Line Office Activity Title Project Manager Activity Mgr Estimated Cost Estimate Placed In Service Date Type of Property OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date: 12/13/2019 Activity # CAO/CAO AHU Replacement in C-Section HML, NOS Charleston, SC Elizabeth Whitsel Elizabeth Whitsel Real 010344 4/10/2019 0.00 Construct New Baseline Atmospheric Observatory, Barrow AK Scott Ingalls Elizabeth Whitsel Real 010315 10/1/2020 7,500,000.00 Emergency Generator Replacement BLDG #1 WRC Timothy R. Calohan Elizabeth Whitsel Real 010316 2/28/2020 425,000.00 NOAA CAO Silver Spring, MD - ARCHIBUS Patrick A. Holt Elizabeth Whitsel Personal 010152 3/31/2021 7,000,000.00 NOAA Honolulu, HI (Pacific Regional Center) Aaron Kaneao Elizabeth Whitsel Real 010067 4/8/2017 300,000,000.00 Replace 2 Chillers in H-Wing, HML, NOS Charleston, SC Elizabeth Whitsel Elizabeth Whitsel Real 010345 4/29/2019 0.00 Roof Replacement Bldg 33 - WRC, Seattle, WA Timothy R. Calohan Elizabeth Whitsel Real 010314 7/2/2019 1,900,000.00 Window Replacement on South Façade of WRC Building 32 Mark Eberling Deborah Johnson Real 010242 7/31/2017 260,000.00 Number of Open CWIP Activities Total Estimated Cost CAO/CAO Subtotals 317,085,000.00 8 CAO/NMFS HVAC Replacement NMFS Santa Cruz Laboratory, Santa Cruz, CA Brantley F Bain Deborah Johnson Real 010313 1/15/2020 620,000.00 Mass Spectrometer Infrastructure Upgrades, NSIL, Pascagoula, MS Michael D. Randall Deborah Johnson Real 010288 1/2/2020 243,000.00 Montlake East Bldg Partial HVAC Brantley F Bain Elizabeth Whitsel Real 010340 12/31/2020 480,000.00 Mukilteo Research Station New Facilities - Mukilteo, WA Brantley F Bain Elizabeth Whitsel Real 010270 7/1/2022 33,000,000.00 Net Pen Replacement Project, Fisheries Science Center - Manchester Research Station Timothy R. Calohan Elizabeth Whitsel Real 010333 8/16/2019 425,000.00 NMFS Floating Dock Replacement Kodiak, AK Jack C. Klaus Elizabeth Whitsel Real 010317 4/22/2019 284,000.00 Page 1 of 9 Note - Data as of: GL period of Report #: CWIPDB 112 and CBS trans date of 12/31/19 12/12/19

Transcript of OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC,...

Page 1: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

CAO/CAO

AHU Replacement in C-Section HML, NOS Charleston, SC

Elizabeth WhitselElizabeth WhitselReal010344 4/10/20190.00

Construct New Baseline Atmospheric Observatory, Barrow AK

Scott IngallsElizabeth WhitselReal010315 10/1/20207,500,000.00

Emergency Generator Replacement BLDG #1 WRC

Timothy R. CalohanElizabeth WhitselReal010316 2/28/2020425,000.00

NOAA CAO Silver Spring, MD - ARCHIBUS Patrick A. HoltElizabeth WhitselPersonal010152 3/31/20217,000,000.00

NOAA Honolulu, HI (Pacific Regional Center) Aaron KaneaoElizabeth WhitselReal010067 4/8/2017300,000,000.00

Replace 2 Chillers in H-Wing, HML, NOS Charleston, SC

Elizabeth WhitselElizabeth WhitselReal010345 4/29/20190.00

Roof Replacement Bldg 33 - WRC, Seattle, WA Timothy R. CalohanElizabeth WhitselReal010314 7/2/20191,900,000.00

Window Replacement on South Façade of WRC Building 32

Mark EberlingDeborah JohnsonReal010242 7/31/2017260,000.00

Number of Open CWIP Activities Total Estimated CostCAO/CAO Subtotals 317,085,000.008

CAO/NMFS

HVAC Replacement NMFS Santa Cruz Laboratory, Santa Cruz, CA

Brantley F BainDeborah JohnsonReal010313 1/15/2020620,000.00

Mass Spectrometer Infrastructure Upgrades, NSIL, Pascagoula, MS

Michael D. RandallDeborah JohnsonReal010288 1/2/2020243,000.00

Montlake East Bldg Partial HVAC Brantley F BainElizabeth WhitselReal010340 12/31/2020480,000.00

Mukilteo Research Station New Facilities - Mukilteo, WA

Brantley F BainElizabeth WhitselReal010270 7/1/202233,000,000.00

Net Pen Replacement Project, Fisheries Science Center - Manchester Research Station

Timothy R. CalohanElizabeth WhitselReal010333 8/16/2019425,000.00

NMFS Floating Dock Replacement Kodiak, AK Jack C. KlausElizabeth WhitselReal010317 4/22/2019284,000.00

Page 1 of 9Note - Data as of: GL period of Report #: CWIPDB 112

and CBS trans date of

12/31/19

12/12/19

Page 2: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

NMFS Galveston, TX - Seawater Treatment Facility

Ashok DesaiElizabeth WhitselReal010177 12/29/2019230,000.00

NMFS La Jolla, CA - Lab Replacement Mark EberlingElizabeth WhitselReal010058 8/21/2013104,450,000.00

NMFS Woods Hole, MA - Berthing Jack C. KlausElizabeth WhitselReal010155 9/1/202018,800,000.00

NOAA/SEFSC NMFS Panama City Lab, FL - Safety and Security System Project

Jack C. KlausElizabeth WhitselReal010271 5/25/2018290,000.00

NWFSC Manchester Research Station Saltwater Stabilization

Timothy R. CalohanElizabeth WhitselReal010276 3/15/2019290,209.00

Renovation of the NMFS JJ Howard Laboratory, Sandy Hook, NJ

Rob L. McWilliamsDeborah JohnsonReal010285 2/1/20221,600,000.00

Number of Open CWIP Activities Total Estimated CostCAO/NMFS Subtotals 160,712,209.0012

CAO/NOS

Design Build Boat Dock Replacement & Associated Improvements

Jack C. KlausElizabeth WhitselReal010278 8/30/2018615,000.00

NOS Cooperative Oxford Lab - HVAC/Geothermal System for Main Lab Bldg

Ashok DesaiElizabeth WhitselReal010254 1/30/2018240,000.00

NOS Galveston, TX - FGNMS Building 216 Renovation

Ashok DesaiElizabeth WhitselReal010130 12/1/2018770,000.00

NOS Stellwagen Bank NMS MOC/Boathouse Renovation, Scituate. MA

Jack C. KlausElizabeth WhitselReal010227 12/30/20192,103,000.00

Number of Open CWIP Activities Total Estimated CostCAO/NOS Subtotals 3,728,000.004

CAO/NWS

Design/Build Recapitalization & Deficiency Correction, WFO Miami, FL

Thomas R. MartinElizabeth WhitselReal010267 1/1/20201,400,000.00

Design/Build Recapitalization & Deficiency Corrections, WFO Brookhaven, NY

Stephen RebetskyElizabeth WhitselReal010269 3/1/20201,100,000.00

Design/Build Recapitalization & Deficiency Corrections, WFO Hanford, CA

Thomas R. MartinElizabeth WhitselReal010268 4/1/2019975,000.00

Page 2 of 9Note - Data as of: GL period of Report #: CWIPDB 112

and CBS trans date of

12/31/19

12/12/19

Page 3: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

Design/Build Services for Repairs at WFO in Pittsburgh, PA

Stephen RebetskyDeborah JohnsonReal010291 1/2/2020397,000.00

EPG Replacement at NWS WFO Guam, WSO Chuuk & WSO Yap

Scott IngallsDeborah JohnsonReal010289 12/15/2019660,000.00

HVAC Replacement Repair System WFO Pueblo, Colorado

Natalae C TillmanDeborah JohnsonReal010295 7/5/2019625,000.00

HVAC Replacement/Repair System WFO Pleasant Hill, Missouri

Natalae C TillmanDeborah JohnsonReal010292 7/15/2019400,000.00

HVAC Replacement/Repair System WFO Sioux Falls, South Dakota

Natalae C TillmanDeborah JohnsonReal010294 7/1/2019600,000.00

HVAC Replacement/Repair Systems WFO Knoxville/Tri Cities (MRX), TN

Michael D. RandallDeborah JohnsonReal010287 10/11/2019350,000.00

HVAC Replacement/Repairs Systems WFO El Paso Santa Teresa, NM

Michael D. RandallDeborah JohnsonReal010286 2/28/2020400,000.00

HVAC Unit Replacement - HVAC Systems NWS WFO Pendleton, Oregon

Timothy R. CalohanDeborah JohnsonReal010283 5/17/2019600,000.00

Install Water Storage Tank at WFO Gray, ME John BattleDeborah JohnsonReal010298 6/30/2020500,000.00

NWS - WFO, Atlanta Priority Repairs, Atlanta WFO, Atlanta, GA

Thomas R. MartinElizabeth WhitselReal010327 1/1/2020279,167.00

NWS - WFO, Melbourne Priority Repairs, Melborne WFO, Melborne, FL

Thomas R. MartinElizabeth WhitselReal010325 1/1/2020451,200.00

NWS - WFO, Tampa Bay Priority Repairs, Tampa Bay WFO, Tampa Bay, FL

Thomas R. MartinElizabeth WhitselReal010326 1/1/2020623,000.00

NWS HVAC Replacement for Guam WFO John BattleElizabeth WhitselReal010219 3/30/2019998,736.01

NWS Nashville WFO Repair/Replace Masonry Timothy R. CalohanElizabeth WhitselReal010346 6/30/2020400,000.00

NWS Tuscaloosa, AL (Water Resource Center) John BattleElizabeth WhitselReal010121 2/14/201425,148,500.00

NWS Weather Forecast Office (WFO), Cleveland, HQ

John BattleElizabeth WhitselReal010229 9/1/20161,800,000.00

Page 3 of 9Note - Data as of: GL period of Report #: CWIPDB 112

and CBS trans date of

12/31/19

12/12/19

Page 4: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

NWS WFO Aberdeen, SD - HVAC Upgrade/Replacement

Jack C. KlausElizabeth WhitselReal010321 3/30/2020650,000.00

NWS WFO Austin/San Antonio Priority Repairs

Scott IngallsElizabeth WhitselReal010329 9/30/2020400,000.00

NWS WFO Grand Rapids, MI HVAC Upgrade/Replacement

Natalae C TillmanDeborah JohnsonReal010306 10/3/2019650,000.00

NWS WFO Green Bay WI HVAC Upgrade/Replacement

Natalae C TillmanDeborah JohnsonReal010307 7/18/2019650,000.00

NWS WFO Louisville, KY - HVAC Upgrade/Replacement

Jack C. KlausElizabeth WhitselReal010319 12/30/2019650,000.00

NWS WFO Midland Priority Repairs Scott IngallsElizabeth WhitselReal010328 9/30/2020500,000.00

NWS WFO Milwaukee, WI HVAC Upgrade/Replacement

Natalae C TillmanDeborah JohnsonReal010308 7/18/2019650,000.00

NWS WFO Nashville Tenn Septic System Installation & Facility Upgrades

Timothy R. CalohanDeborah JohnsonReal010281 6/1/2019500,000.00

NWS WFO Pago Pago Storm Readiness Repairs

Scott IngallsElizabeth WhitselReal010330 9/30/2020630,000.00

NWS WFO San Juan, PR - HVAC Upgrades Brantley F BainElizabeth WhitselReal010261 2/28/2019484,000.00

NWS WFO Wichita, KS - HVAC Upgrade/Replacement

Jack C. KlausElizabeth WhitselReal010322 9/1/2020650,000.00

PAC Unit Replacement - HVAC Systems - NWS WFO, Reno, NV

Timothy R. CalohanElizabeth WhitselReal010320 1/28/2020600,000.00

PAC Unit Replacement - HVAC Systems NWS WFO Seattle, WA

Timothy R. CalohanDeborah JohnsonReal010282 2/15/2019446,574.00

Recapitalization & Deficiency Correction, WFO River Forcast Office, Anchorage, AK

Thomas R. MartinDeborah JohnsonReal010297 1/1/20201,200,000.00

Replacement of Building HVAC Systems - NWS WFO, Glasgow, MT

Mark EberlingElizabeth WhitselReal010258 11/30/2018600,000.00

San Juan Hurricane Upgrades/Repairs, San Juan WFO Carolina, PR

Thomas R. MartinElizabeth WhitselReal010318 2/1/2020519,150.00

Page 4 of 9Note - Data as of: GL period of Report #: CWIPDB 112

and CBS trans date of

12/31/19

12/12/19

Page 5: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

WFO Corpus Christi Hurricane Upgrades & Repairs

Thomas R. MartinElizabeth WhitselReal010323 1/1/2020310,000.00

Number of Open CWIP Activities Total Estimated CostCAO/NWS Subtotals 47,797,327.0136

CAO/OAR

AOML, Miami, FL First Floor Renovation of the Physical Oceanography Engineering Lab/Workshop Area

Jack C. KlausDeborah JohnsonReal010300 8/22/2019999,813.64

AOML, Miami, Hurricane Damage Project Randolph GhertlerDeborah JohnsonReal010312 12/30/20204,520,000.00

GFDL Emergency Generators for Data Center Renovation

Rob L. McWilliamsElizabeth WhitselReal010246 7/16/20181,400,000.00

GLERL LMFS Building 3 Replacement, OAR Muskegon, MI

Michael D. RandallDeborah JohnsonReal010296 9/15/20201,300,000.00

Number of Open CWIP Activities Total Estimated CostCAO/OAR Subtotals 8,219,813.644

CAO/OMAO

OMAO Ketchikan, AK Trestle Upgrade Project Joel VaughnElizabeth WhitselReal010224 9/30/20185,400,000.00

OMAO Norfolk, VA - MOC-A Bulkhead Replacement

Rob L. McWilliamsElizabeth WhitselReal010142 2/28/20127,345,000.00

Number of Open CWIP Activities Total Estimated CostCAO/OMAO Subtotals 12,745,000.002

NESDIS

4th Gen LEOLUT with MEOLUT Jesse ReichKathy P. BelfieldPersonal010237 12/3/20194,717,988.00

Comprehensive Large Array Data Stewardship System (CLASS)

Jay MorrisJames GoudourosPersonal010013 6/30/2017300,000,000.00

Deep Space Climate Observatory (DSCOVR) Michael SimpsonKesha D. HayesPersonal010158 10/28/201585,000,000.00

DSCOVR Antenna Improvement (DAI) Kenneth WattsLenora WoodsPersonal010311 9/29/20201,250,000.00

Page 5 of 9Note - Data as of: GL period of Report #: CWIPDB 112

and CBS trans date of

12/31/19

12/12/19

Page 6: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

ESPC LAN Network and IT Infrastructure Rick VizbulisLenora WoodsPersonal010204 1/10/202015,500,000.00

ESPC NDE 2.0 AND PDA Build-out at CBU Rick VizbulisLenora WoodsPersonal010173 1/10/202025,000,000.00

ESPC NDE 2.0 Development Rick VizbulisLenora WoodsPersonal010182 1/10/202025,000,000.00

Fairbanks CDAS UPS Replacement & Electrical Renewal

David E. HaukJasmine GrayReal010250 1/21/20204,218,000.00

Fairbanks Command and Data Acquisition Station FSOF Entry Canopies

David E. HaukJasmine GrayReal010324 7/31/2020429,219.00

FCDAS Automatic Transfer Switches David E. HaukJasmine GrayReal010332 8/31/2021700,040.00

FCDAS Power and Communications Utilities Relocation

David E. HaukJasmine GrayReal010343 4/16/2021840,000.00

GOES R Series Stephen SchaefferLaila M.YatesPersonal010028 11/30/202110,150,059,000.00

I - Star Panel Refresh NESDIS Suitland MD Ian YankoskyJasmine GrayReal010336 3/1/2020375,207.64

Jason-3 Altimetry Mission James H. SilvaKesha D. HayesPersonal010146 9/30/2016181,000,000.00

JPSS John LongeneckerTom McGarryPersonal010133 12/31/202218,900,000,000.00

Metop-SG PPA James H. SilvaKesha D. HayesPersonal010335 9/30/202250,000,000.00

NSOF Rear Entry Building Access NESDIS Suitland MD

Ian YankoskyJasmine GrayReal010338 3/1/2020459,252.00

NSOF Secure Storage Renovation NESDIS Ian YankoskyJasmine GrayReal010337 3/1/2020410,662.00

ONE STOP Ken CaseyLuke CholidPersonal010232 12/7/20176,600,000.00

OSGS Mission Support System Jon DoranLenora WoodsPersonal010272 9/30/20211,600,000.00

POLAR METOP James H. SilvaKesha D. HayesPersonal010097 7/3/2019561,564,000.00

Page 6 of 9Note - Data as of: GL period of Report #: CWIPDB 112

and CBS trans date of

12/31/19

12/12/19

Page 7: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

Product Distribution and Access (PDA) Rick VizbulisLenora WoodsPersonal010137 1/10/202096,000,000.00

Radio Frequency Interference Monitoring System (RFIMS)

Steven GrippandoLenora WoodsPersonal010234 3/28/2021130,000,000.00

Secure Ingest Jonathan TerrellLenora WoodsPersonal010302 3/31/20206,000,000.00

Southwest USA Medium Earth Orbiting Local User Terminal (SUSA MEOLUT)

Mickey FitzmauriceKathy P. BelfieldPersonal010304 7/29/20205,150,000.00

Space Weather Follow On Kevin TeweyMichael FloydPersonal010273 12/31/2024534,350,000.00

Wallops CDAS Groundwater Supply for Cooling Plant

David E. HaukJasmine GrayReal010248 8/7/2019614,716.00

Wallops CDAS Paving Repairs David E. HaukJasmine GrayReal010249 6/25/2020473,148.00

Wallops CDAS Switchboard BHSB Main Feeder Replacement

David E. HaukJasmine GrayReal010339 12/18/2019299,231.00

WCDAS Paving Repair Phase II David E. HaukJasmine GrayReal010341 11/18/2020424,080.00

WCDAS Physical Access Control and Closed Circuit Television (PACS & CCTV) replacement

David E. HaukJasmine GrayPersonal010303 11/29/20191,000,452.00

Number of Open CWIP Activities Total Estimated CostNESDIS Subtotals 31,089,034,995.6431

NOS

Ogdensburg NY Water Level Station Robert LoeschJason ShadidReal010342 7/31/2021800,000.00

Number of Open CWIP Activities Total Estimated CostNOS Subtotals 800,000.001

NWS

Palau Construction Will FreemanJanet NixReal010094 8/17/20184,846,526.37

WSO Chuuk Construction Will FreemanJanet NixReal010171 8/8/20183,400,000.00

WSR-88D Service Life Extension Program (SLEP)

Dan HoffmanJames B. McLaughlinPersonal010218 5/2/201740,000,000.00

Page 7 of 9Note - Data as of: GL period of Report #: CWIPDB 112

and CBS trans date of

12/31/19

12/12/19

Page 8: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

Number of Open CWIP Activities Total Estimated CostNWS Subtotals 48,246,526.373

OMAO

Hurricane Hunter Jet Replacement and Back-up; N59RF

Alan GoldsteinBradley H. Fritzler CDRPersonal010309 11/1/2022121,000,000.00

Jet Prop Replacement; N67RF Alan GoldsteinBradley H. Fritzler CDRPersonal010310 3/1/202112,000,000.00

Nancy Foster Capital Improvements Jamie LeCompteMichael HefnerPersonal010196 3/1/20204,300,000.00

NOAA Ferdinand Hassler Capital Improvement Sandra WymanMichael HefnerPersonal010279 12/31/20227,000,000.00

NOAA Okeanos Explorer - Capital Improvements

Gunnar ForsmanMichael HefnerPersonal010212 12/31/20252,000,000.00

NOAA P-3 Service Life Extension Project (SLEP) CDR Kristie TwiningBradley H. Fritzler CDRPersonal010172 12/20/201942,232,725.00

NOAA SHIP - Fairweather Capital Improvements

Adlai SudboroughMichael HefnerPersonal010199 12/31/20255,000,000.00

NOAA SHIP - Rainier Capital Improvement Robert EdwardsMichael HefnerPersonal010226 12/31/20255,000,000.00

NOAA Ship Bell M Shimada Capital Improvements

Dale MorrisonMichael HefnerPersonal010233 12/31/20212,000,000.00

NOAA Ship Henry Bigelow - Capital Improvements

Kenneth MarstonMichael HefnerPersonal010213 12/31/20211,000,000.00

NOAA Ship Oscar Sette - Capital Improvements

Kenn AsatoMichael HefnerPersonal010214 12/31/20212,000,000.00

NOAA SHIP Thomas Jefferson - Capital Improvement

Neil S. LamartinMichael HefnerPersonal010184 7/20/202010,300,000.00

NOAA's Oscar Dyson Capital Improvements Jerome SheehanMichael HefnerPersonal010239 12/31/20205,000,000.00

NOAA's Pisces Capital Improvements Stephen W SpindlerMichael HefnerPersonal010252 12/31/20205,000,000.00

OMAO NOAA'S Gordon Gunter Capital Improvement

Brian KellyMichael HefnerPersonal010217 12/31/20205,000,000.00

Page 8 of 9Note - Data as of: GL period of Report #: CWIPDB 112

and CBS trans date of

12/31/19

12/12/19

Page 9: OPEN CWIP ACTIVITIES BY LINE OFFICE · 12/12/2019  · 010314 Roof Replacement Bldg 33 - WRC, Seattle, WA Real Elizabeth Whitsel Timothy R. Calohan 1,900,000.00 7/2/2019 ... HVAC

Line Office Activity Title Project ManagerActivity Mgr Estimated Cost Estimate Placed In Service Date

Type of Property

OPEN CWIP ACTIVITIES BY LINE OFFICE Database Run Date:12/13/2019Activity #

OMAO NOAAS Ronald Brown Capital Improvements

Jamie LeCompteMichael HefnerPersonal010235 12/31/20204,000,000.00

OMAO Ship Hi'ialakai Capital Improvement George NakoaMichael HefnerPersonal010197 12/31/202012,500,000.00

Oregon II Capital Improvement Brian KellyMichael HefnerPersonal010186 9/30/20185,800,000.00

Reuben Lasker Capital Improvements Frank WoodMichael HefnerPersonal010299 5/31/20232,000,000.00

Number of Open CWIP Activities Total Estimated CostOMAO Subtotals 253,132,725.0019

Total Number of Open CWIP Activities Total Estimated Cost31,941,501,596.66120