Operations Planning
description
Transcript of Operations Planning
Greg SullivanUniversity of Maryland
Operations Planning
SAC/PAP Review UW-Madison March 1-2, 2007
March 1, 2007SAC – Operations Planning
Operations Concept
• Analysis– Coordinated by the Collaboration/Analysis
Coordinator– Collaborating institutions supported by
their respective funding agencies
• Operations– Central organization to coordinate and
manage in partnership with the collaboration
– Cost sharing determined by the funding agencies
– Staffing plans include core full-time staff and fractions of staff covered by both research grants and operations support
March 1, 2007SAC – Operations Planning
USA: Bartol Research Institute, Delaware Pennsylvania State University UC Berkeley UC Irvine Clark-Atlanta University University of Maryland IAS, Princeton University of Wisconsin-Madison University of Wisconsin-River Falls Lawrence Berkeley National Lab. University of Kansas Southern University and A&M
College, Baton RougeUniversity of Alaska, Anchorage
Sweden: Uppsala Universitet Stockholm Universitet
UK: Imperial College,
London Oxford University
Netherlands: Utrecht University Belgium:
Université Libre de Bruxelles
Vrije Universiteit Brussel Universiteit Gent Université de Mons-Hainaut
Germany: Universität Mainz DESY-Zeuthen Universität Dortmund Universität Wuppertal Universität Berlin MPI Heidelberg RWTH Aachen
Japan: Chiba university
New Zealand: University of
Canterbury
THE ICECUBE COLLABORATION
33 institutions, ~250 members http://icecube.wisc.edu
March 1, 2007SAC – Operations Planning
Operations Scope
• Detector Maintenance & Operations (M&O) - Maintain and operate a properly functioning detector.
• Data Systems - Enable the collaboration to access data.
• Data Integrity - Confirm that high quality data can be used for analysis.
• R&D - Modest improvements and evaluation of external threats such as EMI, and technical interfaces with ongoing R&D efforts supported separately.
• Education and Outreach
• Program Management
March 1, 2007SAC – Operations Planning
Planning Background
• Operations tasks and budgets are informed by construction (and operations!) experience.
• Organization plans are maturing and during the concurrent construction and operations phase will rely heavily on the ongoing construction project.
• Funding agencies need a clear sense of the level of support required in order to advance discussions on the respective funding responsibilities.
March 1, 2007SAC – Operations Planning
Operations Planning Issues
• Host Laboratory (NSF)– Responsibilities (NSF, UW, Collaboration)– Influence of resource constraints (power, population, etc.)
• Boundary Conditions– MREFC and Research and Related Activities Boundary– Cost sharing algorithms defined by the funding agencies– Data rates, quality and timeliness of analysis– Actual cost of maintenance and operations activities
• Coherency of the IceCube Operations Program– Construction, Operations, Analysis Grants, R&D, E&O, …
• Emphasis on operations and advanced R&D
IceCube OperationsDRAFT
International Oversight and Finance GroupNSF, Executive Agent
IceCube CollaborationCollaboration Spokesperson
Science Advisory Committee
A3RI & Project Support
IceCube Neutrino ObservatoryPrincipal InvestigatorDirector of Operations
Software CoordinationEducation & Outreach
Operations Support
R&D
AdministrativeSupport
Tech Support
Logistics
RPSC
Science Operations
Computing
Data CenterDESY
MC ProductionEurope
Northern DataCenter
Metadata & Database Support
Data Distribution
Data Storage
Software & Data Processing
Data Production
Filtering &Software Systems
ReconstructionSoftware
Online FilteringSoftware
SimulationSoftware
Data Integrity
Detector Calibration
Data Verification
Offline Filtering Software
Tier 2 Support
Monte Carlo
Offline Data
Collaboration Board
Executive Committee
Detector Operations
Trigger Filter Transmit Board
Run Coordination
Detector Monitoring
Online Processing
DAQ
Detector Hardware
SPS Data Handling
AMANDA
Winter Overs
SPTS
March 1, 2007SAC – Operations Planning
Operating Strings
Operations Begin
(Planned going into 06-07 season)
March 1, 2007SAC – Operations Planning
Deployments
AMANDA 01/ 2000
IceCube string and IceTop station 01/06
IceTop station only 2006
21
3029
40
50
3938
4748
49
595857
6667
74
65
73
78
46
56
72
IceCube string and IceTop station 01/05
IceCube string and IceTop station 02/07
2005: 12006: 82007: 13 (12 planned)2008: 142009: 142010: 142011: 7+
March 1, 2007SAC – Operations Planning
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
2005 2006 2007 2008 2009 2010 2011 2012
Date
km3·yr
0
10
20
30
40
50
60
70
80
# Deployed Strings
km3·yr Strings
• Graph shows cumulative km3·yr of exposure × volume
• 1 km3·yr reached 2 years before detector is completed
• Close to 4 km3·yr at the beginning of 2nd year of full array operation.
IceCube Integrated Volume (Projected)
3 yr M&O
March 1, 2007SAC – Operations Planning
Already “Operating”
• Last Year – IC-9 and Amanda array taking data– Physics analysis ongoing
• Continuing Amanda analysis• Publication of results
– First IC-9 analysis within 6 months of data• Publication soon! (paper in pub committee)
• This year 22 strings– People working on Physics filters for Pole
– Active working groups and coordination• See later talks
March 1, 2007SAC – Operations Planning
Atmospheric neutrinos
• Dominant background– Point source
searches– Diffuse neutrinos
• Important calibration “beam”– Standard candle to
measure sensitivity to neutrinos
– Established IceCube as a neutrino detector!
March 1, 2007SAC – Operations Planning
Atmospheric neutrinos in 2006
John Pretz, Ph.D. thesis
Data selection done online at S. Pole and transferred by satellite NorthRatio of data to simulation:
At selected cut strength 10:156 up-going muon eventsPurity of neutrino sample > 95%
March 1, 2007SAC – Operations Planning
First Neutrinos from IceCube-9
Physics paper prepared for publication within 6 months of initial operation!
March 1, 2007SAC – Operations Planning
IceCube-22 calibrations
LED Flashers Standard Candle
March 1, 2007SAC – Operations Planning
IceCube-22 Muon
Plan for Physics data taking with filters in place at Pole (15-25 GB/day satellite rate) to begin before May 1
March 1, 2007SAC – Operations Planning
Operations Planning - History
NSF Baseline Review Feb. 2004 Supported plan to operate during construction phase
International Oversight & Finance Group (IOFG)
Oct. 2004 1st meeting w/discussion of plan for cost sharing of operations
NSF Annual Review May 2005 Recommendations on the scope of an operations program
Collaboration Scrutiny Group
Aug. 2005 Critiqued scope and budgets and encouraged cost reductions and more in-kind contributions
Project Advisory Panel/Science Advisory Committee
Mar. 2006 More recommendations on preparing a comprehensive program and organization
IOFG Apr. 2006 Effort to understand cost and possibilities for cost sharing arrangements
NSF Annual Review
M&O Proposal to NSF
NSF Operations Review
IOFG
Revised M&O budget Review
May 2006
June 2006
Aug. 2006
Sep. 2006
Mar. 2007
Encouragement to proceed with plans for operations
Sent to reviewers & organized review committee
Positively reviewed some suggestions for savings, redistribute M&O and Grants Discussion of funding realities
March 1, 2007SAC – Operations Planning
Revised M&O Budget
FY07 (M$) FY08 (M$) FY09 (M$)
Non-US in-kind 3.3 3.4 3.5
Original M&O Request to NSF/IOFG 6.5 7.2 8.4
Revised M&O Request to NSF/IOFG 3.6 5.1 7
Revised M&O cost delta -2.9 -2.1 -1.4
Non-US Cash in-kind 0.4 0.4 0.4
Revised M&O Request from the NSF 3.2 4.7 (6.6)
March 1, 2007SAC – Operations Planning
Revised M&O details (Non in-kind)
FTE Capital Labor Total FTE
Diff
Capital
Diff
Labor
Diff
Total
Diff FTE Capital Labor Total
FTE
Diff
Capital
Diff
Labor
Diff
Total
Diff FTE Capital Labor Total
FTE
Diff
Capital
Diff
Labor
Diff
Total
Diff
T ier 0 Coordination 0.8 0 102 102 0.0 0 0 0.8 0 102 102 0.0 0 0 0.8 0 102 102 0.0 0 0
Winter Over Personnel 3.0 0 441 441 -0.4 -54 -54 2.0 0 294 294 -1.4 -201 -201 2.0 0 294 294 -1.4 -201 -201
SPS & SPT S at UW 2.0 0 272 272 0.0 -200 0 -200 2.0 100 272 372 0.0 -100 0 -100 2.0 200 272 472 0.0 0 0 0
M onitoring 1.5 0 125 125 -0.5 -36 -36 1.5 0 125 125 -0.5 -37 -37 2.0 0 161 161 0.0 -1 -1
Instr. M aintenance (non-DAQ) 0.2 0 31 31 0.0 -45 0 -45 0.5 0 65 65 -0.2 -45 -33 -78 1.0 50 125 175 -0.3 5 -71 -66
IceT op M aintenance 1.0 0 140 140 -0.5 -66 -66 1.5 0 210 210 0.0 -12 -12 1.5 0 200 200 0.0 -22 -22
Run Coordinator 0.5 0 80 80 0.1 21 21 0.5 0 80 80 0.1 21 21 0.5 0 80 80 0.1 21 21
DAQ M aintenance 0.0 0 0 0 -1.5 -57 -240 -297 2.1 24 336 360 -0.7 -33 -126 -159 2.6 30 411 441 -0.4 -27 -82 -109
Su b -T o tal 9.0 0 1,191 1,191 -2.7 -302 -374 -676 10.9 124 1,484 1,608 -2.6 -178 -387 -565 12.4 280 1,645 1,925 -1.9 -22 -355 -377
UW Data Center 3.0 200 368 568 -1.0 -230 -122 -352 3.0 200 368 568 -1.0 -230 -122 -352 3.0 430 368 798 -1.0 0 -122 -122
F iltering & Software 2.0 0 250 250 -1.0 -19 -54 -73 3.0 0 350 350 0.0 -19 42 23 3.0 20 350 370 0.0 1 42 43
Sim ulation Production 2.0 0 250 250 -1.0 -34 -41 -75 3.0 0 350 350 -1.0 -34 70 36 4.0 20 500 520 -0.5 -14 209 195
Detector Calibration 2.0 0 200 200 -2.2 -211 -211 2.5 0 250 250 -0.9 -124 -124 3.0 0 312 312 -0.3 -50 -50
Detector Verification 2.0 0 200 200 -0.9 -100 -100 2.0 0 200 200 -0.9 -131 -131 2.5 0 250 250 -0.2 -56 -56
Data Warehouse 1.0 0 136 136 0.0 -320 0 -320 1.0 100 136 236 0.0 -220 0 -220 1.0 320 136 456 0.0 0 0 0
South Pole & UW Networking 0.5 0 61 61 0.0 -55 0 -55 0.5 0 61 61 0.0 -55 0 -55 0.5 55 61 116 0.0 0 0 0
US M onteCarlo 0.0 25 0 25 0.0 -47 0 -47 0.5 50 50 100 0.5 -22 50 28 0.0 72 0 72 0.0 0 0 0
T ier 2: Infrastructure Support 0.8 100 75 175 -0.2 0 -31 -31 1.0 100 100 200 0.0 50 -6 44 1.0 100 110 210 0.0 0 4 4
Reconstruction 0.0 0 0 0 -0.4 -39 -39 0.0 0 0 0 -0.3 -31 -31 0.0 0 0 0 -0.3 -31 -31
Su b -T o tal 13.2 325 1,540 1,865 -6.7 -705 -598 -1,303 16.5 450 1,865 2,315 -3.6 -530 -252 -782 18.0 1,017 2,087 3,104 -2.3 -13 -4 -17
Instrum entation R&D 1.0 50 110 160 -1.0 0 -136 -136 2.0 50 220 270 0.0 0 -64 -64 3.0 75 350 425 0.0 0 -76 -76
Science & T echnical Support 0.5 0 70 70 -0.5 -145 -145 1.0 0 140 140 0.0 -83 -83 2.0 0 280 280 0.5 26 26
M anagem ent/Adm in 0.5 0 130 130 -0.8 -85 -85 1.0 0 225 225 -0.5 -44 -44 2.0 0 400 400 -0.5 -70 -70
Education & Outreach 0.0 0 0 0 -1.0 -157 -157 0.0 0 0 0 -1.0 -157 -157 1.0 0 157 157 0.0 0 0
Su b -T o tal 2.0 50 310 360 -3.3 0 -523 -523 4.0 50 585 635 -1.5 0 -348 -348 8.0 75 1,187 1,262 0.0 0 -120 -120
24.2 375 3,042 3,417 -12.7 -1,007 -1,495 -2,502 31.3 624 3,934 4,558 -7.8 -708 -988 -1,696 38.3 1,372 4,919 6,291 -4.3 -35 -480 -515
75 0 175 -91 225 -135
Perso n n el & Cap ital Reserve 150 -454 350 -471 500 -606
Escalatio n 0 0 0 0 0 0
M &O T o tal 3,642 -2,956 5,083 -2,258 7,016 -1,256
1030 Proposal totals 6,568 7,272 8,441
Subtotal
FY07 (April 2007 - March 2008) K$ FY08 (April 2008 - March 2009) K$ FY09 (April 2009 - March 2010) K$
Travel, Materials & Supplies
Ops Support
U.S. M&O Budget Revised
(1/30/07)
Detector Operations
Science Operations
March 1, 2007SAC – Operations Planning
Revised M&O Details (In-kind)
FTE Capital Labor Total FTE
Diff
Capital
Diff
Labor
Diff
Total
Diff FTE Capital Labor Total
FTE
Diff
Capital
Diff
Labor
Diff
Total
Diff FTE Capital Labor Total
FTE
Diff
Capital
Diff
Labor
Diff
Total
Diff
T ier 0 Coordination 0 0.0 0 0 0 0 0.0 0 0 0 0 0.0 0 0 0
Winter Over Personnel 1.5 136 136 -0.2 -112 -112 1.5 136 136 -0.2 -112 -112 1.5 136 136 -0.2 -112 -112
SPS & SPT S at UW 0 0.0 0 0 0 0 0.0 0 0 0 0 0.0 0 0 0
M onitoring 0.8 82 82 0.0 0 0 0 0.8 82 82 0.0 0 0 0 1.0 117 117 0.0 0 0 0
Instr. M aintenance (non-DAQ) 0.1 15 15 0.0 0 0 0 0.2 31 31 0.0 0 0 0 0.3 47 47 0.0 0 0 0
IceT op M aintenance 0.3 25 25 0.0 0 0 0 0.4 39 39 0.0 0 0 0 0.4 39 39 0.0 0 0 0
Run Coordinator 0.5 140 140 0.1 81 81 0.5 140 140 0.1 81 81 0.5 140 140 0.1 81 81
DAQ M aintenance 0.4 34 34 0.0 0 0 0 0.5 44 44 0.0 0 0 0 0.5 49 49 0.0 0 0 0
Su b -T o tal 3.6 0 432 432 -0.1 0 -31 -31 3.9 0 472 472 -0.1 0 -31 -31 4.2 0 528 528 -0.1 0 -31 -31
UW Data Center 0 0.0 0 0 0 0 0.0 0 0 0 0 0.0 0 0 0
F iltering & Software 1.5 204 204 0.0 0 0 0 1.5 204 204 0.0 0 0 0 1.5 204 204 0.0 0 0 0
Sim ulation Production 2.5 280 280 0.0 0 0 0 2.5 280 280 0.0 0 0 0 2.5 280 280 0.0 0 0 0
Detector Calibration 0.5 26 26 0.0 0 0 0 0.5 26 26 0.0 0 0 0 0.5 26 26 0.0 0 0 0
Detector Verification 1.3 109 109 0.0 0 0 0 1.5 126 126 0.0 0 0 0 1.7 143 143 0.0 0 0 0
Data Warehouse 0 0.0 0 0 0 0 0.0 0 0 0 0 0.0 0 0 0
South Pole & UW Networking 0 0.0 0 0 0 0 0.0 0 0 0 0 0.0 0 0 0
US M onteCarlo 0.5 150 61 211 0.0 0 0 0 0.5 150 61 211 0.0 0 0 0 0.5 150 61 211 0.0 0 0 0
DESY Data Center 2.0 392 230 622 0.0 0 0 0 2.0 392 230 622 0.0 0 0 0 2.0 392 230 622 0.0 0 0 0
Wuppertal CPU F arm 1.5 200 184 384 0.0 0 0 0 1.5 200 184 384 0.0 0 0 0 1.5 200 184 384 0.0 0 0 0
Belgium CPU F arm 0.5 78 58 136 0.0 0 0 0 0.5 78 58 136 0.0 0 0 0 0.5 78 58 136 0.0 0 0 0
Sweden SPU F arm 0.5 78 58 136 0.0 0 0 0 0.5 78 58 136 0.0 0 0 0 0.5 78 58 136 0.0 0 0 0
Shared CPU F arm s 0 0.0 0 0 0 0 0.0 0 0 0 0 0.0 0 0 0
T ier 2: Infrastructure Support 0 0.0 0 0 0 0 0.0 0 0 0 0 0.0 0 0 0
Reconstruction 0.2 17 17 0.0 0 0 0 0.4 39 39 0.0 0 0 0 0.5 49 49 0.0 0 0 0
Su b -T o tal 11.0 898 1,227 2,125 0.0 0 0 0 11.4 898 1,266 2,164 0.0 0 0 0 11.7 898 1,292 2,190 0.0 0 0 0
Instrum entation R&D 0.5 42 42 0.0 0 0 0 0.5 42 42 0.0 0 0 0 0.8 73 73 0.0 0 0 0
Science & T echnical Support 1.0 196 196 -0.4 0 -59 -59 1.0 196 196 -0.4 0 -59 -59 1.0 196 196 -0.4 0 -59 -59
M anagem ent/Adm in 0.5 42 42 0.0 0 0 0 0.5 42 42 0.0 0 0 0 0.8 63 63 0.0 0 0 0
Education & Outreach 0.8 118 118 0.0 0 0 0 0.8 118 118 0.0 0 0 0 0.8 118 118 0.0 0 0 0
Su b -T o tal 2.8 0 398 398 -0.4 0 -59 -59 2.8 0 398 398 -0.4 0 -59 -59 3.3 0 450 450 -0.4 0 -59 -59
17.4 898 2,056 2,954 -0.5 0 -90 -90 18.1 898 2,136 3,034 -0.5 0 -90 -90 19.2 898 2,270 3,168 -0.5 0 -90 -90
51 0 57 0 61 0
Perso n n el & Cap ital Reserve 301 -2 309 -9 323 -9
Escalatio n 0 0 0 0 0 0
M &O T o tal 3,306 -93 3,400 -99 3,551 -280
T ravel, M aterials & Su p p lies
Detecto r Op eratio n s
Scien ce Op eratio n s
Op s Su p p o rt
Su b to tal
FY08 (April 2008 - March 2009) K$ FY09 (April 2009 - March 2010) K$In-Kind M&O Budget
Revised (1/30/07)
FY07 (April 2007 - March 2008) K$
March 1, 2007SAC – Operations Planning
Where are we now?
• NSF funding reality plus $400k common fund fall short in first two years of operation– Prioritization of budget elements & cost cutting– Developed the revised budget
• Plan to support core operations areas for IceCube in FY07 and FY08– Goal to Maintain low impact on MRE contingency!– Increased risk to operations
• Need to make case to NSF for better support in FY09 and later years– FY09 (~$6.6M funding needed)– Steady state FY11 on (~$10M)
March 1, 2007SAC – Operations Planning
Operations Planning - Next Steps
• SAC/PAP Review – March 1-2, 2007– collect operations material for reviews– get feedback from you
• NSF Review of Revised Proposal - March 15 2005– At NSF with same review committee from last year
• No direct IceCube participants – Review Operations/Construction transition
• Same committee gave mostly positive review of full funding request
– Revised Budget already drastically cut (~50% in FY07)– Evaluate pending and existing base grants in “big picture” context
• IceCube is operating with 22 strings in the ice–Planning for operations funding to start April, 2007 at reduced levels to support core operations.
March 1, 2007SAC – Operations Planning
Summary
• IceCube is Physics Capable Now!– Competition & Synergy with Other Exps– Students & Postdocs …
• IceCube M&O funding begins this year (April)!!– Planned from initial baseline review in 2004– Budget estimates well grounded in MREFC &
operating experience
• Have “Replanning” numbers for first two years– Ramp up in M&O funding slower then planned– Prioritized tasks to ensure core operations– Try to minimize impact on MRE
• Need to get full requested amount for Year 3 (FY09) funding in NSF budget plans now
March 1, 2007SAC – Operations Planning
• Backup Slides
March 1, 2007SAC – Operations Planning
U.S. Funding Transition Plans
0
10
20
30
40
50
60
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11
(M$)
0
10
20
30
40
50
60
70
80
Strings
MRE
OPS
Strings
US M&O onlyNon-US in-kind ~
$3.5M
March 1, 2007SAC – Operations Planning
SP Systems (Tier 0) Data Flow
5120 DOMs
Event Builder
Online monitor & alert system
All Data
Filtered Data
~30 GB/day 10 TB/year
TWR DAQ
AMANDA
677 OMs
ICECUBE
JEB/PnF
1 MB/s
Filter Reconstruction Processor Farm
5-6 MB/s >400 GB/day
Tape Archive
Tier 0
Tier 1
Tier 2
South Pole System (SPS)
17 Racks, 150 computers, real time DAQ, PnF system, networking, security, data handling 300GB/day tape, 28 GB/day satellite
South Pole Test System (SPTS)
8 Racks, ~60 computers, cable, DOM, DAQ, PnF
Winter Over Operations (WO)
2 Winter Overs, training 3FTE/yr, 300GB/day tape
Data Warehouse
SP&NH Data movement, 30TB/yr Data&MC disk, Tape archive, Database
Data Center US Data Center DESYMC Production UW
MC Production USMC Production UMDMC Production Sweden/Belgium
MC Production GermainyOffline data formatting &
merging, L1 Filtering, >800 GHz-CPU dedicated
Offline data formatting & merging, re-Filtering, >800 GHz-CPU Dedicated
Manage MC Production, MC production, >800 GHz-CPU dedicated + shared CPU resources
MC production, >800 GHz-CPU dedicated + shared CPU resources
MC production, using shared CPU resources
MC production, >400 GHz-CPU dedicated
MC production, >400 Ghz-CPU using shared CPU resources
ALL ICECUBE COLLABORATING INSTITUTIONS
Core IceCube Resources
Distributed Resources
UW Madison Data Center
Data Warehouse (Tier 0) & Data Processing Centers (Tier 1) Data Flow
Data Warehouse (Tier 0)
Monte Carlo Production
US, Germany, Sweden, Belgium (Tier 1) (including GRID resources)
~4 GB/day now growing to ~30GB/day
Level 0 process Calibrate, Detector Monitor Offline data formatting
Monitor data
L1/L2 Production Reconstruction/Filter Muon, Cascade, …
US Tier 1 US, Germany Tier 1
IceCube shift Detector Monitoring
Tier 2 Collaboration Physics Analysis