OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Dr. Garth TaylerACerS/NBRC meeting

Salt Lake City5/14/2013

Page 2: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Operational Goals

• To achieve quality consistency• To achieve color consistency• Maximize first grade quality yield• Minimize bat loss• Optimize the raw material reserve

Page 3: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

The Brick Maker’s Reality:

“Over 80% 0f the Brick Makers success lies with his raw material and how he

uses it”Garth Tayler05/06/2013

Page 4: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 5: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Optimization process…..• Exploration/drilling• Lab analyses/Characterization• Quantify useable reserve and in‐ground ratios• Define mining composite(s)• Determine mining plan• Mining and stockpiling• Lab work to develop optimum body mix• Draw trial studies• Large batch firing simulations• Plant trials• Finalize plant operational conditions• Product acceptance

Page 6: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Tulsa PlantHolland Pit

Weathered Pennsylvania Shale layers.

Page 7: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Tulsa Shale: Mineralogy

Free quartz 31%Muscovite 20.3%Potassium Felspar 3.9%Plagioclase 8.7%Kaolinite 5.6%Amorphous clay 21.3%

Page 8: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Carbon and Sulfur with 5 ft depth increments

Typical: Sulfur CarbonSample 1 0.0514 0.3172Sample 2 0.0483 0.3118Sample 3 0.0987 1.1502Sample 4 0.0658 1.1473Sample 5 0.0733 0.9430Sample 6 0.0676 0.9266Sample 7 0.0613 1.0461Sample 8 0.1041 1.0738Sample 9 0.1077 1.1094Average: 0.0753 0.8917Std Dev: 0.0226 0.337CV: 37.7%

Page 9: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

TULSA HOLLAND PIT

Page 10: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

TULSA PLANT SHALE PIT August 2008

Page 11: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

TULSA PLANT SHALE PIT August 2008

Page 12: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 13: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 14: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 15: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 16: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 17: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 18: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 19: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 20: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 21: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 22: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 23: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

DRAW TRIALS:

Matrix: 2, 4, 6, 8 hours at1500ºF, 1600ºF, 1700ºF, and 1800ºF

• 80% Blue 20% Yellow• 50% Blue 50% Yellow• 100% Blue• 100% Yellow

Page 24: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

ACME BRICK TECHNICAL CENTER

DRAW TRIALS TEST KILN

Page 25: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

ACME BRICK TECHNICAL CENTER

DRAW TRIAL TEST KILN

Page 26: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

TULSA OPTIMIZATION STUDY

DRAW TRIAL

Page 27: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 28: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 29: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 30: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 31: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 32: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 33: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 34: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 35: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 36: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 37: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 38: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 39: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

OPTIMUM CURVE TUP

Page 40: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Large Batch firings……

Page 41: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 42: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 43: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 44: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Optimization process…..• Exploration/drilling• Lab analyses/Characterization• Quantify useable reserve and in‐ground ratios• Define mining composite(s)• Determine mining plan• Mining and stockpiling• Lab work to develop optimum body mix• Draw trial studies• Large batch firing simulations• Plant trials• Finalize plant operational conditions• Product acceptance

Page 45: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Finalize plant operating conditions:

Kiln improvements…..

Page 46: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Before

Page 47: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

After

Page 48: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Before

Page 49: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

After

Page 50: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

After

Page 51: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

After

Page 52: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Before

Page 53: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

AfterTULSA PLANT DATAPAQ  FILE: 04/09/2013

Page 54: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Product acceptance….

Page 55: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 56: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT
Page 57: OPTIMIZATION OF SHALE USAGE AT ACME’S TULSA PLANT

Thank you!