Bridging Your Innovations to Realities midas Civil Optimize Detailed Design of PT B ox Girder Using a Common Platform

Transcript of Optimize MIDAS

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 1/31

Bridging Your Innovat ions to Real i t ies

midas CivilOptimize Detailed Design of PT B

ox Girder

Using a Common Platform

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 2/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Conventional PT Box Girder Design Process

2

Preliminary Design

Static, Moving Load Analysis

Seismic Analysis

Detailed Design

Constructability Check

Pier Design (PMM Curve), Foundation, SSI

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 3/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Preliminary Design

Static, Moving Load Analysis

Seismic Analysis

Detailed Design

Constructability Check

Pier Design (PMM Curve), Foundation, SSI

Conventional PT Box Girder Design Process

3

Software C/D

Software A

Software B

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 4/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Conventional PT Box Girder Design Process

4

Consequences of Using Multiple Platform :

  Longer time in Project Completion

  Different Model files for Different Software for Different Phases More Manpower

  In efficiency in Design, Higher Conservatism

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 5/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Conventional PT Box Girder Design Process

5

Consequences of Using Multiple Platform :

  Longer time in Project Completion

  Different Model files for Different Software for Different Phases More Manpower

  In efficiency in Design, Higher Conservatism

Lesser Projects

in More Time

Lesser Degree of

CompetencyMonetary Effects

Repetition of

Work

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 6/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Conventional PT Box Girder Design Process

6

How Would it feel like to do everything in one Software,

at the same platform?

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 7/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Preliminary Design

Static, Moving Load Analysis

Seismic Analysis

Detailed Design

Constructability Check

Pier Design (PMM Curve), Foundation, SSI

Conventional PT Box Girder Design Process

7

1 Software

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 8/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Conventional PT Box Girder Design Process

8

What would be the benefits?

  Same Model File for different Analysis

  Perform Static, Moving and Dynamic Analysis at one platform  Capture SSI for Design requirements

  Construction Stage Analysis

  Design Check/Constructability Check with AASHTO LRFD’12 

  Higher Degree of Precision, More optimized Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 9/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

What would be the benefits?

  Same Model File for different Analysis

  Perform Static, Moving and Dynamic Analysis at one platform  Capture SSI for Design requirements

  Construction Stage Analysis

  Design Check/Constructability Check with AASHTO LRFD’12 

  Higher Degree of Precision, More optimized Design

Conventional PT Box Girder Design Process

9

More Projects

in Lesser Time

Higher Degree

of CompetencyMonetary Effects

No Repetition

of Work

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 10/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Conventional PT Box Girder Design Process

10

Additional Benefits?

  Generate Model Automatically with Several Auto Bridge Tools

  Better Graphical User Interface  Improved Graphics with CAD effects

  Detailed Stress Check, Pier Crack Analysis, Fiber Model

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 11/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

Static / Moving Load

Design Check

Modify Design

Design Optimization

Problem Statement

Bridge Type : Post Tensioned Box Girder

Number of Spans : 3 (Continuous)

Span Length : 180’ 

Moving Load : AASHTO LRFD

Construction Type : Span by Span

11

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 12/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

Preliminary Design

Steps (in Midas Civil) :

 Define the Material Properties

 Use the Proper Auto Generate Wizard

 Specify the parameters for the Span and Section

12

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 13/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

Step 1 : Static/Moving Load Analysis

  Check the Model Data Generated :

1. Self weight is already defined by the model

2. Tendon Profiles have been defined

  Define the Following :

1. Additional Dead Load

2. Define Rebars in the Section3. Moving Load Data as per AASHTO LRFD

13

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 14/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

Step 2 : Design Check

  Define the Load Combinations for Design

1. Select the Auto Load Combination for AASHTO 122. Manual Definition Supported

3. Check the Strength and Service Limit States

  Define AASHTO LRFD’12 Parameters for Design 

1. Define Material for Design

2. Perform Design3. Check the Design results

14

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 15/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

Step 3 : Modify Cross Section /

Tendon Placement

  Based on the Design results either of the

following can be altered for a optimized design

1. Dimensions of the Box Girder

2. Tendon Location/Number

Iteration 1 : Modify the Cross Section:reducing the depth

15

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 16/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

Iteration 1

Step 1 : Perform the Static Load / Moving Load Analysis

Step 2 : Perform the Design Check for AASHTO LRFD 12

Step 3 : Modify the Design based on the design results

Iteration 2 : Modify the Tendon Location / Number

16

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 17/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Iteration 2

Step 1 : Perform the Static Load/Moving Load Analysis

Step 2 : Perform the Design Check for AASHTO LRFD 12

Step 3 : Check and See if Design is best optimized

**More Iterations can be performed

Design Optimization

17

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 18/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

18

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

Benefits?

Auto Model Generation :

 Acts as Design Guide to the Engineer

 Quick and Error Free Modeling

 Auto Tendon Definition

Easy Model Modification :

 Less Time in Changing the model

 Save Time

 Finish More Projects in Lesser Time

Built in Design Check :

 One Model File for Analysis/Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 19/31

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 20/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

20

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

Soil Structure Interaction is Mandatory :

1. Static Load Distribution might change2. Settlement effects may be there

3. Better visualization of Load Transfer Mechanism

4. Forces for Foundation Design

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 21/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

21

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

Soil Structure Interaction is Easy :

1. Model the foundation2. Enter the Soil Parameters, midas Civil

will Auto Generate the Soil Support

C

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 22/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

22

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

Model the foundation 

id Ci il

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 23/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Design Optimization

23

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

Modeling Foundation is Too Tedious?

1. Approximate Foundation with the SpringSupport, obtained from the Geotechnical

Engineer.

2. Use Auto Settlement Analysis Feature to

Check the Settlement effect

id Ci il

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 24/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Seismic Analysis

Structure

/ActionStatic Dynamic

Elastic Equivalent

Force Method

Response

Spectrum

Non-linear  PushoverNon Linear Time

History

Seismic Analysis Supported

  Response Spectrum Analysis  Pushover Analysis

  Time History Analysis

24

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

id Ci il

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 25/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Seismic Analysis

Perform the Seismic Analysis with Foundation

and Super Structure at the same time.

  Simulate earthquake motion

  Auto Define response spectrum

  50 past earthquake database

25

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

id Ci il

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 26/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Constructability Check

Construction Stage Analysis to check the

erection sequence

  Auto Generate Construction Stage Modelbased on construction type.

  Auto Design Check for consistency in CS

Model

  Obtain Camber Diagrams

  Check the force effect in each stage and

plan accordingly

26

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

midas Civil

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 27/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Constructability Check

Benefits?

  Auto Generated Construction Stage from

the Program leads to lesser modeling time

  Single Model file for Static, moving, dynamic

and construction stage analysis considering

soil structure interaction reduces the data

loss when used different software

  Design optimization in the same software

  No need to learn different software/different

GUIs

27

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

midas Civil

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 28/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Detailed Design

Detailed Design Considering the Static

AndDynamic Effects

28

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

midas Civil

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 29/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Pier Design

  Obtain PMM curve for Pier Design

  Check Pier Section for Cracking

  Obtain Moment Curvature Diagram

  Fiber Section for refined Dynamic Analysis

29

Design Optimization

Static / Moving Load

Design Check

Modify Design

Problem Statement

Preliminary Statement

SSI / SeismicAnalysis / Constructability Check

Detailed Design

Pier Design

midas Civil

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 30/31

midas CivilBridging Your Innovations to Realities

PSC Box Girder

Special Modeling Tools

Before applying variation of

section dimensions 

After applying variation of

section dimensions

Before applying variation of section

dimensions 

After applying variation of

section dimensions

  Model any type of Curve in Bridge

  Auto Generate the Tapered Section

  Define Reinforcement Span by Span

30

midas Civil

8/11/2019 Optimize MIDAS

http://slidepdf.com/reader/full/optimize-midas 31/31

midas CivilBridging Your Innovations to Realities

Thank You

31