OP 16...Contra Costa Pump3 #01 74 Samples 2.1 - 6.5 mg/L as C 3.46 mg/L as C 3.2 mg/L5 as C Barker...

1
! ! ! ! ! ! ! ! San Joaquin River near Vernalis 488 Samples 1.8 - 11.8 mg/L as C 3.8 mg/L as C 3.3 mg/L as C Sacramento River at Hood 351 Samples 1.0 - 11.7 mg/L as C 2.2 mg/L as C 1.8 mg/L as C San Joaquin River at Antioch Ship Channel 7 Samples 1.5 - 3.2 mg/L as C 1.9 mg/L as C 1.7 mg/L as C Sacramento River above Point Sacramento 7 Samples 1.5 - 3 mg/L as C 2.0 mg/L as C 1.6 mg/L as C Contra Costa Pump #01 74 Samples 2.1 - 6.5 mg/L as C 3.4 mg/L as C 3.2 mg/L as C Barker Slough Pump 144 Samples 2.4 - 15.9 mg/L as C 5.7 mg/L as C 4.0 mg/L as C Sacramento River at Mallard Island 87 Samples 1.3 - 7.2 mg/L as C 2.4 mg/L as C 2.1 mg/L as C H.O. Banks Headworks 109 Samples 1.9 - 8.3 mg/L as C 3.3 mg/L as C 3.0 mg/L as C O P 275 O P 4 O P 33 O P 262 O P 61 O P 13 O P 26 O P 120 O P 132 O P 24 O P 104 O P 128 O P 88 O P 113 O P 16 O P 99 O P 160 £ ¤ 50 § ¨ ¦ 780 § ¨ ¦ 205 § ¨ ¦ 505 § ¨ ¦ § ¨ ¦ 80 § ¨ ¦ 5 Clarksburg Hood Thornton Byron Ryde Benicia Brentwood Elk Grove Isleton Oakley Rio Vista Lodi Tracy Courtland Fairfield Freeport Locke Suisun City Antioch Bethel Island French Camp Knightsen Lathrop Lincoln Village Manteca Sacramento Pittsburg Stockton Terminous Walnut Grove West Sacramento Discovery Bay Bay Point Country Club Mountain House Sources: Plan Area, ICF 2012; Area of Additional Analysis, ICF 2012; Constructability (Rev 10), DHCCP DWR 2012; Constructability (Rev 5a), DHCCP DWR 2015; Constructability (Rev 3b), DHCCP DWR 2012; Streets, ESRI 2010; Aerial Photograph, NAIP 2010; Hydrology, HDR 2010; Water Quality, EMP 1999. Legend ! Sampling Location Plan Area Areas of Additional Analysis Conveyance Construction Footprint Modified Pipeline/Tunnel Alignment Pipeline/Tunnel Alignment East Alignment West Alignment Through Delta/Separate Corridors 0 9.5 4.75 Miles ´ Figure 8-38 Spatial Summary of Dissolved Organic Carbon Data at Delta Stations (2001 - 2006) K:\Projects_1\DWR\00726_11_BDCP\mapdoc\_Recirc\Ch08\Fig_08_38_Diss_Carbon_Delta_20150326.mxd Date: 3/27/2015 Time: 4:25:32 PM 28266 COUNT MIN - MAX MEAN MEDIAN !

Transcript of OP 16...Contra Costa Pump3 #01 74 Samples 2.1 - 6.5 mg/L as C 3.46 mg/L as C 3.2 mg/L5 as C Barker...

Page 1: OP 16...Contra Costa Pump3 #01 74 Samples 2.1 - 6.5 mg/L as C 3.46 mg/L as C 3.2 mg/L5 as C Barker Slough Pump 144 Samples 2.4 - 15.9 mg/L as C 5.7 mg/L as C 4.0 mg/L as C Sacramento

!

!

!

!

!

!

!

!

San Joaquin River near Vernalis488 Samples

1.8 - 11.8 mg/L as C3.8 mg/L as C3.3 mg/L as C

Sacramento River at Hood351 Samples

1.0 - 11.7 mg/L as C2.2 mg/L as C1.8 mg/L as C

San Joaquin River at Antioch Ship Channel

7 Samples1.5 - 3.2 mg/L as C

1.9 mg/L as C1.7 mg/L as C

Sacramento River above Point Sacramento

7 Samples1.5 - 3 mg/L as C

2.0 mg/L as C1.6 mg/L as C

Contra Costa Pump #0174 Samples

2.1 - 6.5 mg/L as C3.4 mg/L as C3.2 mg/L as C

Barker Slough Pump144 Samples

2.4 - 15.9 mg/L as C5.7 mg/L as C4.0 mg/L as C

Sacramento River at Mallard Island

87 Samples1.3 - 7.2 mg/L as C

2.4 mg/L as C2.1 mg/L as C

H.O. Banks Headworks109 Samples

1.9 - 8.3 mg/L as C3.3 mg/L as C3.0 mg/L as C

OP238

OP275

OP4

OP33

OP262

OP61 OP112OP185

OP13

OP92

OP26

OP120

OP132

OP24

OP104

OP128

OP88

OP113

OP16

OP99

OP160

£¤50

§̈¦238

§̈¦780

§̈¦205

§̈¦880

§̈¦505

§̈¦680

§̈¦80

§̈¦5

Clarksburg

Hood

Thornton

Byron

Ryde

Benicia

Brentwood

ElkGrove

Isleton

Oakley

RioVista Lodi

Tracy

Courtland

Fairfield

Freeport

LockeSuisunCity

Antioch

BethelIsland

FrenchCamp

Knightsen

Lathrop

LincolnVillage

Manteca

Sacramento

Pittsburg

Stockton

Terminous

WalnutGrove

WestSacramento

DiscoveryBay

BayPoint

CountryClub

MountainHouse

Sources: Plan Area, ICF 2012; Area of Additional Analysis, ICF 2012; Constructability (Rev 10), DHCCP DWR 2012; Constructability (Rev 5a), DHCCP DWR 2015; Constructability (Rev 3b), DHCCP DWR 2012;Streets, ESRI 2010; Aerial Photograph, NAIP 2010; Hydrology, HDR 2010; Water Quality, EMP 1999.

Legend! Sampling Location

Plan AreaAreas of Additional Analysis

Conveyance Construction FootprintModified Pipeline/Tunnel AlignmentPipeline/Tunnel AlignmentEast AlignmentWest AlignmentThrough Delta/Separate Corridors

0 9.54.75Miles

´

Figure 8-38

Spatial Summary of Dissolved Organic Carbon Data at Delta Stations (2001 - 2006)

K:\Pr

ojects

_1\D

WR\00

726_

11_B

DCP\m

apdo

c\_Re

circ\C

h08\F

ig_08

_38_

Diss_

Carbo

n_De

lta_2

0150

326.m

xd D

ate: 3

/27/20

15 Ti

me: 4

:25:32

PM 2

8266

COUNTMIN - MAXMEANMEDIAN

!