Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument...

31
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM-Newton
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    227
  • download

    0

Transcript of Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument...

Page 1: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Ops. AGENDA

• Status of open Action ItemsMetcalfe

• Science Operations Status Metcalfe

• Instrument Operations Buenadicha

• EPIC MonitoringStuhlinger/Smith

1Science Operations & Data Systems Division Research & Scientific Support Department

Page 1

XMM-NewtonXMM-Newton

Page 2: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Meeting/action Status Subject Actionee Due

EPIC TTD-0014/3 Open Explain increases in pn offset variance in the 840 M. Smith 2005-03-03 to 870 plus revolution range

EPIC TTD-0014/5 Open Provide an agenda draft for a hypothetical OBSW G. Buenadicha 2005-03-03 contract meeting addressing all concerns raised

during the presentation EPIC TTD-0014/9 Open Make MOS2 CCD5 effect public M. Stuhlinger 2005-03-03 EPIC TTD-0015/2 Open Identify what is needed for testing and preparing M. Casale 2005-11-03

for the use of redundancies EPIC TTD-0015/3 Open Subsequently to evaluate and decide which of the A. Abbey 2005-11-03

items resulting from action 15/2 can be delivered

EPIC TTD-0016/1 Open Investigate the possibility of MOS small window A. Abbey 2006-05-29 mode in peripheral ccds M. Casale

EPIC TTD-0016/2 Open Provide SOC with the sequence for MOS extended A. Abbey 2006-05-29 small window mode.

2Science Operations & Data Systems Division Research & Scientific Support Department

Page 2

XMM-NewtonXMM-Newton

ACTIONS

Page 3: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

SCIENCE OPERATIONS STATUSfor

EPIC TTD MEETING

PALMA de MALLORCA

26 October 2006

L. Metcalfe SCI-SDX

XMM-Newton Science Support Manager

3Science Operations & Data Systems Division Research & Scientific Support Department

Page 3

XMM-NewtonXMM-Newton

Page 4: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

CONTENTS

• Significant meetings and dates

• Operations: Status & Modes

• General Calibration Points

• Data Processing - SSC

• Miscellaneous

4Science Operations & Data Systems Division Research & Scientific Support Department

Page 4

XMM-NewtonXMM-Newton

Page 5: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

SIGNIFICANT MEETINGS

AND

DATES

5Science Operations & Data Systems Division Research & Scientific Support Department

Page 5

XMM-NewtonXMM-Newton

Page 6: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

SIGNIFICANT MEETINGS

• Users Group Meeting #7 18/19 May 2006

• SAS Workshop 2006 30 May-02 Jun. 2006

• ICWG meeting, Iceland 14-16 Jun. 2006

• Variable & Broad Fe Lines around Black Holes 26-28 Jun. 2006

• EPIC Background Working Group @ Palma 25 Oct. 2006

• EPIC Cal./Ops. Meeting @ Palma de Mallorca 26-27 Oct. 2006

• SSC Consortium Meeting @ Potsdam 13-15 Nov. 2006

(incl. SAS Wk. Group Meeting)

• OM Cal. & TTD meeting @ ESAC late 2006

• EPIC Cal. Workshop @ ESAC 18-19 Jan. 2007

• Inter-mission X-ray cross-calibration 08-11 May 2007

Intnl. Working Group on cross-cal. & the defn. of X-ray standards no.II.

• ESAC Science Workshop 2007: Legacy Science modes 04-06 Jun. 2007

• Users Group meeting #8 07-08 Jun. 2007

• SAS Workshop 2007 18-21 Jun. 2007

Page 7: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

SIGNIFICANT DATES I

Proceedings of 2005 conference (“The X-ray Universe 2005”)

• Distributed Mar. 2006

Calibration

• Progress, especially with RGS (t dept.) vs EPIC, at UG#7 May 2006

• EPIC Background Working Group tools Apr. & June 2006

SAS

• SAS 7.0 release (+ RGS vs EPIC cal. Improvements) 30 June 2006

• to be used for the reprocessing

7Science Operations & Data Systems Division Research & Scientific Support Department

Page 7

XMM-NewtonXMM-Newton

Page 8: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

SIGNIFICANT DATES II

XSA

• XSA 2.9 Querying other Archives Apr. 2006

• XSA 3.0 Release of the Slew Survey Catalogue 03 May 2006

• XSA 3.5 2XMM-beta 28 Aug. 2006

2XMM-beta

• Released by SSC 24 July 2006

• and through XSA 3.5 28 Aug. 2006

8Science Operations & Data Systems Division Research & Scientific Support Department

Page 8

XMM-NewtonXMM-Newton

Page 9: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

SIGNIFICANT DATES III

AO6 Call

• AO6 Call 28 Aug. 2006

• Closed Phase I 06 Oct. 2006

595 valid proposals yielding an over-subscription of 6.91

• Open phase II 15 Jan. 2007

• Close XRPS 09 Feb. 2007

• Begin AO6 observations May 2007

9Science Operations & Data Systems Division Research & Scientific Support Department

Page 9

XMM-NewtonXMM-Newton

Page 10: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

OPERATIONS

10Science Operations & Data Systems Division Research & Scientific Support Department

Page 10

XMM-NewtonXMM-Newton

Page 11: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

STATUS and MODES

All instruments essentially stable

Slew Mode tests on rev.1242 (Sept.19-21) went well

essentially ready with EPIC (pn & MOS) and RGS instruments

but SOC systems need to handle slew scheduling less manually

also OM mode

RGS2 ADC-problem glitch

now better understood

see dedicated splinter on contingency preparation

Slewing / re-pointing ‘mode’ for RGS !

implementation requirements/plan by end-year ??

Page 12: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

APOGEE GAP & SANTIAGO COVERAGE

Santiago provided coverage across Kourou-Perth gap

• allowed continuous coverage throughout complete revolution

Gap shrinking through years & closes by end 2007

By end 2006:

• the gap in telecommanding is as little as 35 minutes

• and telemetry gap totally disappeared

Decided to discontinue Santiago as of 1 Dec. 2006

Plot shows evolution of apogee gap from 2006 to 2010

Page 13: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

13Science Operations & Data Systems Division Research & Scientific Support Department

Page 13

XMM-NewtonXMM-Newton

In the graph the TC gap on 01/12/2006 is ~1300 sec (22 min) to which a little margin (say 10 min) is added for acquisition of signal, carrier sweeping, etc.

Page 14: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

APOGEE GAP & SANTIAGO COVERAGE

In the 810 revs. from 450 to 1259 there were 5 cases of instrument

closure due to soft protons (detected by the instruments themselves)

at the time of the Santiago pass around apogee -/+ 2 h

1) Rev-614 : instruments were closed for 35 min

2) Rev-621 : instruments were closed for 2 h 20 min

3) Rev-628 : instruments were closed for 20 min

4) Rev-873 : instruments were closed for 1 h 30 min

5) Rev-1149 : instruments were closed for 1 h 35min

The probability of having an alert at that point in the revolution is, for the

period considered, about 0.62 % (note also that three cases were very close

together in rev-614 to 628 due to exceptionally high solar activity, so this

could actually bias a bit the statistics and make it slightly worse).

14Science Operations & Data Systems Division Research & Scientific Support Department

Page 14

XMM-NewtonXMM-Newton

Page 15: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 15

XMM-NewtonXMM-Newton

Page 16: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 16

XMM-NewtonXMM-Newton

Page 17: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 17

XMM-NewtonXMM-Newton

Page 18: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 18

XMM-NewtonXMM-Newton

Page 19: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 19

XMM-NewtonXMM-Newton

Page 20: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 20

XMM-NewtonXMM-Newton

Page 21: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 21

XMM-NewtonXMM-Newton

Page 22: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 22

XMM-NewtonXMM-Newton

Page 23: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

GENERAL CALIBRATION POINTS

23Science Operations & Data Systems Division Research & Scientific Support Department

Page 23

XMM-NewtonXMM-Newton

Page 24: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

CCF RELEASE NOTES IN PERIOD

XMM-CCF-REL-220 RGS1 CCD9 node1 CTIX scale factor 11 Aug 2006

XMM-CCF-REL-218 RGS cool pixels 29 Jun 2006

XMM-CCF-REL-217 RGS background spectra templates 28 Jun2006

XMM-CCF-REL-216 A new model for RGS effective area 29 Jun2006

XMM-CCF-REL-215 RGS per.-CCD sens. 2&3 order gr.eff. 29 Jun 2006

XMM-CCF-REL-214 Revision of the RGS CCD gains 27 Jun2006

XMM-CCF-REL-213 Evolution of the RGS CTI 29 Jun 2006

XMM-CCF-REL-212 Tuning RGS Instr. MgF2 abs. Mkn421 27 Jun 2006

XMM-CCF-REL-207 Update of EPIC MOS Gain 17 May 2006

XMM-CCF-REL-206 Update of EPIC MOS CTI 24 May 2006

XMM-CCF-REL-204 EPIC PN Bad Pixels 06 Mar2006

XMM-CCF-REL-203 Long term EPIC-pn CTI refinement 05 Apr 2006

Page 25: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

NRCOs

59 RGS long- response & MOS CTI with Vela 2006-01-25

48 Refinement of pn-CTI corr. (follow-up NRCO 34) 2005-02-25

51 Establishing X-ray stdrds: RGS and RXJ 1856-3754 2005-04-20

54 The RGS response to the Crab X-ray standard 2005-08-23

55 RGS CTI calibration 2005-09-01

56 Verification of the EPIC high energy resolution 2005-11-11

57 Investigation of the random EPIC-pn gain scatter 2005-11-11

58 Verification of the EPIC-pn relative timing 2005-11-11

59 RGS long- response & the MOS CTI with Vela 2006-01-25

62 EPIC-pn Burst mode energy calibration refinement 2006-05-17

Page 26: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

DATA PROCESSING - SSC

26Science Operations & Data Systems Division Research & Scientific Support Department

Page 26

XMM-NewtonXMM-Newton

Page 27: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Science Operations & Data Systems Division Research & Scientific Support Department

Page 27

XMM-NewtonXMM-Newton

Turn-around time between data acquisition and GO (PIPE) delivery as of 31-March-2006

Page 28: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

MISCELLANEOUS

PUBLICATIONSOTHER …

28Science Operations & Data Systems Division Research & Scientific Support Department

Page 28

XMM-NewtonXMM-Newton

Page 29: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

29Science Operations & Data Systems Division Research & Scientific Support Department

Page 29

XMM-NewtonXMM-Newton

Oct. 09 2006 1224

Page 30: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

30Science Operations & Data Systems Division Research & Scientific Support Department

Page 30

XMM-NewtonXMM-Newton

Page 31: Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

XSA

31Science Operations & Data Systems Division Research & Scientific Support Department

Page 31

XMM-NewtonXMM-Newton