature of Expenditure. Commitment hierarchies are maintained in the preparation of commitment items for the grouping of commitment items of similar nature and reporting purpose.

The following FM area will be used:

Company Code FM Area ID FM Area Description

1000- Arch Pharmalabs Limited1000 Arch Group FM Area

3000- Avon Organics Limited

2.4. Profit Centre Accounting

Profit centre accounting helps management to analyse the profitability position of each and every profit centre for decision making purposes. All the revenues are posted statistically to profit centres and costs are also posted to profit centres through the assigned cost centres, there by providing the profitability at each profit centre level.At each Profit Center level Balance Sheet and Profit and Loss Account can be generated

© 2008 ZensarTechnologies Ltd. Page 11 of 41 SAP-2010-252

Page 12: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 12 of 41

SL No

Profit Centers

Description Company code

1 110000 Head Office - Corporate Services 10002 110010 Head Office - Intermediates 10003 110020 Head Office - API 10004 110052 Head Office - R & D Services` 10005 110051 Head Office - R & D Services- FTE 10006 115110 Logical Port Plant1 - Intermediates 10007 115120 Logical Port Plant1 - API 10008 115190 Logical Port Plant1 - Common Services 10009 115210 Logical Port Plant2- Intermediates 100010 115290 Logical Port Plant2 - Common Services 100011 115220 Logical Port Plant2 - API 100012 115310 Logical Port Plant3 - Intermediates 100013 115320 Logical Port Plant3 - API 100014 115390 Logical Port Plant3 - Common Services 100015 110110 Arch Pharmalabs ltd - Tarapur factory - Intermediates 100016 110132 Arch Pharmalabs ltd - Tarapur factory - CRAMS - API 100017

110131Arch Pharmalabs ltd - Tarapur factory - CRAMS - Intermediates

1000

18 110210 Arch Pharmalabs ltd - Badlapur Unit - Intermediates 100019 110220 Arch Pharmalabs ltd - Badlapur Unit - API 100020 110232 Arch Pharmalabs ltd - Badlapur Unit - CRAMS - API 100021

110231Arch Pharmalabs ltd - Badlapur Unit - CRAMS - Intermediates

1000

22 110290 Arch Pharmalabs ltd - Badlapur Unit - Common Services 100023

110331Arch Pharmalabs ltd - Taloja G - 6 Unit - CRAMS - Intermediates

1000

24110390

Arch Pharmalabs ltd - Taloja G - 6 Unit - Common Services

1000

25 110452 Arch Pharmalabs ltd - Taloja R & D Unit - R & D Services 100026

110520Arch Pharmalabs ltd - Tarapur Oncology factory GMP - API

1000

27110532

Arch Pharmalabs ltd - Tarapur Oncology factory GMP - CRAMS - API

1000

SL No

Profit Centers

Description Company code

© 2008 ZensarTechnologies Ltd. Page 12 of 41 SAP-2010-252

Page 13: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 13 of 41

28

110531Arch Pharmalabs ltd - Tarapur Oncology factory GMP - CRAMS - Intermediates

1000

29 110620 Arch Pharmalabs ltd - Dombivali unit - API 100030 110632 Arch Pharmalabs ltd - Dombivali unit - CRAMS - API 100031

110631Arch Pharmalabs ltd - Dombivali unit - CRAMS - Intermediates

1000

32 110732 Arch Pharmalabs ltd - Turbhe R & D Unit - CRAMS - API 100033

110731Arch Pharmalabs ltd - Turbhe R & D Unit - CRAMS - Intermediates

1000

34 120110 Arch Pharmalabs ltd - Merven Unit - Intermediates 100035 120132 Arch Pharmalabs ltd - Merven Unit - CRAMS - API 100036

120131Arch Pharmalabs ltd - Merven Unit - CRAMS - Intermediates

1000

37 120210 Arch Pharmalabs ltd - Siddipet Unit- Intermediates 100038 120232 Arch Pharmalabs ltd - Siddipet Unit - CRAMS - API 100039

120231Arch Pharmalabs ltd - Siddipet Unit - CRAMS - Intermediates

1000

40 120310 Arch Pharmalabs ltd - Sibra Unit - Intermediates 100041 120320 Arch Pharmalabs ltd - Sibra Unit - API 100042 120332 Arch Pharmalabs ltd - Sibra Unit - CRAMS - API 100043

120331Arch Pharmalabs ltd - Sibra Unit - CRAMS - Intermediates

1000

44 120390 Arch Pharmalabs ltd - Sibra Unit - Common Services 100045

130110Vitalife Laboratories (A divison of Arch Pharmalabs Ltd) - Intermediates

1000

46130120

Vitalife Laboratories (A divison of Arch Pharmalabs Ltd) - API

1000

47130132

Vitalife Laboratories (A divison of Arch Pharmalabs Ltd) - CRAMS - API

1000

48130131

Vitalife Laboratories (A divison of Arch Pharmalabs Ltd) - CRAMS - Intermediates

1000

49130190

Vitalife Laboratories (A divison of Arch Pharmalabs Ltd) -- Common Services

1000

50120400

Arch Pharmalabs ltd - RO- Hyderabad - Corporate Services

1000

51 117210 Arch Pharmalabs ltd – Bhiwandi- Intermediates 1000

SL No

Profit Centers

Description Company code

© 2008 ZensarTechnologies Ltd. Page 13 of 41 SAP-2010-252

Page 14: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 14 of 41

52 117220 Arch Pharmalabs ltd – Bhiwandi - API 100053 117290 Arch Pharmalabs ltd – Bhiwandi - Common Services 100054 117310 Arch Pharmalabs ltd - Bhiwandi Godown- Intermediates 100055 117320 Arch Pharmalabs ltd - Bhiwandi Godown - API 100056

117390Arch Pharmalabs ltd - Bhiwandi Godown - Common Services

1000

57 117110 Arch Pharmalabs ltd - Tarapur WH- Intermediates 100058 117120 Arch Pharmalabs ltd - Tarapur WH - API 100059 117190 Arch Pharmalabs ltd - Tarapur WH - Common Services 100060 127110 Arch Pharmalabs ltd - Hyderabad WH- Intermediates 100061 127120 Arch Pharmalabs ltd - Hyderabad WH - API 100062 127190 Arch Pharmalabs ltd - Hyderabad WH - Common Services 100063

157110Arch Pharmalabs ltd - Vitalife Bhiwadi Godown- Intermediates

1000

64 157120 Arch Pharmalabs ltd - Vitalife Bhiwadi Godown - API 100065

157190Arch Pharmalabs ltd - Vitalife Bhiwadi Godown - Common Services

1000

66 137110 Arch Pharmalabs ltd - Vitalife Godown1- Intermediates 100067 137120 Arch Pharmalabs ltd - Vitalife Godown1 - API 100068

137190Arch Pharmalabs ltd - Vitalife Godown1 - Common Services

1000

69 137210 Arch Pharmalabs ltd - Vitalife Godown2- Intermediates 100070 137220 Arch Pharmalabs ltd - Vitalife Godown2 - API 100071

137290Arch Pharmalabs ltd - Vitalife Godown2 - Common Services

1000

72 127210 Arch Pharmalabs ltd - Sibra WH- Intermediates 100073 127220 Arch Pharmalabs ltd - Sibra WH - API 100074 127290 Arch Pharmalabs ltd - Sibra WH - Common Services 100075 147110 Arch Pharmalabs ltd - Vadodara Godown- Intermediates 100076 147120 Arch Pharmalabs ltd - Vadodara Godown - API 100077

147190Arch Pharmalabs ltd - Vadodara Godown - Common Services

1000

78 320000 Head Office - Corporate Services 300079 325110 Logical Port Plant1- Intermediates 300080 325120 Logical Port Plant1 - API 3000SL No

Profit Centers

Description Company code

81 325190 Logical Port Plant1 - Common Services 3000

© 2008 ZensarTechnologies Ltd. Page 14 of 41 SAP-2010-252

Page 15: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 15 of 41

82 325210 Logical Port Plant2- Intermediates 300083 325220 Logical Port Plant2 - API 300084 325290 Logical Port Plant2 - Common Services 300085 325310 Logical Port Plant3- Intermediates 300086 325320 Logical Port Plant3 - API 300087 325390 Logical Port Plant3 - Common Services 300088 310120 Solapur unit - API 300089 310132 Solapur unit - CRAMS - API 300090 310131 Solapur unit - CRAMS - Intermediates 300091 320110 Sadasivpet unit- Intermediates 300092 320132 Sadasivpet unit - CRAMS - API 300093 320131 Sadasivpet unit - CRAMS - Intermediates 300094 320140 Sadasivpet unit - Agro Chemicals 300095 340110 Vadodara unit- Intermediates 300096 340120 Vadodara unit - API 300097 340190 Vadodara unit - Common Services 300098 317110 Bhiwandi Warehouse- Intermediates 300099 317120 Bhiwandi Warehouse - API 3000100 317190 Bhiwandi Warehouse - Common Services 3000

© 2008 ZensarTechnologies Ltd. Page 15 of 41 SAP-2010-252

Page 16: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 16 of 41

3. Materials Management

3.1 Plant

Plant is an operational unit within a company code. Plant is an organizational unit that structures the enterprise from the production, procurement, distribution and Stock Storage AreaExample: Production facility, Trading Office where material movements are tracked and inventory valuations are monitored.

Company Code Plant Plant Description

Plant Location Activity

1000 1100 Head Office MumbaiARCH HO

1000 1101 Arch Pharmalabs ltd - Tarapur factory Tarapur MFG1000 1102 Arch Pharmalabs ltd - Badlapur Unit Badlapur MFG1000 1103 Arch Pharmalabs ltd - Taloja G - 6 Unit Taloja MFG1000 1104 Arch Pharmalabs ltd - Taloja R & D Unit Taloja R & D1000 1105 Arch Pharmalabs Ltd- Tarapur, Plot- E-64 & E-82 Tarapur MFG1000 1106 Arch Pharmalabs ltd - Dombivali unit Dombivali MFG1000 1107 Arch Pharmalabs ltd - Turbhe R & D Unit Turbhe MFG1000 1151 Logical Port- Mumbai Mumbai Bonding1000 1152 Logical Port- Chennai Chennai Bonding1000 1153 Logical Port- Kandla Kandla Bonding1000 1161 Arch Pharmalabs Ltd- Tarapur, Plot- E-80 & E-81 Tarapur MFG

1000 1171 Arch Pharmalabs ltd - Tarapur WH TarapurNE Depot

1000 1172 Arch Pharmalabs ltd - Bhiwandi Bhiwandi E Depot

1000 1173 Arch Pharmalabs ltd - Bhiwandi Godown BhiwandiNE Depot

1000 1201 Arch Pharmalabs ltd - Merven Unit Hyderabad MFG1000 1202 Arch Pharmalabs ltd - Siddipet Unit Hyderabad MFG1000 1203 Arch Pharmalabs ltd - Sibra Unit Hyderabad MFG

1000 1204 Arch Pharmalabs ltd - RO- Hyderabad HyderabadARCH RO

1000 1271 Arch Pharmalabs ltd - Hyderabad WH HyderabadNE Depot

1000 1272 Arch Pharmalabs ltd - Sibra WH Hyderabad E DepotCompany Code Plant Plant Description

Plant Location Activity

© 2008 ZensarTechnologies Ltd. Page 16 of 41 SAP-2010-252

Page 17: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 17 of 41

1000 1301Vitalife Laboratories (A divison of Arch Pharmalabs Ltd) Gurgaon MFG

1000 1371 Arch Pharmalabs ltd - Vitalife Godown1 Gurgaon E Depot1000 1372 Arch Pharmalabs ltd - Vitalife Godown2 Gurgaon E Depot

1000 1471 Arch Pharmalabs ltd - Vadodara Godown VadodaraNE Depot

1000 1571 Arch Pharmalabs ltd - Vitalife Bhiwadi Godown BhiwadiNE Depot

3000 3101 Avon Organics Limited - Solapur unit Solapur MFG

3000 3200 Head Office HyderabadAVON-HO

3000 3201 Avon Organics Limited - Sadasivpet unit Hyderabad MFG3000 3251 Logical Port- Mumbai Mumbai Bonding3000 3252 Logical Port- Chennai Chennai Bonding3000 3253 Logical Port- Kandla Kandla Bonding3000 3401 Avon Organics Limited - Vadodara unit Vadodara MFG

3000 3171 Avon Organics Limited - Bhiwandi Ware House BhiwandiNE Depot

3.2 Storage Locations

Storage Locations: To monitor the stock of the material it is necessary to be able to store in the system location at which materials are kept. You can do this by using storage location.

As per material storage requirements the following storage locations are created for plant 1110, 1120 & 1130 as per the list.

Plant SL ID Description

1100 HO01 Head Office Mumbai1101 RM01 COLD STORES

1101 RM02 COOL STORAGE RM

1101 RM03 AMBIENT TEMP RM STORE

1101 RM04 SOLVENT RM

1101 RM05 ACID AND HAZARDOUS MATERIALS STORES

1101 RM06 DEEP FREEZER ROOM Plant SL ID Description

1101 RJ01 REJECTED RM STORE

1101 PM01 PACKAGING STORE

© 2008 ZensarTechnologies Ltd. Page 17 of 41 SAP-2010-252

Page 18: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 18 of 41

1101 RJ02 REJECTED PM STORE

1101 SF01 INTERMEDIATE STORE

1101 SF02 RECOVERED MATERIALS STORES

1101 PP01 PRODUCTION BLOCK-011101 RJ03 PRODUCTION-REJECTED MATERIAL STORES

1101 FG01 FINISHED GOODS STORE(BSR)

1101 RT01 FG RETURN STORE

1101 CS01 CONTROL SAMPLE

1101 EN01 ENGG STORES

1101 SY01 SCRAP YARD

1101 MS01 MISC ITEMS STORE

1101 LS01 LAB MATERIALS STORE

1101 DS01 DIESEL DAY STORE

1101 SS01 STABILITY SAMPLE

1101 ES01 WAREHOUSE SCRAP YARD

1101 PS01 PROJECT MATERIALS STORES

1101 EW01 ENG WORKSHOP STORE1102 RM01 COLD STORES

1102 RM02 AMBIENT TEMP RM STORE

1102 RM03 SOLVENT RM

1102 RM04 WAREHOUSE- RM/ PM STORE

1102 RM05 ACID AND HAZARDOUS MATERIALS STORES

1102 RM06 CONTROLLED SUBSTANCES

1102 RM07 TANK FARM

1102 RJ01 REJECTED RM STORE

1102 PM01 PACKAGING STORE

1102 RJ02 REJECTED PM STORE

1102 SF01 INTERMEDIATE STORE

1102 SF02 RECOVERED MATERIALS STORES

1102 PP01 PRODUCTION BLOCK-01

1102 PP02 PRODUCTION BLOCK-02Plant SL ID Description

1102 PP03 PRODUCTION BLOCK-031102 RJ03 PRODUCTION-REJECTED MATERIAL STORES

1102 FG01 FINISHED GOODS STORE(BSR)

1102 RT01 FG RETURN STORE

© 2008 ZensarTechnologies Ltd. Page 18 of 41 SAP-2010-252

Page 19: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 19 of 41

1102 CS01 CONTROL SAMPLE

1102 EN01 ENGG STORES

1102 SY01 SCRAP YARD

1102 MS01 MISC ITEMS STORE

1102 LS01 LAB MATERIALS STORE

1102 DS01 DIESEL DAY STORE

1102 SS01 STABILITY SAMPLE

1102 WH01 WARE HOUSE OUTSIDE FACTORY - 1

1102 WH02 WARE HOUSE OUTSIDE FACTORY - 2

1102 WH03 WARE HOUSE OUTSIDE FACTORY - 3

1102 EW01 ENG WORKSHOP STORE1103 RM01 AMBIENT TEMP RM STORE

1103 RM02 SOLVENT RM

1103 RM03 WAREHOUSE- RM/ PM STORE

1103 RM04 CONTROLLED SUBSTANCES

1103 RJ01 REJECTED RM STORE

1103 PM01 PACKAGING STORE

1103 RJ02 REJECTED PM STORE

1103 SF01 INTERMEDIATE STORE

1103 SF02 RECOVERED MATERIALS STORES

1103 PP01 PRODUCTION BLOCK-01

1103 PP02 PRODUCTION BLOCK-021103 RJ03 PRODUCTION-REJECTED MATERIAL STORES

1103 FG01 FINISHED GOODS STORE(BSR)

1103 RT01 FG RETURN STORE

1103 CS01 CONTROL SAMPLE

1103 EN01 ENGG STORES

1103 SY01 SCRAP YARD

1103 MS01 MISC ITEMS STOREPlant SL ID Description

1103 LS01 LAB MATERIALS STORE

1103 FT01 FO TANK

1103 WH01 WARE HOUSE OUTSIDE FACTORY

1103 EW01 ENG WORKSHOP STORE1104 RM01 AMBIENT TEMP RM STORE

1104 RM02 SOLVENT RM

© 2008 ZensarTechnologies Ltd. Page 19 of 41 SAP-2010-252

Page 20: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 20 of 41

1104 RJ01 REJECTED RM STORE

1104 SL01 Synthetic Lab -1

1104 SL02 Synthetic Lab -2

1104 SL03 Synthetic Lab -3

1104 SL04 Synthetic Lab -4

1104 SL05 Synthetic Lab -5

1104 SL06 Synthetic Lab -6

1104 SL07 Synthetic Lab -7

1104 SL08 Synthetic Lab -8

1104 SL09 Synthetic Lab -9

1104 SL10 Synthetic Lab -10

1104 SL11 Synthetic Lab -11

1104 SL12 Synthetic Lab -12

1104 MS01 MISC ITEMS STORE

1104 DS01 DIESEL DAY STORE

1104 SS01 STABILITY SAMPLE

1104 RD01 R & D STORES

1105 RM01 COLD STORES

1105 RM02 COOL STORAGE RM

1105 RM03 AMBIENT TEMP RM STORE

1105 RM04 SOLVENT RM

1105 RM05 WAREHOUSE- RM/ PM STORE

1105 RM06 ACID AND HAZARDOUS MATERIALS STORES

1105 RM07 CONTROLLED SUBSTANCES

1105 RM08 TANK FARM

1105 RJ01 REJECTED RM STORE

1105 RM09 EXPIRED RM STOREPlant SL ID Description

1105 WH01 WAREHOUSE-1

1105 WH02 WAREHOUSE-2

1105 WH03 WAREHOUSE-3

1105 PM01 PACKAGING STORE

1105 RJ02 REJECTED PM STORE

1105 SF01 INTERMEDIATE STORE

1105 SF02 RECOVERED MATERIALS STORES

1105 PP01 PRODUCTION BLOCK-01

© 2008 ZensarTechnologies Ltd. Page 20 of 41 SAP-2010-252

Page 21: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 21 of 41

1105 PP02 PRODUCTION BLOCK-02

1105 PP03 PRODUCTION BLOCK-03

1105 PP04 PRODUCTION BLOCK-04

1105 PP05 PRODUCTION BLOCK-05

1105 PP06 PRODUCTION BLOCK-06

1105 SW01 SPENT SOLVENT/WASTE1105 RJ03 PRODUCTION-REJECTED MATERIAL STORES

1105 FG01 FINISHED GOODS STORE(BSR)

1105 QG01 QUARANTINE GOODS-FG

1105 AG01 APPROVED GOODS

1105 RT01 FG RETURN STORE

1105 CS01 CONTROL SAMPLE

1105 EN01 ENGG STORES

1105 PS01 PROJECT MATERIAL STORE

1105 SY01 SCRAP YARD

1105 MS01 MISC ITEMS STORE

1105 EW01 ENG WORKSHOP STORE1106 RM01 COLD STORES(F-40)

1106 RM02 AMBIENT TEMP RM STORE(F-40)

1106 RM03 SOLVENT RM(F-40)

1106 RM04 SOLVENT RM(C-21)1106 RM05 ACID AND HAZARDOUS MATERIALS STORES(F-

40)1106 RM06 CONTROLLED SUBSTANCES(C-21)

1106 RM07 TANK FARM(C-21)Plant SL ID Description

1106 RJ01 REJECTED RM STORE(F-40)

1106 RJ02 REJECTED RM STORE(C-21)

1106 LN01 LIQUID NITROGEN TANK 1106 PM01 PACKAGING STORE(F-40)

1106 RJ03 REJECTED PM STORE(F-40)

1106 SF01 INTERMEDIATE STORE

1106 SF02 INTERMEDIATE COLD STORE

1106 SF03 RECOVERED MATERIALS STORE

1106 PP01 PRODUCTION BLOCK-01

1106 PP02 PRODUCTION BLOCK-02

© 2008 ZensarTechnologies Ltd. Page 21 of 41 SAP-2010-252

Page 22: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 22 of 41

1106 PP03 PRODUCTION BLOCK-03

1106 PP04 PRODUCTION BLOCK-041106 RJ04 PRODUCTION-REJECTED MATERIAL STORES

1106 FG01 FINISHED GOODS STORE(BSR)

1106 RT01 FG RETURN STORE

1106 CS01 CONTROL SAMPLE

1106 EN01 ENGG STORES

1106 PS01 PROJECT MATERIAL STORE

1106 SY01 SCRAP YARD(F-40)

1106 LS01 LAB MATERIALS STORE

1106 DS01 DIESEL DAY STORE

1106 SS01 STABILITY SAMPLE

1106 FT01 FO TANK

1106 FT02 LDO TANK

1106 SY02 SCRAP YARD(C-21)

1106 ES01 ETP STORES

1106 EW01 ENG WORKSHOP STORE1107 RM01 AMBIENT TEMP RM STORE

1107 RM02 SOLVENT RM

1107 RJ01 REJECTED RM STORE

1107 PM01 PACKAGING STORE

1107 PM01 PRODUCTION BLOCK-01

1107 RD01 R & D STORESPlant SL ID Description

1107 GS01 GAS CYLINDER STORE

1151 WH01 Custom Bonded Warehouse1152 WH01 Custom Bonded Warehouse1153 WH01 Custom Bonded Warehouse1161 WH01 Arch Pharmalabs Ltd- Tarapur, Plot- E-80 & E-811171 WHT1 Arch Pharmalabs ltd - Tarapur WH1172 WHB1 Arch Pharmalabs ltd - Bhiwandi1173 WHB2 Arch Pharmalabs ltd - Bhiwandi Godown1201 RM01 COLD STORES

1201 RM02 COOL STORAGE RM

1201 RM03 AMBIENT TEMP RM STORE

1201 RM04 SOLVENT RM

© 2008 ZensarTechnologies Ltd. Page 22 of 41 SAP-2010-252

Page 23: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 23 of 41

1201 RM05 ACID AND HAZARDOUS MATERIALS STORES

1201 RM06 CONTROLLED SUBSTANCES

1201 RM07 TANK FARM

1201 RJ01 REJECTED RM STORE

1201 PM01 PACKAGING STORE

1201 RJ02 REJECTED PM STORE

1201 SF01 INTERMEDIATE STORE

1201 SF02 RECOVERED MATERIALS STORES

1201 PP01 PRODUCTION BLOCK-01

1201 PP02 PRODUCTION BLOCK-02

1201 PP03 PRODUCTION BLOCK-031201 RJ03 PRODUCTION-REJECTED MATERIAL STORES

1201 FG01 FINISHED GOODS STORE(BSR)

1201 RT01 FG RETURN STORE

1201 CS01 CONTROL SAMPLE

1201 EN01 ENGG STORES

1201 PS01 PROJECT MATERIAL STORE

1201 SY01 SCRAP YARD

1201 MS01 MISC ITEMS STORE

1201 LS01 LAB MATERIALS STORE

1201 WS01 WATER TREATMENT CHEMICALS STOREPlant SL ID Description

1201 DS01 DIESEL DAY STORE

1201 SS01 STABILITY SAMPLE

1201 ES01 ETP STORES

1201 EW01 ENG WORKSHOP STORE1202 RM01 RM STORE

1202 RM02 SOLVENT RM

1202 RM04 ACID AND HAZARDOUS MATERIALS STORES

1202 RM05 TANK FARM

1202 RJ01 REJECTED RM STORE

1202 PM01 PACKAGING STORE

1202 RJ02 REJECTED PM STORE

1202 SF01 INTERMEDIATE STORE

1202 SF02 RECOVERED MATERIALS STORES

1202 PP01 PRODUCTION BLOCK-01

© 2008 ZensarTechnologies Ltd. Page 23 of 41 SAP-2010-252

Page 24: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 24 of 41

1202 PP02 PRODUCTION BLOCK-02

1202 PP03 PRODUCTION BLOCK-03

1202 PP04 PRODUCTION BLOCK-041202 RJ03 PRODUCTION-REJECTED MATERIAL STORES

1202 FG01 FINISHED GOODS STORE(BSR)

1202 RT01 FG RETURN STORE

1202 CS01 CONTROL SAMPLE

1202 EN01 ENGG STORES

1202 SY01 SCRAP YARD

1202 MS01 MISC ITEMS STORE

1202 LS01 LAB MATERIALS STORE

1202 WS01 WATER TREATMENT CHEMICALS STORE

1202 DS01 DIESEL DAY STORE

1202 SS01 STABILITY SAMPLE

1202 PS01 PROJECT MATERIALS STORES

1202 ES01 ETP STORES

1202 EW01 ENG WORKSHOP STORE1203 RM01 COLD STORES

1203 RM02 COOL STORAGE RMPlant SL ID Description

1203 RM03 AMBIENT TEMP RM STORE

1203 RM04 SOLVENT RM

1203 RM05 ACID AND HAZARDOUS MATERIALS STORES

1203 RM06 CONTROLLED SUBSTANCES

1203 RM07 TANK FARM

1203 RJ01 REJECTED RM STORE

1203 PM01 PACKAGING STORE

1203 RJ02 REJECTED PM STORE

1203 SF01 INTERMEDIATE STORE

1203 SF02 RECOVERED MATERIALS STORES

1203 PP01 PRODUCTION BLOCK-01

1203 PP02 PRODUCTION BLOCK-02

1203 PP03 PRODUCTION BLOCK-03

1203 PP04 PRODUCTION BLOCK-04

1203 PP05 PRODUCTION BLOCK-05

1203 PP06 PRODUCTION BLOCK-06

© 2008 ZensarTechnologies Ltd. Page 24 of 41 SAP-2010-252

Page 25: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 25 of 41

1203 PP07 PRODUCTION BLOCK-07

1203 PP08 PRODUCTION BLOCK-08

1203 PP09 PRODUCTION BLOCK-09

1203 PP10 PRODUCTION BLOCK-10

1203 PP11 PRODUCTION BLOCK-11

1203 PP12 PRODUCTION BLOCK-12

1203 PP13 PRODUCTION BLOCK-13

1203 PP14 PRODUCTION BLOCK-14

1203 PP15 PRODUCTION BLOCK-151203 RJ03 PRODUCTION-REJECTED MATERIAL STORES

1203 FG01 FINISHED GOODS STORE(BSR)

1203 RT01 FG RETURN STORE

1203 CS01 CONTROL SAMPLE

1203 EN01 ENGG STORES

1203 PS01 PROJECT MATERIAL STORE

1203 SY01 SCRAP YARD

1203 MS01 MISC ITEMS STOREPlant SL ID Description

1203 LS01 LAB MATERIALS STORE

1203 WS01 WATER TREATMENT CHEMICALS STORE

1203 DS01 DIESEL DAY STORE

1203 SS01 STABILITY SAMPLE

1203 FT01 FO TANK

1203 LT01 LDO TANK

1203 SY02 WAREHOUSE SCRAP YARD

1203 RD01 R & D STORES

1203 ES01 ETP STORES

1203 SP01 Solvent Recovery Plant1203 EW01 ENG WORKSHOP STORE1204 RO01 Arch Pharmalabs ltd - RO- Hyderabad1271 WHH1 Arch Pharmalabs ltd - Hyderabad WH1272 APSI Arch Pharmalabs ltd - Sibra WH1301 RM01 COLD STORES01

1301 RM02 COLDSTORe02

1301 RM03 AMBIENT TEMP RM STORE

1301 RM04 SOLVENT RM

© 2008 ZensarTechnologies Ltd. Page 25 of 41 SAP-2010-252

Page 26: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 26 of 41

1301 RM05 ACID AND HAZARDOUS MATERIALS STORES

1301 CS01 CONTROLLED SUBSTANCES

1301 RM06 TANK FARM

1301 RJ01 REJECTED RM STORE

1301 CR01 CARBON ROOM

1301 CT01 CAUSTIC LYE TANK1301 HT01 HCL TANK1301 NT01 LIQUID NITROGEN TANK 011301 NT02 LIQUID NITROGEN TANK 021301 MF01 MAZANINE FLOOR1301 ST01 SULPHURIC ACID TANK1301 AT01 ABSOLUTE ALCOHOL TANK1301 GS01 GAS CYLINDER STORE

1301 AR01 A.C. ROOM -011301 AR02 A.C. ROOM -02

Plant SL ID Description

1301 AR03 A.C. ROOM -031301 PM01 PACKAGING STORE

1301 RJ02 REJECTED PM STORE

1301 SF01 INTERMEDIATE STORE

1301 SF02 RECOVERED MATERIALS STORES

1301 PP01 PRODUCTION BLOCK-01

1301 PP02 PRODUCTION BLOCK-02

1301 PP03 PRODUCTION BLOCK-03

1301 PP04 PRODUCTION BLOCK-04

1301 PP05 PRODUCTION BLOCK-05

1301 PP06 PRODUCTION BLOCK-06

1301 PP07 PRODUCTION BLOCK-07

1301 PP08 PRODUCTION BLOCK-08

1301 PP09 PRODUCTION BLOCK-09

1301 PP10 PRODUCTION BLOCK-10

1301 PP11 PRODUCTION BLOCK-11

1301 FG01 FINISHED GOODS STORE(BSR)

1301 RT01 FG RETURN STORE

1301 CS01 CONTROL SAMPLE

1301 EN01 ENGG STORES

© 2008 ZensarTechnologies Ltd. Page 26 of 41 SAP-2010-252

Page 27: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 27 of 41

1301 SY01 SCRAP YARD

1301 LS01 LAB MATERIALS STORE

1301 FT01 FO TANK

1301 FT02 FO TANK 02

1301 LT01 LDO TANK

1301 HT01 HSD TANK 01

1301 HT02 HSD TANK 02

1301 SY02 WAREHOUSE SCRAP YARD

1301 WS01 WAREHOUSE SPENT SOLVENT

1301 PS01 PROJECT MATERIALS STORES

1301 FG01 GURGAON FACTORY FOR GENERAL

1301 EW01 ENG WORKSHOP STORE1371 VG01 Arch Pharmalabs ltd - Vitalife Godown1

Plant SL ID Description

1372 VG02 Arch Pharmalabs ltd - Vitalife Godown21471 VDGN Arch Pharmalabs ltd - Vadodara Godown1571 APVB Arch Pharmalabs ltd - Vitalife Bhiwadi Godown3101 RM01 AMBIENT TEMP RM STORE

3101 RM02 SOLVENT RM

3101 RM03 WAREHOUSE- RM/ PM STORE

3101 RM04 ACID AND HAZARDOUS MATERIALS STORES

3101 CS01 CONTROLLED SUBSTANCES

3101 RM05 TANK FARM

3101 RJ01 REJECTED RM STORE

3101 PM01 PACKAGING STORE

3101 RJ02 REJECTED PM STORE

3101 SF01 INTERMEDIATE STORE

3101 SF02 RECOVERED MATERIALS STORES

3101 PP01 PRODUCTION BLOCK-01

3101 PP02 PRODUCTION BLOCK-02

3101 PP03 PRODUCTION BLOCK-03

3101 PP04 PRODUCTION BLOCK-04

3101 PP05 PRODUCTION BLOCK-05

3101 PP06 PRODUCTION BLOCK-06

3101 PP07 PRODUCTION BLOCK-07

3101 PP08 PRODUCTION BLOCK-08

© 2008 ZensarTechnologies Ltd. Page 27 of 41 SAP-2010-252

Page 28: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 28 of 41

3101 PP09 PRODUCTION BLOCK-09

3101 PP10 PRODUCTION BLOCK-10

3101 PP11 PRODUCTION BLOCK-113101 RJ03 PRODUCTION-REJECTED MATERIAL STORES

3101 FG01 FINISHED GOODS STORE(BSR)

3101 RT01 FG RETURN STORE

3101 CS01 CONTROL SAMPLE

3101 EN01 ENGG STORES

3101 SY01 SCRAP YARD

3101 MS01 MISC ITEMS STORE

3101 LS01 LAB MATERIALS STOREPlant SL ID Description

3101 WS01 WATER TREATMENT CHEMICALS STORE

3101 DS01 DIESEL DAY STORE

3101 SS01 STABILITY SAMPLE

3101 PS01 PROJECT MATERIALS STORES

3101 ES01 ETP STORES

3101 BY01 BAGGASE YARD

3101 CY01 COAL STORAGE YARD

3101 SY02 SOLID WASTE STORAGE YARD

3101 IT01 INPROCESS SOLVENTS STORAGE TANKS

3101 RS01 RECOVERED SOLVENTS STORAGE TANKS

3101 DB01 DL BASE STORE

3101 BY01 BARREL STORE YARD

3101 QQ01 QC QUARANTINE 1

3101 QQ02 QC QUARANTINE 2

3101 QQ03 QC QUARANTINE 3

3101 GS01 GAS CYLINDER STORE

3101 PM02 PACKAGING STORE 2

3101 EW01 ENG WORKSHOP STORE3200 HOHD Avon Organics Limited-Head Office3201 RM01 AMBIENT TEMP RM STORE

3201 RM02 SOLVENT RM

3201 RM03 CONTROLLED SUBSTANCES

3201 RM04 TANK FARM

3201 RJ01 REJECTED RM STORE

© 2008 ZensarTechnologies Ltd. Page 28 of 41 SAP-2010-252

Page 29: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 29 of 41

3201 PM01 PACKAGING STORE

3201 RJ02 REJECTED PM STORE

3201 SF01 INTERMEDIATE STORE

3201 SF02 RECOVERED MATERIALS STORES

3201 PP01 PRODUCTION BLOCK-01

3201 PP02 PRODUCTION BLOCK-02

3201 PP03 PRODUCTION BLOCK-03

3201 FG01 FINISHED GOODS STORE(BSR)

3201 RT01 FG RETURN STOREPlant SL ID Description

3201 CS01 CONTROL SAMPLE

3201 EN01 ENGG STORES

3201 PS01 PROJECT MATERIAL STORE

3201 SY01 SCRAP YARD

3201 MS01 MISC ITEMS STORE

3201 DS01 DIESEL DAY STORE

3201 LT01 LDO TANK

3201 SY02 WAREHOUSE SCRAP YARD

3201 EW01 ENG WORKSHOP STORE3251 AVP1 Custom Bonded Warehouse3252 AVP2 Custom Bonded Warehouse3253 AVP3 Custom Bonded Warehouse3401 WH01 Avon Organics Limited-Vadodra3171 WHB3 Avon Organics ltd - Bhiwandi Godown

3.3 Purchase Organizations

Purchasing organization: An organizational unit responsible for procuring materials or services for one or more plants and for negotiating general conditions of purchase with vendors. The purchasing organization assumes legal responsibility for all external purchase transaction requirements.

All the material (bought out items) required by production plants are purchased separately for local, import except chemical.

As per the business requirement the following purchasing organizations are created.

Purchase Org. Description

© 2008 ZensarTechnologies Ltd. Page 29 of 41 SAP-2010-252

Page 30: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 30 of 41

1000 CPO - Mumbai

1100 Arch - Maharashtra1101 Arch - Tarapur factory1102 Arch - Badlapur Unit1103 Arch - Taloja G - 6 Unit1104 Arch - Taloja R & D Unit1105 Arch - Tarapur, Plot E-64 & E-82

Purchase Org. Description1106 Arch - Dombivali unit1107 Arch - Turbhe R & D Unit1171 Arch - Tarapur W/H1172 Arch - Bhiwandi1173 Arch - Bhiwandi W/H1200 Arch - Andhra Pradesh1201 Arch - Merven Unit1202 Arch - Siddipet Unit1203 Arch - Sibra Unit1271 Arch - Hyderabad W/H1272 Arch - Sibra W/H1300 Arch - Haryana1301 Arch - Vitalife Laboratories1371 Arch - Vitalife Godown11372 Arch - Vitalife Godown21471 Arch - Vadodara Godown1571 Arch - Vitalife Bhiwadi Godown3101 Avon - Solapur unit3200 Avon - HO3201 Avon - Sadasivpet unit3401 Avon - Vadodara unit3171 Avon - Bhiwandi Ware House

3.4 Purchase Groups

Purchasing group: The purchasing organization is further subdivided into purchasing groups (buyer groups), which are responsible for day-to-day buying activities. A purchasing group can also act for several purchasing organizations.

© 2008 ZensarTechnologies Ltd. Page 30 of 41 SAP-2010-252

Page 31: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 31 of 41

As per the business requirement the following purchasing groups are created.

Purchasing Group DescriptionP01 Raw MaterialsP02 Packing MaterialsP03 Engg. MaterialsP04 Capital (Plug-ins)P05 ServicesP06 Gen. ConsumablesP07 SubContractingP08 ITP09 Lab ChemicalsP10 R&D MaterialsP11 Stationary & House KeepingP12 Projects (NIPs)P13 Allied ProductsP14 Internal AuditP15 HRP16 AdminP17 QUP18 OthersP19 Stock TransferL01 BadlapurL02 DombivaliL03 G-6L04 Taloja R & DL05 Turbhe R & DL06 TarapurL07 Oncology nGMPL08 Oncology GMPL09 MervenL10 SiddipetL11 SibraL12 Vitalife

© 2008 ZensarTechnologies Ltd. Page 31 of 41 SAP-2010-252

Page 32: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 32 of 41

L13 SolapurL14 SidashivpetL15 Vadodara

© 2008 ZensarTechnologies Ltd. Page 32 of 41 SAP-2010-252

Page 33: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 33 of 41

4.Sales & Distribution

4.1 Sales Organisation

The Sales Organization is an organizational unit within logistics that structures the company according to its sales requirements. A Sales Organisation is responsible for the Sale and Distribution of Goods and Services. Each Business transaction is processed within a Sales Organisation .The Sales Organisation must be specified in all the SD Documents.

The Sales Organisations are:

4.2 Distribution Channels

The distribution channel represents the channel through which saleable materials or services reach customers. Typical distribution channels include wholesale, retail and direct sales. Within a sales organization a customer can be supplied through several distribution channels

The Distribution Channels are:

Distribution Channel

Description

10 Direct20 Depot / Warehouse30 Inter-company Sale99 Stock Transfer

© 2008 ZensarTechnologies Ltd. Page 33 of 41 SAP-2010-252

Company Code

Sales Org Code

Sales Organization Description

1000 1100 Arch - Domestic Sales Organization1000 1500 Arch - Export Sales Organization3000 3100 Avon - Domestic Sales Organization3000 3500 Avon - Export Sales Organization

Page 34: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 34 of 41

4.3 Division

A division can be defined as a Product group that could be made up of a wide-ranging spectrum of products. This entity normally groups together saleable materials and services for the purpose of responsibility and analysis.

Division Description

10 Intermediates20 API31 CRAMS - Intermediates32 CRAMS - API40 Agro Chemicals51 Services90 Others91 Job work92 Scrap sale

4.4 Sales Area

A Sales Area can be defined as a combination of Sales Organization, Distribution Channel and Division for which each transaction is carried out

SL No Sales Organization

Dist Channel Division

1 1100 10 10

2 1100 10 20

3 1100 10 31

4 1100 10 32

5 1100 10 40

6 1100 10 51

SL No Sales Organization

Dist Channel Division

© 2008 ZensarTechnologies Ltd. Page 34 of 41 SAP-2010-252

Page 35: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 35 of 41

7 1100 10 90

8 1100 10 91

9 1100 10 92

10 1100 20 10

11 1100 20 20

12 1100 20 40

13 1100 20 90

14 1100 30 10

15 1100 30 20

16 1100 30 40

17 1100 99 10

18 1100 99 20

19 1100 99 40

20 1100 99 90

21 1500 10 10

22 1500 10 20

23 1500 10 31

24 1500 10 32

25 1500 10 40

26 1500 10 51

27 1500 10 90

28 1500 10 91

29 3100 10 10

30 3100 10 20

31 3100 10 31

32 3100 10 32

SL No Sales Organization

Dist Channel Division

© 2008 ZensarTechnologies Ltd. Page 35 of 41 SAP-2010-252

Page 36: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 36 of 41

33 3100 10 40

34 3100 10 51

35 3100 10 90

36 3100 10 91

37 3100 10 92

38 3100 20 10

39 3100 20 20

40 3100 20 40

41 3100 20 90

42 3100 30 10

43 3100 30 20

44 3100 30 40

45 3100 99 10

46 3100 99 20

47 3100 99 40

48 3100 99 90

49 3500 10 10

50 3500 10 20

51 3500 10 31

52 3500 10 32

53 3500 10 40

54 3500 10 51

55 3500 10 90

56 3500 10 91

4.5 Shipping Point

A Shipping Point can be defined as a physical location (ex – a warehouse or a collection of loading ramps) from which the item is shipped for delivery. All SD deliveries from the respective plants

© 2008 ZensarTechnologies Ltd. Page 36 of 41 SAP-2010-252

Page 37: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 37 of 41

shall originate from the respective shipping points. In deliveries where SD functionality is used, the shipping point is determined automatically.

© 2008 ZensarTechnologies Ltd. Page 37 of 41 SAP-2010-252

Page 38: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 38 of 41

© 2008 ZensarTechnologies Ltd. Page 38 of 41 SAP-2010-252

SL No

Storage Condition

Lgrp Plant Shipping Point

01 01 0001 1101 1101

02 01 0001 1102 1102

03 01 0001 1103 1103

04 01 0001 1105 1105

05 01 0001 1106 1106

06 01 0001 1107 1107

07 01 0001 1108 1108

08 01 0001 1151 1151

09 01 0001 1152 1152

10 01 0001 1153 1153

11 01 0001 1171 1171

12 01 0001 1172 1172

13 01 0001 1173 1173

14 01 0001 1201 1201

15 01 0001 1202 1202

16 01 0001 1203 1203

SL No

Storage Condition

Lgrp Plant Shipping Point

17 01 0001 1271 1271

18 01 0001 1272 1272

19 01 0001 1301 1301

20 01 0001 1371 1371

21 01 0001 1372 1372

22 01 0001 1471 1471

23 01 0001 1571 1571

24 01 0001 3101 3101

25 01 0001 3201 3201

26 01 0001 3251 3251

27 01 0001 3252 3252

28

Page 39: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 39 of 41

4.6 Sales Office

Geographical aspects of the organizational structures in business development and sales aredefined using sales offices. A sales office can be viewed as an actual office or perhaps a territoryor region. Sales offices are assigned to sales areas.

© 2008 ZensarTechnologies Ltd. Page 39 of 41 SAP-2010-252

SL No

Code Office Description

01 NOR North Office

02 SOU South Office

03 EAS East Office

04 WES West Office

05 USA USA Office

06 EUR Europe Office

07 ASP Asia Pacific Office

08 MIE Middle East Office

09 LAT Latin America Office

Page 40: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 40 of 41

5. Plant Maintenance

Planning Plants and Maintenance Plants

In Plant Maintenance, a distinction is made between the organizational units "planning plant" and "maintenance plant".

Maintenance plant is the organization in which technical objects and main work centers can be maintained

In a Planning plant, maintenance task lists are defined for the respective maintenance plants, material planning is carried out on the basis of bills of material in task lists and orders, maintenance plans are managed and scheduled, maintenance notifications are created and maintenance orders can be handled.

NOTE: Planning Plant and Maintenance plants - both are same i.e. 1101, 1201, 3101

Company Code

Maintenance Plant Plant Description

Maintenance Planning Plant Plant Description

1000 1101Arch Pharmalabs ltd - Tarapur factory 1101

Arch Pharmalabs ltd - Tarapur factory

1000 1102Arch Pharmalabs ltd - Badlapur Unit 1102

Arch Pharmalabs ltd - Badlapur Unit

1000 1103Arch Pharmalabs ltd - Taloja G - 6 Unit 1103

Arch Pharmalabs ltd - Taloja G - 6 Unit

1000 1104Arch Pharmalabs ltd - Taloja R & D Unit 1104

Arch Pharmalabs ltd - Taloja R & D Unit

1000 1105

Arch Pharmalabs Ltd- Tarapur, Plot- E-64 & E-82 1105

Arch Pharmalabs ltd - Tarapur Oncology

1000 1106Arch Pharmalabs ltd - Dombivali unit 1106

Arch Pharmalabs ltd - Dombivali unit

1000 1107Arch Pharmalabs ltd - Turbhe R & D Unit 1107

Arch Pharmalabs ltd - Turbhe R & D Unit

Company Code

Maintenance Plant Plant Description

Maintenance Planning Plant Description

© 2008 ZensarTechnologies Ltd. Page 40 of 41 SAP-2010-252

Page 41: Organisation Structure - Final

Project ManagementDoc No: 252/120/PO/101/00Effective Date: 31/07/2010 Version : 1.0Page 41 of 41

Plant

1000 1201Arch Pharmalabs ltd - Merven Unit 1201

Arch Pharmalabs ltd - Merven Unit

1000 1202Arch Pharmalabs ltd - Siddipet Unit 1202

Arch Pharmalabs ltd - Siddipet Unit

1000 1203Arch Pharmalabs ltd - Sibra Unit 1203

Arch Pharmalabs ltd - Sibra Unit

1000 1301

Vitalife Laboratories (A divison of Arch Pharmalabs Ltd) 1301

Vitalife Laboratories (A divison of Arch Pharmalabs Ltd)

3000 3101Avon Organics Limited - Solapur unit 3101

Avon Organics Limited - Solapur unit

3000 3201Avon Organics Limited - Sadasivpet unit 3201

Avon Organics Limited - Sadasivpet unit

© 2008 ZensarTechnologies Ltd. Page 41 of 41 SAP-2010-252