Operations management (1)

39
GROUP MEMBERS: GROUP MEMBERS: SADIA NOUREEN SADIA NOUREEN WAQAS SIDDIQUE WAQAS SIDDIQUE AFSHAN NAZAKAT AFSHAN NAZAKAT SAMEER TARIQ SAMEER TARIQ

description

 

Transcript of Operations management (1)

Page 1: Operations management (1)

GROUP MEMBERS:GROUP MEMBERS:

SADIA NOUREEN SADIA NOUREEN WAQAS SIDDIQUEWAQAS SIDDIQUEAFSHAN NAZAKATAFSHAN NAZAKAT

SAMEER TARIQSAMEER TARIQ

Page 2: Operations management (1)

HB Contract Furniture established since 1964, prides

itself as the leading Contract furniture manufacturer

HB Contract Furniture is providing B2B standard & customized furniture for its customers.

HB Contract Furniture offers a very wide range of products and services to meet the needs of today's changing workplace.

Introduction

Page 3: Operations management (1)

HB stands for Hasan Brothers.

Mr. Tahir Hasan Gardezi at the age of 23 years established Hasan Brothers, as a kitchen furniture manufacturing company.

In 1969, HB established its first Showroom for Kitchen Furniture & Office Furniture in Karachi.

History of the Firm

Page 4: Operations management (1)

In 1987, HB started using Autodesk AutoCAD for

design and drafting purpose.

In 1992, HB opens a new furniture factory at Islamabad & eventually closed the one in Karachi.

In 1999, HB established a 3 story Furniture showroom for at a very vital location in Islamabad at I-10/3.

History of the Firm (Contd…)

Page 5: Operations management (1)

The main target customers are the offices, companies, hospitals and other businesses.

Target Market

Page 6: Operations management (1)

It is a consumer based market as the HB Contract based on the customers demand, makes the furniture using the finest wood imported from overseas.

Type of Market

Page 7: Operations management (1)

Rose Wood Inter Wood Bashir Design Furniture Furniture Classifieds Furniture City Furniture Decorators Studio Interiors Infinity Interiors Furniture Kingdom Barry’s Furniture Mechano Furniture Premier Furniture

Competitors

Page 8: Operations management (1)

The current demand forecast of the firm for a simple chair is

almost 1500 units per month

As the business of HB Contract is to make custom made furniture on the basis of the orders placed by the customers including the offices, hospitals and businesses.

So, the exact forecast cannot be made on the previous data. Still the HB Contract forecast the demand through intuition.

Forecasting

Page 9: Operations management (1)

The forecasting method of the firm i.e.; using the intuition

only is not accurate.

It can be improved by applying the other qualitative method of forecasting. It is because the situation in the case of the custom making furniture is vague and the firm has little or no data available regarding the market of such business.

So, the best method of forecasting that can be used in current scenario is jury of executive opinion.

Recommendation

Page 10: Operations management (1)

The HB Contract keeps on improving its processes,

strategies, methods just to improve its quality.

HB Contract have recently changed the equipment for manufacturing furniture from hand making to introducing CNC machines in 2007.

HB Contract imports wood and other raw material from international suppliers to ensure the quality of wood they are buying.

Quality

Page 11: Operations management (1)

The HB Contract to reduce the errors and improve on the

data:

1) Offers site survey and measurements.

2) Keep in mind the errors that may occur while materializing the projects in future.

3) They use AutoCAD to create 3D scenes development so as to improve on errors.

4) They provides customer with different design options and unique tailoring also.

Quality (Contd…)

Page 12: Operations management (1)

They have bought two CNC machines for cutting the wooden

sheets.

First CNC cutting machine which cuts 60 sheets a day while the second machine which is panel saw, cuts 900 sheets a day.

They use board optimization software to design different models as to how the wood can be cut and the wastage can be lowered then it depends on the personnel to decide which model is best for their purpose.

Quality (Cont…)

Page 13: Operations management (1)

The international standards like ISO 9000 have not yet been implemented in the company.

ISO 9000 Implemented or Not?

Page 14: Operations management (1)

HB started using AutoCAD for design and drafting

purpose in 1987.

From 1987 onwards they have been improving on their products and furniture showrooms.

In 2007 they replaced the employees and introduced CNC machines to improve the quality of cutting, carving, finishing, laminating and printing.

Has The Firm Achieved TQM?

Page 15: Operations management (1)

The HB Contract have the capability of achieving six sigma.

But the problem is that they previously did not have the concept of achieving six sigma until they have been conveyed the problem.

Even in CNC machines requires the justification and correction.

The error can occur while adjusting the wooden sheet in the CNC cutting machine.

TQM Achievement (Cont…)

Page 16: Operations management (1)

The process that is implemented in the firm is close to

the process focus.

The equipment used by the firm is very simple CNC machines which includes CNC cutting machine, CNC Panel Saw, Drilling machine (boring), Edging machine.

Operators are broadly skilled.

There are not many job instructions.

Process Strategy

Page 17: Operations management (1)

Process Structure

Page 18: Operations management (1)

Cross Over Analysis of two cutting machines tells us

that:

The company should use CNC Router when they have to cut sheets less than 3067.

For the order in which the sheets used are greater than 3067 they should use CNC Panel Saw.

Recommendation

Page 19: Operations management (1)

Design Capacity: The capacity of a firm to produce maximum

theoretical output is 150 units / day.

Effective Capacity: The real time capacity that a firm wants to achieve is

120 units / day.

Capacity Planning

Page 20: Operations management (1)

Utilization:

Design Capacity = 150 units / dayActual Output = 100 units / day

Utilization = Actual output/ design capacity

Utilization = 100/150Utilization = 0.667 ~ 67%

Capacity Planning (Cont…)

Page 21: Operations management (1)

Efficiency:

Effective Capacity = 120 units / dayActual Output = 100 units / day

Efficiency = actual output/ Effective capacity

Efficiency = 100/120Efficiency = 0.833 ~ 83%

Capacity Planning (Cont…)

Page 22: Operations management (1)

The HB Contract takes order from their customers;

sometimes there are huge contracts, so, they have to sign a legal document in which the time and place for the delivery of the furniture is mentioned.

HB Contract schedules such time that enables the firm to manufacture furniture that is closer to the customers’ needs and demands.

How is the Firm Managing Demand Regarding

Capacity?

Page 23: Operations management (1)

Currently, they are furnishing the control panel of National Transmission Dispatch Company, who were given 2 months. But they are unable to furnish the control panel in time.

Problem

Page 24: Operations management (1)

If the demand of the products is less they should make

an estimate and study that how much time the employees consume in each of the process, what are the difficulties and variations that the employees face.

After calculating each scenario they should redesign the processes as how the employees should complete each task and in what specified time.

Recommendation

Page 25: Operations management (1)

The firm is divided into 3 portions:

The 1st portion which is in front-middle is the furniture showroom.

The layout of the furniture showroom is more like the fixed position layout.

They don’t have to sell products from that showroom. This showroom fulfills the function of showing the customers how the product will look like in a certain arrangement.

Layout of the Firm

Page 26: Operations management (1)

The 2nd portion is in the front-left side which is the office

section.

The layout of this portion is like the work cell layout.

The arrangement of the departments is such that it makes the movement of information easier with comfortable space and equipment.

The 3rd portion is in the rear- right corner which is the factory.

Layout of the Firm (Cont…)

Page 27: Operations management (1)

There is a problem in the layout of the 3rd portion

(factory).

The movement of goods is not well managed and the cost of moving goods from one place to another is relatively higher.

Problem

Page 28: Operations management (1)

The firm should change its layout to process oriented

layout.

So, that it becomes easier to transfer raw material and finished goods from the production department to the delivery / shipment department.

Implication

Page 29: Operations management (1)

There is no space for warehousing and stocking of

finished goods.

As soon as the order is complete, it is delivered through the private transporters.

Until the production for the order is not finished the finished goods are placed in the production department as there is a lot of space available.

Warehousing and Stocking

Page 30: Operations management (1)

Assembly Line Balancing

Page 31: Operations management (1)

Types of Inventory

1. Raw Material (Wooden sheets, Laminated board, Printed Sheets, Nails, Hinges e.t.c.)

2. Work in process (Not placed in the store but is left in the production department.)

3. MRO (Parts for repair and maintenance are kept in the store. Like cutting blades, fuses, bulbs, hammers, pliers e.t.c.)

4. Finished Goods (As soon as the order is complete the goods are delivered to the destination decided within the Contract.)

Inventory Management

Page 32: Operations management (1)

The firm is not using any of the demand models.

According to HB Contract the order of raw material is placed on the basis of the orders by the customers.

The firm keeps safety stock in case of uncertainty because the current situation of almost all the businesses in Pakistan is not favorable.

What independent demand model the firm is currently

using?

Page 33: Operations management (1)

Categories Cost in percentage

Building Depreciation 5% Raw Material Depreciation 10% Labor Cost 5% Raw Material (Loss) 20%

___________________________________________________________________ Total 40%

Cost of Holding the Inventory

Page 34: Operations management (1)

They should make the store or inventory room water

proof.

The wood should be kept dry all the time.

Other option is that the wood that is of greater value should be stored in the least amount for that ABC Analysis should be done.

Suggestions to minimize the cost of inventory

Page 35: Operations management (1)

The HB Contract are not using any probabilistic model for safety stock but they are keeping the safety stocks on the basis of intuition.

Probabilistic Models

Page 36: Operations management (1)

The HB Contract should use the probability models for

probabilistic demand and safety stock probability.

It will help them improve the quantity of safety stock required at the specific time.

It will also help minimize the cost of inventory held.

Suggestion

Page 37: Operations management (1)

It is possible to apply just in time to this firm if the

economy of the country is improved.

Layout can be improved in the HB Contract to allow continuous flow of information from one department to another.

Inventory can be reduced to the lowest using the probabilistic models but still zero inventory cannot be achieved and there is a necessity of safety stock in this kind of business.

Is It Possible For The Firm To Work On JIT Or Zero Inventory System?

Page 38: Operations management (1)

Scheduling is common in the developing countries

because of the unpredictability.

Six sigma can be applied in this firm if the adjustments are made in the CNC.

The employees are committed and dedicated to their work.

Possibility of JIT (Cont…)

Page 39: Operations management (1)

Thank You