Operation of storm surge monitoring system of NORI … of storm surge monitoring system of NORI for...

29
Operation of storm surge monitoring system of NORI for coastal disaster prevention Operation of storm surge monitoring system of NORI for coastal disaster prevention National Oceanographic Research Institute Ministry of Maritime Affairs and Fisheries National Oceanographic Research Institute Ministry of Maritime Affairs and Fisheries

Transcript of Operation of storm surge monitoring system of NORI … of storm surge monitoring system of NORI for...

Operation of storm surge monitoring system

of NORI for coastal disaster prevention

Operation of storm surge monitoring system

of NORI for coastal disaster prevention

National Oceanographic Research Institute

Ministry of Maritime Affairs and Fisheries

National Oceanographic Research Institute

Ministry of Maritime Affairs and Fisheries

I. STATUS OF OCEAN OBSERVATIONI. STATUS OF OCEAN OBSERVATION

II. Ocean Monitoring BuoyII. Ocean Monitoring Buoy

III. ARGOS BuoyIII. ARGOS Buoy

IV. Problem and improvementIV. Problem and improvement

ContentsContents

I.I. STATUS OF OCEAN OBSERVATION

Ocean Characteristics of the Korean Peninsula

Surrounded by the Yellow Sea, East Surrounded by the Yellow Sea, East

China Sea and East SeaChina Sea and East Sea

Different bottom topographyDifferent bottom topography

Different coastline shapeDifferent coastline shape

Distinct Seasonal changeDistinct Seasonal change

Each coast show very distinguished Each coast show very distinguished

tidal patterntidal pattern

Affected by the Affected by the KuroshioKuroshio

Affected by a typhoon every yearAffected by a typhoon every year

July 2001 : A Basic Plan for the establishment of the National Ocean

Observation Network was set up.

July 2002 : A Long-term Plan for the operation of Ieodo Ocean Station was

decided

June 2003 : Construction of Ieodo Ocean Station

Feb. 2006 : Internal Plan of the transfer of all ocean observation stations to

NORI was fixed.

2007 now : NORI operate all ocean observation stations including Ieodo

Ocean Station.

National Real-Time Ocean Observation Network

○ 91 observing stations will be established

by 2010 (59 stations , 2006)

- Ocean observation base : 5

- Lighthouse observatory : 20

- Dolphin observatory : 20

- Ocean buoy : 8

- Tidal station : 38

○ Ocean phenomenon such as tide,

wave, water temperature, current and

weather, etc.systematically is observed

and provided in real-time

National Real-Time Ocean Observation Network

진전산

Ieodo Location

wave radar ADCP

weather sensor CTD

-- Total Height: 77m (underwater : 40m) Total Height: 77m (underwater : 40m)

-- Total weight: 3,400t Total weight: 3,400t

-- Main Deck: lab, seminar room, bed, etc Main Deck: lab, seminar room, bed, etc

-- Cellar Deck: generator, battery roomCellar Deck: generator, battery room

-- Equipment: 108 (44 types)Equipment: 108 (44 types)

·· AtmosAtmos. obs. : 41 (14 types) . obs. : 41 (14 types)

·· Ocean obs. : 40 (21 types) Ocean obs. : 40 (21 types)

·· Structure safety obs. : 19 (4 types) Structure safety obs. : 19 (4 types)

·· Environment obs. : 8 (5 types)Environment obs. : 8 (5 types)

Ieodo Ocean Research Station

Ocean Monitoring BuoyOcean Monitoring BuoyOcean Monitoring Buoy

○ Introduction- Provide boundary conditions for surgeprediction

- Complementary data supply for ocean current observation

- Acquisition of weather data in bad weather, such as typhoon and Produce current data

○ Application plan- Provide calibration and verification data for ship-mounted ADCP

- Calculation of boundary conditions- Long and short-term prediction of tidal and ocean current

Ocean Observation – Ocean Buoy

ARGOS BuoyARGOS BuoyARGOS Buoy

○ Introduction

- Observe typhoon using minimets and barometer

drifters

- Deploy the instrument using airplane (e.g.

Helicopter)

○ Application

- Provide SST, wind speed and air pressure at

typhoon core for typhoon prediction

- Provide calibration and verification data for storm

surge model

- Long & short-term prediction of ocean current

Ocean Observation – ARGOS Buoy

II.II. Ocean Monitoring Buoy

Decision of buoy installation position

<Typhoon Track distribution map><Typhoon Track distribution map>

Ocean monitoring buoy installation

Meteorological Sensors Hydrological Sensors

Wind Direction Sensor

Wind Speed Sensor

MIRA Visibility Sensor

Air Pressure Sensor

Air Temperature Sensor

Wave Height Sensor

Buoy Orientation Sensor

C/T Sensor

Doppler Current Sensor

General type of buoy

Counter weight lowering the center of gravity

High Bending Radiuswith stress on cable and Instrumentation

Small Bending radius Giving very littleor no stress on cable and instrumentation

move up and down vertically

Acorn buoy is shaped for sub sea installations and to handle waves and swells

Buoy monitoring Program

Korea Meteorological Administration(KMA)- Installation : 2006 year

light house & sea bottom- Obs. Item : Air-tem, Pressure, Wave,

C/T etc.

National Oceanographic Research Institute(NORI)- Installation : 2005 year

Buoy- Obs. Item : Air-tem, Pressure, Wave,

C/T, Current etc.

Distance : about 2kmDistance : about 2km

Oceanographic sensorsOceanographic sensors

Meteorological sensorsMeteorological sensors

Data comparison

No. 11 Typhoon “NARI” Track - 2007

Wind Speed (2007. 9. 11 ~ 9.23)

-5

0

5

10

15

20

25

30

35

2007

/09/

11 0

1:00

2007

/09/

11 1

8:00

2007

/09/

12 1

1:00

2007

/09/

13 0

4:00

2007

/09/

13 2

1:00

2007

/09/

14 1

4:00

2007

/09/

15 0

7:00

2007

/09/

16 0

0:00

2007

/09/

16 1

7:00

2007

/09/

17 1

0:00

2007

/09/

18 0

3:00

2007

/09/

18 2

0:00

2007

/09/

19 1

3:00

2007

/09/

20 0

6:00

2007

/09/

20 2

3:00

2007

/09/

21 1

6:00

2007

/09/

22 0

9:00

2007

/09/

23 0

2:00

2007

/09/

23 1

9:00

buoylight house

Air Pressure (2007. 9. 11 ~ 9.23)

980

985

990

995

1000

1005

1010

1015

1020

1025

2007

/09/

11 0

1:00

2007

/09/

11 1

8:00

2007

/09/

12 1

1:00

2007

/09/

13 0

4:00

2007

/09/

13 2

1:00

2007

/09/

14 1

4:00

2007

/09/

15 0

7:00

2007

/09/

16 0

0:00

2007

/09/

16 1

7:00

2007

/09/

17 1

0:00

2007

/09/

18 0

3:00

2007

/09/

18 2

0:00

2007

/09/

19 1

3:00

2007

/09/

20 0

6:00

2007

/09/

20 2

3:00

2007

/09/

21 1

6:00

2007

/09/

22 0

9:00

2007

/09/

23 0

2:00

2007

/09/

23 1

9:00

buoylight house

Water Temperature (2007. 9. 11 ~ 9.23)

2323.5

2424.5

2525.5

2626.5

2727.5

28

2007

/09/

11 0

1:00

2007

/09/

11 1

8:00

2007

/09/

12 1

1:00

2007

/09/

13 0

4:00

2007

/09/

13 2

1:00

2007

/09/

14 1

4:00

2007

/09/

15 0

7:00

2007

/09/

16 0

0:00

2007

/09/

16 1

7:00

2007

/09/

17 1

0:00

2007

/09/

18 0

3:00

2007

/09/

18 2

0:00

2007

/09/

19 1

3:00

2007

/09/

20 0

6:00

2007

/09/

20 2

3:00

2007

/09/

21 1

6:00

2007

/09/

22 0

9:00

2007

/09/

23 0

2:00

2007

/09/

23 1

9:00

buoylight house

Signigicant Wave Height (2007. 9. 11 ~ 9.23)

0

2

4

6

8

10

12

14

2007

/09/

11 0

1:00

2007

/09/

11 1

8:00

2007

/09/

12 1

1:00

2007

/09/

13 0

4:00

2007

/09/

13 2

1:00

2007

/09/

14 1

4:00

2007

/09/

15 0

7:00

2007

/09/

16 0

0:00

2007

/09/

16 1

7:00

2007

/09/

17 1

0:00

2007

/09/

18 0

3:00

2007

/09/

18 2

0:00

2007

/09/

19 1

3:00

2007

/09/

20 0

6:00

2007

/09/

20 2

3:00

2007

/09/

21 1

6:00

2007

/09/

22 0

9:00

2007

/09/

23 0

2:00

2007

/09/

23 1

9:00

buoylight house

III.III. ARGOS Buoy

ARGOS Location

<Dropping position & way of a Drifting Buoy><Dropping position & way of a Drifting Buoy>

○ Dropping line of a buoy with Blue, Red, Green according to a path of a typhoon

○ A buoy keeps 30km interval and drops

○ A dropping of a buoy uses a parachute

ARGOS Monitoring program

No. 13 Typhoon “SHANSHAN” Track

Dropping line(2006.9.16)

990

995

1000

1005

1010

1015

1020

1025

1030

2006/09/1615:03:41

2006/09/2303:59:54

2006/09/3002:02:26

2006/10/0512:02:45

2006/10/0813:02:09

2006/10/1023:39:22

2006/10/1403:59:07

2006/10/1623:01:53

2006/10/1914:03:34

2006/10/2305:01:41

2006/10/2621:03:26

2006/10/3003:01:27

60215

60218

60220

60222

Feb 7, 2007

Aug 28, 2007Mar 9, 2007

IV.IV. Problem and improvement

Problem and ImprovementProblem and Improvement

& GPS