Page 1: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

One Belt One Road

October 15, 2015

Page 2: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

Table of Content

Location

Site Map

Khorgos Gateway in the new Logistics equation

Start of operation

Outlook for coming months

SEZ Advantages

Conclusion

Page 3: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – Where are we?

Almaty

Lianyungang

Astana

Dostyk

Altynkol

Page 4: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – Aerial Map

Dry Port 149 Ha

Logistics Zone 189 Ha

Industrial Zone 230 Ha

Warehouse

Warehouse

Customs

Page 5: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – The alternative for Central Asia

Page 6: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – Eurasian Economic Union

• 17 cities with more than 1 million inhabitants

• EEU introduces free movement of goods, capital and services.

• Provides for common policies on transport, agriculture and energy.

Page 7: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – The alternative for Europe

730 million

Consumers

Europe to Asia

93,000 teus / week

Asia to Europe

250,000 teus / week

1,4 billion

Consumers

Page 8: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – When?

START OF OPERATION JULY 29th, 2015

Page 9: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – Operational KPI for the ICD– from July 29 -October 13, 2015

KPI RESULT UNIT

THROUGHPUT 8,532 TEU

NO OF TRAINS HANDLED 162 NUMBER

TRAIN TURNAROUND TIME 47 MINUTES

WAGON / TRAIN 38 WAGONS

GROSS CRANE RATE 15 MOVES / HOUR

Page 10: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – Equipment delivery

• Current equipment in dry port

• 6 Reach stacker DRT450 Kalmar

• 2 Empty Handler DCT80 Kalmar

• Waiting to be delivered this year

• 3 RMG estimated delivery 25th of September 2015

• 7 ITV and 10 trailer will be delivered in batches as follow

• 1st batch: 5th September 2015 (2 trucks)

• 2nd batch: 25th September 2015 (1 truck, 4 trailers)

• 3rd batch: 7th November 2015 (4 trucks, 6 trailers)

• Waiting to be delivered next year

• 4 RTG estimated beginning of 2016

Page 11: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – DP WORLD Procedures Roll out

DPW corporate governance guidelines being reviewed to be introduced for Khorgos Gateway

In order to have safe operations DPW safety and security guidelines being implemented in Khorgos Gateway.

IT infrastructure and IT policies implemented as per DPW policy

Operations is carried out with implementing DPW best practices and procedures to achieve highest Efficiency

Training for Khorgos gateway Operations staff planned in DPW Subcontinent terminals with first batch proceeding in 3rd week of September.

Active involvement of DPW in monitoring and inspecting equipment procurement and construction.

Page 12: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – October 2015

Page 13: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – Highway East West - October 2015

Page 14: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – The coming months

Increase of volumes and productivity

block train activity to increase offering regular departure to

many destinations

Handling of new types of business using our yard capacity (cars,

Xborder cargo, Chemical, etc. )

Simplification of Customs procedures

Development of the logistics area with the

first warehouses

track and trace

Schedules

Page 15: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – SEZ advantages

Proximity to China and Europe

Multimodality

Infrastructures

Free land lease for 10 years

Customs Union privilege

CIT, Property, VAT waiver

One stop shop

Page 16: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – Conclusion

From Concept to Reality

The OBOR is rolling out

Bringing Business Opportunities and alternative

Efficiency and new standards

Prosperity to a whole region

Page 17: One Belt One Road October 15, 2015 - JOC Events · PDF fileKTZE - Khorgos Gateway – Equipment delivery • Current equipment in dry port • 6 Reach stacker DRT450 Kalmar • 2 Empty

KTZE - Khorgos Gateway – Contact

Mr. HICHAM BELMAACHI,