FY11-week 22:
FY11-week 23:
FY11-week 24:
FY11-week 25:
FY11-week 26:
0
24
48
72
96
120
144
168
6142
31
79
12
5
3159
36
29
11
30
38
9
37155 56
3451 48
35
4
3
3
MARCH 2011
HO
UR
S
FY11-week 27:
FY11-week 28:
FY11-week 29:
FY11-week 30:
0
24
48
72
96
120
144
168
8477
68
2 21
5
40
3331
9 37
33 33 38
20
APRIL 2011
HO
UR
S
0.0%0.5%1.0%1.5%2.0%2.5%3.0%3.5%4.0%
LINAC_VACUUM
PS_AGS
PPS_AGS
RadMonPermitPull
CntrlsSftwr
CntrlsHdRHIC
Water_RHIC
HumanError
ESHQ
QLIQuenchProtect
CRYO_RHIC
Rf_RHIC
PS_RHIC
PPS_RHIC
ES&FD_AtR
ES&FD_Exp
sum< 1 hr
INTEGRATED FAILURES (GREATER THAN ONE HOUR) BY SYSTEM --APRIL 2011PS_AGS
UPS for RHIC QD systemRADMON_pulls Permit link8XControlsSoftwarereload firmware in QD fecsHuman ErrorBBQ locked on wrong tunes Op-erator procedsESHQPhenix gas leakQLI2 beam induced quenchesQuenchProtectY9d-qpsw bad connectorCryo RHICLead flow interlocks - card in ringRf_RHIC9 MHz tripped off - failed.PS_RHICbo11-tq6, bo3-tq6ES&FD_AtRpsuarc8 breakerES&FD_EXPPhenix Vertex Detector Cooling