Plant Growth Promoting Rihzobacteria Enhanced Phytoremediation Systems for
Remediation of Contaminated Soils
Xiao-Dong Huang, Ph.D.Vice President
Waterloo Environmental Biotechnology IncWaterloo, Ontario
![Page 2: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/2.jpg)
Outline
1. Bacteria enhanced phytoremediation
3. Remediation cases: PHC and Salt
3. Cost analysis
![Page 3: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/3.jpg)
1. Preserves natural environment and improves soil quality2. It is driven by solar energy and suitable to most regions
and climates3. It is cost effective and technically feasible4. Restoration of ecosystem5. Can be used effectively at remote sites6. Effective for remediation of PHC and salt – relevant to the
energy industry
Advantages of Phytoremediation
![Page 4: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/4.jpg)
Phytoremediation process is too SLOW10-20 years for completionFeasibility ? Not goodThe Question:How to speed up the process to 10-20 months?The answer: Soil Rhizobacteria
Disadvantages of Phytoremediation
![Page 5: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/5.jpg)
Microorganisms in soil: Plant associated bacteria:
Plant Growth Promoting Rhizobacteria (PGPR) Degrading Bacteria:
Contaminant degradation
![Page 6: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/6.jpg)
Inoculationto plants
![Page 7: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/7.jpg)
1 week later
uninoculated
Inoculated
![Page 8: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/8.jpg)
![Page 9: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/9.jpg)
Greenhouse experiment for PHC degradation
BioremedaitionBacteria enhancedPhytoremediaionPhytoremediation
Bacteria enhancedPhytoremediaion
![Page 10: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/10.jpg)
Greenhouse testing: PHC remediation
Enhanced phytoremphytorem
![Page 11: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/11.jpg)
Plant promote rhizobacteria population
5 x 108
5 x 107 有
PhytoremEnhanced phytoBiorem
June seeding
July August September
Rih
zosp
ere
bact
eria
pop
ulat
ion,
log
![Page 12: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/12.jpg)
0
10
20
30
40
50
60
0 2 4 6 8
Degradation kinetics of bacteria enhanced phytoremediation
time
Deg
rada
tion
rate,
%
Phytoremediation Enhanced Phytorem
![Page 13: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/13.jpg)
HPLC analysis of PAH Degradation by PEP System
DBP
CHRBAP
DBA
BBA BKF
BBFPYR
FLA
PHE
BGP
3 months40%
![Page 14: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/14.jpg)
Application of PEPS for PHC Remediation(2007- 09)
All sites met applicable criteria1. Sarnia, ON – land farm for oil sludge – 3 year study (15% w/w –
60% F3 (C16-C34), 30% F4 (C34 – C50)2. Quebec City, QC – Tier 1 criteria met in one year3. Steinbach, MB – Complete remediation in 1 year – Gas station
site 4. Hinton, AB – Complete remediation in 2 years – Diesel invert
drilling waste5. Peace River, AB – Complete remediation in 3 years – Flare pit
material6. Edson, AB – Complete remediation in 2 years – Diesel invert
drilling waste
![Page 15: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/15.jpg)
2006/6/19
Field application: Sarnia refinery landfarming site
![Page 16: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/16.jpg)
PH
C, %
Field application: Sarnia refinery landfarming site
3 years remediation: PHC from 15% down to 3%
![Page 17: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/17.jpg)
PEPsPhytorem
7
14
21
28
F2 (C16-15) F3(C16-25) F4 (C26-50) >C50
g/kg
35%
![Page 18: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/18.jpg)
Quebec City, QC PHC contaminated soil treated with bioremediation for one year
![Page 19: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/19.jpg)
Soil contain 1000 ppm PHC
Quebec City, QC – start of Season May 20 2009
Quebec tier 1 criteria: 300 ppm
Treatment pads
![Page 20: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/20.jpg)
Quebec City, QC – End of Season Oct 20 2009
![Page 21: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/21.jpg)
PHC Removal for Growth Season
QB Tier 1 standard
![Page 22: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/22.jpg)
Field application: Gas Station in Steinbach, Manitoba
One year remediation: PHC from 2200 ppm down to 1000 ppm
![Page 23: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/23.jpg)
Plant Growth and Coverage at a Diesel Invert Site near Hinton AB
2008 remediation operation: Plating on June 25Final sampling on Oct 5Plant coverage 95%Pant height: 45 cm
![Page 24: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/24.jpg)
PHC removal at Hinton site, AB
Alberta Tier 1 standard
![Page 25: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/25.jpg)
A closed contaminated site near Peace River, AB
![Page 26: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/26.jpg)
PHC Remediation at Peace River Site, AB
28%
51%
Alberta Tier 1 standard
![Page 27: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/27.jpg)
Plant growth and coverage at a diesel invert site near Edson AB
July 31 2008
![Page 28: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/28.jpg)
PHC Remediation near Edson, AB
Alberta Tier 1 standard
![Page 29: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/29.jpg)
Second Generation Full Scale Sites
1. Three sites near Dawson Creek, BC2. One site near Fort Nelson, BC3. One site near Swan Hills, AB4. One site near Hinton, AB5. One site near Edson, AB6. One site near Red Earth Creek, AB
![Page 30: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/30.jpg)
Application of PEPS for Salt Remediation (2007- 09)
1. Norman Wells, NWT 2. Provost, AB3. Cannington Manor, SK4. Alameda, SK5. Kindersley, SK6. Brazeau, AB7. Weyburn, SK (7 sites)8. Red Earth, AB
![Page 31: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/31.jpg)
Norman Wells, NWT – Start of Season (2008)Soil Impact – Salt
![Page 32: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/32.jpg)
Norman Wells, NWT – End of Season (2010)
Soil Impact – Salt
![Page 33: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/33.jpg)
Norman Wells, NWT – End of Season (2009)Soil Impact – Salt
Plant Biomass (dry wt g/m2 ± SE)
Year Plot A Plot B Plot C
2009 300 ± 26 397 ± 50 623 ± 44
2010 393 ± 16 592 ± 40 525 ± 20
![Page 34: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/34.jpg)
![Page 35: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/35.jpg)
• ECe (2009): decreased from 13-17 to 4-12 dS/m
• ECe (Spring 2010): all sampling points were below applicable targets
• Successful remediation was achieved in 1 year
Soil Impact – Salt Provost, AB: End of Season (2009, Year 1)
• High salt spots have filled in with plants
![Page 36: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/36.jpg)
Phytoremediation Cost analysis for the Edson Site
• 1.07 ha impacted to a depth of 0.3 m or 3,210 m3 of PHC impacted material
• The costs for the entire project for PEPs was: $104,000 or $32.50/m3
• Landfilling this material would have cost $70/m3 • Assumes a 2 h truck turnaround time if no backfill
required • If backfill was required, the cost would rise to $90/m3
• Composting would cost $75-150/m3
![Page 37: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/37.jpg)
Examples of Remediation Methods• Dig and dump - Any contaminant type - $100-500/m3• Soil incineration - On or off site - Organic contamination -
$200-600/m3• Chemical extraction - Any type of contamination -
$250/m3• Electrokinetic separation - Metals/Salts - $200/m3• Soil flushing/fracturing - Any contaminant type - $250/m3• Land farming - Small organics - $50/m3• Bioremediation - Organics - $100/m3• Our PEPs - Any contaminant type - $25-50/m3
![Page 38: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/38.jpg)
Development, Proof, and Application of PGPR Enhanced Phytoremediation
Systems (PEPS)Over 10 years of research and full-scale field application:1. PHC: 18 sites in AB, BC, MB, QC and ON(2004-10)
2. Gas station: site fully remediated in 1 summer (2007)
3. Salt: 14 sites in SK, AB and NWT (2007-10)
![Page 39: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/39.jpg)
• Works effective for PHC and salt remediation. • Remediation at all sites have been successful; > 20 sites.• Costs of PHC and salt remediation are low.• Unit cost drops as the volume of material increases. • Phytoremediation costs (all in) < half the cost of landfilling.• Liability is reduced, not transferred to a landfill.• Cost effective at remote sites.• Purchase of backfill not required. Soils are reused.• Tier 2 approach - if required only marginal cost increase.• Green technology, solar energy and carbon sequestration. • Environmentally friendly and Positive PR opportunity.
Why Use Phytoremediation?
![Page 40: ONEIA Xiao-Dong Huang presentation](https://reader034.fdocuments.net/reader034/viewer/2022051412/54b8785e4a7959507f8b4623/html5/thumbnails/40.jpg)
Colleagues and PartnersPeople in the group
• Bruce Greenberg• Karen Gerhardt• Jola Gurska• Xiao-Ming Yu• Mark Lampi• Shan Shan Wu• Julie Nykamp• Nicole Knezevich• Greg MacNeill• Xiaobo Lu• Scott Liddycoat• Han Zheng• Brianne McCallum• Peter Mosley• Matt Hannaberg
Partners • S Willets, O Mrklas, C Gordey,
Conoco Phillips Canada• B Moore, Devon Canada Inc• E Harrison, Cenovus Energy• P Coldham, Questerre Engegy• L Lawlor, Imperial Oil• A Traverse, Baytex Energy Corp• G Millard, Shell Canada• Canadian Forestry Oil Corp• Perry Gerwing, Earthmaster • T Chidlaw, MWH• J Budziak, Seaway • D McMillan, SNC• G Stephenson, Stantec• S Steed, NorthWind• G Adams, URS• B Chubb, Maxxam