Opening up new possibilities for customers and …...2016/04/07 · © 2015 Kawasaki Heavy...
Transcript of Opening up new possibilities for customers and …...2016/04/07 · © 2015 Kawasaki Heavy...
Opening up new possibilities for customers and community at large
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 2
1. Outline of Kawasaki Heavy Industries, Ltd.
2. Outline of Plant & Infrastructure Company
3. Introduction of CKK system
Main Points
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 3
Profile
1. Company Name : Kawasaki Heavy Industries, Ltd.
7. Number ofConsolidated Subsidiaries: 97
2. Head OfficesTokyo Head Office : 1-14-5, Kaigan, Minato-ku,
Tokyo 105-8315, Japan
Kobe Head Office : Kobe Crystal Tower,1-3,Higashikawasaki-cho 1-chome,chuo-ku,Kobe,Hyoko,650-8680,Japan
3. Founded : April 18784. Incorporated : October 15,18965. Paid-in Capital : Abt. ¥ 104 billion6. Number of Employees : 35,471(consolidated)
8. Main Production Bases : 18 in Japan,23 overseas (consolidated)
(as of March 31, 2015)
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 4
Overview
¥1,486 billion
Employee
Global Network
Net Sales
(Fiscal year ended March 31, 2015)
35,471 people(As of March 31, 2015)
97 Subsidiaries
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 5
PLANT & INFRASTRUCTURE
ROLLING STOCKAEROSPACE
GAS TURBINE & MACHINERY
MOTORCYCLE & ENGINE
Kawasaki Business Segment
SHIP & OFFSHORE STRUCTURE
PRECISION MACHINERY
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 6
1. Outline of Kawasaki Heavy Industries, Ltd.
2. Outline of Plant & Infrastructure Company
3. Introduction of CKK system
Main Points
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 7
Cement Plant
Fertilizer Plant
Industry / Environment / Energy
Shield Machine
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 8
Industry / Environment / Energy
Waste Incineration Plant
Waste Incineration Plant
Flue Gas Desulfurization System
Water Treatment System
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 9
Industry / Environment / Energy
Coal Fired Power Plant LNG Storage Tank
Waste Heat Recovery Power Plant
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 10
1. Outline of Kawasaki Heavy Industries, Ltd.
2. Outline of Plant & Infrastructure Company
3. Introduction of CKK system
Main Points
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 11
Concept of CKK(Conch Kawasaki Kiln) system
・Total Solution of Urban Waste Problems(Municipal solid waste(MSW), sewage sludge, water treatment)
・Saving Investment & Running Cost of Waste Treatment・Utilization of MSW as Alternative Fuel for Cement Production・CKK System is co-developed with CONCH CEMENT GROUP
in China.
MSW
Water Treatment
Total Solution by CKK System Saving Investment by Utilizing Cement Plant
Sewage Sludge
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 12
Overview of CKK System
Refuse Incineration Cement Production
MSW Receiving
Gasification Furnace: 500~600℃Iron, Aluminum
Collection & Recycle
・Utilization of MSW and Sludge
as Fuel and Raw Material for
Cement Production
・DXNs and Odor are ecomposed
in High Temperature of 900 ℃
Calciner:900℃
Waste 300ton/d Clinker 5000ton/d
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 13
Introduction of Tongling plant
Landfill of MSW, Before the introduction of CKK System
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 14
Appearance of Pilot Plant
Introduction of Tongling plant
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 15
Overview of Pilot Plant
Introduction of Tongling plant
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 16
Measuring Facility
Discharging platform
Receiving and Storing Facility of MSW
Introduction of Tongling plant
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 17
Wastes pit and crane
Crusher
Introduction of Tongling plant
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 18
Sewage treatment plantSludge Hopper
Introduction of Tongling plant
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 19
Center control room
Crane operation room
Introduction of Tongling plant
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 20
Incombustibles after Separation
Metal After Separation
Introduction of Tongling plant
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 21
New Project progress in China by March 2016
・16Plants Operation・3Plants Construction
安徽省
広西壮族自治区
上海市
貴州省
甘粛省
雲南省
陝西省
重慶市
広東省
四川省 湖北省
湖南省
山西省
山東省
河南省
河北省
浙江省
江西省
江蘇省
北京市
天津市
遼寧省
黒龍江省
吉林省
青海省
内モンゴル自治区
新疆ウイグル自治区
西蔵自治区
海南省
台湾
福建省
Gansu Pingliang 300t/d2014.11 MSW treatment start
Chongqing 200t/d+ sludge 80t/d2015.5 MSW treatment start
Guizhou Zunyi 400t/d×2炉2014.12 MSW treatment start
Guizhou Guiyang 300t/d+ sludge 50t/d2015.10 MSW treatment start
Anhui Tongling 300t/d2010.4 MSW treatment start
Guizhou Guiding 200t/d2012.11 MSW treatment start
Hunan Qiyang 300t/d2015.10 MSW treatment start
Hunan Shimen 200t/d2015.11 MSW treatment start
Hunan Shuangfeng 200t/d2015.9 MSW treatment start
Guangdong Yangchun 200t/d2015.7 MSW treatment start
Guizhou Yuping 100t/d2015.7 MSW treatment start
Guizhou Xishui 300t/d2015.10 MSW treatment start
Guizhou Anshun 200t/d2016.1 MSW treatment start
Guizhou Shuicheng 200t/d2016.1 MSW treatment start
Guangxi Fusui 200t/d+ sludge 10t/d2016.1 MSW treatment start
Yunnan Baoshan 300t/d2015.1 Construction start 2016.4 MSW treatment start
Sichuan Esheng 400t/d2016.1 MSW treatment start
Guangxi Lingyun 100t/d2015.8 Construction start2017.1 MSW treatment start
Sichuan nanjiang 200t/d2014.9 Construction start 2016.3 MSW treatment start
© 2015 Kawasaki Heavy Industries, Ltd. All Rights Reserved 22
Thank you for sharing your valuable time
KAWASAKI HEAVY INDUSTRIES, LTD.
Cảm ơn.