WP/II-H-1.3/2 Page 17 of 32 Oncor Electric Delivery System 2015 Analysis of System Losses Exhibit 6 — Development of Loss Factors, Unadjusted This exhibit calculates demand and energy losses and loss factors by specific voltage levels based on sales level requirements. The actual results reflect loads by level and summary totals of losses at that level, or up to that level, based on the results as shown in Exhibit 5. Finally, the es- timated values at generation are developed and compared to actual generation to obtain any difference or mismatch. Exhibit 7 — Development of Loss Fa:dors, Adjusted The adjusted loss factors are the results of adjusting Exhibit 6 for any difference. All differences between estimated and actual are prorated to each level based on the ratio of each level's total load plus losses to the system total. These new loss factors reflect an adjustment in losses due only to the MW and MWh mismatch. Exhibit 8 — Adlusted Losses and Loss Factors by Facility These calculations present an expanded summary detail of Exhibit 7 for each segment of the power system with respect to the flow of power and associated losses from the receipt of energy at the meter to the generation for the Oncor power system. Exhibit 9 — Summary of Losses by Delivery Voltage These calculations present a reformatted summary of losses presented in Exhibits 7 and 8 by power system delivery segment as calculated by voltage level of service based on reported metered sales.. MIK 14 4405

Transcript of Oncor Electric Delivery System 2015 Analysis of System Losses

Page 1: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 17 of 32

Oncor Electric Delivery System 2015 Analysis of System Losses

Exhibit 6 — Development of Loss Factors, Unadjusted

This exhibit calculates demand and energy losses and loss factors by specific voltage levels based on sales level requirements. The actual results reflect loads by level and summary totals of losses at that level, or up to that level, based on the results as shown in Exhibit 5. Finally, the es-timated values at generation are developed and compared to actual generation to obtain any difference or mismatch.

Exhibit 7 — Development of Loss Fa:dors, Adjusted

The adjusted loss factors are the results of adjusting Exhibit 6 for any difference. All differences between estimated and actual are prorated to each level based on the ratio of each level's total load plus losses to the system total. These new loss factors reflect an adjustment in losses due only to the MW and MWh mismatch.

Exhibit 8 — Adlusted Losses and Loss Factors by Facility

These calculations present an expanded summary detail of Exhibit 7 for each segment of the power system with respect to the flow of power and associated losses from the receipt of energy at the meter to the generation for the Oncor power system.

Exhibit 9 — Summary of Losses by Delivery Voltage

These calculations present a reformatted summary of losses presented in Exhibits 7 and 8 by power system delivery segment as calculated by voltage level of service based on reported metered sales..

MIK

14 4405

Page 2: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 18 of 32

Oncor Electric Delivery System 2015 Analysis of System Losses

Appendix A

Results of 2015 Oncor Integrated Power System Loss Analysis

MIK

4406

Page 3: Oncor Electric Delivery System 2015 Analysis of System Losses

d 1/d e 1/e

TOT TRANS 345,138,69 1.00000 1.00000 1.00000 1.00000

PRIM SUBS 25 TO 4 1.00637 0.99367 1.00574 0.99429

PRIMARY 25 TO 4 1.02019 0.98021 1.01506 0.98517

SECONDARY 120/240 TO 1.03885 0.96261 1.03717 0.96416 477

CUMMULATIVE SALES EXPANSION FACTORS SERVICE KV DEMAND (Peak) ENERGY (Annual)

_ _

WP/II-H-1.3/2 Page 19 of 32

Ot4COR 2015 LOSS'ANALYSIS

ONCOR EXHIBIT 1

SUMMARY OF COMPANY DATA(Includes Losses)

ONCOR LOAD AT ERCOT PEAK - INPUT 22,679 MW

ANNUAL SYSTEM INPUT .106,435,000 MWH

ANNUAL SALES OUTPUT 102,972,872 MWH

SYSTEM LOSSES @ INPUT 3,462,128 or 3.25% SYSTEM LOSSES @ OUTPUT 3,462,128 or 3.36%

SYSTEM LOAD FACTOR 53.6%

SUMMARY OF LOS*SES - OUTPUT RESULTS

SERVICE KV --- MW.--- Input

% TOTAL --- MWH --- Input

% TOTAL

TRANS 345,138,69 0.0 0.00% 0 0.00% 0.00% 0.00%

PRIM SUBS 25 TO 4 143.5 17.79% 607,273 17.54% 0.63% 0.57%

PRIMARY 25 TO 4 299.7 37.15% 942,056 27.21% 1.32% 0.89%

SECONDARY 120/240 TO 363.6 45.07% 1,912,799 55.25% .477 1.60% 1.80%

TOTAL 806.7 100.00% 3,462,128 100.00% 3.56%- 3.25%

SUMMARY OF LOSS FACTORS

../..a..,•••••••• • I .•••••-•••••

4407

Page 4: Oncor Electric Delivery System 2015 Analysis of System Losses

ON

CO

R 2

01 5

LO

SS

AN

ALY

SIS

SU

MM

AR

Y O

F C

ON

DU

CT O

R IN

FO

RM

AT

ION

4408

(1) 0

0 0

0

0 0 0 01 0 0, CO 1".. CO T- r) h: co Tr co r••• a> Cs1

o o o 01 o co o co r io -

0 0 0 01 0 '1' 0 CO 0 V' 0 CO CS) h.

coCOU5 CON: N.C5

O

0 0 0 0 0 0 0 0 0 000

SE

CO

ND

AR

Y LI

NE

S

PR

IMA

RY

LIN

ES

SU

BT

RA

NS

0 L

c0 (j)

Z 111 c>>

< Z CO (1) X Z Z

1 1- = 1— 1-

o c). o o O

co o

ro 0

Tr

0 0 0 CD 0 0

0 01 c) ,

1 0 000 0 o o o g C? g D o o 0 ci

1 0 0 0 0 0 1.-- CO r- o ca o c, o o co r- o q o o o Tr r,- I's c; o d d ci a r•• Lri

a) co r, c-4 o

0 0 0 0 0 0

0 0 0 o

oO000 00000 ca o d o d

o ci

o o 4 0 0 0 0 0 o o o o 0 0 0 0 0 0 0 0

0 O o o 0000 O

eeee o 0 0000

0.4.̀ 0 0 0 0

0 0 01 0 CNI o Ns- 61 O "4" co csi co2

N- CSJ .

• < < < • z z z

765 K

V O

R G

RE

AT

ER

0 0 0

o o o

10 o • 0 CO co o o d 0 csi

CV CO CD

3 in 0, N-

co r- a> v.> co 04

0

DE

SC

RIP

TIO

N

0 01 0 1 0 0 01 0

0 ol o 0 0 01 0

0 01 0

0" 0 01 0

Page 5: Oncor Electric Delivery System 2015 Analysis of System Losses

UJ 0 .CCW MN W 0

<

W LJ 00 2Z =0( ZM

ON

CO

R 2

015

LO

SS

AN

ALY

SIS

a O < mS

o

8,4.! <"

0000 00000 0000 000 000 000 C....e...- 000 000 000 0 10 WOO- g aD uo Tr. oo r- CD IS 1...:—.5 v- a; I g = 0

X I .... r.- i 04-

I

0000 000po 0000 000 600 000 are--N 000 000 000 N l0 C....MN. i74 l o, OOR X W 0.06. 1"... M. 0 CT WM

C4 q.

V.. '1...

CD C3 CD CD C7 0 CJ 0 CD CD CD CD CD C) CD 0 C> CD 0 0 CD CD pr CD CD CD CD CD CD CD 0 0 0 CD Tr ‘1. I 0 CD /..... M CO N I,- .47.1`.. 0 M 1...- 0 CV CV- Ccf OT

0 CD C4 OD

e- y- CA Tr

0000 00000 0000 000 000 000 0.701 000 000 000 CD, W l N CD 0 CD CD 0 CD 0 0 0 0 CD CD CD CD CD CD CD CD 0 0 CD CD 03 M 0 CD CD 0 CD CD 0 C7 CD 0 U7 CO l t..- 0000 00000 0000 000 000 000 0NN 000 000 ORO N. OD o 6066 66666 6666 666 666 666 4 ,- -- . 666 666 666 6 o

4 lor

C4 07

CD C) CD C) 0 C) CD CD CI CD CD C3 CD CD CD C) 0 CI CD CD 0 CD CD M 0 C) CD 0 CD 0 C3 CD 0 0 CD le- 0 CD CD CD 0 0 CD 0 0 C3 CD C7 0 C) CD CD CD C3 0 0 CD CD ,C) N M 0 CD CD CD CD 0 CD CD CD U7 CD l C7 0000 00000 0000 000 000 000 tr 07 CD 000 000 000 M 6666 66666 6666 666 666 666 sr-Tr6 666 666 666 o <-0.) 71;

0 "C) CD CD 0 CD CI 0 CD CD CD CD CD CD CD CD CD C) CD CD CD CD CD CD CD CD 0 CD CD CD CD 0 C3 CD N CD CD C) CD 0 CD CD CD 0 0 CD CD CD CD CD CD 0 0 CD Z CD CD 0 OD y- 0 CD 0 CD CD CD 0 CD CD 0 .747 0 00 00000 0000 000 000 CD 0 0 CD N CD 0 00 CD o CD CD CD Tr Tr l ea 6 6 6 6 ca 6 ca ca CD 6 6 6 ca 6 CD 0 6 6 6 6 6 co e4 CD CD 6 c) ca 6 C3 0 6 o c, co tsJ M0 CD co

CD CD CD CD 0 CD CD CD CD CD CD ca co o CD CD CD CD C) Z CD CD 0 CM et 07 CD CD 0 CD 0 CD CD 0 CD NI- <1.

U, TT CV CD CD 0 N

ri T- C4

a

8e 8e a-e eeeee e a° e a° e e e 8e ae 8e ae ae e e eee e a° e a° C3 0 0 CD 0 CD CD CD 0 CD 0 CD CD CD CD 0 C) C3 CD CD 0 0 Tr co CD CD CD CD CD CD CD CD CD CD CD 0 CD 0 CD CD C) CD CD CD CD CD 0 CD CD CD 0 0 CD CD 0 CD CD N. LO 0 CD CD CD C) CD CD 0 CD 0 rØ 6 c) ca o CD CD 6 CD CD C3 6 CD CD 6 ca ca 6 6 ca CD 6 ca o rØ 0 CD C) 0 0 CD 0 CD 6 CD . U7 W CO N

AS

TR

IBU

TIC

DE

SC

RIP

TIO

N

CD CD CD 0 CD CD CD CD CD CD CD CD CD 0 CD CD 0 CD CD C) CD 0 CD d CD C) CD CD CD CD CD C) 0 CD CD CD CD

0000 00000 0000 000 000

0000 00000 0000 000 000 0000 00000 0000 000 000

.2<<< ZZZZ ZZZzZ ZZZZ ZZZ ZZZ

c,;(cV07 c7i&ifo' 0-a-a- ,zzz zzz =DM

m s-N = W ggg Sggg lid-d- WWW

0 co ciL N I-- h- I-- fi I-- h- I-- h- h- h- 7 Y 2! 2! LU CO DO CO LUCIOCOCCI 0 0 0 0....1<< F-1-7=7 1-77D ,-csim W=CCIe 07 , 0? 0? U? WWWW ZZZ 1.--COF-F- CO I I I WW W00 C.C.6TAL §gg zzzzz zzzz ,,,

mmm

77== xxxm DDD WWWM 1.--1--1--. I-I-I-I- WWW

C7 CD CD M M e- CD CD 0 CD CD CD CD CD CD 0 CD 0 CD CD o u) 47 CD CD CD CD CD CD CD CD CD CV C) C4 y- CD

CD CD CD CO CD 47 CD CD CD CD CD CD CD CD CD 0 CD y- ct CD eq 01 T- co 05

or

0 CD o CD C) CD CD CD C) CD CD CD CD CD CD U7 CD CD CD 0 CV 4, CD 0 CD CD CD CD C) 0 0 CD CO

CP N.- CO CO Op 47 47 .Ct c- Tr T-

i 0 47 U7 CD csi 0 4"). CD L'' 0 ul• . N „ C4 co • C4 ,-.0 (CI - ,-- c7J'-..e2 C7l esr ,- '-'-'°

CV CO N 0 C4 0, CV C'") 04 CO ,- ,-

OMM 000 <Tr< 000 <Cur< <<< <<ct

ZZZ MMM ZZZ ZZZ ZZZ

AAA

Z"Z cZ 'Z'Z cZ 7)&32; ggg ggg ggg ZZZ ZZZ ohi c1730171 t-0173 17.

2

ggg ggg =7= MDD DM= WWW WOW WWW P

RIM

AR

Y -

PR

IMA

RY

LIN

E T

RA

NS

FR

MR

I rØ co

Tr-

-1

1-

4409

Page 6: Oncor Electric Delivery System 2015 Analysis of System Losses

ON

CO

R 2

015

LOSS

AN

ALYS

IS

SU

MM

AR

Y O

F L

OS

SE

S D

IAG

RA

M -

DE

MA

ND

MO

DE

L -

SY

ST

EM

PE

AK

222 *0000 8 o

-J D0 0 LU M 03Z< Nw YES0 °W D0 0 0> 133.-J2-J<Z

a_ W00 wix wz< Nw yE00010

=000>= m_,Z_J<Z

eo§ oo 00 000

W WW W COW Z 0 00 -J YE00

=000

CO UJ

COCO COCO

LU 00 j- Y000

=000

e000

8880 000

COD N = NC00 CO

,- Z0025CC

zO0oNal az -i <w2 m000>n

COCO COCO

0 00 c7Z_J-J Z000

00U

<

22 e0.00

2888 N000 0

10

ZOO Lum Z2Z5t, Lu 1- 0'Llo w m m< <02 o000>m co_lz..4<z

10

co w

..3 W0 CCru ZT,F4C Fuj ZOSONW az <w2 z000>O

222

g§§ ocio

CO UJ

111 l= co COCO Z WW < 00

1-000 W<<-I D000

26.88 00

0_000 UJ co 07 aU

c7W C.1 Zi=c1 gco< Wuj 1-0 0 0NW WZ -J <CO2 D000>D w_IZ_J<Z

cs, com zos,cs,

500 m000

(7) ww z0808

1000 03 <<-1 o000 co.J_4z

g4 0e0Q 8888 -000

CO CO COM

0 00 C4 Z co_JJ z000 M000

22

"§§ 000

CO COW Z 000 Eqo

D000

2268

0 0

MW

o

SU

BT

RA

NS

1

22

§§0° 08 oodo a uJ

CO

LDO 144CC

YESO WW D0 0 0>= co_Jz_laz

222 e0000 888

Oddo

a UJ

-(Do Hz , z Lzuj E<

6Sou'm a< <02 w000>D

§ 4222 egoc,0 000 000 C:100

0 0 0_ L1J

2-0

=00 Wce Nw

YES0 WW .J‹ <02 D000>0 CCI-JZ-J<Z

222

g§8 o o odo

CO 11.1

7.1 co CO LU CO CO P 00 co U.-. Z000 <<<F M000 I- -I Z

EX

HIB

IT, 4

PA

GE

1 o

f 2

4410

Page 7: Oncor Electric Delivery System 2015 Analysis of System Losses

EX

HIB

IT 4

PA

GE

2 o

f 2

2 ,-a,

048 0 R0 8 606 0 o

o o

3 —E

a-

o § o c'

Ooo

-0e00000 8880 8

2 Ocio cc a_

— 2

0e00000 8880 8 N 000 o — re

Q.

R CD e g2 o 8 0000 000

,Theo§o0o oo oo 0 o odo

—E

cy 2 ood o 0-2 — < a 0 _I 2 w 0 -E l- CV 00§00M§ 0 0 W ,_ o o 0 ›- 2 000 0 z ce _

o ... I= D M

COM0.-M§* M NVIMt.- M i- .-li,00.1 Ln

0 0 0 .-

ce, a

Vggf-'48 u„,t,mwoz:0

EE am

memommo 000m -0. _wmcvvop,mo - __ ce L6 m,

oecD00 0 g 8880 8 000

-14

0.6g -00000 . 8880 8 NN 2- 000 o

0- 01

ON

CO

R 20

15 L

OS

S A

NA

L YS

IS

FR

OM

HI G

H V

OL A

GE

SY

ST

EM

20

0e00000 888 0 8

-14

-14

CU

ST

OM

ER

SE

CO

ND

AR

Y L

OA

D

1-WW W*0'881jjm

-J-wW < cn ,.,...m.. dg.dgggL. >_,e,:cz.. 4411

15

, 00

1 6

84 M

W

NO

SE

CO

ND

AR

Y L

INE

S

-14

0

0 2 CD ag c,

CY-C)1

—14

2

cSj

SU

BT

RA

NS

1

-J

0

o

N CD

cy 000

aoe 8§§. §

* 22222

WNWOM LO 0 0) N N

N N N N

—14 ILI

CO (n m LLW 0 W

< -0 20}00-,

11-0000

222

r) 0 0 0

OWNO Noom 0 (0(00. cy

—14 u_ co

§ co co 2 co co

E000L,jfx 2 500wm Eoco>m a_Jz_iaz

mco m m ujRui c-g5 oz-z-> F--W 2.7],_, 2 w

RODOORZ az0z 0 a=

(/) L11

CC OD (n < Co r) CO 0 00o Z -1-J0

w0000

o

yr ag o

0_8

Page 8: Oncor Electric Delivery System 2015 Analysis of System Losses

C)

2L1

° XCL liJ

0C cL o

1(7)

LO

Fri

ON

CO

R 2

015 L

OS

S A

NA

LYS

IS

SU

MM

AR

Y of S

ALE

S a

nd

CA

LCU

LATE

D L

OS

SE

S

NO

LO

AD

+ L

OAD

= T

OT

LO

SS

0

LO

SS

# A

ND

LE

VE

L

CD C7 0 C) 0 0 C) CD 0 CD C) 0000 CD C) CD CD CD C7 0000 nr Tr et N uD 0 C) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0) 0 0 0 0) 000 0 CD CD CD CD CD CD C) 000 0000 CD CD 0 C3 CD CD CD M C7 0 C) M QD Ch CV Ps C) C7 CD CD C7 C) C7 0 C7 0 0 CD C7 0 CD 0 0 CD 0 CD CD P- CD C7 CD Ps 0 OD CO T- O C7 CD 0 C7 CD 0 0 CD CD C3 C) CD C3 0 C3 CD 0 CD CD C) 0 C) 0 0 U) UD N M Ps C7 CD 0 C3 0 CD CD CD CD CD CD C) C7 CD C) 0 CD CD C) CD 0 C) CD C3 CD 0 l. M M M CD 0 C) 0,0 C) CD C7 C) C) 0 CD 0 6 C7 CD CD 0 CD 6 0 CD C7 CD 0 CD CD CD CD CD 6 6 6 6 6 ci y- c) 6 6 ÓOÓ ci ci 6 6 c) 6 y- c) 6 6

. . . T'. 1.'. !... V.... ..,

°0000000 000 0000 000000 0000000 0 0 0 0 0 0 0 000000 0 0 0 0 0 0 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 66o666.- 666 oddo 666666

O et CD 0 C) Ir C) W N Tr m CD M 0 CD 0 0) CD Ps CD W 0 CD M 0 CD 0 M 0 W Ps Ch et CD r- CD CD C) Ps C) N u M CD W 0 CD 0 0 CD M Ps CD m CD 0 0 CD CD CD CD CD e- CD CD C) C3 0 CD CD CD 0 C7 CD C7 0 • • • 6 ,- ci 0 6 c)

CD 0 0 C) CD 0 OD W 0 es M O)cD- . cD M NOM es

Cs 0,-. 6- Re

0 ggœt:, 0 0

OMOOOM 03VtOM CO N et 0

09 OD M COr-sMts

ui dofr:d 0 MNODN N MN e-

0 PsOOCIPs ONOM I N LO VC 0

41 et CO CO "Cr I.0 0

LO I s:1- CV 0

M CO CO A- 1 r-

00000000N00 W (00)N0

OD 0 1--COMM

CO m es o r- Tr Tr co Ps e- CD

CsiC0- 05 a o omcom

(o r- u) 05-r- r-

CD CD C7 C7 CD C7 CD CD C) 0 CD CD CD CD CD CD CD CD CD CD

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

00000000 0 0 0 0000 0 0 0 0 0 0

0 0 0 0 CD 0 00 0 0 0 0 0 0 0 0 0 0 0 00

2 L1

c) UJ

0_0 xE LU CD

U-

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C/00000 0 0 0 0 0000 0 0 0 0 0 0 0000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c) 0 0 0 0 0 0 0 0 0 0 0 0 c:! 666606 O ,-- 6 o o o 6 o d o 666 o o

M CV CD CD 0000 et vt WMCOM CD 0 CD CD CD 0 v- M 0 W CD M CD 0 0 M

CD 0 0 CD C7 0 Rg4g2 0 CD C7 0 CD CD 0 CD CD CD CD CD 0 000 0 e- 60o.-

00000000 000,0000 000000 oTr000Tro.-coo).- op0000cao 000 m m -- 0000 000000 oc00000ma). 00000000 000 0000 00000.0 om000morTrwm 00000000 000 CV M 0000 000000 0000000Mv- 00000000 000 0000 000000 0000000e-e-00 00000000 000 ooaa oocl000 00000000000 6 66 6 6 CD 6 y- 0 0 0 6 6 cio 060060 . . . . .

0 •-• 0 06.-0 .- •- 1-

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 000000

CD 6 CD C7 6 6 6 o 6 C3 6 6 6 CD Ci C, 6 c5 CD CD

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 66006066 060 0606 066 o o o

00000000 000 0000 000000 00000000 coo 0000 000000 66600660 066 ciooci 006000

om000m comma) oTr000Tr u)(Drr ci c> 6 6 co a) u)

Tr Tr m Tr m r- NN

CD 0 CD CD CD 0 et 0 m et 0 P- CD CD C3 Ps M eT Ps r- 6 co 6 6 6 ri (D r- ri

a) m mcomm

0 P- CD C7 CD r- y- <- 0 ct C7 0 C3 CD CD UD et, CD CD ci 6 C7 CD CD 6 cu

yr co y-

a

co co

CD CD C7 CD CD C) CD CD C) CD CD CD CD CD CD CD CD CD CD CD CD CD CD C) CD C7 C) 0 CD CD C7 0 0 CD 0 OOÓOO Ó

CD Ps 0 CD CD rs CD CV M CD CV 0 W 0 CD CD M 0 Ul 0 r- m

r- r- y- Tr m m O CO es N M M N N N N CV e-- 1--

g E-

W W 0 _1 I— U.I LU

.7ZI U.J LLJ 11.1< 0

Z Z Zi— co = g X

0 0 M M MO CO 111 9, cn

2cou_z—z wo0c7) 0000 z ->LLui Mwxm iL35,tM u_z cn 0000wo coo'coz co cocncozz 0

P <1—zLL>.- oz 10Ez2m — — cy cy cs, _,,,,g iv= ic-2 g 1:: IS2 (ii g g m LI-1 ,-r<o w x-Jommow zzzzz 031.---, NNN1-- MOMM1.- 1:07)( "iUEZO

5,,,ggggg f:' EE 11 15.12 ic IEES Rzzi-1-1-02 (Ds t; g g 23 S 2 E2 E2 l Ej 8 6 co co I-- I-- I-- 1.- I-- u) UD W W 07 0 0 0 07 07 CO 07 07 CO

OD 0) CD '". el VD 'T U) U) N. e° Cr) C' .- Es 1-- i-- WOO CO Q. CL ::: 00 co — cy el Tr u) co Ps ..-- es e- es og cv

TO

TA

L S

YS

TE

M

4412

Page 9: Oncor Electric Delivery System 2015 Analysis of System Losses

0.00 0.00 0.00 0.00 0.00

422.67 3,236,586

1,600.45 12,134,571

20,655.54 91,064,509

22,678.66 106,435,666

22,679.00 106,435,000

(0.34) 666

0.00% 0.00%

MW

MWH

4413

ONCOR 2015 LOSS ANALYSIS

DEVELOFMENT of LOSS FACTORS UNADJUSTED.

DEMAND

WP/II-H-1.3/2 Page 25 of 32

EXHIBIT 6

LOSS FACTOR CUSTOMER LEVEL SALES MW

a

CALC LOSS TO LEVEL

b

SALES MW @ SUB INPUT

c

CUM PEAK EXPANSION FACTORS d 1/d

BULK LINES o.d 0.0 0.0 0.00000 0.00000 TRANS SUBS 0.0 0.0 0.0 o.00000 0.00000 TRANS LINES 0.0 0.0 0.0 1.00000 1.00000

TOTAL TRANS 0.0 0.0 0.0 0.00000 0.00000 SUBTRANS 0.0 0.0 0.0 1.00000 1.00000 PRIM SUBS 420.0 2.7 422.7 1.00636 0.99368 PRIM LINES 1,568.8 31.7 1,600.4 1.02018 0.98022 SECONDARY 19 883.5 772.1 20 655.5 1.03883 0.96262

TOTALS 21,872.3 806.4 22,678.7

DEVELOPMENT of LOSS FACTORS UNADJUSTED

ENERGY

LOSS FACTOR CUSTOMER LEVEE SALES MWH

a

CALC LOSS TO LEVEL : b

SALES MWH @ SUB INPUT

c

CUM ANNUAL EXPANSION FACTORS d 1/d

BULK LINES 0 0 0 0.00000 0.00000 TRANS SUBS 0 :0 - 0 0.00000 0.00000 TRANS LINES 0 0 0 1.00000 1.00000

TOTAL TRANS 0 0 0 0.00000. 0.00000 SUBTRANS 0 0 0 1.00000 1.00000 PRIM SUBS 3,218,116 18,470 3,236,586 1.00574 0.99429 PRIM LINES 11,954,531 180,040 12,134,571 1.01506 0.98516 SECONDARY 87,800,225 3,264,284 91,064,509 1.03718 0.96415

TOTALS 102,972,872 3,462,794 106,435,666

ESTIMATED VALUES AT DIST SUB INPUT LOSS FACTOR AT VOLTAGE LEVEL BULK LINES TRANS SUBS TRANS LINES SUBTRANS SUBS SUBTRANS LINES PRIM SUBS PRIM LINES SECONDARY

SUBTOTAL

ACTUAL ENERGY

MISMATCH

% MISMATCH

Page 10: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 26 of 32

ONCOR 2015 LOSS ANALYSIS

DEVELOPMENT of LOSS FACTORS ADJUSTED DEMAND

EXHIBIT 7

LOSS FACTOR CUSTOMER SALES CALC LOSS LEVEL SALEŠ MW ADJUST TO LEVEL

a

SALES MW @ SUB INPUT

d .

CUM PEAK EXPANSION FACTORS

e f=1/e

BULK LINES 0.0 0.0 0.0 0.0 0.00000 0.00000 TRANS SUBS 0.0 0.0 0.0 0.0 0.00000 0.00000 TRANS LINES 0.0 0.0 0.0 0.0 1.00000 1.00000

TOTAL TRANS 0.0 0.0 0.0 0.0 o.00boo o.00000 SUBTRANS 0.0 0.0 0.0 0.0 1.00000 1.00000 PRIM SUBS 420.0 0.0 2.7 422.7 1.00637 0.99367 PRIM LINES , 1,568.8 0.0 317 1,600.5 1.02019 0.98021 SECONDARY 19 883.5 0.0 772.4 20 655.9 1.03885 0.96261

806.7 SYSTEM COMPOSITE TOTALS 21,872.3 0.0 806.7 22,679.0 1.03688 0.66443

DEVELOPMENT of LOSS FACTORS ADJUSTED ENERGY

LOSS FACTOR CUSTOMER SALES CALC LOSS SALES MWH CUM ANNUAL EXPANSION LEVEL SALES MWH ADJUST TO LEVEL @ SUB INPUT FACTORS

a d ' f=1/e

BULK LINES o o 0.00000 000000 TRANS SUBS o o 0.00000 0.00000 TRANS LINES o o 1.00000 1.00000

TOTAL TRANS , o 0.00000 0.00000 SUBTRANS o 1.00000 1.00000 PRIM SUBS 3,218,116 o 18,466 3,236,582 1.00574 0.99429 PRIM LINES 11,954,531 0 180,005 12,134,536 1.01506 0.98517 SECONDARY 87,800,225 0 3,263,656 91,063,881 1.03717 0.96416

3,462,128 SYSTEM COMPOSITE TOTALS 102,972,872 0 3,462,128 106,435,000 1.03362 - 0.96747

ESTIMATED VALUEŠ AT DIST SUB INPUT LOSS FACTOR AT VOLTAGE LEVEL BULK LINES TRANS SUBS TRANS LINES SUBTRANS SUBS SUBTRANS LINES PRIM SUBS PRIM LINES SECONDARY

ACTUAL ENERGY

MISMATCH

% MISMATCH

MW

MWH 0.00 0.00 0.00 0.00 0.00

422.67

o o O

• 3,236,582 1,600.46 12,134,536

20,655.86 91,063,881

22,679.00 106,435,000

22,679.00 106,435,000

(0.00) (0)

0.00% 0.00%

4414

Page 11: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 27 of 32

ONCOR 2015 LOSS ANALYSIS

Adjusted Losses and Loss Factors by Facility

Unadjusted Losses by Segment MW

,` - Unadjusted M1A11-I

EXHIBIT 8

Unadjusted Service Drop Losses 75 78 75.78 276,161 276,161 Secondary Losses 37 76 37.76 ' 87,940 87,940 Line Transformer Losses 249.89 249.89 1,549,066 1,549,066 Priinary Line Losses 299 56 299.56 942,238 942,238 Distnbution Substation Losses 143.43 143.43 607,390 607,390 Subtransmission Losses 0.00 0.00 0 0 Transmission System Losses 0.00 0.00 0 0 Total 806.40 806.40 3,462,794 3,462,794

Mismatch Allocation by Segment MW MWH Note adjusting

Service Drop Losses -0.03 53 53 Secondary Losses -0.02 17 17 Line Transformer Losses -0.11 298 298 Primary Line Loises 10.13 181 181 Distribution Substation Losses -0.06 117 117 Subtransmission Losses 0 00 0 0 Transmission System Losses 0.00 '0 0 Total -0 34 666 666

666 Adjusted Losses by Segment

MW % of Total MWH % of Total Service Drop Losses 75.81 9 4% 276,108 8.0% Secondary Losses 37.77 4.7% 87,923 2 5% Line TransfOrmer Losses 249.99 31 0% 1,548,768 44.7% Primary Line Losses 299.68 37.1% 942,056 27 2% Distribution Substation Losses 143 49 17.8% 607,273 17 5% Subtransmission Losses 0.00 0 0% 0 0 0% Transmission System Losses 0 00 0 0% 0 0 0% Total 806.75 100 0% 3,462,128 100.0%

Loss FactOrs bY Segment Retail Sales from Service Drops

MW 19,883 47

MWH 87,800,225

Adiusted Service Drop Losses 75.81 276 108 Input to Service Drops 19,959 28 88,076,333 Service Drop Loss Factor 1.00381 1.00314

Output from Secondary 19,959.28 88,076,333 Adiusted Secondan/ Losses 37 77 87 923 Input to Secondary 19,997 05 88,164,255 Secondary Conductor Loss Factor 1.00189 1.00100 ,.

Output from Line Transformers 19,997 05 88,164,255 Adjusted Line Transformer Losses 249.99 1 548 768 Input to Line Transformers' 20,247 05 89,713,024 Line Transformer Loss Factor 1.01260 1.01757

Secondary Composite 1 01829 1 02179 Retail Sales from Primary 1,454.78 11,494,341 Req. Whls Sales from Primary 114 00 460,190 Input to Line Transformers 20,247 05 89 713 024 Output from Primary Lines 21,815.83 101,667,555 Adiusted Primary Line Losses 299.68 942 056 Input to Pnmary Lines 22,115 51 102,609,611 Primary Line Loss Factor 1.01374 1.00927

Output PI from Distribution Substations 22,115 51 102,609,611 Req. WhIs Sales from Substations 73 00 305,471 Retail Sales from Substations 347.00 2,912,645 TotalOutput from Distribution Substations 22,535.51 105,827,727 Adjusted Distribution Substation Losses 143.49 607 273 Input to Distribution Substations 22,679.00 106,435,000 Distribution Substation Loss Factor 1.00637 1.00574

Retail Sales at from SubTransmission 0 00 0 Req. Whls Sales froM SubTransmission 0 00 0 Input to Distribution Substations 0 00 0 Output from-SubTransmission 0.00 0 Adiusted SubTransmission_System Losses 0.00 0 Input to SubTransmission 0.00 0 SubTransmlision Loss Factor 1.00000 1.00000 Input to Distribution Substations 22,678.66 106,435,666 Retail Sales at from Transmission 0.00 0 Req. Mils Sales from Transrnission 0.00 0 Input Subtransmišsion 0.00 0 Output from Transmission 22,679 00 106,435,000 Adjusted Transmission System Losses 0.00 , 0 Input to Transmission 22,679.00 106,435,000 Transfnission Loss Factor 1.00000 1.00000

4415

Page 12: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 28 of 32

1

DEMAND MW SUMMARY OF LOSSES AND LOSS FACTORS BY DELIVERY VOLTAGE EXHIBIT 9 PAGE 1 of 2

SERVICE SALES LOSSES SECONDARY PRIMARY SUBSTATION LEVEL MW

SERVICES 2 SALES 1'9,883.47 19,883.5 3 LOSSES 75.8 75.8 4 INPUT -:19,959 3 5 EXPANSION FACTOR 1.00381

6 SECONDARY 7 SALES 8 LOSSES 37.8 37.8 9 INPUT 19,997.1 10 EXPANSION FACTOR 1.00189

11 LINE TRANSFORMER 12 SALES 13 LOSSES 250.0 250 0 14 INPUT 20,247.0 15 EXPANSION FACTOR 1.01250

16 PRIMARY 17 SECONDARY 20,247 0 18 SALES 1566.78 1,568 8 19 LOSSES 299.7 278 1 21 6 20 INPUT 21 EXPANSION FACTOR 1.01374

22 SUBSTATION 23 PRIMARY 20,525.2 1,590 3 24 SALES 420 0 420 0 25 LOSSES 143 5 130.7 10 1 2 7 26 INPUT 20,655.9 1,600 5 422 7 27 EXPANSION FACTOR 1.00637

28 SUB-TRANS MISSION 29 DISTRIBUTION SUBS 17,309 6 30 SALES 0.00 832.2 t 0 0 31 LOSSES 0 0 0.0 0.0 0 0 32 INPUT 17,309 6 832.2 0 0 33 EXPANSION FACTOR 1.00000

34 TRANSMISSION 35 SUBTRANSMISSION 17,309 6 832.2 36 DISTRIBUTION SUBS 3,346 3 768 2 422.7 37 SALES 0 00 38 LOSSES 0 0 0 0 0.0 0.0 39 INPUT 20,655 9 1,600 5 422 7 40 EXPANSION FACTOR 1.00000

41 TOTALS LOSSES CALCULATED 806 7 772.4 31 7 2.7 SCALED 806.7 772 4 31.7 2 7

42 % OF TOTAL 100% 95 74% 3 93% 0 33%

43 SALES 21,872 3 19,883.5 1,568.8 420 0 44 % OF TOTAL 100 00% 90 91% 7 17% 1 92%

45 INPUT 22,679 0 20,655 9 1,600 5 422 7

46 CUMMULATIVE EXPANSION LOSS FACTORS 1.03688 1.03885 1.02019 NA (from meter to system input) SYSTEM

4416

Page 13: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 29 Of 32

1

ENERGY MWH

SERVICE LEVEL

SERVICES

..SUMMARY OF LOSSES AND LOSS FACTORS BY DELIVERY VOLTAGE EXHIBIT 9 PAGE 2 of 2

SALES LOSSES SECONDARY PRIMARY SUBSTATION

2 SALES 87,800,225 87,800,225 3 LOSSES 276,108 276,108 4 INPUT 88,076,333 5 EXPANSION FACTOR 1.00314

6 SECONARY 7 SALES 8 LOSSES 87,923 87,923 9 INPUT 88,164,255 10 EXPANSION FACTOR 1.00100

11 LINE TRANSFORMER 12 SALES 13 LOSSES 1,548,768 1,548,768 14 INPUT 89,713,024 15 EXPANSION FACTOR - 1.01757

16 PRIMARY 17 SECONDARY 89,713,024 18 SALES 11,954,531 000 11,954,531 19 LOSSES 942,056 831,285 110,771 20 INPUT 21 EXPANSION FACTOR 1.00927

22 SUBSTATION 23 PRIMARY 90,544,309 12,065,302 24 SALES 3,218,116 3,218,116 25 LOSSES 607,273 519,572 69,234 18,467 26 INPUT 91,063,881 12,134,537 3,236,583 27 EXPANSION FACTOR 1.00574

28 SUB-TRANSMISSION 29 DISTRIBUTION SUBS 81,320,045 4,805,277 0 000 30 SALES 0 0 000 31 LOSSES 0 0 0.000 32 INPUT 81,320,045 4,805,277 33 EXPANSION FACTOR 1.00000

34 TRANSMISSION 35 SUBTRANSMISSION 81,320,045 4,805,277 36 DISTRIBUTION SUBS 9,743,835 7,329,260 3,236,583 37 SALES 0 38 LOSSES 0 0 0 0 39 INPUT 91,063,881 12,134,537 3,236,583 40 EXPANSION FACTOR 1.00000

41 TOTALS LOSSES Calculated 3,462,128 3,263,656 180,006 18,467 Scaled 3,462,128 3,263,656 180,005 18,467

42 % OF TOTAL 100% 94 27% 5 20% 0 53%

43 SALES 102,972,872 87,800,225 11,954,531 3,218,11'6 44 % OF TOTAL 100 00% 85 27% 11.61% 3 13%

45 INPUT 106,435,000 91,063,881 12,134,536 3,236,583

46 CUMMULATIVE EXPANSION LOSS FACTORS 1.03362 1.03717 1.01506 NA (from meter to system input) SYSTEM

4417

Page 14: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 30 of 32

Oncor Electric Delivery System 2015 Analysis of System Losses

Appendix B

Discusiolt of Hoebel Coefficient

MIK

4418

Page 15: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 31 of 32

Oncor Electric Delivery System 2015 Analysis of System Losses

COMMENTS ON THE HOEBEL COEFFICIENT

The Hoebel constant represents an established industry standard relationship between peak losses and average losŠes and is used in a loss study to estirnate energy losses from peak demand losses. H. F. Hoebel described this relationship in his article, "Cost of Electric Distribution Losses," Electric Light and Power, March 15, 1959.

Within any lbss evaluation study, peak demand losses can readily be calculated given equipnient resistance and approximate loading. Energy losses, however, are much more difficult to determine given their time-varying nature. This difficulty can be reduced by the use of an equation which relates peak load losses (demand) to 'average losses (energy). Once the relationship between peak and average losses is ktiown, average losses can be estimated from the known peak load losses.

Within the electric utility industry, the relationship between peak and average losses is known as the loss factor. For definitional purposes, loss factor is the ratio of the average power loss to the peak load power loss, during a specified period of time. This relationship is expressed mathematically as follows:

(1) FLS ALS ± PLS

where: FLS = Loss Factor

ALS = Average Losses

PLS =. Peak Losšes

The loss factor provides an estimate of the degree to which the load loss is maintained throughout the period in which the loss is being considered. In other words, loss factor is the ratio of the actual kWh losses incurred to the kWh losses which would have occurred if full load had continued throughout the period under study.

Examining the loss factor expression in light of a similar expression for load factor indicates a high degree of similarity. The mathematical expression for load factor is as follows:

(2) FLD ALD PLD where: FLD = Load Factor ALD = Average Load PLD = Peak Load

This load factor result provides an estimate of the degree to which the load loss is maintained throughout the period in which the load is being considered. Because of the siinilarities in definition, the loss factor is sometimes called the "load factor of losses." While the definitions are similar, a strict equating of the two factors cannot be made. There does exist, however, a relationship between these two factors which is dependent upon the shape of the load duration curve. Since resistive losses vary as the square of the load, it can be shown mathematically that the loss factor can vary between the extreme limits of load factor and load factor squared. The

MAC

1 .4419

Page 16: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3/2 Page 32 of 32

Oncor Electric Delivery System 2015 Analysis of System Losses

relationship between load factor and loss factor has become an industry standard and is as follows:

(3) FLS H*FLD2 + (1-14)*PLD where: FLS = Loss Factor FLD = Load Factor H = Hoebel Coefficient

As noted in the attached article, the suggested value for H (the Hoebel coefficient) is 0.7. The exact value of H will vary as a function of .the shape of the utility's load duration curve. In recent years, values of H have been computed directly for a number of utilities based on EEI load

• data. It appears on this basis, the suggested value of 0.7 should be considered a lower bound and that values approaching unity may be considered a reasonable upper bound. Based on experience, values of H have ranged from approximately 0.85 to 0.95. The standard default value of 0.9 is generally used.

Inserting the Hoebel coefficient estimate gives the following loss factor relationship using Equation (3):

(4) FLS 0.90*FLD2 + 0.10*FLD

Once the Hoebel constant has been estimated and the load factor and peak losses associated with a piece of equipment have been estimated, one can calculate the average, or energy losses as follows:

(5) ALS PLS * [H*FLD2 + (141)*PLD] where: ALs = Average Losses PLS = Peak Losses H - = Hoebel Coefficient FLD = Load Factor

Loss studies use this equation to calculate energy losses at each major voltage level in the analysis.

MAC 2

4420

Page 17: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-1.3.1/1

Page 1 of 1

2017 RATE CASE

ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTMENTS TO TEST YEAR LOAD DATA

FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-1.3.1.

4421

Page 18: Oncor Electric Delivery System 2015 Analysis of System Losses

wP/II-H-1.4/1

Page 1 of 1

2017 RATE CASE

ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED TEST YEAR LOAD DATA

FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-1.4.

4422

Page 19: Oncor Electric Delivery System 2015 Analysis of System Losses

n

WP/II-H-1.5

Page kof 1

2017 RATE CASE

ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTMENTS TO OPERATING STATISTICS

FOR THE TEST YEAR ÈNDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-1.5.

0

u

4423

Page 20: Oncor Electric Delivery System 2015 Analysis of System Losses

wP/II-H-2.1

Page 1 of 1

2017 RATE CASE

ONCOR ELECTRIC DELIVERY COMPANY LLC

MODEL INFORMATION

FOR THE TEST YEAR ENDING DECEMBER'31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers f6r Schedule II-H-2.1.

4424

Page 21: Oncor Electric Delivery System 2015 Analysis of System Losses

\W/II-H-2.2

Page 1 of 1

2017 RATE CASE

ONCOR ELECTRIC DELIVERY COMPANY LLC

MODEL DATA

FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no suppoqing workpapers for Schedule II-H-2.2.

4425

Page 22: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-2.3

Page 1 of 1

2017 RATE CASE

ONCOR ELECTRIC DELIVERY COMPANY LLC

MODE1 VARIABLES

FOR THE TESTYEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-2.3.

4426

Page 23: Oncor Electric Delivery System 2015 Analysis of System Losses

Page 1 of 1

PUC DOCKET NO.

ONCOR ELECTRIC DELIVERY COMPANY LLC

CUSTOMER INFORMATION

FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-3.1.

4427

Page 24: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/H-H-3.2

Page 1 of 1

PUC DOCKET NO.

ONCOR ELECTRIC DELIVERY COMPANY LLC

CUSTOMER ADJUSTMENTS

FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-3.2.

4428

Page 25: Oncor Electric Delivery System 2015 Analysis of System Losses

VVP/II-H-3.3

Page 1 of 1

PUC DOCKET NO.

ONCOR ELECTRIC DELIVERY COMPANY LLC

CUSTOMER ADJUSTMENT DATA

FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-3.3.

4429

Page 26: Oncor Electric Delivery System 2015 Analysis of System Losses

Page 1 of 2

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

'REVENUE IMPACT DATA FOR THE TEST YEAR ENDING DEMI3ER 31, 2016

SPONSOR: D. ENELSON

OTHER NON-ELECTRIC REVENUE

Line No.

Acct No. Detail Of Miscellaneous Other Revenue

Retail T&D Rev Credit

(a) (b) (c) 1 450 Forfeited Discounts $147,065 2 3 451 Miscellaneous Service Revenue $1,533,1.66 4 5 454 Rents from Pole Contacts $8,422,002 6 454 Rents from Fiber Optics $964,045 7 454 Rents from Property $1,546,876 8 9 456 Other Revenue-Other

10 456 CIAC Gross Up $4,649,186 11 456 Lab Services $129,326

12 456 Pro-rata/Dual Feed $111,325

13 456 Tampering - TDSP energy portion of tampering $270,047

15 Total - Non-Electiic Revenue $17,773,039

Note: See WP/II-E-5

4430

Page 27: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-4.1 Page 2 of 2

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

REVENUE IMPACT DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

LINE NO.

1 Outdoor Lighting Revenue $11,153,803 * 2 3 Street Lighting Revenue 4 5 ' Non-Metered Facilities 6 Adjusted Lighting @ Present Rates 7 8 POD Charge $335,504 9 10 Schedule A $39,545,027 11 Schedule B $4,097,848 12 Schedule C $10,150 13 Schedule D $1,700,635 14 Rectangular $134,896 15 Post Top $13,253 16 Incandescent $35,339 17 Historical $50,599 18 Facilities Cliarge $45,587,747 19 20 Total $45,923,251 21 22

*Schedule II-H-4.1 Page 9

4431

Page 28: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-4.2 Page 1 of 1

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY

REVENUE CALCULATION METHODOLOGIES FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-4.2.

4432

Page 29: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.1

Page 1 of 1

2017 RATE CASE

ONCOR ELECTRIC DELIVERY COMPANY LLC

WEATHER STATION DATA

FOR THE.TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-5.1.

41

4433

Page 30: Oncor Electric Delivery System 2015 Analysis of System Losses

20

17

RA

TE

CA

SE

E.

NE

LS

ON

S

PO

NS

OR

: D

-0

.0 C 'C 0 0 O CD .CD a)

'al E

t v p E T.., O 0 C 1—CD Li-

i as a) en c cc• E :'=. ?— c a) o ., as al •— a) — 17) • . 8 a) it) o r 7) cz .— = .6 _c — o m _1 <

o cQ

(r)

.c°3

cP)

- 3

.eeeeeeeeeee E 6 4 cki c \I -4 cri oj cc co 6

eeeeeeeeeee N 0 7 Ln 7 0 7 c0 lr) 0 CD lti C6 N 4 c‘i g

8eeeee-eeeeee z 0 co N. CO 0) 0 N. 0 6 4 oi oi 4 ri r•-•

eeeeeeeeeee 4 CV 7 01 4 ri c‘i c6 4 g

wo-eeeeeeeeeee u p,: in co c oe o o oL N N 4 N C6 4 6

N.

coe ,oe e

co eeeee

r•-• •cr o o ▪ c‘i CsJ 4 oi c\I cci o

e eeeeeeee,e cq N: 7 CO CO N. 0 10 0 • CV Ni 4 C6 N C6 4

e eeeeeeeeee 4 CV CO CS! LSI 4 N. q 0 CV 0 0 tri cNi 4cimm4

66

e eeeeeeeeee cg 7 CY) CO 0 N. 7 0 0) N N 0i Cs1 oi Q 6 co

e eeeeeeee ee • N.ONCD0)070)N-0 a) oi oi 4 4 N cci CD 0

O

e eeeeeeeee • LO 0 CS! 0 CS! N 0 N 0) 4 oi o-i Lc) oi cci co

2 eeeeeeeeee - - N 0) 4 C6 oi Lc) 4 cci co

CT1 -eeeeeeeeee co co - o) cs4 N 0) 7 oi ci c‘i Lo 4 oi co

O

o •

O

o ci

e eeeeeeeee • c\i c‘i (Ni c6 s••••

e eeeeeeeee ma) •cr 7 CV LO oj 0, CO

CO 0 0

We

at h

er

Sta

tion

_. . t 0 O (,) .2 - Csi a) oi = 76

a)

073 3 _I'S i u) Y

CD •

Ol CV CO Tr 111 co a) Z 0 CV 01 vt ucoo, cu co ... 7 7 7 7 c5.1 ctj cj cj cv CV CV

4434

Page 31: Oncor Electric Delivery System 2015 Analysis of System Losses

0

ci

0 o 1-1

9 0 0 ,

Ci o

o

o

0

0

ua

lias-

i -ort

wo

rtn

Mid

lan d

-Ode

ssa

S he

rman-

Den

iso

n

aJ c

LN—c' 4—

I• CT1 <

-5

2 20

17

RA

TE

CA

SE

SP

ON

SO

R:

D. E

. N

EL

SO

N

7a-

a) o

-g

00

-0

Wea

the

r Sta

tion(

* ********* .4- 00 OrrNNNOrO r- rn ci 4 ni ni eri ni

* *********

CO 01 1-1 CO 1/1 Cr; in Ln Lrr LO

* ********* o oco f•I N CO C71 0 N 0

ni rN rn

* *********

N LID Or 0 1-1 • 4 r.1 ni eri r‘i ni n.

* ******

LD M.? CO 0 Cr 0 • ni n4 4 ni r4 m 4

g g g g 2R 00 N r-ILfl th r OCr 0

t-I ni 4 en ni ro

* ********* roLOh.rLO roNOLOO - ni n4 4 ni ni en 4 n.

* ********* • rs, co 1,4 141 N I.13 rg O Lei n4 IN 4 re; n4 en 4

* ********* Lb N CO 0 N 1-1

CA CD rN1-I criLO

4

* *•******** ▪ N rq 111 DI 0 • 4 en t•LI 4 4 ni LO

* ****** L g rl LI" 0 NI q rs4

cri rei Lei ni 4 ni to

* ********* CO DI 0 01 N

cr; 4 tri r ro ui 4 ni LO

* ********* rn co r`sl cri rri cri O

a) • c 01 IN rn •o- Lfl Lo N. co al F_,)

Z

4435

Page 32: Oncor Electric Delivery System 2015 Analysis of System Losses

š ššš

444 r

co 0 C.) 01 CC -I -

- < š

-1 67 IL >< Z < CC >

CO O. al 2 Z 2 m ..... 0 0 w 0 t— — X

4 w 0 < CC u,

— 0 IL 0 uj > CC ZLU >

Z is 0 la CC 0 0 11 cm 1— 0 w

0 -I la j- F 1 -I u) co I-- 111 m 111 Z 0 CC -2 1/1 0 0 ai 0 () < X (/) Z l- Ill 0 CC CC —

0 IL

r

4 4 g

5 F1H

!!

;

Siii

3 3333

l' 1 Y2

---- ...-e _t___ 2222 3333

šš aaaa 'I t 8 8 8'8 g '2333

3 3 3 3

4436

Page 33: Oncor Electric Delivery System 2015 Analysis of System Losses

Zs'

0 ,

0 CC- 0 csi 4,..., -I . LII 0

J , >- 0 ›

4

"1-.... >-

Z.g.- M 40m

a M m 2z2

0 0 ui - •

LU 0 P. CC

("- O 0 *I 0

F-13 Z 4Mm

0 ILI 0 Z

uj > re Z 2 —

i- M 1410 >-

CCO:gW = I- —

N 0 Ill CC oZ 219 GE3<cno

011- 0P 2 ow ,'

u.3)-1-- D _1 -1mm cn 4

illmw PE

m -11- Z

00m w

04X 0

Z I- iT) 0 M

0 CC— U.

.1 mg 2i.P; HAA PAR ... 1 11 L=LL

ItY,tt '3U!

s13333 mmLlm 4g4,„

tt,tv :Ti•LT.• al 0000 ,:, . 2 2 2 2 1-1,24 3331 W.?, EEEE .4

--'""""'F4:14,11gM,9.,g1f4MgggIgg,T,PA,'2WA.74;1 q4:2'44-T,2,174 1421

4437

Page 34: Oncor Electric Delivery System 2015 Analysis of System Losses

20

17

RA

TE

CA

SE

o

cG LL ctS .a)

= E c o 112C3 as° :CC.)

-0 -C = 0 < CO

co

cG

65

SP

ON

SO

R:

D. E

. N

EL

SO

N

cO

0

0

o o

o

o d o

o o

o o

o.

o o

8

qo o

O

>, 2 C.)

(21

We

ath

er S

tatio

n

777 • e e cq cc?

eeeeeee CO 41 CO q CD CO

N oi oi 4 co 4 ri co

e eeeeeeeee CO CO 0) CO N. LO

0

• N: c•i cri 4 co 4 co

tq

tq tt tq N. co cv

e eeeeee • C? Le)

• N: oi oi oi eee q CO CD Cs/ 4 oi

e e-eeeeeeee ar..--ocatncoocaco • oi oi 4 co 4 oi

` • )e.;;°- : c." :1) c r) • N :ci

e eeeeeeeee COO)C0 ,00u103 ,-COX,

co

N ci oi 4

e e r, co Tr- h-

e ee r•-• 4 c‘i cO

eee 0

CO 4 vi

ee co to tri vi

e eeeeeeeee • N-COCOCOLOUIOUICO Cc) NS CO ni CO Cc/ CO ‘ct: CO CO

e eeeeeeeee tqtqQ tttq

co Oi NS CO Cs/ ai a; oi 4 cO

co e eeeee • 0 ul • 6 6 6 co

eee CD

CO ccl:

eeeeeeeeee CV CO 1- .gt CO 1.0 N.,. CD CO CO

c\i r-: 4 c‘i ci ri ri 4 ri co ci

ci 0

e eeeeeeeee (3) LI) C7) V Lq CO N CO • N: CO 01 CO CI 4 <6 oi CD

e eeeeeeeee CO ovoLocotococvalco oi oi ri CO co

-0

eeeeeeeeee CV 10 0) CO CO LO LO LO CD

r•-•: ri CSJ ri ri ri 4 ri co

Mid

lan d

- Ode

ssa

ca • c ol C\I C, 1.0 co Ns co c„ d CV CO 'Cr LO (D h. CO 0) 0 CV CO 'cr LO

Z CV CV CV CV CV CV CV

4438

Page 35: Oncor Electric Delivery System 2015 Analysis of System Losses

-7t" o_cubj) o_

20

17

RA

TE

CA

SE

SP

ON

SO

R: D

. E. N

EL

SO

N

> o

o. a)

1.°

O rn

ro o o

oj O

rn

o •-•

rn

ej a o

rnj rn o

O

rn

76-

Wea

t her

Stat i

on l

5

e ggeggegee CO LO 0 ger co en to o LLD

eV! h 4 N ni en 4 rn 4 ni

g eggeg.**** rn CO 03 0 en N fl o n

rn n en e.Jni nict en 4 ni

g e*eggt*e.** co en co C4 01 LC) 14 CT VI n eri m rei rflvi n 4 en

e g,'s•teg*Ae.e o v•,.e rn n n n rn oo rO en h et e-4 en en C4 ni

e ggegegege .N rJv 0., 03 0 01 VD N vvr t-.) en en rn en

* * g g tce rn eLel al kJ, oo em ter

h 4 ni en en en vt en

e gege**4e* 0 CO rn .1 0 Ul 00 CO l0

N ei a en rn en

egegeggege N 03 n 0 01 .1 • h rJ ni en .vr ko

• h. • cn r,1 LID al .1 0 01 en n rn eV 0,i en en en

* ********* N 00 n1 N: L.r1 k/1 rn n en r4 en en rn cr rn

e ggeggegee ‘-e en al cr toe Ll1 l0 rn n en n en en a cr en

* ******* g on ten em m oq 0 n tO rJ r•••• rn nrn rri 4 en 4 rn Lc)

ggegggeg • st oq VI al In tO en to

rei n en en en cr en

0

0

"a" ti) ro 00 o M

idla

n d-O

dess

a

:2

a.)

(1.)

Sher m

an

-Den i

son

Wic

hita

Fa

lls.

0) • • C (N1 n co co ea z

4439

Page 36: Oncor Electric Delivery System 2015 Analysis of System Losses

4414 444

5 5 5 t 5

5,

55,,,

SP

ON

SO

R:

D. E

. N

EL

SON

.4, .7 7

g 7 .7

4 4 4 7 7 7

4 4 a 7 z

4: 7 3 S

4 e.

4. g

4

4 4 4 4 3 3 3 3 c c c *

,144r. Z iit° 8 1: 8

_gga2 3 2 1,5 .2 .2 .2 uaila 3 2 2 3 i

2 2 2 2 ,S!

2222 4g:4A EEEE

« « 3 3 3 3 2 2 2 2

ššš

4440

Page 37: Oncor Electric Delivery System 2015 Analysis of System Losses

5;-

!

SP

ON

SO

R: D

. E

. NE

LS

ON

7 EEEE3 3

< < « 2 g 2 2 2 2 3 3 3 3 « 3 3 3 3

2:

RiE

2 2 2 2

d Y.`

PS.

4441

Page 38: Oncor Electric Delivery System 2015 Analysis of System Losses

773 2

rn

Lri

a.

S 5

eeeeeeeeee CD 17 03 0) CD 0 CD C N c‘i

2 0 as 0

eeeeeeeeee 0) CD c‘l cn N. co cp cy)

ui c‘i c‘i (NI c‘i c‘i

We

ath

er

Sta

t ionj

Sh

er m

an-

Den i

son

eeeeeeeeee o

"1, N N N CO CO N

eeeee ggegg 4 to N Di Di o o

eeeeeeeeee c0 7 N 0 0) CO

Lri cv c6 csi

eeeeeeeeee CO co N- CD 0 CO

oi 4 oi

o o

a

o

20

17

RA

TE

CA

SE

SP

ON

SO

R:

D. E

. N

EL

SO

N

CC

gteeeeeeeeege = tD CO •-• co VD 0 co 0. C5

r- o

>- Reeeeeeeeeee. < to a) 7 al C9 a? rx?

= T1: 4 oi N N CO 1- CO N 0 0

0

eeeeeeeeeee s 0 CD N C7) N 0 LC) 0

oi 4 —C CsJ o

X E r-

0 .,- , z s i eeeeeeeeee < --, N CO N concocoocog

c‘i r-

oi o a i co ,- oi o o

tu co>•eeeeeeeeeee

< co CO DO 03 N Cl3 0 CO

W Tr: 4 c‘i cm • (Tr ,- g

Uj O keeeeeeeeeee

rri N N DI CO N N C° q7alqqq0 a?

a CC CD Uj

4442

>- (.75eeeeeeeeee ,=, 03(..:!C‘!C' C° q

a -

Lri cv N Di 03 Di Di 0 0

O 2,eeeeeeeeee w LL 0c0 co c•I n co n ro

cn

o o

o : o

eeeeeeeeee Lo tC oe h- N- co or to

Ln 4 or oi ,-

o

CC?)

ci

o co

c Ol Lc, c‘j „, c, coc,, o N V' 10 CO t•-• CO 0) 0 -7 CV cO •;1- LI) CD

Z • NNNCVNNCV

Page 39: Oncor Electric Delivery System 2015 Analysis of System Losses

.Ct 4- o

esj

cu

.."•••

> 0

D.

SP

ON

SO

R: D

. E. N

EL

SO

N

- re

Wea

ther

sta

tioni

O O

ci 0

O O O

O

O

d O

d O

O o O

ci O

O O O

O O O

O O

O O

O

O

01 N ID eee400KgI00gt; et V. r4 N - m r4

* ****e**e* 00 0 1.0 r.< 01 N. CO LID 01 tO • 1.11 ol rO <-1 r./ r4

* ********* N CO N Cri V31

01 oi oi N

tO g g*4g0.'gggg L.r1 o.1 r4

* ****e**** 01 U3 ID 03 1.0 0 1.0 • r4 r4 n

e eatee****e. 01 1.0 03 CO 01 1.0 0 01 a ol rJ c<1

* ******** 01 1.10 N .-1C,NONOLO a n • r4 .rl rO r4

• * N 03 • a

1▪ -1 01 N 01 1.13 O 113 m

e ***e****e cc CO 1.13 .-400N01 00 000

r4 r4 r4

e ******e** CO 00 01 1.0 01 1.0 r4 m

e eeeee***e LAD o.1 01 1.0 00 1.10 01 01

Ln r4

- A*AAge*A* 0 03 1.13 r..1 1`.. 00 N. ul 14 n r4 N en 1.4 r4 r4

A ********e • ln r.< CO • 1.0 Cr) 1.11

V1 a r4 ni en

Mid

lan d

-Ode

ssa

—J

CU

a)

Sher m

an- D

enis

on

Wic

h ita

Fa

lls.

CU '5 c to Z; c o <

a.) • C 01 rsi Tr LA CO I, CO CA

Z

4443

Page 40: Oncor Electric Delivery System 2015 Analysis of System Losses

SP

ON

SO

R: D

. E.

NE

LS

ON

šer 4 444

rr ✓ r.

sst

• r

r

— r4r

g

:_°--

ššš gšg š 444

44š š ššš

ašš! ššš

. ssjt jt. 4,4

šceš- 444

g g r X

444 ✓ A r

e

g 444

jt

2,-. :4,-i R:Cil :9AF:4 HVP R.I.AP RiPP '-4 " + i .. ... .. ... 31 . t t t t

3333 toot

i•tttt I,

4,242 .S.E.E 5 iF,25 ,,t.

7:17.11 ,•"-` a :i'- i' "I'l ff.!_° ;

rn g33. ii.fc .fc 3' 3' 3 5 - - -- "

2 2 aaa 0 0 0 0 2277

1232 :2 2 2 2 2 LigA .44'4 14 4 ug-7,

g44

g g

jt

4444

444

r.š

ššš

44a X X r

5,5

444 X X X

g44 • r r

ar

Page 41: Oncor Electric Delivery System 2015 Analysis of System Losses

...c...... ttY, RFAR

s ==== 9.2 "

" ' L2

i 8 0 88 nil it: f, -, i! A 2 1. ,922 EEEE 12-2m-la cEEE 2«22

____.,%•.:, 3 a 3333 .i. 2..f7 2322 " f=1344444444 Psi 47.,' 444 g

SP

ON

SO

R:

D. E

. NE

LS

ON

4445

Page 42: Oncor Electric Delivery System 2015 Analysis of System Losses

cc — (5 w ,-, eeeeeeeeee e O 2 CV CD 0 1- h- CO a n 4 cc) q

5 --6, cd 4 c8 o V' CV 0

CC — 11.1 U) >- -seeeee eeeeee cc u_ •cl: N n ,- r' °R L° N:

a a C. ) n a ,- 4 — cm — o 4 TS .4 N 0

cc o. ,,,eeeeeeeeee

co co co N co co 4 a 4 cs.i. N: <o oi 4 (NI

od V' CV

_c c

c co o o u) .co a,

gi c a) a oi

-c v to E = o 0 &

ci3 .6g .g.. ,rscp (E:1 ct o am 1.2

Li-

ci C" to Ta :2 "5 :5 a=

CV CO ',V- 0 (O r•-- CO 0) 0 ,- CV CO '4' CO CO I's- OD C) CV CO st 0 a), cv

Wea

ther

Sta

t ion!

We

ath

er

Sta

t ion(

0

o TY 0 0 CO 0 0 0 CO VD CV CI; 0 C6 Co C \I 0 C‘i

C \I

2 o

1- CO 0) 0 N: o2 c•i

C

eeeeeeeeee °1 L° CP CP 01 Cq c‘I

a a oi CD cu 4 C4

eeeeeee CO h• Lf) CO N. co 4 cri h: 4

N

eee -,.„- a o

ee Lcz a) Co oo co c‘l

' co c‘i ,- 4 N

t8eeeeeeeeeee •ct CO CD CI cp CD CV 0

d — N 0 7N1'

LT1 s-e'eeeeeeeeee c„ co CD CO 0 N C--• CO 0 oi 4ciaoic 8 ,- c‘i

N

Z 0 I= •5eeeeeeeeeee M '') CD CD cr - N, 0 .- CD h• N 0 CO, .--. a 4 a co a a a — c \ i ,- a

"2 E

V N , o c I— CO 0 seeeeeeeeeee

4 cm 4 o `-'

0 .1—

co›-ee-eeeee eeee oc, LC) CO LO

2 co co h: OJ,- 4 c N

cc w I- Leeeeeeeeee < - co oo 0 h- CO. CO CD LO Cl c* q. < CD CD CO h: Csi 1- •ci 1- CV ..- 0 LLI 76 ,,,t CV 0

20

17

RA

TE

CA

SE

SP

ON

SO

R: D

. E

. NE

LS

ON

o

a

I 1- Z .eeeeeeeeeee o .

4 c4 0 %.7.:,

4446

Page 43: Oncor Electric Delivery System 2015 Analysis of System Losses

20

17

RA

TE

CA

SE

SP

ON

SO

R: D

. E. N

EL

SO

N

* * * * * N • cn 6 al a, al co N. Ln 6 6 rri 6 rsi et N4

Wic

hita

Fa

lls.

Mid

land-O

dess

a

Da l

las-

Fo r

t W

ort

h

We

ath

er

Sta

tio

n!

e ee***ateate cnN Lti LD IN 00 et IN et rn LO N efLN r4 • r4

* ******eate 0 0 LO ul 01 01 CO LD eiLNj 00 N 6 6 r4 ei r4 et NI

* * A * * rn LO rn cn cn 1.0 00 N cr: lfl rn 6 rn r.1 q-1 • N

e e****e*** CO r4 113 LO ri 0 N4 1.0 • fn cri a:efl LD rn N NI .4 et N4

* ********* CO et et LID re LO 4-1 03 rn 6 ni

N

* ********* LD 10et IN 0 4 r4 10 h. N Ct; rn LO 01 ej v.) r4

N

* ********* 00N OL OL LD1OLN

cri ue el 10 ni a N4

* * * * A * * a a t0e4 oe00uLDue r.l co Le, rri nq a NJ

g e gg gg 03 Ln 0 IN CO 113 LO ue rn

co 10 rn ▪ N et N4

e******* w N oe In IN et n1

co 10 rn r4 rn‘t r..1

* *****eate* N 4-1 N co LA IN 6 rn

CO LO rn L. N N rf rsl

e ********* 03 CO et 03 et N1

N 10 rn b N .41.rr N et NI

a) • c 01 ,•-) (.1 m Ls) 1.0 N CO Cr' Z

o O o

o o

o

o o

o o o

0

o

O o o

o o O

o o o

4447

Page 44: Oncor Electric Delivery System 2015 Analysis of System Losses

SP

ON

SO

R: D

. E. N

EL

SO

N

2,22 3333

-4 Al2 8 jj E.4 5.2 ,T1 2 3E33 .i.?c&t 33E3 3 3 3 3 5(' •?c § § 3 §

:62

g 4 4

4 g

g 4

A .2

4 4 P,1

4 4 ▪ s s

tátlt

4 g *

g A • 7 3

ltt lt s

ltltlt át ,?s àtlt A

4 4 4 A A,

lt

e re:

lt

3,

4 tátt • " 4 4

t áttlt

3,

lt

4

e 557

4 4 A

4 4 4

A 4

1

g rig lt

lt e, 717'1, r erg

g egg

A 4 4

e

4 4 r :

lt

3

ccr cog '1.

A 79: 3

4

A'21

AE 22 . Ei 2 a o Y. 1. Y Yr

4448

Page 45: Oncor Electric Delivery System 2015 Analysis of System Losses

W0 —

g . 1- -.J . c.)

:: 5 IX E A A Ei u.1 co . )... m cc 2 • 5 i ic---'

cy - _ —I e, z.zm 4CIW M M mZM 0 ° W

W0P0 4W

4Mco CJW.,0 w>wZ I—M W O <WEZ CCO4cw

6m3a 011— m W

WmW

MOW 04= Z 0 CC

0

SP

ON

SO

R: D

. E. N

ELS

ON

,T!,TTC g '4 LI

.N j3 .12 3333

4 4' <a<

4

t• L ttt 0.0

0 0 0 0 0 3 3 3 3 0 1 .ettt

AAII; .5,4-1; HEE UEL scee 222g 1551 aarzu !LF311 g5“

ea en

2201

AAJj Hrig EEE 7.3 772 -9.12

222 MI ILL

4449

Page 46: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.2/5 Page 1 of 16

2017 RATE CASE ONCOR 'ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

Line No. (a) (b) (c) (d) (e) 1 Model: Residential Spline 2 After Corrective Procedures for Autocorrelation 3 Dependent Variable: ResDMWH 4 Estimation Begin Date: January 1, 2013 5 Estimation End Date: December 31, 2015 6 7 Crigfaent, stdEh.7-1-:§517---Fv-giFj 8 CONST 87922.454 1 483.294 59.275 0.00% 9 Calendar_13_15.DLSiv -7162.197 1501.254 -4.771 0.00%

10 Calendar_13_15.Monday -7133.455 512.757 -13.912 0 00% 11 Calendar_13_15.Tuesday -8383.469 557.238 -15.045 0.00% 12 Calendar_13_15.Wednesday -8173.731 519.19 -15.743 0.00% 13 Calendar_13_15.Thursday -8331.626 518.775 -16.06 0.00% 14 Calendar_13_15.Friday -9053.789 558 599 -16.208 0.00% 15 Calendar_13_15.Saturday -4091.399 502.7 -8.139 0.00% 16 Calendar_13_15.PresDay -3413.101 2823.442 -1.209 22.70% 17, Calendar_13_15.MemDay 8392 103 2811.343 2.985 0.29% 18 Calendar_13_15.LaborDay 15438.784 2851.428 5.414 0.00% 19 Calendar_13_15.Thanks -4328.255 2930.326 -1.477 14.00% 20 Calendar_13_15 FriAThanks 4701.088 2934.065 1 602 10.94% 21 Calendar_13_15.XMasEve 7704.035 2918.169 2 64 0.84% 22 Calendar_13_15.XMasDay 9805.544 2914 26 3.365 0 08% 23 Calendar_13_15.NYEve 4712.189 2974.305 1.584 11.34% 24 Calendar_13_15.NYDay 9668.831 3533.614 2.736 0 63% 25 DayTypeVars.Feb -3734.674 1910.673 -1 955 5.09% 26 DayTypeVars Mar -5752.552 2024 145 -2.842 0.46% 27 DayTypeVars.Apr -5829.672 1878.036 -3 104 0.20% 28 DayTypeVars.Jun 6871.628 1933 541 3.554 0 04% 29 DayTypeVars.Jul 10163.789 2082.769 4.88 0.00% 30 DayTypeVars Aug 4912.5 1945.07 2.526 1.17% 31' DayTypeVars.Nov -5987.619 1843.695 -3.248 0.12% 32 RESDD_13_15.ResHDD40 1173.35 ' 192.396 6.099 0.00.6 33 RESDD_13_15.ResHDD50 1524.724 165.936 9.189 0.00% 34 RESDD_13_15.ResHDD60 2063.572 81.15 25.429 0.00% 35 RESDD_13_15 ResCDD65 1584.129 180.925 8 756 0.00% 36 RESDD_13_15.ResCDD70 1790.95 357.604 5.008 0.00% 37 RESDD_13_15.ResCDD75 1218.014 378.979 3.214 0 14% 38 RESDD_13_15.ResCDD80 774.529 285.47 2 713 0.68% 39 AR(1) 0.426 0.031 13.796 0.00% 40 AR(2) 0.094 0.033 2.849 0.45% 41 AR(3) 0 196 0.033 5.926 0.00% 42 AR(4) 0.089 0.031 2.871 0.42% 43 44 [Regression Statiair 45 Adjusted Observations 1091 46 Deg. of Freedom for Error 1056 47 R-Squared 0.9810 48 Adjusted R-Squared 0.9810 49 F-Statistic 1640 50 Prob (F-Statistic) 0 0000 51 Model Sum of Squares 1 6053541 43682 52 Sum of Squared Errors 30,403,682,387.09 53 Mean Squared Error 28,791,365.90 54 Std. Error of Regression 5,365.76 55 Mean Abs. Dev. (MAD) 4,023.61 56 Mean Abs. % Err. (MAPE) 3.93% 57 Durbin-Watson Statistic 2.002 58 Ljung-Box Statistic 18.21

- 59 Prob (Ljung-Box) 0.7928

4450

Page 47: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.2/5 Page 2 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

4451

Line No. 1 2 3

'1.0 4 5

7 8 0.0

9. 0.5

10 11 1.0 12 13 14 1.0 15 16 0.5 17 18 0.0

19 20 0.5

21 1.0

22 23

Residential Spline Model After Corrective Procedures for Autocorrelation

1 I _l l IMMO I,

1 2 3 4 5" 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACF

It;

MN= 11111100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PACF

Page 48: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/ll-H-5.2/5 Page 3 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR ME TEST YEAR ENDING DECEMBER 31,2016

SPONSOR: D. E. NELSON

Line rsir

2

(a) • (b) (c) (d) Model: Secondary Service Less Than or Equal to 10 KW Spline After Corrective Procedures for Autoconelation

(o)

3 Depondant Variable: GSSDMWH 4 Estimation Begin Date: January 1, 2013 5 Estimation End Date. Drieember 31, 2015 6 7 r - va,abo . Coefficient 9td:Eir̂ """""*"T.Stat1=Plyeiliiiirl 8 CONST 3364.515 0.00% 9 Calendar_13_15.DLSav -114 017

34676.

796169 9.17

-2 387 1.72% 10 11

Calendar_13_15 Monday Calendar_13_15.Tuesday

543 433 582 792

22.552 31.445

24.097 18.534

0 00% 0 00%

12 13

Calendar_13_15 Wednesday Calendar_13_15 Thursday

624.389 606.835

32 852 32.838

19 006 18 48 ° °% 0°0 0 %

14 Calendar_13_15.Fnday 593 604 31 466 18.865 . 15 Calendar_13_15 Saturday 176 832 22.457 7.874

0 000./04

0 0

16 Calendar_13_15.MemDay -458.914 56 666 0.00% 17 Calendar_13_15.July4th -547 223 56 458 - 9 -98 6°993 ' 0.00% 18 Calendar_13_15.LaborDay -592.697 58 087 -10 204 19 20 21

Calendar_13_15 Thanks Calendar_13_15 FnAThanks Calendar_13_15 XMasEve

-375 073 -98.517

-316.627 31 66311134

88.803

-5 .6

461 ..19

-3.565

0°.0°0°%% 11 90% 0 04%

22 Calendar_13_15.XMasDay -572.01 77 021 -7 427 0 00% 23 24

Calendar_13_15 XMasWk Calendar_13_15.NYDay

-149.493 -485 388

88 718 80 352 :61'064851

9.23% 0 00%

25 Calendar 13_15 XMasLights 5.547 3 022 6 67% 26 27

DayTypey-ars TimeTrend DayTypeVars.Apr

196 347 -135 325

130 426 51.357

11.'580356 103.82

65.%4

28 20

DayTypeVars May DayTypeVars Jul

-236 777 -175 427

51.455 58 666

4-2

660325

-2.99 0 00%

30 DayTypeVars Aug -268 499 76.437 -3 513 0°.0259%% 31 32

DayTypeVars.Sep DayTypeVars Oct

-319.238 -297.2

86 466 89 295

-3 692 -3.328 0

0 002

904%

33 34 35

DayTypeVars.Nov DayTypeVars Dec GSSDD_13_15 GSSI-IDD35

-358.241 -125 797 -15 369

86 46 79 358

4 63

:41.6

18463

-3.319

0 00% 11.33% 0 10%

36 37

GSSDD_13_15.GSSHDD50 GSSDD_13_15 GSSHDD60 1187 0843

2 972 1.776 . 6100.0154

0 00%

38 GSSDD_13_15 GSSCDD65 26 829 4.03 % 0° 0°0° 39 40

GSSDD_13_15 GSSCDD70 GSSDD_13_15 GSSCOD75

17.441 22 398

7 312 7 5.3685 26 1 72% 0.01%

41 AR(1) 0 713 5 725 .0 0 32 2 3221 '9 .6 0 00% 42 43 44 45

AR(2) AR(3) AR(4) AR(5)

0'0°122 0 2 0 113

-0 035

0 039 0 038 0 038 0.038

0 307 0.579 29

.0.90511

75 87% 56 27%

360..7326Z 46 AR(6) 0 020 0 038 0 525 59 95% 47 48

AR(7) AR(8)

0 180 -0 097

0 038 0.039

4.707 -2 493 01.298°Z

49 AR(9) -0 008 0 039 -0 194 84.61% 50 AR(10) 0.010 0.255 79 87% 51 AR(11) -0 072

003,8

8 00

6 03% 52 AR(12) 0 017 0 038 -01.483871 66 20% 53 AR(13) 0 4 1.193 54 AR(14)

0160

6 0

8 09.0°338 4 174

203

0300

%%

55 AR(15) -0.134 0 05% 56 AR(16) 00°3399 .0 3 4 --068778 49 23% 57 AR(17) 7 -0 0°29 0.3 0 039 1.015 31 01% 58 AR(18) -0.022 -0 576 56 47% 59 AR(19) -0 029 ° °3399 0 0 -0 756 45.00% 60 AR(20) 0 039 0 96 % 61 AR(21) 00.0367 13 0 039

33.071

04

0 4 62 AR(22) -0 051 0 038 3 -1.353321 18.32%

63 AR(23) -0 067 0 031 -2.143 3 23% 64 65 1=141174MOnfatitia""'""T"I 66 Adjusted Observations 1072 67 Deg of Freedom for Error 1016 68 R-Squared 0 969 69 Adjusted R-Squared 0.968 70 F-Stabstic 582 71 Prob (F-Stabstic) 0 000 72 Model Sum of Squares 500216797 73 Sum of Squared Errors 15,872,935 74 Mean Squared Error 15,622.97 75 Std Error of Regression 124 990 76 Mean Abs Deo. (MAD) 94 62 77 78

Mean Abs % Err (MAPE) Durbin-Watson Statistic

2.119%7

1 .9

79 Ljung-Box Statistic 4 16 80 Prob (Ljung-Box) 1.000

4452

Page 49: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.2/5 Page 4 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

4453

Line No. 1 2 3

1.0 4 5 6 0.5

7 8 0.0

9 0.5

10 11 1.0 12 13 14 1.0 15 16 0.5 17 18 0.0

19 20 0.5

21 1.0 22 23

Secondary Service Less Than or Equal to 10 KW Spline Model After Corrective Procedures for Autocorrelation

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACF

4

I -4

1

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PACF

Page 50: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/ll-H-5.2/5 Page 5 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

Line No (a) (b) (c) ; (d) (e) 1 blociel: Secondary Service Greater Than 10 KW Spline 2 After Comely. Procedures for Autocorrelation 3 Dopendent Variable: GSLDMWH -4 Estimation Begin Date: January 1, 2013 5 Estimation End Date; December 31, 2015 6 7 Coefficiere stdElt-sfp-viii171 8 CONST 85270 64 1222.886 69 729 0 00 9 'Calendar_13_15.DLSav -2073.029 766 205 -2.706 0.69%

10 Calendar_13_15 Monday 25150 815 358.495 70.157 0 00% 11 Calendar_13_15 Tuesday 26615.343 458.765 58.015 0.00% 12 Calendar_13_15.Wednesday 27648 181 495 72 55.774 0.00% 13 Calendar_13_15 Thursday 26595 997 496 058 53 615 0 00% 14 Calendar_13_15 Fnday 24402 743 460.407 53.003 0 00% 15 Calendar_13_15.Saturday 4896.703 353 58 13.849 0.00% 16 Calendar_13_15 MLK -7626 521 1245.688 -6 122 0 00% 17 Calendar_13_15 PresDay -6366 5' 1250 939 -5.089 0.00% 18 Calendar_13_15.GoodFri -3734.973 1100 378 -3 394 0.07% 19 Calendar_13_15 MemDay -24060.725 1251.858 -19 22 0 00% 20 Calendar_13_15 July4th -16605 025 1239.776 -13.394 0 00% 21 Calendar_13_15.LaborDay -22953.379 1272 052 -18 044 0.00% 22 Calendar_13_15 Thanks -19120 732 1440 094 -13 277 0 00% 23 Calendar_13_15 FriAThanks -8178.95 1434 375 -5.702 0.00% 24 Calendar_13_15.XMasWkB4 -2611 444 2132 814 -1 224 22 11% 25 Calendar_13_15.XMasEve -16918.431 1943.712 -8 704 0.00% 26 Calendar_13_15 XMasDay -28917 876 1727.81 -16 737 0 00% 27 Calendar_13_15 XMasWk -14747.125 2088 699 -7 06 0.00% 28 Calendar_13_15 NYEve -8086 007 1507.863 -5 363 0 00% 29 ,Calendar_13_15 NYDay -18810 386 1714 675 -10 97 0 00% 30 Calendar_13_15.XMasLights 179 645 59 042 3 043 0 24% 31 DayTypeVars.TimeTrend 965 932 409.707 2 358 1 86% 32 DayTypeVars Jun 4239 73 1000 617 4 237 0 00% 33 DayTypeVars Jul 3626 108 1100.724 3 294 0 10% 34 DayTypeVars.Aug 6790 301 1142 906 5 941 0 00% 35 DayTypeVars Sep 5845.495 1183.264 4.94 0.00% 36 DayTypeVars.Oct 2072 001 1066 053 1 944 5 22% 37 DayTypeVars Nov -3206 473 946 939 -3.386 0.08% 38 GSLDD_13_15 GSLHDD35 -184 187 118 214 -1 558 11 95% 39 GSLDD_13_15 GSLHDD45 241.179 1 24 409 1 939 5 28% 40 GSLDD_13_15.GSLHDD50 632.289 86.282 7 328 0 00% 41 GSLDD_13_15.GSLCDD60 590.014 76.071 7.756 0 00% 42 GSLDD_13_15 GSLCDD65 502 744 148.742 3 38 0 08% 43 GSLDD_13_15.GSLCDD70 456.996 125 181 3 651 0.03% 44 GSLDD_13_15 GSLCDD80 178 448 99 05 1 802 7 19% 45 AR(1) 0.694 0 031 22.255 0 00% 46 AR(2) -0.056 0 038 -1 459 14.48% 47 AR(3) 0 089 0 038 2 318 2 07% 48 AR(4) -0.036 0 038 -0 929 35 30% 49 AR(5) -0 012 0.038 -0 302 76 27% 50 AR(6) -0 076 0 038 -1 978 4 82% 51 AR(7) 0 246 0 038 6 446 0.00% 52 AR(8) -0 108 0.039 -2.773 , 0.57% 53 AR(9) -0 011 0 038 -0.285 77 60% 54' AR(10) -0 077 0 039 -1 992 4 66% 55 AR(11) 0.031 0 038 0.801 42 32% 56 AR(12) 0 002 0.038 0 051 95 90% 57 AR(13) 0 041, 0.038 1 061 28 89% 58 AR(14) 0.115 0 038 2.991 0.29% 59 AR(15) -0 082 0 032 -2 592 0.97% 60 61 FIMrssi-driStlistics_ 62 Adjusted Observations 1080 63 Deg of Freedom for Error 1028 64 R-Squared 0 9820 65 Adjusted R-Squared 0 9820 66 F-Statistic 1129 67 Prob (F-Statistic) 0 0000 68 Model Sum of Squares 425589562340 69 Sum of Squared Errors 7,596,786,186 70 Mean Squared Error 7389869 830 71 Std Error of Regression 2718.430 72 ' Mean Abs Dev. (MAD) 1943, 45 73 Mean Abs. % Err. (MAPE) 1 65% 74 Durbin-Watson Statistic 1 997 75 Ljung-Box Statistic 10 900 76 Prob (Ljung-Box) 0.9897

4454

Page 51: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.2/5 Page 6 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

Line No. 1 2 3

1.0 4 5

6 0.5

7

8 0.0

9 0.5

10

11 1.0 12 13

14 1.0 15

16 0.5- . 17

18 0.0

19

20 0- 5

21 1.0

22 1 2 23

Secondary Service Greater Than 10 KW Spline Model After Corrective Procedures for Autocorrelation

3 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACF

WIMI11111.

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PACF

1 2

4455

Page 52: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.2/5 Page 7 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

Line (a) (b) (c) (d) (e)

1 Model: Primary Service Greater Than 10 KW Distribution Spline 2 After Corrective Procedures tor Autocorrelation 3 Dependent Variable: GPLDDMWH 4 Estimation Begin Date: January 1, 2013 5 Estimation End Date: December 31, 2015 6 7 'tiaraire Coeffscient Mtn' T-Stat PIVal=

CONST ' 26566.585 217.663 122.054 0.00% 9 Calendar_13_15.DLSav -381.591 193.389 -1.973 4.87% 10 'Calendar_13_15.Monday 2848.184 46.524 61.219, 0.00% 11 Calendar_13_15.Tuesday 3383.024 61.53 54.982 0.00% 12 Calendar_13_15.Wednesday 3552.039 64.216 55.314 0.00% 13 Calendar_13_15.Thursday 3377.175 64.299 52.523 0.00% 14 Calendar_13_15.Friday 3224.954 61.722 52.25 0.00% 15 Calendar_13_15.Saturday 1051.452 45 663 23.026 0.00% 16 Calendar_13_15.MLK -505.67 229.636 -2.202 2.79% 17 Calendar_13_15 GoodFri -439.228 199.59 -2 201 2.80% 18 Calendar_13_15.MemDay -2495 230.19 -10.839 0.00% 19 Calendar_13_15.July4th -1731.58 229.251 -7.553 0.00% 20 Calendar_13_15 LaborDay -2991.722 233.187 -12.83 0.00% 21 Calendar_13_15.Thanks -3072.732 288.566 -10.648 0.00% 22 Calendar_13_15.FriAThanks -2422.481 288.501 -8.397 0.00% 23 Calendar_13_15.XMasEve -3485.217 422.32 -8.253 0 00% 24 Calendar_13_15.XMasDay -5007.955 354.197 -14.139 0.00% 25 Calendar_13_15.XMasWk -2196.582 402.563 -5.456 0.00% 26 Calendar_13_15.NYEve -1754.896 300.063 -5.848 0.00% 27 Calendar_13_15.NYDay -3718.696 335 681 -11.078 0.00% 28 Calendar_13_15.XMasLights 56.429 13.147 4.292 ' 0.00% 29 DayTypeVars.Feb -580.543 191 329 -3.034 0.25% 30 DayTypeVars.May 299.457 191.522 1.564 11.82% 31 DayTypeVars.Jul 507.282 230.992 , 2.196 2.83% 32 DayTypeVars.Aug 825.34 276.062 2.99 0.29% 33 DayTypeVars.Sep 524.16 281.806 1.86 6.32% 34 DayTypeVars.Oct 644.174 245.159 2.628 0.87% 35 GPDDD_13_15.GPDCDD60 76.923 8.571 8.975 0.00% 36. GPDDD_13_15.GPDCDD70 36.511 13.367 2 731 0.64% 37 AR(1) 0.889 0.031 28.787 0.00% 38 AR(2) -0.263 0.041 -6.358 0.00% 39 AR(3) 0.116 0 042 2.732 0.64% 40 AR(4) 0.022 0.043 0.526 59.89% 41 AR(5) -0.016 0.043 -0.381 70 34% 42 AR(6) -0 042 0.043 -0.987 32.40% 43 AR(7) 0.078 0 043 1.82 6.90% 44 AR(8) 0.051 0.042 1.192 23.36% 45 AR(9) 0.006 0.042 0.137 89.12% 46 AR(10) 0.062 0.031 1.999 4.58% 47 48 Regression Statistics_ 49 Adjusted Observations 1085 50 Deg. of Freedom for Error 1046 51 R-Squared 0.9400 52 Adjusted R-Squared 0.9380 53 F-Stabstic 434 54 Prob (F-Statistic) 0.0000 55 Model Sum of Squares 4854660076 56 Sum of Squared Errors 308,147,355 57 Mean Squared Error 294595.940 58 Std. Error of Regression 542.7700 59 Mean Abs. Dev. (MAD) 387.66 60 Mean Abs. % Err. (MAPE) 1.32% 61 Durbin-Watson Statistic 2 001 62 Ljung-Box Statistic 17.08 63 Prob (Ljung-Box) 0.8451

4456

Page 53: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.2/5 Page 8 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADjUSTED.WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

Line No. 1

2 3

1.0 4 5 6 0.5

7 0.0 8

9 0.5

10

11 1.0 12

13

14 1.0 15

16 0.5-

17

18 0.0

19

20 0.5

21 1.0

22 1 2

23

24

25

26

27

28

Primary Service Greater Than 10 KW Distribution Spline Model

After Corrective Procedures for Autocorrelation

MON

I 4 MIN 1 I /

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 , 21 22 23 24 PACF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACF

4457

Page 54: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/ll-H-5 2/5 Page 9 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON •

Line (a) (b) (c) (d) (a) No

1 Model: Residential Spline (B) Before Corrective Procedures for Autocorrelation

3 Dependent Variable: ResDMWH 4 Estimation Begin Date: January 1, 2013 5 Estimation End Date: December 31, 2015 6 7 Variable Coeificiont 8 CONST 83807.336 1407.558 59 541 0 00% 9 Calendar_13_15 DLSav -6923 385 1418 696 88 0.00%

10 Calendar_13_15.Monday -7617.79 732.562 -10.399 0 00% 11 Calendar_13_15.Tuesday -8811.165 715 056 -12.322 0 00% 12 Calendar_13_15 Wednesday -8481 189 717 628 -11 818 0.00% 13 Calendar_13_15 Thursday -8547.346 719.286 -11.883 0.00% 14 Calendar_13_15.Friday -9134 513 720 278 -12 682 0.00% 15 Catendar_13_15.Saturday -3934 311 714 41 -5 507 0 00% 16 Calendar_13_15.MLK -989.838 3734 331 -0.265 79.10% 17 Calendar_13_15 PresDay -3907.98 3734.555 -1.046 29.56% 18 Calendar_13_15.GoodFn -3178.739 3201.278 -0 993 32.09% 19 Calendar_13_15 MemDay 9957 701 3705 319 2.687 0.73% 20 Calendar_13_15 July4th -3308 381 3700.521 -0 894 37.15% 21 Calendar_13_15 LaborDay 17345.498 3729.311 4.651 0.00% 22 Calendar_13_15 Thanks -2393 215 3704.396 -0.646 51.84% 23 Calendar_13_15.FnAThanks 7032 559 3712 093 1.894 5.84% 24 Calendar_13_15 XMasWkB4 -2528 916 4171.811 -0 606 54.45% 25 Calendar_13_15 XMasEve 13392 961 3833 364 3 494 0 05% 26 Calendar_13_15.XMasDay 17426 011 3834 638 4.544 0.00% 27 Calendar_13_15.XMasWk 4016 301 3900 099 1.03 30 33% 28 Calendar_13_15 NYEve 9564.225 3843 511 2 488 1.30% 29 Calendar_13_15 NYDay 7684 788 3685.74 2.085 3.73% 30 Calendar_13_15 XMasLights 343.155 84.006 4 085 0 01% 31 DayTypeVars.TimeTrend 949.559 232 996 4.075 0 01% 32 DayTypeVars Feb -6029.254 974 624 -6 186 0 00% 33 DayTypeVars Mar -5598 99 1386 856 -4.037 0.01% 34 DayTypeVars Apr -6766.29 1698 568 -3.984 0 01% 35 DayTypeVars.May -584.752 1782.378 -0.328 74 29% 36 DayTypeVars.Jun 6613.905 1949.193 3.393 0 07% 37, DayTypeVars Jul 8069.856 1980 94 4 074 0 01% 38 DayTypeVars.Aug 5539.445 2012 766 2 752 0 60% 39 DayTypeVars.Sep -81 665 1913.181 -0 043 96 59% 40 DayTypeVars Oct -5190 917 1740 342 -2 983 0 29% 41 DayTypeVars Nov -13226 598 1015 254 -13 028 0 00% 42 DayTypeVars.Dec -5388 666 1462 762 -3.684 0 03% 43 RESDD_13_15.ResHDD35 571 766 539.057 1 061 28 91% 44 RESDD_18,15 ResHDD40 -54.716 675 19 -0 081 93 54% 45 RESDD_13_15 ResHDD45 688 684 614 679 1.12 26 28% 46 RESDD_13_15 ResHDD50 1739 139 562 176 3 094 0 20% 47 RESDD _1 3_15 ResHDD55 -19 054 534 415 -0 036 97.16% 48 RESDD_13_15.ResHDD60 2263 97 495.882 4 566 0 00% 49 RESDD_13_15 ResHDD65 5.789 270 283 0 021 98 29% 50 RESDD_13_15 ResCDD65 2080 826 272.899 7.625 0 00% 51 RESDD_13_15.ResCDD70 1082 737 492.791 2.197 2 82% 52 RESDD _1 3_15.ResCDD75 1693 708 490 318 3.454 0 06% 53 RESDD_13_15 ResCDD80 968.656 435.524 2 224 2 63% 54 RESDD_13_15.ResCDD85 -212.007 412.611 -0 514 60 75% 55 56 tisearttsion 57 Adjusted Observations 1095 58 Deg. of Freedom for Error 1048

. 59 R-Squared 1 60 Adjusted R-Squared - 1 61 F-Statistic 889 62 Prob (F-Stabstic) 63 Model Sum of Squares 1 59806969721 532 00% 64 Sum of Squared Errors 40,952,604,321.69 65 Mean Squared Error 39,076,912 52 66 Std Error of Regression 6,251 15 67 Mean Abs Dev (MAD) 4,748 67 68 Mean Abs % Err (MAPE) 4 53% 69 Durbin-Watson Statistic 1 232 70 Ljung-Box Statistic 482.92 71 Prob (Ljung-Box) 0

4458

Page 55: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.2/5 Page 10 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

445q

Line No. 1 2 3

1.0 4 5 6 0.5-

7 0.0

8 9 *

0.5- 10 11 1.0 12 13 14 1.0 15 16 0.5 17 18 0.0

19 20 21

1.0 22 23

1

Residential Spline (B) Model Before Corrective Procedures for'Autocorrelation

F51 it ark WEI gel PPS rem, en

3 4 5 6 7

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACF

I - I

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PACF

1 2

Page 56: Oncor Electric Delivery System 2015 Analysis of System Losses

WPM-H-5 2/5 Page 11 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

Line No: 1 2 3 4 5 6 7

, (a) (b)

Model: Secondary Service Less Than Before Corrective Procedures for Autocorrelation Dependent Variable: GSSDMWH Estimation Begin Date: January 1, 2013 Estimation End Date: December 31, 2015

(c) or Equal to 10

CMffifin itlEr----"1"-Stit

(d) KW Spline (B)

(e)

i Venable 8 CONST - 3161 92 53 79 58.782 0 00% 9 10

Calendar_13_15.DLSav Calendar_13_15 Monday

-23.888 530.475

54 022 27.895

-0 442 19 017

65 85%

11 12 13

Calendar_13_15 Tuesday Calendar_13_15.Wednesday Calendar_l 3_15 Thursday

580.624 625 977 608.436

27.232 27.341 27.398

21 321 22 896 22.207

00.

0000Z

0 00% 0.00%

14 Calendar_13_15.Friday 607 386 ' 27 439 22.136 0.00% 15 Calendar_13_15.Saturday 196 234 27 21 7.212 0.00% 16 17

Calendar_13_15 MLK Calendar_13_15.PresDay

-59 609 -92 543

142 319 142.182

-0.419 -0.651

67 54% 51 53%

18 19

Calendar_13_15 GoodFn Calendar_13_15.MemDay

40 86 -415 569

121 897 141 161 -20..934436

73 76% 0.33%

20 21

Calendar_13_15.July4th Calendar_13_15 LaborDay

-689 555 -527.458

140 981 142 145

-4 891 -3 711

0.0020%

0

% 22 23 24

Calendar_13_15.Thanks Calendar_13_15.FnAThanks Calendar_13_15 XMasWkB4

-440 344 -173.435 -257.233

141 064 141 294 158 93

-3.122 -1 227 -1.619

201.9199Z 10.59%

25 26

Calendar_13_15 XMasEve Calendar_13_15.XMasDay

-297.592 -531 846

146 068 146 008

2 -- 0 3

. 84337 0 03% 4 19%

27 28 29 30 31 32

Calendar_13_15 XMasWk Calendar_13_15.NYEve Calendar_13_15 NYDay Calendar_13_15 XMasLights DayTypeVars TimeTrend DayTypeVars Feb

-113.311

3.2473 -812 54 -4 10 24

27 0 052 -200 566

148.562 146.411 140.371

3 2 8 874

37.118

-0.763 -0 092 -3 4

.

33

26

-6

30.432

44 58% 92 67% 0 06% 0 14% 0 00% 0.00%

33 DayTypeVars Mar -247 227 52 822 -4.46083 4 34 DayTypeVars Apr -501 747 ' 64 731 -7 751 00 000"%* 35 DayTypeVars May , -579 382 67 983 -8 522 0 00% 36 DayTypeVars Jun -263.658 74 36 -3 546 o 04% 37 DayTypeVars.Jul -322 316 75 551 -4.266 o 00% 38 DayTypeVars Aug -160 174 76 742 -2 087 3 71% 39 DayTypeVars.Sep -310 686 72.871 -4 264 o 00% 40 DayTypeVars.Oct -422.367 66 279 0.00% 41 DayTypeVars.Nov -555 248 38.677 6 3 763 -4 -1 3 5 0 00% 42 DayTypeVars Dec -341 218 55 688 -6 127 0 00% 43 44 45

GSSDD_13_15.GSSHDD35 GSSDD_13_15 GSSHDD40 GSSDD_13_15 GSSHDD45

-20.781 -15 25 31 627

20 394 25 422 23 104

-1 019 -0.6

1 369

30 84% 54.87% 17 13%

46 GSSDD_13_15 GSSHDD50 10 343 21 013 0 492 62 27% 47 48

GSSDD_13_15.GSSHDD55 GSSDD_13_15.GSSHDD60

8.184 10 66

19 925 18.573

0 411 0 574

68 13%

49 GSSDD_13_15 GSSHDD65 9 619 2 10198 10 3

0 944 , 35466

51Z

.5 50 GSSDD_13_15 GSSCDD65 32.62 3.143 51 52

GSSDD_13_15.GSSCDD70 GSSDD_13_ 15 GSSCDD75

21.681 18.426

18 716 18.567

1 158 0 992

(17 24 107 32 12%

53 54

GSSDD_13_15 GSSCDD80 GSSDD_13_15.GSSCDD85

11 681 -8.04

16 501 16 08

0 708 -0 5 t>

47 92% 61 72%

53 54 rarelniOntatistics_ . 55 Adjusted Observations 1095 56 Deg. of Freedom f or Error 1048 57 R-Squared 0 886 58 Adjusted R-Squared 0 881 59 F-Stabstic 176 9680 60 P rob (F-Stabstic) 0 000 61 Model Sum of Squares 46147318941 00% 62 Sum of Squared Errors 59,409,523.95 63 Mean Squared Error 56,688.48 64 Std Error of Regression 238 090 65 Mean Abs. Dev. (MAD) 185 46 66 Mean Abs % Err. (MAPE) 4.19% 67 Durbin-Watson Statistic 0.489

,68 Ljung-Box Statistic 5718 78 60 Prob (Ljung-Box) 0 000

4460

Page 57: Oncor Electric Delivery System 2015 Analysis of System Losses

1.0

0.0

0 5-

111111111111011 11 Si RI Pa Ell 0.5-

1.0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACF

WP/II-H-5.2/5 Page 12 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

4461

Line No. 1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 0.0

19 20 21 22 23

Secondary Service Less Thin or Equal to 10 KW Spline (B) Model Before Corrective Procedures for Autocorrelation

1.0

0 5-

- OM pm rill no Era are PM

1.0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

PACF

Page 58: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5 2/5 Page 13 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

Line No. 1 2 3 4 5 6 7

(a) (b) (c) (d) (e) Model: Secondary Service Greater Than'10 KW Spline (B)

, Before Corrective Procedures for Autocorrelation Dependent Variable: GSLMWH Estimation Begin Date: January 1, 2013 Estimation End Date: December 31, 2015

L Variants traffniali rdEr7----"T-8tar"""°*--P:ValiFM 8 CONST 85026.289 721 492 117.848 0 00% 3 10

Calendar_13_15.DLSav- Calendar_13_15 Monday

-2453.541 25124 688

788.854 407.346

-3 11 61 679

0.19%

11 Calendar_13_15 Tuesday 26590.388 397.705 66.86 9 9 0.009Z 12 Calendar_13_15 Wednesda 27688.29 399.089 ,69.379 0 00% 13 Calendar_13_15 Thursday 26614 244 400 016 66.533 14 15

Calendar_13_15 Friday Calendar_13_15.Saturday

24496.242 5016.357

400 546 397.303

61.157 12.626

0.00Z 0 00

0 00% 16 17 18

Calendar_13_15.MLK Calendar_13_15 PresDay Calendar_13_15.GoodFri

-8988.595 -9257.422 -4247.004

2077.559 2077.15

1780.575

-4 327 -4 457 -2.385

0 00% 00 0

1..72%% 19 20

Calendar_13_15.MemDay Calendar_13_15 July4th

-25162.192 -23750 301

2060.604 2058 019

-12 211 -11.54 9 8 ° 0 009k°

21 Calendar_13_15.LaborDay -22569 226 2073 272 -10.886 0 00% 22 Calendar213_15 Thanks -21358 19 2060 23 -10.367 0.00% 23 Calendar_13_15.FnAThank. -7859.928 2063 002 -3 81 0 02% 24 Calendar_13_15 XMasWkB -5877 282 2320 998 -2.532 1 15% 25 Calendar_13_15 XMasEve -16938 46 2131 891 -7.945 0 00% 26 Calendar_13_15 XMasDay -29436.795 2132.787 -13 802 0.00% 27 Calendar_13_15 XMasWk -15472 932 2169 074 -7.133 0 00% 28 29

Calendar_13_15.NYEve Catendar_13_15 NYDay

-12001.212 -25967 071

2137 253 2050.484 -II-5.68618 2 4

0 00% 0.00%

30 Calendar_13_15 XMasLight 228 296 46 744 4.884 0.00% 31 DayTypeVars.TimeTrend 1021 88 129.593 7.885 0 00% 32 DayTypeVars Feb -812 612 542 312 13 43% 33 DayTypeVars.Mar -1053 975 771.321

:11.346968

17 21% 34 DayTypeVars Apr -324 818 944 714 -0 344 73 11% 35 36

DayTypeVars May DayTypeVars Jun

355.491 2767 494

990.955 1083 254 0 3 2 55559 711.0989%%

37 DayTypeVars Jul 708.938 1100.606 , 0 644 51.96% 38 DayTypeVars.Aug 5520 052 1118 26 ' 4.936 0 00% 39 DayTypeVars Sep 6201' 567 1063 816 0 00% 40 DayTypeVars.Oct 2427 878 968 85.883 2 0 1.23% 41 DayTypeVars Nov -4548 209 564 524 -8 057 0 00% 42 DayTypeVars.Dec -1705 633 813 899 -2 096 43 GSLDD_13_15 GSLHDD35 -472.154 297 355 -1.588 131 2863%% 44 GSLDD_13_15.GSLHDD40 571.606 371 261 1 54 12 40% 45 GSLDD_13_15 GSLHDD45 -80 088 337.902 -0 237 81.27% 46 GSLDD_13_15 GSLHDD50 921.47 309 994 2 973 0 30% 47 GSLDD_13_15 GSLHDD55 -57 187 295.563 -0 193 84 66% 48 GSLDD_13_15.GSLHDD60 25.847 158 865 0 163 87.08% 49 GSLDD_13_15.GSLCDD60 390.261 149.882 2 604 50 GSLDD_13_15 GSLCDD65 989 924 268 652 3.685 09 0933Z 51 GSLDD_13_15 GSLCDD70 82 565 274.076 0 76 33% 52 GSLDD_13_15 GSLCDD75 411 551 273 787 5

3031

1

0

13 31% 53 GSLDD_13_15 GSLCDD80 226.227 242.572 0 933 35.12% 54 GSLDD_13_15.GSLCDD85 ' -430 79 225 496 -1 91 5 63% 55 56 [R7Feriirn-grars'a 57 Adjusted Observations 1095 58 Deg. of Freedom for Error 1048 59 R-Squared 0 971 60 Adjusted R-Squared 0 970 61 F-Statistic 764 62 Prob (F-Stabstic) 0.000 63 Model Sum of Squares 424758807155 64 Sum of Squared Errors 12,667,424,468 65 Mean Squared Error 12,087,237 09 66 Std Error of Regression 3,476 67 67 Mean Abs Dev. (MAD) 2,473 42 68 Mean Abs % Err (MAPE) 2 10% 69 Durbin-Watson Statistic 0 934 70 Ljung-Box Statistic 519 21 71 Prob (Ljung-Box) 0.000

4462

Page 59: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/11-H-5.2/5 Page 14 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTEb WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

4463

Line No. 1 2 3

1 .0 4 5 6 0.5-

7 8 0.0

9 0.5- '10 11 1.0 12

1

13 14 1.0 15 16 0.5 17 18 0.0

19 20 0.5

21 1.0 22 1 23 24 25 26 27 28

Secondary Service Greater Than 10 KW Spline (B) Model Before Corrective Procedures for Autocorrelation

ON PP rrto

2 3 4 5 6 7 8 9 10 11 12 13 .14 15 16 17 18 19 20 21 22 23 24 ACF

roma ammo. t

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PACF

MOM

m

OWN ,

Page 60: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/ll-H-5.2/5 Page 15 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

Line No 1 2 3 4 5 6 7

(a) Model: Before Corrective Procedures Dependent Variable: Estimation Begin Date: Estimation End Date:

(b) (c) (d) Primary Service Greater Than 10 KW Distribution Spline (B)

for Autocorrelation GPLDMWH January 1, 2013 December 31, 2015

(e)

r---""'"Vetiable7--- Coefaient StdErr T-Stat P:Vage=1 8 CONST 25713 992 125.141 205.48 0.00% 9 Calendar_13_15.DLSav -29.601 183 544 -0.161 87.19%

10 Calendar_13_15.Monday 2865.542 95.895 29.882 0.00% 11 Calendar_13_15.Tuesday 3384.369 93.89 36.046 0.00% 12 Calendar_13_15.Wednesday 3564.691 94.232 37.829 0.00% 13 Calendar_13_15.Thursday 3398.7 94.381 36 01 0.00% 14 Calendar_13_15.Friday 3250 5 94.498 34.397 0.00% 15 Calendar_13_15.Saturday 1049.575 93.643 11.208 0.00% 16 Calendar_13_15.MLK -205.316 488.032 -0.421 67.41% 17 Calendar_13_15.PresDay -328.137 490.482 -0.669 50.36% 18 Calendar_13_15.GoodFn -887.315 420.915 -2 108 3.52% 19 Calendar_13_15.MemDay -3519.702 488.654 -7.203 0.00% 20 Calendar_13_15.July4th -3323.124 488.178 -6.807 0.00% 21 Calendar_13_15.LaborDay -3861.335 492.617 -7.838 0.00% „ 22 Calendar_13_15.Thanks -3531.434 486.794 -7.254 0.00% 23 Calendar_13_15.FnAThanks -3429.566 487.589 -7.034 0.00% 24 Calendar_13_15.XMasWkB4 191.62 545.862 0.351 72.56% 25 Calendar_13_15.XMasEve -4321.443 504.073 -8.573 0.00% 26 Calendar_13_15.XMasDay -6365.671 503.956 -12.631 0.00% 27 Calendar_13_15.XMasWk -1835.674 512.399 -3.583 0.04% 28 Calendar_13_15 NYEve -2477.496' 504.075 -4.915 0.00% 29 Calendar_13_15.NYDay -5050.956 484.37 -10.428 0.00% 30 Calendar_13_15.XMasLights 23.594 10.946 2.156 3.13% 31 DayTypeVars.TimeTrend 180.694 30.642 5.897 0.00% 32 DayTypeVars.Feb -106.864 127.642 -0.837 40.26% 33 DayTypeVars.Mar 263.953 182.398 1.447 14.82% 34 DayTypeVars.Apr 329.051 224.374 1.467 14.28% 35 DayTypeVars.May 418.892 235 793 1.777 7.59% 36 DayTypeVars.Jun 40 344 257.713 0 157 87.56% 37 DayTypeVars.Jul 617.418 261.633 2.36 1.84% 38 DayTypeVars.Aug 1064.669 265.575 4.009 0.01% 39 DayTypeVars Sep 924.874 251.031 3.684 0.03% 40 DayTypeVars.Oct 611.126 229.102 2.667 0.78% 41 DayTypeVars.Nov -92.498 131.868 -0.701 48.32% 42 DayTypeVars.Dec -380.902 189.889 -2.006 4.51% 43 GPDDD_13_15.GPDCDD55 31.632 ' 22.292 1.419 15.62% 44 GPDDD_13_15.GPDCDDSO 44.051 33.441 1.317 18.80% 45 GPDDD_13_15.GPDCDD70 15.515 43.035 0.361 71.85% 46 GPDDD_13_15.GPDCDD75 37.809 58.193 0.65 51.60% 47 GPDDD_13_15.GPDCDD80 20.937 55.187 0.379 70.45% 48, GPDDD_13_15.GPDCDD85 -56.645 58.03 -0.976 32 92% 49 50 Rezession Stabštics 51 Adjusted Observations 1095 52 Deg. of Freedom for Error 1054 53 R-Squared 0 8630 54 Adjusted R-Squared 0.8580 55 F-Statistic 166 56 Prob (F-Statistic) 0.0000 57 Model Sum of Squares 4510237209 58 Sum of Squared Errors 714,401,724 59 Mean Squared Error 677,800.50 60 Std. Error of Regression 823.2900 61 Mean Abs. Dev. (MAD) 600.78 62 Mean Abs. % Err. (MAPE) 2.05% 63 Durbin-Watson Statistic 0.605 64 Ljung-Box Statistic 1475.96 65 Prob (Ljung-Box) 0.0000

4464

Page 61: Oncor Electric Delivery System 2015 Analysis of System Losses

own 1E11 1 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PACF

W P/1111-5.2/5

Page 16 of 16

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

ADJUSTED WEATHER STATION DATA FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPONSOR: D. E. NELSON

4465

Line No. 1

4

2 3

1 0

5 6 0.5-

7

8 0.0

9 *0.5-

10 11 1.0 12 1 2

13

14 1.0 15

16 0.5

17

18 0.0

19 20 0.5

21

22

23

Primary Service Greater Than 10 KW Distribution Spline (B) Model Before Corrective Procedures for Autocorrelation

111 111 ea is Es ca 111 133 El EC FR rza mom Nem

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACF

Page 62: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/II-H-5.3

Page 1 of 1

2017 RATE CASE,

ONCOR ELECTRIC DEEIVERY COMPANY LLC

ADDITIONAL WEATHER INFORMATION

FOR THE TEST YEAR ENDING DECEMBER 31, 2016

SPCiNSOR: D. E. NELSON

There are no supporting workpapers for Schedule II-H-5.3.

t

4466

Page 63: Oncor Electric Delivery System 2015 Analysis of System Losses

69

tlj

Ot CO 0 00 0 cr C) cv yg r- cn u, yr cy 6t y, r, o cy CO CD CD ' 4. 66.-.:6066.15. 66

NNOLOCr.0.0,00

99

69

69

0 a cv o co co T- cO co Tr Tt cv ' Cr CO C, 0t cQ

0605 ,- 0606NM c- MOOMWOON Ncr0C0c-6-0,N T C c c5oco11dF CD 0- co c- CV z

§ s

5

5 la- g°

co

<

a k oz M iu Fzlz 02,-D

w u wee am = m um o O m 1,1> w 3 1-71 m oz remmui , r- uzce - SE2m<K c4F->alw 011.0- 2

... cow wwwo-m,m 65 00 0 7 a

WO

RK

PA

PE

R 1

.1 -

CO

NS

OU

DA

TIO

N OF

FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SE

RV

I CE

co I,- M 0 0 CP cr CD CD N 0 cf CD 0 CD CO c- CO

" a qg F.- 6- co CD 0 cr CV

tr, tc CO. 0 N CD CO 0 01 %. V- co a a c- cy

6 0 Ot csicdaic.56 ,456 orimuicocci,-, 66 0 g cymmo .,- Nmeo ,-. 0cvmmoocy u) motoa ommo Ncr.. 0,W ,- NMN 0 cd 0 6- 00/0560C1005 cf0C6dC61, 014. 0 N Nr.... ,- 6-COMN,CD W0001,00 ,- N cr C9 Cr 01 cr cy co r- o cy co o

6,-,-.....,

tlj

69

Ot

co cO Ot cQ

69

tlj

.n co cQ

o

cQ

(01

Ot o O

cO

o o

c o

o cO

• Z.Ec cQ cQ

cO

iil . -‘. A i

zg '6 2 8 2 z Is

.c134. c,

co m,

„,_Tie -L-Ri . 1 g j mo. c ma SO

i4! til "ktl ililMiliit!

5 ii 11 .5 li I, "1-Mi870,16.;!. .8312 T 600“gh22W-13 cjc 7,.62-2m

s

s

.(pL,f.i0LL.fg. 2.3,-6,0ge.Ost2233,-75 I . 2

P : 2

E. E c-Ncoc.-N0 ° 00N0,1-0or-000°00olm.q-mm0 2000B00olaoomoom000i‘ro00000000

MMM MCOM,MCOMMCOMMMCOM COMCOMMMMCOMM

c- cQ 0, Tr 0 co N oo cn c° N cQ sr 0 co C"- CV .- NMO- 00,000 NNNOINNNNNM

4467

o

8

E,72"

-er

15.1(jcSt

228,b,m 2tM aonDir

Page 64: Oncor Electric Delivery System 2015 Analysis of System Losses

z g

o 2. — .5 --E.

00

a m >.

m <,„ gt—GT —Nm o 2g, wm w —,

C▪ •11 uj

uj• > ui 3 1- ci 2 114LU Z •

1—>•••,-;.; wm1-0 141 1/1a- m M i_ rt.c 00

07 A

WO

RK

PA

PE

R 1

.1 -

CO

NS

OL

IDA

TI O

N O

F FU

NC

TIO

NA

LIZE

D C

OST

OF

SE

RV

ICE

be

be

MgNN ,-0,-MMO 0 0

0 ,-. 0 ,-- NI. h00 cN W. W.MI. ,-0.4- 0m , 0

oi og r: ci co ,- ci ,i 000WO000,-,- N 00 000 ,-.0.0M0Wh 0 N.N. dr.0.-. A0 Oi 33 .,-wh MOOM h 0

0 W0WhON n

. . . . —

be

csioct cn

°to.- N. m ,,,, iiiiiii ,,,,

ci 45 gi <I o

h-,ta, o

ott co

i ' nco co

E9

,,,,,,, •

be

be

bO

Nomo(Dom.-- (T. 3 3 2 2 cN( ,-- c6-1,- ,(5,6c4m(riocsico ,%WSF.1$6M- g8K?( 3 2 N-76,5 o5OOO&O `O-

S222`8P2( co

69

N .1. 0 M0h mOh c‘i Lri c,5

0h NNW

mococv.-co.-mocncom co,-- moocomm.-momom 3 WO N.Ww0.- MN WhoMmohm0,00, hcoNW0.4. 0000 , 0.0 NW0NONWN-00m.- h: csic,;,:ec4 5.0. ,605- 4. 2 0i— 2 .--hhwoo00,-,--NN 00 oOMN0wh-00 NI, NI. h ,-.00MLOMP-00 NCO 0 N. 0N0 0 r- cnot--000. c, 66td.- Acciec,i qa ,...:., ,iosec66,5,4— N. NNI, m000) 'S 222(718-w 2.9 f ,-. I.. Wo.WhON0 01 ,.

œE

E_ EE mg gg

12 04 —.„eoe.

o

22°-kiVeAg gL, .0z.E_,—.16 w.o.21, 22z 2Lo.myc'LgmFERoc

am2EM,,i 0p,OjD.uegM t cCa t 8R,,i( B UI—YhO lf, ..Stg-C22-20.Egg 2 T 2.2 21TiOrt20217;212 VC.565&58-0DD.SIAME3(7)3:42 0DDZWIE.11(7)

ESZTAO23 t;52°0)(T(ZM'418,70- 12,V8221T. —mm.mmm mmmmmmmm—mmmmmmmmosmmmmm o«<«««<<<«<m<<<<<<<¢¢¢«.(c< ""m,00,...„0 ,-- NM ,700h000.--NMI. 00h000,-

NNNNNNNCINNmW

co 6 T5

s ccc ?0,7'JTo

To..-0- ?50120.

.E T,Eco E ME c Tu. Tu. e -es° 2 (log 2 g 17 17

ti7 2,152

EttiPg 0

4468

Page 65: Oncor Electric Delivery System 2015 Analysis of System Losses

tO CI 0 CO 01 L.- 0 0,

CN CO CO CO co n 00

U5 ca' 6 6 c$ 6 Co co ao 0 0 C., cr

co. O LCC CO CO 6 6 CD

co o o • N o LO (000 OLOLL)N.CDCO 0, 0- c0 cc) ,F C5C e4 ,..: 0, co N. O. 0 0, 0 0 N.

01 ca • 69

0.1. CO co CO CO, 0 CV 4 8 si 0' 02R sf

.01: 0, 0 v... 4

CD

(.0 0 CO N. N. 0 .0 01 CU co CO 40 pp o .0 v- co. co N N ui u5 145 Cs! Q 145 N4 N

O

: 8 8 2 8 2 2

N.0 0NUJCN CNLOCN -

ea.

0, (.0. 00 CO,-CN ON. 00 01 c0 Lo O CO CV co 0 N. n n co 03 cq 0 co CO 01 O.: U5 o: Ci a5 u5 ,i a5 co 00 Cf, 0 0 CO 0 01 00 CO 0.1 6 6 PS 6 la co CN CO

csi g

,- oa Lo a, 01000-000,0000 0, o. .- LO 01 ct. LO ,- N. 0, 0 cC, 0 0 N.. 0 CV c- 0 LO s' 0, N. 0, 0. co ,-- 0 0 0 00. 0 OO ' ' ' ca 00 0 LO 01, 0 0 •ar. o: oi .1- 6 .- 6 o .1. CO 03 CV 0 0 0 , 0 N. 0, N. 0 CO c.- CO 0, 01 0 CV N. .- 0 .- N. c0 T- 00 CU LO 0 (0 00 M. (0 ..0 0 0.1.. 01 O.. of d 6 6 6 T: ad 6 6 6 6 6 .- ..- 6 6 4- 0 .- CU CO 0 CO 0, 0 0 0 ,_ ,... N,

.- 01 ,--

tO o

WO

RK

PA

PE

R 1

. 1 -

CO

NS

OL

IDA

TIO

N OF

FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SE

RV

ICE

5

2 o

r3 F-Z

0 0 23 23 •3 0CCOOC;t- u5 c5 ci 6 o: 6 o: 6

OCO UJCO0C CO N 00

2 ..1- 0 ,,, 0 — 0 N-

C,/ .-- C, 0, 0,

05 N: of Oi Q5 cd

al 0 N CO N.

61

§ UJN. 00LOOC ,

04. NI UR. g'c'',. 4̀ 8084421

A CD

c\-4 ̀E•L'i' 2 2 g o. co co. al. co o,

u5 o5 c6 aq. 04 (46 SÏ OC co_N S e Fob

rs: o 6 6 6

69

00,0c-0,010000 0 0, 0 00 00 CO LO co 0 0 c0 N. 00 0 0.1 LO CO

0: 0: u5 c5 uS ,e ei L-. 010000000,000N. ca oo co co a, ts- 6 CO CO

CD

-C:" 1: . o. s 5 5 5 Ur ;=,' E F.

W t

0- •- ,Y., 9.5 2, E '`) t >, To 6 a. a, a.' E 2 = >,

2.8 er k E.'5 4'0.Etiii 4 85E R.L—a-zit -= 5 .g'"3- 0u 5 3 ? a- 3- g 8- t. 2 -5,tiLS2- A 2 2.- ,-, ,.°4

w 0- ri- 0 Li. -rE E -6 ‘-' LU I.11 5 .

G 2 n F,2 = E 2, -,g-.92E,w„,..t',.-7, e t' t 2 --5 -2 -53 ?,-, g- a Lu t-,°, -it; 5 i, it5 5, 2 '?--:-.9 -/ 'c's'. 5 -1° ?a' § ---a-

2 § -5 LO- 2 g- 8. 1-(u„ , 0 -6,.° 0 0S '5 LL a . W_ ro a, -o Zr1"2 2 soi 8 E 1 :g a 22-512-":“t1L,' g

.g Er4 g !,, 11 iF56 if-2 g i2 ii0°. a f i5?S 3 3 eii 8 it ciii- _1 a. o 2 0

t S' 2

B: a.

e . 00,0 ,-010,•00(0O-0,0, 0 000,0.--010,O00O-000, 5 000000,00, 00, 00, 00, =030,0,0,00,00,0,0,0, CD Olv)VIMCICOCOMMCOMM ,DCOMVIC9COMMolt,Clo,01 (5<<<<<<<<<<<< 0 < < < < < < < < < < < <

0/ CN cu 01 01 Cu CU

4469

Page 66: Oncor Electric Delivery System 2015 Analysis of System Losses

61

kr)

.-- *-9904 iii,o

raom mq,. N NO NO NM MN

,- Ni ,- 0 ,.....0

09

M OMMCO N M • m Lri t•T MMM0

duic666 CSJ M

09

v.M.-NMM 0 91401, to

004 r vic.i.--MMr- ci m-momm

,i—..5 -- — ,.. — co .. N

69

z §

E

t22— x,0

WO

RK

PA

PE

R 1

. 1 -

CO

NS

OU

DA

TIO

N O

F FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SE

RV

ICE

00 ,00MON NMMMLON0

CAN-N.(71MM.- 000000,

c15.-

2,8

47, 9

07,2

91

MOMMM66,66. . . „

a

- C

0. "0 V. W 3 0 u, 5. 3 En •`: < Sea Dm u71 2 0, LL.Vg .° 1§1Fg 8 V2

• o CT_ ;...E2..5 .-11.222:120,285 oaamoaMo«

232 2'122

-I- < >- 2

aZ

40▪ 2:7,„, W°Wre'

Ve502 •-• w> 17;3 1-nwmz aw z moww -i 'S.2z5. 12 oww@o 0110- 2

(0 1,0

0-1 0 0 Z" o7 4

4470

Page 67: Oncor Electric Delivery System 2015 Analysis of System Losses

(r) O▪ ----

z

(l)

>"Z

ZNW

W>j

wU wi:1&'

011i -'wm •

1-7w02

g W ILJE -; 0

c're w 0 041-> UW' u,tuc -J ow n iumWa

Mq

Z 0,7

WO

RK

PA

PE

R 1

.1 -

CO

NS

OL

IDA

TIO

N OF

FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SE

RV

ICE

0.--NM NN ,-00N0Nv- MMM t,00N 01. 0 MNO0r.-N01... oNmo M0)l ,--000000JMv- oQ oi pi .- aM M O

M0 p to NN oel 6,-op . . c i 5 vi

N0M0 0,(00) W,MN N-0,0 C6C6OM -.- CC ,1 if (6' .46. C4 ,-O, M NO 000

N M

CO 01 CN

REV-"3

00N N MN,1- N. cOMN 0 p: 05 pi p

00

0000-00 000 000 MOM MON ',own 0.in'cio oicsiv- cooroo 0 NNNI,.

CO

be

8g3§ . 0,0 O

- 01 si g !! g 2,6

CJ

El El g be

00NO 001. 0 00011

00N-v-ai 6 ui 6

‘acomr, acoul6 (0,-(00 NO9030

000 ‘omp- 10,15

coNN

CO 0000

0,00 N QC

69

69

69

be

be

E

<03 1 s 4,45 as% s2 uo

ii 01 i h z ce „

25z .x E o 88. P .-..o. wm (2i 7: E8 1 :4.28 E -prom a,, w000N 4 28 2E g 0-0-000EE 4 „ —

eel's:6-122 ,; E seeTIV-7-' ° 55 -0- 0,<RRN 4 n12-8- TT.12TAI;;::731nr: ! "88.2:%tin1:74%1PLI!'2w3" s.

1 OO 2 filaMOROilftillign

.ve2 9E8ggt

(7 , 12 < a412 2. Wiggg131L222giooDwPMMIg2

1 i

003, 2 001 ,,NN N00 15 CONCOM A 0 00 000 00 000g00q00J N

NNN

NNNNNNNNNN

V;e 4tE = 2 2 it 00

iR tt

ONNNNNNNW0WW g000000000000030

'7 17 c c o o Z Z

4471

Page 68: Oncor Electric Delivery System 2015 Analysis of System Losses

WO

RK

PA

PE

R 1

. 1 -

CO

NS

OL

IDA

TIO

N O

F F

UN

CT

ION

AL

IZE

D C

OS

T O

F S

ER

VIC

E

a T1 UJ

8"-= '

UJ L. owo-m

<LuYo-g EOVLT 1.;F L?gO TD MCOMM 3A3Y, NNNN

n-NM.1.0 .-NOI.4.00NWM

o

.3

+“, 8EF.. z

-J

UQ

øQ

69

69

69

0 0)

>- z z < < a li g §2 w ..c14 02gR

LL"wre 0 >-tz.-w tiE5=0' Gzo w>w-i-n cea <w z. zoWw -3 is Ozre -grew<P,

>-(1) w Z ILI Le 1- _1 w

(I) ILI ILI Cf) <

o 00

0,7

4472

Page 69: Oncor Electric Delivery System 2015 Analysis of System Losses

01.

NZ_

NO

0

cft

g COt

MO

66 MN MM

co oO cON

10

ee

69

ee

10

ee

MME ''SPM&S,

./N-C° 0 e C5C44,, N

N "1. CO 2 4q , th '•° E3uJ i'=!_

ee

42Y) Nto.50.; eLo 4 § •

ee

.-2 128n - So.

cl

49

10

NN

8NM ,11:-. V..,=,..

NM M...

N 10

NvG%';-12:g CJ

O n )OC)0 tJ N.

ee

R. ,

ee

-En

sl fT2 -v2 t -5

O

e

(-5 ).

.J ‹

>-z zet w, <1.-" z IzRz O zw;:m

mF,02 wuwF4re .2 m5 0 X Ow Ozw. w > ws 2

gR14! w o w Z W1- 0

..(0 11Ja. ",C01-0

0U

0'7

WO

RK

PAP

ER

1. 1

- C

ON

SO

LID

ATI

ON

OF

FUN

CTI

ON

AU

ZED

CO

ST

OF

SE

RV I

CE

,-.0 N g "°21,1 . 1 ,,,r- P,„17,- ( 0 *I. 00 c) . . - ' - al - cf cir 4 :,,r,,9:. 06.c° 6 — _ N. co o N- r.. 0, .- .4-0 . c6-4',- CON

101) I- Cs1 -

N. a CO nt. 0;00.2

g cfC,C

uJ '"-4R1igLiigR

60i 2002 °S.'"M3 N.c-g 003„,

1(Jc

:2; Ci N uJ

M .10'7 COMMMR.i.NF2M N

2 '8

7 0

? 2 L. e ,%'

8

E g

[ En

§ (-T," ;

.

i'.72 :

E 0

i

: :glgiii:; ;

ia: :: 1:::48:F3isi:

g

oj

: 7'f' : di iq

slii111111

w E . w

E

cuo ' no.

fggegA!!E iPallEM;

l'

Li

- sEff a§:::

a 5;

793t2 2kggei-FAA2.-5§4,2

fii%

.-. =

ligqnl! flUiiikaBILTE-g,sz---. -011111 i!ITAT,118E',,t,Y)20. ---= plhiglipligrIgg8-113333 „ .2

!::::<::N‹!:m ::::26:::=:::::::::::: 8.'8$182V$E59L17- 2,°8222 2222L%S.°323S53213;53

NNNNNNNNNNMMMMM0mM

J

4473

Page 70: Oncor Electric Delivery System 2015 Analysis of System Losses

m 0

gs,42P8 0 "M.N MT1. 6-0.

6166 M omm

‘-s! r- o

cO

f,CD MMOI0TJTI. NOMT-SC1,2 N-OTTMP-MCDMNCID 5-. 0001- 0,1. N

T-7 !•: 05(45:Rr-7 .1. T-1.ZMO NN 0092000,h-0)r, MM C-..1. 00,-- F.-r-.0W 6.- mit0Mt6M vi .-csi TTTT.- MciDNI, T-

0›.

>•Z

m oZ z Nw zz,7,,,

LuUtu ce Se›-Z,w "••=m0X UL OZW LU - I- 71 LT1i tL4 Z •

OW W4 0 cmi->fw U W-e Z -1 0, 0) m W WIYu)

00

07 A

WO

RK

PA

PE

R 1

.1 -

CO

NS

OL

IDA

TI O

N O

F FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SE

RV

ICE

1--

LL.1 Co7,

z

co

0000 NA.egt MMO

NM T-N ai

cO

CO 03 N N N

cO

gg

cO

bSL

0.4-, C... CY, 000)00 '"))qtg.pttiZt2g°1-''48 0- - m rzotd-t..7 - 0 50 '' V) g s- N to. ,. N .0. OD 04 vi 7. t..i

et,

69

CNCO 5C2t g COLOCO LO

N

§g s 03,

ty)

bSL

.0 0 co N N

Oc g4 0 etd 05.1596S

ON NOm M MT- .0....e-TrN 05 C,1

bSL

NI,- 61. 00NNWn6tM,- ,--N0 ,-.N.h..900 6-000M ootNotm,00 0c6L-0 uivi mmomm mono N : m g-- g2 <t'tY4-'8_ ,-<0 •zi, st, <6 ,t, t0 L6 ui utt- u) 0D0NM

bSL

too 03 ,-‘-co mcom0t.- N (0 comn N. .-c,10 c..4 to 0D0 OYWN-61- . MoO.CS, OS ui 65 r: tri <- 65 66 c4 ,- ,--Lo 06-0T- 00T-00 T-0 '0000 MN 61., OM r..:05,rT- „._ ,..- T- M

10

bSL

bSL

1 $ 71) tld zt ! gsf 172g ‘1.1f LIV, L; 1 ilk Pil !H

Of5- 11 79 E'El 'IA ;nil 01`0 11 2 `HIM gU

E,̀4 -,t, E-Egi=tr,e5E,8 22 61,Q,),, E1-T, s113,3aEhs -;

111MitItil 1131iiirililigi h w_g1.---eiT4 gLgo sim8.-0.-cjo 2 ag>"13 Agit>E172 44E.75-,121"

0-, :I co

a) F) i!

,13 D. x <a E E LU tl T- CNI 0 T- C.4 OD ,r Lo .-. 0 r- o m CD .n n- CV OS 0 r- AE CD T.- N 01 6t 0 QD 00 cp CD T- N V) I; c, c, c, c, c, 0 op c, C) CD W ENNNNNNNNmeIMMM =MMOMMumMMOMMMMOMM.,OMMMCDMMOMMOMM

NNNNNNNNNNMMM

4474

Page 71: Oncor Electric Delivery System 2015 Analysis of System Losses

cn c.)›. w w w < z4ww <1-"O. z

02g m wUctirt m}ce,w 4=50X Ow Oz(4 w>w-1-7Ax0 4 w do w W -' - 4 owl..9 w 0

z w re 1.7,0

m5

O.

0 uU

4

WO

RK

PA

PE

R 1

.1 -

CO

NS

OL

IDA

TI O

N O

F FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SE

RV

ICE

w

5 -5_

69

LO

co C6 co O

oo N- I

6'9

55

69

m M CO M `4' co

0'

m

69,

MO'03 cO o , CD. Crf-, c=;

o

55

55

55

cn

(0 0 Z,T) " C) D: Oi

55

oe

foe

oc

69

F0 '7032 4 LO ON , NCOMR ON ore-

c6..6 Lci (0

oc

,7

cn

V- Csi CD CO OD N

1- CO_ , • o) t- ” ,.0`0M° j..:00 MCO't

55

L6 Ci e- 6fC0

co

69

V' 0 (- 0 10 N- co (9 N CV ' ' 0 '

N ,,,,,,,01

05 61.- cd yr u)

69

N 000N`C2° 0 MONNO = a, ,r ,r_ .) -:. .? or . m

. MI-:.8,21- N ..yr.06,- ,.-

69,

55

,nw"4„,7i, co. N

0 'd r': 0 N.N. 0 ncv.

a 0 .0 co co

A CV C0 c, g2 0,

. CD co CI

04D4:1',;: ocõ .,4,2a..o- „;a5..:(6‹ a

A

N. 52,, wcTirz80i O O 2t:Soscv.,—t

o

'd E 2 0

g 0

°

&>, as S

E

Em-IET 2;2 2 2

a

2; 2u2 a!F2L:NOEpt at n gw 113-" F3g2tVe°42g

.10 11:41 iDith4b1Mgri?; og

:c7)00061PU-Eikt°

-!8,simv%iqggIcs5 1611" E113"

2

HtU;i1Lgn - 350- i i.3,3m o o. o.

cD .o C) ,- CI M 0 (0 0c0c00 ), C0 T- CV M ,t 000,E.0 C4C),t 0 D-

c0,0 0, w (.0c, ao .lococoopooc000co co CO CO 4+ CD 0) CD 0000 CD 0)

(0 U) 0 0 0 0 0 0 0 0 0 U) 0 0 0 (1) 0 11) (1) U) 0 0 (A) 0

—Nm'10,0N<00,0—N""'"Ric7MQgWRIgig12070:102A22 N.

4475

Page 72: Oncor Electric Delivery System 2015 Analysis of System Losses

M >.

>"Z Z < <,VW Mt0Z 2,01Z 02,7E

W}LeV.w x

UW 0 w- w <Ill 2 ZOWW -i

°re W<0 NI->m OW-T 2 Lu -J m0 w enwo. ce4C 0-1 00 z- 07

4

WO

RK

PA

PE

R 1

. 1 -

CO

NS

OL

IDA

TIO

N O

F F

UN

CT

ION

AL

IZE

D C

OS

T O

F S

ER

VIC

E

.-

-71:- V eo CI"' "

g

§A

2 _ a m m I'l m 4 ,S9 0

,,,u, '

11 ..... xr.

1 I'L :1:71 wr 1 ,o ,, S2 „, —

i i I Fc7di' 1

. lw., 2g ,Il ....._ a ‘'.2)) 210'13 144 ts-ic' 20 .1 i FIT m :1-4 2 T, E714 2sh ,_,_ giu i

ul ig3Lto' 4ulit.1;12I H _ af§r g-72,3 lib ,i-77, 4 14,1",21 ho, 1.-gThEi.V:" zOeEEEEeO 2.2.28,03.gaggs §EFFE MIVIIIILII g2T.,511p.,st,i§g

°1112 Mililligg24 piD,IsdlE.; c7,,s.V1,2 E -t Ugg 1„.0.,...L. '4

E .--N ..0.00110.0. E 0 No..tOwW Cb030,0,0)0,00,M0-0,00,0,0, igT/igggggg§Meg 0««<0««<a‹«« <<<<<<<<<<<<<<

„m,00,0,0,0•-NMON-Wm.,- NM ,tOwN.m0,0.-NO7TOW,Wm o NNNONN NNNNMMCOMmOMMCOM,I

k

LU 2 —

ce —

z

4476

ow . eoeo

o 06 0

NO" ON

C7fl , 413

Nn- OC

.-co , m . O. • . -- w w‘-

mo w ,t m

m i'*609 , mm ,—

m—.

Page 73: Oncor Electric Delivery System 2015 Analysis of System Losses

0 OD

' 0

6

uJ - CO.C-- uJN-o N CO CO CO CO c0 a

66 CO 0 q q oo cN o a> 6- 6 a> CO CO CO CD CO 04 CO N i 03 C. 66 0 N- Lu co CO N 03 CV N N 0 0 CO c6) 6- CO 6- 0 0 N- N-

or at 6 CD 6- CD CO ' 6- co. (0 a> .-- CV 0 6- 6- 6- CD 03 ' 61. I-- 0 0.. 0) 61: 6,- CD 0 CO oN 66 6- 6 6' 6 6 or 6 co 6 q r-- 6 6- 6 ci

Ni 6 C4 0 6 oi q N. N. 6 6 6 .6- 6- 6- Nri N .0 CO N LO 0 61. LO 6- CO

2 2 2 <71.: ci 07 ,, 3

C31

WO

RK

PA

PER

1 :1 -

CO

NSO

LID

AT

ION

OF

FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SER

VIC

E

o

z

t'2's4

o

§ '8

c‘i .066c06-6-6- 0 CV 5g1 CO C. 6--

N 0 0 6- 0) ' co q 6- 6 6 6 6 R

6 6- CO N 6- c0

, cO LO

00 6- 03000N0) N N

• c0 N o0 N oc. cq sJcN 61-

CO oo

St

69

oo o c6 CO

69

...

...

•ct co cn o co co o N CO 0 03 N N 0 .0 0 CO CD 03 61-.. LO CO 0 0 C6 6 6- N: oi

6- co 6 6 NI N

(0

59

OD N 0 31- 66 CO N 0 C. 6- CD 03 6- conocomoicoNIN op co

NI 6 6- .-. 6- > 6 q 6 oi e 4- 6 6 6- N 0 CO 6- 6.- C. 0 CD CD 0 CO N o 0 6- N c0 0 r- co co N - .

C31 6- N. c.6 d oi •••rf N: 6 6 N cOcONL00 ,6

n) 0 0 .0 0 0 110 67 (0 03 CO 0 CO LO CO 6- 6r rr cN c0 0 6- N. uJ 63 0 0 CO '

N (si "rt:- N: uJcN0c cO 0uJ

6 9

69

69

0 N .3 6- 0 Cr 0.100363000 ,100 CD 03. CO CD 10 6- 0 0 ' CN cg 6- 6 92 6

69 u/ CNCNuJ N• N LO .,

a' in C̀.:i E

CO LO N 67 0 c0.. 0 CD 0 (6

co 0 6- 6-

0)0CD061- 03- .00,- LO N .0 CO oc 1- CO

66. 00NO ‘- orr-oroq 6- 6 6 6 61 6- 6 6 to

oc cr co h (0 0 0 0 0: CO CV 61. N, •61.

69

69

. '

F') g f,

g ra. E 15. rg rg

E. 0 -?, to To 1- I- 2 f:. 0 c -cio. 5' ii, :2' ii, rl" E co 4 5

uj-

.8 ' - sE . .E ? i •E'

a, a -o . -2 . T.- ,.. .c2 E t g E 0 J, §, 1— _ E - "." w 2 z' • .

5 a,

"2 -9.', „, I (1 <5

x z 2 saosoFt" lo: 0 5 -EP.Ejg- g ,. 0 a ' 0Ew.- . 2 2 o w

1! c!.ft:17,,tion! I:5"c400-2 70$ ca.gs 5 1 sog

5 -'

tj 37 2E i .it, ..- 54 2̀al 1 I Fo22 .522 E c.o_c f, -5 -pm 'ti g (7, ',' 4 if g-,s ,s5o Foe= 23 Egsz ' - < -,,i) 121.g!sig E S' 43 Z6 IV

.,2L-2,-,-,0,2 2088c2t 2roairoc208DE-0(3i) 2 36i _, 6,o1--01-c- 8zoo a. 41 = 2 c c7-

cl 5 'c'3 c o E .1,2

..,.._ E 0 a 7'..

N .1 20,,,,t00 6- CO 03 E 0 3- N CO 66 0 0 6- C. 0 6- Ni vo », 03 0 3- N CO 61. LO CO N CO CD 0 g o o o n, LO 0 LO LO 0 LO 0 to 0 . CO CO CO CD 03 CD CO 0 0 N N 6- 6- F., .0 0) 0 03 03 03 03 0 03 CD 03 CD e/ 000 1. Moln,M000lolc90 — 00000000

‘.._,,co,,,,or.s. c0 0,06- C3100 61006-00303-NC061. 0cD6-000303-N,061. 000NCOCOCD.-NCO NNNNN N N Nicsiol0000moororooroncorocrqqq

4477

Page 74: Oncor Electric Delivery System 2015 Analysis of System Losses

° 0 - m

c' -4 0 0

?,1 'in' 28 .5 4 id a- n: CO 0

LONM 2.1, 04-00 r-0,0 mm00 mc. L co mm m m0A. o5 CN d cq17.[3R co 0 2 com

0 CO 0 0 LO CNCO d N

s-NMaLOODNCO0 C. '-NM 41. 000NCO'00.-MOCONO00, 0 ,-. NMOCON NN NNNNNNNMMMCOMMWM

z §

VI) 0.c — ccw

§2-1112

‘.1q)

Lj.. a

L1-2 g

t-, 0a

gr4E,22i s2gg r,,,g

<E 2E5 ti 5.0E0E0

1- Li

C 'i 0

s' 5 LI :4: a- rq EL- -.,.. .6 E -=a52 ;44. E

qC

g W22 B. ET? E E.2.15Za .0tE vs p,"0 20 215c 0z-6

LillEiiiSfA 1Sliq

,ag .g.i c"g°'222.! t138 0- 0_0=6b gipElowg8oazk

ki E 11

>.xs °MD Dya,2 LT/J..012< w.

.13

7.1 13.

2 Fed

eral I

nc

om

e T

ax

es

44

MN ON

CN

c4

69

CL

69

84

,738 436 $ 8

7,1

84,8

46

$

3,8

88556

$

69

01-0 ONsn

CN

104

NNO 4-03M NN0

(7;

69

CN 000

00/6-

68

N1-0

0010 OMM N010

277,717 0 N OC

MNW WON 00N nr-sM

68

0 '

ce

CN

69

69

4 OD "

69

N0 00

CO CN

69

2 8(2' m • M.. ad

68

. .

. .

co mo

op co

619

N.

C(iNCO ..d

69

MMN

e-

64

0010

ced

COWN

dm,-

69

0,00 8,7)2 cid— NNM

69.

Noo oq.

00 ,-M o

69

gmmNo

Lei 8

49

00NOW NNMNN

NC6N

69

000.10,ON NCOMOCIN.

6ONNMW CN - 6fr •-

69 •

NNO00 004FCOM

doidd NO0 ,--MN Nc2CN 0

68

WO

RK

PA

PER

1.1

- C

ON

SO

LID

AT

ION

OF

FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SE

RV

ICE

4478

Page 75: Oncor Electric Delivery System 2015 Analysis of System Losses

tL

69

0MNLO ON'a 8882 083 LO CO M.

ulod 000L0N(0 CO ,11 ,f) N N 0)

0, CO

69 69-

Min (ON MM ,_d ,_ (ON MO c00

69,

69

$ 31

, 158

,313

$ 5

7,23

5,808 1

923,

707,7

09

$ 3,

130,

815,

871 $

315

,336

,896

69

.0

o

WOMMNaMOWN 0 000000000 ,-CD N w000000 ,-0050, CO

0.0. 00NNN MN a Inv-NO1,1. 00 00 M N. r-7 05 oi r.

4,4

58, 2

54, 5

98

co co

10, 9

89, 5

02,4

64

0 030.-WN MNNMNO

X McOMMN. 66a

a

W 000.-03. N COONOM M MCO ,-LOM 0 N •OCD0ONM N COLOVIMP- 6 d6,-,

N NNMN0,1. M W 0,-MOD•cl.CO • N. 0- 05 05 vt 8 000ONMN ,,f,000CD

u5c6do- ,-N cn.-a

co

8

cs

ON:

UJ 0 W 0 0

I- ,I 0 6

OL oo

cO

N.

6

co

6

uj

Sh

oul

d be

all TR

UE

==> 21,,—,13z

igWLV t vla5 11

sit; PI, i g2i °E x% st 21

218

c,S. x

Sh

oul

d be

all TR

UE

==>

Tot

al P

ayroll Exp

ense

(th

is fi

le)

0

co. 0

CD OL OL

N. Ccl 05

CO

ST

-BA

SE

D F

2 2 tom W 2t.0231 Yi -Egamm.-17000 cc-0

• >ttttt 31'28.E18.21U

o 0 EEEEE'oi 5.13,000 00000M .

W.

.?Cifng4ICHCa

&

6,10

U'ap•

fri▪ SZT),733333 ; ol z ct Zi 1 1 < 1 <

WO

RK

PA

PER

1.1

- CO

NS

OL

IDA

TIO

N OF

FU

NC

TIO

NA

LIZ

ED

CO

ST

OF

SE

RV

ICE

LIJ

z

.ft'z

,t: X uj

a

4479

Page 76: Oncor Electric Delivery System 2015 Analysis of System Losses

WP/ 11-1-1 2 Page 1 of 1

2017 RATE CASE ONCOR ELECTRIC DELIVERY COMPANY LLC

II-1-1: CLASS REVENUE REQUIREMENT ANALYSIS TEST YEAR ENDING 12/31/2016 SPONSOR: J. M. SHERBURNE

WORKPAPER 1.2 - WHEREIN CERTAIN ACCOUNTS ARE SPLIT

,Line Acct Descnption Allocation TRAN DIST MET TBILL TDCS Total i

(WP/11-1-1.2) (a) (b) (c) (d) (e) (0 (g) (i) (j) k

A454b Rent from Property Fiber Optics 100% 961,339 964,045 1,925,384 A454b1 Rent from Property: Fiber Optics Overhead 9% 86,521 86,764 173,285 A454b2 Rent from Property: Fiber Optics Underground 91% 874,818 877,281 1,752,100

Acct Description Allocation TRAN DIST MET TBILL TDCS Total (VVP/I1-1-2.1)

(a) (b) (c) (d) (e) (f) (9) (I) (j) rl

II-B-1

Ori inal Cost A364 Poles, Towers & Fixtures Total (WP/11-1-1 1) 1.000000 1,831,095,411 - 1,831,095,411 A364P Poles, Towers & Fixtures: Primary 0.733318 _ 1,342,775,670 .. - 1,342,775,670 A364S Poles, Towers & Fixtures. Secondary 0 266682 488,319,741 - - 488,319,741 A365 0 H. Conductors & Devices: Total (WP/11-1-1.1) 1.000000 1,062,602,126 - 1,062,602,126 A365P 0 H. Conductors & Devices Primary 0 825332 876,999,458 - 876,999,458 A365S 0 H. Conductors & Devices: Secondary 0.174668 - 185,602,668 - 185,602,668 A366 Underground Conduits Total (WP/11-1-1 1) 1.000000 - 807,368,041 - - 807,368,041 A366P Underground Conduits: Primary 0 585628 472,817,150 - 472,817,150 A366S s Underground Conduits Secondary 0 414372 - 334,550,891 334,550,891 A367 U.G. Conductors & Devices* Total (WP/11-1-1.1) 1.000000 1,792,557,473 - 1,792,557,473 A367P U.G. Conductors & Devices. Primary 0.763582 - 1,368,764,554 - - 1,368,764,554 A367S U G. Conductors & Devices* Secondary 0.236418 423,792,919 - 423,792,919 A368 Line Transformers Total (WP/11-1-1 1) 1 000000 1,934,310,639 - - - 1,934,310,639 A368P Regulators, Protectors, PnmaryTransformers 0.046369 - 89,691,266 - - 89,691,266" A368S Secondary Transformers 0 889787 1,721123,640 - 1,721,123,640 A368C Capacitors 0.063845 - 123,495,732 - - 123,495,732

II-B-5 Accumulated Depreciation A364 A364P A364S

Poles, Towers & Fixtures. Total (WP/ II-1-1 1) Poles, Towers & Fixtures Primary Poles, Towers & Fixtures. Secondary

1 000000 0 733318 0.266682

-

983,562,139 -

721264,060 - - 262,298,079

-

-

983,562,139 721,264,060 262,298,079

A365 0 H Conductors & Devices: Total (WP/11-1-1 1) A365P ' O.H. Conductors & Devices Primary

1 000000 0 825332 -

568,956,506 - 469,577,968 -

568,956,506 469,577,968

A365S 0 H Conductors & Devices. Secondary 0 174668 - 99,378,537 - - 99,378,537 A366 Underground Conduits. Total (WP/11-1-1 1) 1 000000 - 336,775,771 336,775,771 A366P Underground Conduits Pnmary 0 585628 197,225,246 - - 197,225,246 A366S Underground Conduits' Secondary 0 414372 - 139,550,525 139,550,525 A367 U.G Conductors & Devices' Total (WP/ II-1-1 1) 1 000000 - 529,959,433 - - 529,959,433 A367P U.G. Conductors & Devices: Primary 0 763582 404,667,464 - 404,667,464 A367S U.G Conductors & Devices Secondary 0.236418 125,291,969 ' 125,291,969 A368 Line Transformers. Total (WP/11-1-1 1) 1.000000 660,004,395 - - 660,004,395 A368P Regulators, Protectors, Primary Transformers 046369 ,0 - 30,603,476 30,603,476 A368S Secondary Transformers 0 889787 r - 587,263,051 - 587,263,051 A368C Capacitors 0.063845 - 42,137,868 42,137,868

1 2

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

4480

Page 77: Oncor Electric Delivery System 2015 Analysis of System Losses

3,58

4,90

2,64

2 CO CO 0 0 CI 0 sr 10 OD <0

<xi comf co to 0) cn co a, o a, co c- N- CO 0 0 Is 0 el

a, CV 0 0 0'3 CV Sr CO 0, 0 rs 0 rN co co op in 6 re ai oi e c. . 0 . :71- CO at CDcn CO c0

ms. cd •.-- cs i co

03

cel's

03

N CO 0 CO 0) CV r- sr Oi N 00 00 c0 CO 0)

0:

4.1

2,0

24, 5

0 4,6

44

oc

oc cn

o op o r-<

co co a, op N:

C00 O 0

0 1-F- +

_I

CO

CD CO CO CO CV V- D, el 0 11: 0 0 CV CO 0 0 0

3,17

2,70

5,25

9 94

6,16

9,72

2

CV sr 0 CD ra 6 6 a, op 0N-

oc

irr; co

2,16

6,57

0,75

1

to r

oc

-

op

cn

-

CV 0 00

o • N: o a, o co cd r-oo co N.•

1,84

3,80

3,40

5

sr 0,

o c0 sr sr

CO N-CO

< CC, oc 14

c0 oc Nco CO cSJ

cr, Lo

CN 3 2

00

cn 01 r:

cn cn

a,

3,13

0,81

5,87

1

F-

co co co co co a, .-- tp, o co co i•N op ct r- cn r- 6 re 6 N: 0.1 CO CD 01 7 ..) _,... ;I:. ei CV ep .al' ra TZ Tr; cn r.. t... a (.1 co

CO .-- 0 CO 0 CV Is CO CV CD CO 0

0- 0/ N e sf e N: r: . g op co ,N.

o, ar a, rs <... 3 <0, - c•-i. I.: <0

• .-co 0 0

0 - 2 4 l-. co

Cscn

CO Is CID N. 0

0, LO CD CO cr CO d u,cCi o cNcn 0 co

tri co N 0)

4 0 0 <0 0 - ca co a, or :::;.; "r7r N: oi CV is 0 0 CV sr 0 Ci N: N: 0 is CO CO CO DI CO s- sr

4,5

< a) cr c, co , o ai re a, co

=t3 6 o, ai 6 r- 6,

o N 0 CO 40 0 0 u) N. r-. co N N: op 6 ,N,

..; g Is CD ".. ./ 0

6 .--- 6 6 ..... a, Ca Is N 01

"an,

“, CV el sr 0 0 rs 00 0

Ret

urn

on

Ra

te B

ase

4481

Page 78: Oncor Electric Delivery System 2015 Analysis of System Losses

CO wo 2E-

i7101-3 =1- c)

ct N

co a

o

• d

12,1

12,4

95,4

41

,

5,5

71

,015

,888

6,5

41,4

79,5

53

ON. ON . i .N. N

d .-0 N. .-.clo .- aM z_--... doo .-

Eri oc CL

dw co

171.1-1N.

NdN0N-W amON-d.- addaN 0i N: C: ri NeuaNMO

NMOON

— —M0

ct ct o cc

3

^

( 1,1

41,1

65,2

81)

77;

m0 00 NN • N

co

ad OW CN

oa 00 0 d•- do5

Nd

eta

cord coc-r,

co•-rm cri cf ci dmd anco

20,2

25,2

50,3

90

dd

Nd • ‘1, u)

d • 44 co

cs,

cco

si oc

N:

19,5

64, 6

9 2,5

07

12,5

70,3

27,9

98

o

tI

2

o co

CI, CO c0 co d co d d a N 0 .D. a. d d co

d

duo mo mr, u5 u5 mm cod

tI

N. cctco Oct

N. am N1 ,1"

m. .5. .5 ,m m. g4

4,8

41,0

82, 3

53

6,20

2,90

2,13

4

6,02

8,84

8,44

5

2,08

3,90

6,50

4

777 eeT 01 03 CO CO CO

Acc

umul

ated D

epre

ciat

ion

2

NET

PL

AN

T IN

SE

RV

ICE

Oth

er R

ate

Bas

e It

ems:

N.

Inta

ngib

le, T

rans

mis

sio

n, D

istr

ibut

ion

Pla

nt O

ngin

al

Cos

t

oo

-En

c.° iiE

egt 702- g 001-

707,4 o

T2• g, • o o -6E2 gg I a) &73 B E 5

2▪ 2t

uJ -63

Ts

L▪ J

Ret

urn

On

Rat

e B

ase

tP

4.; LO cc oo

cti cc co r: co LÖ

co

4,8

87,6

83,1

64

o ct

•••

,M111••••

CO

ST

- BA

SE

D R

ate o

f R

etu

rn

o 43

0,65

9,12

8

is?

co cc

COLO

.00

Na 01° cors.

a etc-.N0-:70 - 7 MoMaNda

N Nade-NNO d 0 OmMaNON

NOLO..-01mco.

dc6. --04NO Nam q0 q

ct 3 ct Cct

2 cc ct

co A4P2z2 . N M.-0N0N u5 05 d cri r: ei 0 g

.5, ,05

de-NN.

9'9 4°99(000L1

< Fc3

msa) u-amsm‹.

E -c_- 0, 0 i E

-'-gr3E-F,3a2e1 0E<Mocr.'fwa

NNNNNNNNINNMM

4482

Page 79: Oncor Electric Delivery System 2015 Analysis of System Losses

co

oo

' 01 c7)

co

co eo

n-

CO CN

00 d

1 I ..... ..

7,7

3 4,1

17,1

71

CID cl NI LO CO 0 I, OS g CNI in • .1- u") Y.- CO LD CNI CD CD '

,f ci c6 NI' yi ai 6 ui .5 01 N CO CO 0 00 ..- 0- 01 40 (0 N N 0 CO 0, (,) 0 475 ,-- ui c4 c6 co 6 (p. ei

W N- N. N- N. 0 0 OA or CD

N. t- ..- e...

2

co

"g ":1

tr. a)

i' E

I g .,, s il

a t -cg nt cZ) ' P5' e o' gc§i

cgt .

1 ci 1 2A-- E,

765 ei •t• 33(7)05122oScc2 co c F OA CO 'id 01 0 IN ,v) -.1, u, co N- 0 CO

CO 0 CD 0 ,.00 tQLOU10I110000 .. C. 2 C' 'Q'

" 0, 0) CO 01 CO CO CO 01 CO 01 0- < < < < < < < < < <

0,, a, t- CO 0 0 N.

7,4

23

,239

,934

Iu CO

Iu

4483

r.

CO

01 02

10

CO

O `Cr

1— 8

— co c,2

+

0 1--J

CT3 o3

:2

cs•

Inta

ng

ible

an

d T

ran

sm

issi

on

Pla

nt

Gro

ss

,r ,r) o ,r cp CN tO I,- OS

N- CO LO Of CO CO • csi c6 c6 c6 6 6 06 N CO CO 01- 0- 01 CO CsJ CsJ. tO. c0 CP co 6 ui 05 ci

N- Iu c.0 CSI gct CV CO N.

CN E7D

CN

C‘I CN

CN

CD CO

co

o

Iu 0 CO

CO Cs1 U.o

cj Iu CO NS

ai

Page 80: Oncor Electric Delivery System 2015 Analysis of System Losses

8 c" tc.F oci en or

CD 0, co 0 OC c6'

Csi

CS

co

C.1 A A 0 CI

n-"CD

A CD N. CD.. 6. 0

• CO A CO 0 CD

r- CO CD C CO 0 CD CSJ

a, •

CO CD CV CV 0 CO 0 •-• 'ct C72 03 04 CD CO CO CO

0 43 LO 0) o .cr. CO CO CD co v. co co co co co o o • N-7 tri of a, of rf." ccif. c6 cri oi C CD

LO 0 03 LO CD 02 CV 0) CV CV COOC 1.0 0 CO •-• N CO CD CD CO 0 0 CNF • N 03 CV CO 43 LO CV 00 COC <- CO CO CO CO 71 • CO N. co N.. co N- co co oi co CV CV N. CO LO 10 CJD q. C•Nr .cr co

10,9

41, 7

9 7,4

01

11, 3

6 0,9

75,7

50

0 0 CD N CO CO CD CD CO 0 CV al 0 CD CO 0 0 0 0 LC) CD Lo CO .7 CO CO (,) r- CO CV r- CD CV CO 0 N. C0 •-• CO 1.0 0) 0.1. C0 N CO CO O O c0

c6 c6 t6 of oi •ri c6 O cri • N CO CD LO C72 CD CV .72 1- CV CV CD 10 CV CD 00 CO *- N- 0 CV CO • 0 O oi O cci CV CV •ct cr CO N- CO CD CV CO CV CV 03 0 0 N ol a .cr co or N..- tO CO

s- CD CO 0) s- A 01 • ct CO

ol 0 CD 0 O W.

CV N.: a A Cfl CD 0 01 COOCO 01.

•••••

, .

0 0

0 CV 0 C6 c0 0

19,5

01, 8

5 3

87

051

, 840

1,

078,

801,

81 2

1

_

1,1

87 8

52

CI v-• CO CO 0 .- d- 0 CO Q CV N. c1. 0 CD 0 02 LO r- CO -.0. CO ,0 N. .1. 0 .- co 0 02 CV 0 N- Ui 0 Oi 04- NZ 0 TF 01 ..- yi ui r — o., co e- LO 0 0 01 cv 02

ci cc; yi yi Y; cci yi oi ‘.- ei ‘Y co r co r CO CV CO CV CV

c0 c0 .:1- r, ,—

1,2

78, 7

16,3

8 9

53,5

21, 0

16

354,

260,

036

54

,793

,548

710,

902

33,4

26

, 760

36

6,97

6,4

14

18,0

64,2

73

N-CDrcflOC 01 FCfl 0 s- .17 <10 Oi 16 oi oi CD 01 0 CD F. COCOOCI {-7 ef. o ▪ No co 0 01 CI CO 03_ 00 A M..

s- Ts

Dis

trib

u tio

n P

lant

Gro

ss

,C; r. .6 iii,BiziO §

,•-, .-, m CO CD tO CD CD CI { • ...C..,

grt 5 ef. E....

0 0 0 0 0 .0 .0 .0 .0 .0

I 11 2

7 0 7 0 7

. 0

. 6 b- . s -, 2 ' 2 2 90 k g '#, E e ?! E

;2 °- ,_, %‘,' ei. g vg 1 i to, 1-3 .. E ....„„

2,TE1L1122'gV51 -§115 "2 ig E

CD 5 C 0. . . ID, 0 0 .0 'a -0 -0 CL IL

t '/' ,I3 5 .E a a O 0 c c c c - (-) P:213 226, CI CI, 6 2 S a'E-'

- - - n _c - - .1-., zrA s 2 `i g 7.— 1 y, -2° g P. IF ti3 i'3 tii - 0 w .,.. F, 2 cl 0 z ifi s >) 'E 2 F 2 e 2 a ,i, '6 17, m _i 65 65 65 a o_OOD=DnCLcoOcOM.lici-jj P LL V1 LL 1.11 LL Li/ LL V1 LL L/1 ,.-1

s .7.• C) •,- cv co ,4- co co o co co N- C. co co co co o ..- c.4 co o. TA o co co to co co co co co co co co co co OD CO ,- C. l'- N. N... -. CO CO CO C,) CO CO CO CO CO CO CO CO CO CO CO co Cc) CO CO CO CO 0 <<C<<<<<<ct c:C<<<<<..C.CC cr <cr.<

. , , ,,, .i. „a ,a N. ca a, CV CO O. 0 CD N 00 17) 0 .- CV

CV CV N CO V' .0 CO N. 00 01 0 (V CV CV CV CV CV CV CO cO CO

4484

Page 81: Oncor Electric Delivery System 2015 Analysis of System Losses

co

co co

co co

775 a

co cti

c0 03 I h. h. co co

co

co co rt.

ei co

a, co co

co

co co

cO

cO co

co

CL.)

co rt

co

co

00,COL- 00000 • co 0 03 0 N Lt 03 0 D- 01 0) ; 0 ILS DS 0 CC, a oC 05

a co r- cf. 0, CC, N. LDI. L- 010 031. 0-L- o a a .6 a c6

c• CO CO CV

CO DI CO .1. CD, L 00 01 L-

CO - I LO 0 I Lc/ CO LO CO DS DS a) OO JO Ci CV 0 0 .cr CO CV CO CV 0 L. co - • c5

• cO

▪ co a at a on rt- co cn o o, n- co t- co to co r•- • LO c0 0 CV CV N. c0 co CL:1 c6 c6 a 05 Cf CD cO 01 03 N co CD CO ct

VD c0 03 CV CN; 0 05 c6 a a NI 0, 0 CO VI

L.- CV

a co 0acocrator-oom

t; 0 E

_ to I-

.°2

03 0, 0, 0, 01 01 < <

-J

cT3

Ge

nera

l Pla

nt G

ross

0, c0 ‘9.

c0

V. I

O

CN

CV

o o Co

0 CO 0 CO CV L-0 CO 01 n 0 0 7Ir cc) on t- co, a a CV 0 L- o3 V) 0 CO ct 0 0 0, • n- trr

c6

co a a n- co co co to ccO o to to n 0, N- 03 0, L- vl 6o c•-: cn h- .1- 0 c0 N.

oi cO CV

• LDt N- 0, LI' cO C, 0 Lcc. Ltt n 0, co T- 0 CNcocoN.cOtco O. o N.1 00 ci u5 co a cO cn h.h.COCN co cJcO C0 L- CV • cOcO

• CO

0 CO CV L- 0 co c- rt. CV cv 0 Co co CD 0 CO ccoL- NNO.01‘1...ct acciaaaodar-: cn co a to ob co ot ,- C co ,otoocOc000 ▪ n: si a a a a - 00

cO 0, 0 0 CV Lct or, CV 0 0 0 o CO CV CO N-h. c0 0, CO. 0 OD CO. n DS L6 DS a a cr co r- co h. c0 Lct c0 CD DO LI. 0 0 0, CO 0. CV 0 0 NI o to Co

ro •-• CV

4485

Page 82: Oncor Electric Delivery System 2015 Analysis of System Losses

o a

-J -J LO

LIJ

3 4 CO tS LO

o

cn

c0 o co

LO

LO

.47 LO

1-

co a CO

LO

LO

LO co co tS

LO o LO LO

CO LO

LO

01

LO co

LO LO

ccLO tS LO

Tu. 12

coo o LO

10 LO

LO LO

2 LO LO LO

03

tS LO

LO

h. 10 LO

LO

LO

LO

LO

o 10 LO

LO

o

tS co 07 LO CO

LO o

c0

10 LO

Co

mm

un i

cati

on

Eq u

iOm

ent

jc)5 CQ

R- CV CO -rr to to t. co cr, Q

CD

LO LO

LO

LO LO

LO

-

LO

LO LO

LO

LO

CO

LO CO

LO

LO

LO

LO

LO LO tS

LO

LO LO

CD CS; `Cr

LO LO o

LO LO cO

LO

LO

LO

4 co

LO

3 LO

11, 0

43, 9

84, 4

86

8,11

2,754

,949

LO

19

LO

A397 T

ota

l Com

mun

ica t

ion

Eq

uip m

ent

LO o

LO rs. LO

«CI

LO

tS

LO

10, 9

38, 7

51, 1

80

8,02

3,28

7,29

7

4486

LO ‘1. s- LO tS

MM.

o LO

ce co LO

tS

o LO F.: LO

4 LO

.ct

s-

3 ,tLO

LO

LO

•cr LO

CtS cu cu

Page 83: Oncor Electric Delivery System 2015 Analysis of System Losses

AMMO

=6-

:3

Co

ns t

ruct

ion

Wo

rk in

Pro

gre

ss

To O

uJ

4487

c 1— o 0 uJ 0 2 +

co-=

+

CI) 0 C.) 0 0 1—

+

Ea —1 1— co

Page 84: Oncor Electric Delivery System 2015 Analysis of System Losses

en oc cr er Lei est en

ec co en ec Lei ccc en

cn

co

c,

oc ecc

" cJ o oo co o

co co to co r

CJ

-

o to to

e, o to

c7Tp ço co

cJ

to

ec

co

co

ec

3 o

Is.

cD

ec

csl cD csj co

o -I -1 o

2

co

71-

05 0,

co

co oi op

VMOOWN- M r.-• N V 0 0 OVN

to o5 u5 05 ai e5 c-mcsimmomo,

cn. m m .5f 6 co 6 6 ,f co co op oc N

004M0

CO V N ClOW <-M.- 00V V ,N MV0000V. N 005 oi co oe co ,-MMME000N NV 00<-,MN ,F 6 ,c1, c5 M cJ,F m m m m m csr

m (NI MO

co

2

E a 1 4 1

0 o E 4 8

"5 g c 0 w s- - E ' 2 8 .11-) Ek V r g F. 0 tn, - s -2,E,...,L08Tr-r, . gs ag.5 6 Pc1332g-oci: F 1

*6111 tl: 2il_3 L19-2 21,cin ggfEl gom.cemo-c- .i-00-g:1 11 e T 22 -E aou-2 •Ef13&ic"r)geoc2 2.7,0C.JCV 00 L E A c̀ .9 'a .:3 PI Pa g.3 t -rii- a ccii F-9,3

N en v m con o5m° -̀ c'""...).) N-

o o

<-3

2

a.)

78 <

co

1,87

7,19

6,986

c Dc

co° o ca 52 co

<7

4488

Page 85: Oncor Electric Delivery System 2015 Analysis of System Losses

5,0

74

689,

975

5,18

3,54

1, 6

16

• cr no ci co o m m o

mo

ui ui

3. 10 CN

uJ

WM

V

o

I 4. M• W

Ct MM WV

en 10

10 uJ 10 CN

. .

. .

.....

.6 ,6

. . - , <6 <6

uJ cv CN

o ea 10 o

WO WW

uJ &CD ON

,N

34

nN ,W 0N • cF 00 MO ei ei e. t. r- eF ei

uJ e. el N et al 34

• os 00t CN n

tcel ==

• (121 CD W M c0 M mr M ,.- CO 0 a] cr ct M M M W M CV 0 p- 0 0 pp M el CD CD o cn un cm to nr m cr CD uJ M u, N. w P- CD W CV M N CV 0 VD M CD VD M CV ,t M CO CV N CV M CV 0 UD CV N CD M

,0li0(air:610uicir:ricnc.i, CN ,r CD NWWMMMO [OMNI' co.COOD W vf P.. CV .cr V' Nr. s- 0 Ns

00000McONWOr0 ,0000 10 MNOMWP-COMerN 0NOWOWN 0 N OOMONO CD,POWCOON' , rimr:6,F6r:66dr7,eivir:wai, uJ m un vn VD M P.. N W M CD W 01 0 CV ,t M 0 N.. CV CV. CV M 0D N N P- 0 M. r:Mui ,viddr:diu56n:c46vi, CN

100 cm uD M M M CV M M cr M U) W Ul N CV NI' P- cr cv

C) M

' 0 ' C6 es, CD CV. M .4-

7,37

9,94

7 40

, 494

,136

4

08

663

, 330

22

6,99

8 OMMN00,PM0 ,0

760,

758,

309

61,8

41, 2

76

282,

038

, 154

LONODM,I- NW0P-00 00.0,11,10,PM,P.OW ,F co I,: on O. c5 n: ,-, vn v5 N: CO M P, P.- CV V) 0 M C) UD M CV CV 0 M CV 0 uD CV 0 CV r- . . . . . . . . . . . ,.. cv M M P... M cf 0 0 r- cm CA CO 0 M M M CD CV M M cl. I.- CV ,,l- , , ,,- , ."

212,

332

13,2

65,5

3 4

97,3

73, 7

75

'

0 MWA-M0 uJ MOP.MO, M nUle.VM Ci (4 6 ui 6 eF w wwnow W 00,1,00 Ci 6 6 6 6 6 V WWMNW W MOMOW 10

a, -a . m .6 1010101:i6 a

wwwww • a.ID Z mcnmenm c

al R§Fr,' . .gg-gii

28 riot ....m.

,,'ci 1OD 88'r; ..... MM=M=

a" -0 • • 0 5 c

? § 21 21, ,3• 1--g12

1g' , ri iu a 0 E ?,2<7, E E E Ed3.10;MO,C;

E 2 gj liar-9:igN a l,. E .Enii-Frt u 4 ,3' 2c '455 acEE zw27,="=E,SED 4%') `432tiggMV,-.)Vgn2

S'ui'S E

c c 0 20- 2 ,5-1-42 0- ggg ea, e

TA, g . .tov.i.if.Ekith-53.---(.1; .9. 277,b1,12.,1,,,,,..8 ,8 22 s 13 65 Z5 Z5 ilD_ ,2 e) (5 3 I' J3

ij (!3 (%) N 12 13 65

Cm,cmmoowor-r-wwwcnor-cm'm 2wwwwwwui,wowwwwowor -mmmoncomr,mmmmmmmonmmonmm 0<<<<c[4.2.2.2¢¢¢4ur<<46<<

,- cm m un N. c0 C''

4489

CO,PUDTIP-MMO ,NCO.,,r000N NNNNNNNMCOMMmeIMM

-J

uJ 2

Dis

trib

utio

n P

lant

Acc

um

Dep

reci

atio

n

P,

Page 86: Oncor Electric Delivery System 2015 Analysis of System Losses

WO

Lc; en CD N W. 0.

o • r10.'

m4

41 et

40 10

3 uJ

o o CN

uJ

N.

co

00 AM ci 00 0N

0

A CN

CSL

ON CNs- WO

CN CN

o r. 40 o

CN

NO

MM. w-M ON N,11

.4. 030,1. 0NON .P..:2 X2S882.

vi 04 NI' ri 6 0: 06 a .-- 000N010) NOON,I. N c.icr

N N- V) 0 N N 0) 0 N.- CO CD CO 0 6 n OCLI)0CCN o) e- cr,

O

46

, 312,4

48I

6,4

36

,66 4

,504

1

co co 0 U 0

-I- + J Fo--1

Fin

uJ 2

O

1.11 V/ o-

w 0

>-0) Zo <0 0- 2 C Oil Omw w

ZZNce 1.1'0.71. M =1.7E11(0 J u Nce W,v-w 0,0=

O W CC CI CI w or 'X ci w w .% ..

t.wMwcp -(e0›-w mOw l_z r-oz coo gzOwm 040cio-w

Gen

era

l P

lant:

A

ccu

mu

lated D

epre

cia

tio

n

42 -m 10

CSL

A0 NM

MM 4q

32 AN,

mo

om

CN

10

Nr.

IW

dM AN

1,7 V WO

CN

WM WV NA d a NV qw 4g

6,202,

902,134

0.1

6,1

47,9

67,4

77

5,9

90

,01

3,4

05

.-010.-MNMN 'M,YNNNWO0 NMO.N.-61.0 MN00.-MMN

00M0eTON NLO

moo ere-M.- 00

Lci oi r:

CN NW

uJ

CD '

0:6 mm

t.

CN

0,1- MMO.- mcv ,-,--- co

, .co,--. no- 05 N: vi oi co s

Me-rWOONWO

00 CONM.I. 00 e-NM N CVJ

ATvACARS7o8 , Nm n elo 7 com • oi o) 6 6 C4 W ,--mcvm.94 CO co COMMaDON ,I.

n- c6

MM01 ,- MNO0 001000M0e-

'e-NOMN,WON N: C. 0 CT, e- uJ US e-N0WWCOMM McOMMMN0 rAM

CSL

uJ

uJ CN

N.

40

3

CON MM 040 , 06 06 cv

.70 N0

Mcv sro

A

NN OW MM. NM Mm 010 04

tow con

do) ON 00

co

CN

SL CSL

CN

NCSINNN

CD O

r-

4490

Page 87: Oncor Electric Delivery System 2015 Analysis of System Losses

a- NM..1. 00

!TO

TA

L P

LA

NT

HE

LD

FO

R FU

TU

RE

US

E

Pla

n t H

eld

for

Futu

re U

se

CO0 0 0

-J -J cri • m

2

uJ

cn a Ij

a 0

uJ

a

IJJ

cc

ow -I 0

›- Z

o. 2C1 ON Onw w >Gz !:5zN ix

="oNce

uwzm LLIceorTi

—wa r,

clf4 0>-co OCOI-Z

tZ.OZ00 .20w0. o4001-CO

Pla

nt

Held

for

Futu

re U

se

<

4491

Page 88: Oncor Electric Delivery System 2015 Analysis of System Losses

Acc

umu l

a ted

De f

erred Fe

deral

Inco

me

Taxe

s

T'g

co o

t

T5= ,7 oo0—

§

=c7

Oth

er R

a te

Bas

e Ite

ms

csi

a

V CO Cl

( 1, 4

12, 1

62,3

34)

( 1, 2

87, 5

40,7

66)

AC

CU

MU

LATE

D P

RO

VIS

ION

S E

X A

DFI

T

••101,

•S*

1- 0 w

1.- +

— cn — +

4492

Page 89: Oncor Electric Delivery System 2015 Analysis of System Losses

co A

TO

TA

L M

AT

ER

IAL

S &

SU

PP

LIE

S

111

0 0 Cv> C•1 Csi C6 h• N-O 0 CNF

LU

CO cD

0 r•-• 0 03 "4. 0 e-V, (0 CI CD 6. 6

cD

0 I,.

CNI

1'7 CO

Mat

eri

als

and Supplie

s

-6 — .2 a, o cv.) Lc) up h. 0

Page 90: Oncor Electric Delivery System 2015 Analysis of System Losses

OD DI-

CT3 -1 1-.02

a

(NI

co a, e;

a;

a

e,

a, o 01

a

Le CI

OC

ITOTA

L CAS

H WOR

KING C

APITA

L

40. 04

c‘t o

la

CN

o

•)-

c(g Mei NN

(0 o O

-J -J Fo

LO

3 111 ()

LU

ou- _1p >0) Zo

2 ° ON 07.3W w >. <ZZ 5ZNit >-m 0 71/-,/ce

DOM OLLZW WZOID <NWZ UW.C ce ILI -J D VU7"16 ▪ OW F.,z tl' UZ WOO =ZOWM NOONCO

11 a

Cas

h W

ork

ing

Cap

ital

'a-N(0,1-1010

4494

Page 91: Oncor Electric Delivery System 2015 Analysis of System Losses

C) 0 0 0 I-I--1 4--1 _1 E 1- 03

LE 4g, E: çv

ro

cv

0'; 03 uJ

10

10

0

TO

TA

L P

RE

PA

YM

EN

TS

3

r-

r- 10

.01?

(.6

r

uJ

uJ

- oi co

17;

cu -J

CNI ccr 0 0 0 a,

4495

Page 92: Oncor Electric Delivery System 2015 Analysis of System Losses

5,7

21

, 952 1

(

1,4

00, 7

77,6

15)1

ds

co

o,

( 2,5

60

, 052, 5

24)1

( 1

,25

1, 9

06

,366)

coro

4 "a — 50

4496

co 733

UJ

Custo

me

r D

eposits

to'

ca

a F- 1-- -J J

Page 93: Oncor Electric Delivery System 2015 Analysis of System Losses

000.,.. MON N .41. 1,NN 401,,T. N 400101.4f 00010. , 00' ,,, N- 05 0.7 1605 M 00.4t,.. N40 ,-- N ,- 40

.4c

coe-co *ere

, mec,r

weeo NNN,

ui

WWM MMM .0. '

m014-

,41—c1-4- 40 LON4- M 00W0 MN.41-WN 0 .41- M

. NEOMM . MMOMO.NM..-'0" • c5 M ci C OccØCc oo e:

co ce C0 N 0, CI M CD CD Cc, LO 40

W cct P-

.- .4F g 4 : Tr

(51

00N0 [ONO/ NM

Wc0 .41- 40 NMI, M- M

000,1. 7c000 'IV.

<-046a; r- Tf 6' T..,

400..-N MC10 .41- N.41.

0401,,- MNN NN

oi oi 6- ci ,a5 or d

h_ el eao ,-, m

,i.,1001, •-.41- N .4r0 ..- ,-N .ct ..-.4rN ON 1-_4010c0 WMW , .,1- 40. W014-1, 01,N ,F40 W ,--WO MMW tON NMOIM N 40 MN

N • W

MNM, 014-1,M40NN0.4- MI,M g.1 2_ q :3 . 2. 2 a A :3 :3 RI A :2 . 2 g q c40,4,6 p7.5(61-:.4, c6.5.-7 1,7 ,--4-1,' MNMI, mOMIONOWMO LON ,* c1. 01M..- (0.---.MONM 42. MN 4-0.01 d or. N: ai T- e: Ti-

gf g NF 4. e

m T

T- N WW N 0.1 M

OWN.- 4 .41. 40 ,- N MI. M4- OWN N.

40NO co cri d e: ei rs: co rri 05 co to ..:1- cv 01 P. 0 •41. 000104 00 d .-

W.-NM NCV4-010N401,,- MMM NLOWN MNOONNOV. M 0 ,70 WNMW'mN7. 00cONM4-.0W ,- WMC6.- RM06.-1,7 4- NI' VMM03 MONN 010MN 40.0-0 NWMO c0 ,411.41- M 40.4. MI, 4-000 M vi cri ei T.- oriTi ei Tf vi ei oi .-- o, co o r- o ro 40

CV CV m

1,0

75

,22

9,7

98

7.)

co co r-

co

co

11) co

eq To' Zi .o i 2 P

4« IT, co ra 0, N

li 2 = :71: .-0 83 2- -'' 2 g

-----2 r-m lz , fa 2 e o_ o_ -g

CO gg ''') CC ! hia w0 F;,3 t-5 ,5(5 re0. 2 M.<5tir As 5 Eg 2 7615

gsaclw EE Ow2. C.)

S07,2 2 -- wc°c"-. C62 El 2 21-1"1"" .2ST E § 72 .55 -9-aTo. >„ 2 8ZSg2w ] El°G-9-g . 1 .3 .. /- 817

' >` g

cA1e, I

2-3cc,

libT:igenlaaagOlquis p7)

5

loEsEg2,w1.- ...,1,2 > 6•(?)

go.-Aamm3333-F,:m go Pacsnej2 11-v-g--00-T,%,%24-6— 8 0 Es.2

2.2a,1,%0.9"1,922.2".12 shT.1- ;; lq,NE ,24 g rcjx0ocT8(2,88L1222288858cU gD.T(73W00 ,SBMNNNNNNNWWWWNNINNNNNWO 2.tMcOM M 4000

r, M00 M 0040 MWM 00 M 00 M 00 MM

/-WNMWV.M

actz

2 0 2, cNNLeN CV scs,

0 0.1

.-NmaN wr,mm° y w'm 0304-NM .d- N401,c00,0,-NM-41- 4040 NNNNNNNNNNMMMMmMM

4497

rn COL) 0 0 1- 1:1+ -J

1- co

L1J 2

-- 3

a,

Page 94: Oncor Electric Delivery System 2015 Analysis of System Losses

W o

nm - ...

mo Op

c5-1 nm

J

DJ

C.) IL - CD

›-CO ZO <L)

2 0 o om. w )"<c7,z MZace Wo

--1- 004 m w oz w 00= 0wz0 ,m00 co-wz 011,4_ ti w =w0 x ce0>-0 001._w ,C.:0z m o oz0ww N.001-0

ti S

-J

I

a o.

g4 2

22 02 , . i'' ea . co

S In .o -o o g"6gig(T) 0 w

p 430 leg2m2 ,6 -° El- e72 I 6. i E, 2 28 02 a ci LI 1 ' _ ,

u7 08 re

m

,I.„- Q, a f E a) a - A

8 . D? 52

is. ' ul °3 m 7 5D - Lalt4T.2 1 2 er'"; 7teio,cti99, ..s1=>TIA w r LU l)QP.,g Iss-ggss mc,27,..gb. -.--,7,2-- Bow—,00, •11 w2p,i7, .-go cc

-011i1Silil ILLZ'inillg Waaaaaa Wa ,ri-st m 00000m x oini0000

maaNaNa n n

I

J

MCI. LOCDN•W0 NNNNNNNNNN

uJ

N.

uJ

tD

a,

uJ uJ

01 V5

VI

cri

cr,

•-• o C-1 uJ

o

tD

uJ

03

r-a

csi uJ a

r- uJ et. co o

co

CO

uJ uJ

uJ

uJ

a,

tD

cr,

uJ

tD uJ

o

ruJ

uJ uJ

-

tD uJ

cr, cn

tD

tD

4

5,5

58

, 68

5, 0

98

0 N.

7.= co

4, 8

87

,68

3,1

64

Ra t

e of R

eturn

Page 95: Oncor Electric Delivery System 2015 Analysis of System Losses

01 co co

1,2

57,1

91,510

1- Op 021 CO CO 0 •-• 0 N. 0 40 0 CONO,N-000 O oi e6 c oc - CV 'Tr CV

v- 0 CV 'I- 0 ‘000.-CV01

(11 co. CO 0 N.: 0, ix, CD CV a- LO o

car oe

4- C.1 N

ni

1,2

56,9

81

, 827

0 co

Qc

CN

cac74

1,2

57,1

88, 0

89

0 I-000010 CO a- 0 N. CO OD tO CO OD N 0, N. CO 0 oi c; csi co c6 <: cei LO N V. CV CO

1.2

56

, 985, 2

48

CO 0) n A CV at co cc, CV CO N. CD 0 .-0,,tc000NO, co ai ci co ,f ai ,f (5 0 N. CO N 1`..

0 N. CO a- N. CO coCc LO CO

,.. ca. Cs1 CO c- N. 0 www.c,,,, ;... •tw.,,,,,w, N

cei c6 cci cci .-- co- N CO - ,•, JD •,,t LO CV

0 CO 1,- 0 NI. cx. co' Ol a-

co CN

(.6

co h.

dc

Tra

nsm

issio

n E

xpens

e

o

co

Tra

nsm

issi

on

Op

erat

ion

exc

l. 5

65

o

o

gOggg3

OD CD 0 a- CV CO CD r- N-

LO LO LO LO 0 0 <<<<<<

,r u, c„, cc c- LO c0 0, CD ,- CV CD CV CV CV CV CV CV N CV

4499

To o

(0

Page 96: Oncor Electric Delivery System 2015 Analysis of System Losses

uP cu r- 7i-1. ' oi up m

a CD r- 01 M a ,- N. (O a c0 .1) 0 0 CD CD CD 0 , , , M , N (ID M M 0 u5 s: cc; a; a co co a, N co

(6 CV

a 0 a ,- op , çO - QD CD (D Cr) c0 CO a CD

CO CD r- CO CO CD CV CV a c0 CD CV P.- CD CI o0 N or or O) O,CO Co

cq r- c.5 0 01 a vi

CV 1-

U) 0 f.-- 0 v- a 0

' ' 0 . QD C5 COL CD al 0 01

N M 0-

N m s- CV CD

r-

N a N M N a CD a ,OWC0a00) ,- N W M c0C0 c0 M U5 ,5 r- of o 6 co h- CJ cp o n cu h. . co o M CDMNU) QD • (6 oi csi s:

0 M 04 C) M Z-0-- C) r- C) CO CD 0 , 0 M M r- ' CD . 0 oi a - u5 ,-- m co up

CO C. Co ,▪ CO

0 C. 03 01, ri

04 N

(71. 10 01 • 3 o co

MaW,M r- N .0 M CD r- M CV 1- m m r- CO

M UD M OD 0 r- 05 c5 oi o5 c6 oi co N CO C4 CD a 0 M CO CO M U) M 0 CV r- CO 0 0 ui oi of o5 s: e5

N 0

W 44. TT or N- m a Nq N.. 0 M M TN NT TT M V- W cq m cq 0 T- o; oi N-çO h. o rO. O 6 -- 0 r- 0 0 CD CD N

O)LÕCOLÕ CoQ LO N oi oi op N- o. N-

Sub

total

581-

587, 5

89

Co

a

oD Co y- a M r- N a M m a JCoCoçOCo Co m m m r, m up CD 0 CO CD 0 0 0 6 cri o5 ui oco,-ma woo CO NCOCOM0 CCDO

'dr N: csi

co LÕ

co

2 4.31 ,j3

2:11. 0 w a • o 2TA, g

CO C a 2 o W 2 4• 5 2'2w.s.,%,,,go- r.

2 a-S="2 701 21'3S O 0)76 8z1...-c.2_G0

-1 1111

2,Q-h32

O nt,5 22 2'72u2g70

Vgtrai 03.2E. S 21 65 61 f 42 <,) ,r) CO CO cn 2 ▪ moo moo co co oo c0c0

Lr)c)Lr)Lr)LÕ Lr)Lr)LÕ Lr) O <<<<<<<<<<

NOla.00,COM C).-N

WCOMMOMa r- N CD C) CV C) or n CD M CO r- C. M M a r- r- ,: Co g ui n 6 6 u5 o5 m OD CD CO CD W CN O. M CO C) QD h.C C0Cn1h COc- -

''C i 0

o En

0 =

- co 0 Cl. v

I: ,._, O EA A m

w, 5..-]=42..

4 = g'it e -a—, .

5.-_,.

r:

?.t.4-,-.8 2_.,t2 I_ 8'a 8 _-." a m f co 15 13 15 13 15 15 15 13

2CHMIn" mommocommo @s,scsg@gz--,-% E—E.E-6-2 :E 3 g 2 g 3 2 2 2 CD m or up m N. m MMMMMCDMCD M

U) U, 0 co 0 < < < < < < < < <

CO CO M O N M or up CO CD CD ..- CV N CV N CV N CV CV CV N CV M M M

7 -L

O

Sub

tota

l 591

- 597

9

o

4500

0 0 01-

+ - J -J _J

i•-• co

0 0

Fto

LU o 5:

o -1 0

Z0 <0

2,9 ON Um o w

><OZ Z N W 0 es-0 > - m

M

d 2 115 ow z0 w z

O w w w . 2

gm0)-m 0,0,z ,0z. 0 g Z w m NOUI-O

Dis

trib

u tio

n E

xpen

se

32 eg a,

Page 97: Oncor Electric Delivery System 2015 Analysis of System Losses

CO 0 0 0 0 1-

- + J =' i-- F-

8

co

0 0 0 0, CV

oo cN a, 03 •rt

"0 N. a,

00 0

co 3 t- •,-. co 1--. 0 .7...

N

co as

0 • 02 N

3 0 0

0 0 W)

A A co. u,

LO 03 N

4 4'

3 0

Lr, 0 cY) 0.1 co '

LO

00 0, 0 0 0 0 .- 0, a, 0, 0, 03 < < < < <

ZS 24 '8 3 Le, o 0> 0) CO 0', ••LC<C<<<C

W N 00 N. a' 00 oi ▪ co to co

CO N. N

N N Is Is S CD <6 co co ce.1 cee. e

03 0 N 00 CO LII aLi CLIC <0- 4 .6. a o 00_ "

Sub

tota

l 9

12-9

17

sr 2

03 c0 o

" 0, CV CO CO N a 05-

CO Is

CV CV 0 CD 00 00 01 V- 1,- 0

6 6 oo cN

c6

0, N LO aS N Lei 0 LO • LO

CO CO CV 0 • 0, .6 of CO P- S O

o " a,

oi o

00

o o co co

N ▪ N

Cus

tom

er

and Sale

s E

xpen

se

s

t •̀-°-

Fi .., ,`

ii,) 7-70 0, m

i 2° o o 2 3 ri

I 7,7.• ' g

r, U) 0 X t S2 tj

la 8 8 ':(37°. co E

0 x

i :n5311" i

22.gg -g

8 w2 11 1`,8 aS

= ,?,

- .5.5773-T.8 03=liql, g Ec'ELD2CflE2E00i tj 21 0) "il F; 0,,maf Ticilig

CV CI (C,

0, CD 01 0) < < < < <

0„, Lo 03 LO co I"- CO CM O C•1 C,) cr 0 0 00 0, 0 , cN - CV cv CLL Cv CSJ (NI cv CV cv 01 0) 000

Subto

tal 9

06, 9

08, 9

09

on

00 ør

uj 00

7, u,

4501

Page 98: Oncor Electric Delivery System 2015 Analysis of System Losses

Oc Oc a, o

4

4

C4

co

4

CO CO

o co

co

co c't

Oc

co

cs cit 4

CV 0) C) U, 0 Ns CD Tr m Tr CA ts n CV ts v- OD c> Oc n 03 Cl Tr CA CO Ns ts C.O 40604dRdr cf24.60; CD n Tt n Tt CD CO c0 00 oD CO. CO. 00 CO h- 0 Tr rJCO [171;g"i co

mn c, m mm.-,41:-. eqo o 1..... ,r-ro.-T-o mo.c.)..m.m.nm.-co oi o ai 4 cci cn M 1.6 N. .- ;.7- CI CD 01 CV 4D N-. 01 C7, CO co o Ni 4 cc; M ,-

0 I- LLI 0

1.- +

(7) 0 0 OÕ 0 I-t -J -J

Cr3

-1

cTo

UJ 2

C)

111 U)

()U. 0

0 o a. O N OnW w

>-.(gZ WZNX WO,M >pMm :10NW

OWZ0

g4M0E1

U W4c, WJIM <Li

.1.g7 W7IWO ceM0>-0 00p.Z

.ZOWO.

Ns CD CO C0 el c0 cr CV CD CO T- O CD Ns CD ct CD Ns 01 0 CA N CD co. N. CO

. .4. On CV 0 cr CV

cs, CV 0 CO CO C) N. N. N, 0) 01 'IC 0 V) Ns Ns Ns 0 oo d cci r: ui vi ci

cOCONn N-

c, N, n m 0 un no cn o ul

p0 CA 0) C4 CD 0, 1 Ns ' . RI 'COLOctM0) cis. m n'cio,-N:

,cicsi c6 cn

NM M 3 80 0 01 4D OD 28 '..4—cpW C.2.',7-192A - Cd *: N: Od c0 Oi CO 0 o co v- tv) 0 CV N. •ct

CO ul 0 CO 0 co ,-- CO cl- CV cv) C.4 , IN - OD 1 LC) ol. 00 "8

CD .00..7, CV , 0 0) 14:6 0 CO0 00cdCd CD N 04 CD CV CV CD M 0 vt N- a n- -,-..-.4-. ,, a - a ,,

CUh. ,r co CV N co ,cr N- 04 CO e- I.. N. 00 CA LO A- CO CD 40 CD CD CV 0) 00 ,- CO Ch 00 .- C0 CAA' Ad MCAlIIMCA COMOLO OAM CI- A- NAV...AO A- 0400M A-.00 0.- C.000 ,0 cOO- o O-O- cOvrOLOO co .- C) ,COcO C.JOc

LOCI We-A- CO mMMCON N0 WCON-N .-CDIONCO MO 0011,-0 MW00 0546 45N-0N- Cd060,1%- N- CD Ns CO c- 03 r- CD •-• VD VI CO C) m Cs! '4- 0505

e- n)

.z.6 gi 1), ,42" 321,E 10k 79IW MLL2 wotp' T, T,t1t45 T2 T22 0 8 R.Sg 6)(aD) V.9, 'at) (ST>_AgEug.'g ow

4,-E4(7)wo.c2n Ed, WiE2.2 01

ER.71&"4.1&"42,53288 Timmo,mmom.c.mmmm a<««««««

f4 cs ui

Oc LO

co

el

LO LO

LO

r. co cd" co

Oc T. 00

Oc Oc co CO

Oc co

a, cs co CO

02

co co co co

Oc

CO 413

n-

tei

LO CO Oc Oc LO Lei

Tr Oc CO

CO

A Oc CO

co st

15 CO co Oc

LO CV CV 05

Oc co

co

el

LO co CO

1,84

3,80

3,40

5

CO

ccco a, Oc CO

CO

co co Oc Oc CD

co co

TO

TA

L A

&G

EX

PE

NS

E

TO

TAL

O&

M &

A&G

EX

PE

NS

E E

XC

L (

DIS

T 9

28) &

565

4502

Page 99: Oncor Electric Delivery System 2015 Analysis of System Losses

o

cn O

uJ 2

M M m CO V CO

CD c- A (c) .- ,

CO

CO A

03

- mm - ma

• cv

o M CO NI et CD. C A U1 NI

^ COO.4-0. M C3c-N4) ,I- ,1: A Ns ‘C ' ' CO . 7..ggE=1 d cs1 C. 00 —. o co N: — (4)

• A M N

.6 NI c0

▪ M N N

N , 0— . 0- , A. co

W o m

Csl u, cv uJ

N

cOlOcO'V V.-Ain V. ANV..7) ,

co V- 0.- .-- M NM.- M c6,. ',15

„ a . .4. 0. co 22 . ct ..c., ,. co c.i. . 0-‹ . — ,-, cm , , CO 41. " CO Cc) CV A 4. N N N N

CO CO W A Wt. L./ nt co 3 N. u*, .1

UJ O

uJ

W 0

W Z O <0 213 °WI U niEW

W 0,- D >p(O m n o Nce

e.Z

UWZCO

IgreMai ,FWZ

OW*4-111-10,ttii AW .7.3,0

m ;:-.0zwo Nou.m

— O c, m 0 A W W CO 43 W CO U, U) CO u) CO Ul

e-NMVOWAMM'D '-

Sub

total 5

61-5

67

Mai

nte

nanc

e g

yrol

m m . co a m.m.. .2. d .— ," M .- .1 A

M

- coM MV

00- .MA..

04 04

CO 0 0 1—

+ -I -I Fo —1 I- CO

15 ci!

y Ict

• "

• C C 5 c o

igEg!,%) g-? h7= 43-

E22,v0

4T2IT.2§1T2IT2§ 2 2 2 2 2 2 CO 01 CD c- CV CO OD A N. A (L) CO CO 0 IA <cr<<<.2

4503

NCO,CLOWAMMOc- NM ,70.1. NNNNNNN

cci

CV

CI

Page 100: Oncor Electric Delivery System 2015 Analysis of System Losses

CV Is N CO -ts r<4 csi

csl A

o) CO N. CN 4- 04 CD

uJ ui o

CN

Co

o

CN

CT; CN

CV

CV CV

0 0 LO tcr c0 0 0 04 04

• CV 03 CO tri

CN -

oo

• 03 04 • CO 03

•(,uJ

o

-

0 0 0, CI' 0 0 0, 04 0.1 fs CV cC, 0, 0 .tt N&.-uJ

.- <- uJ <<f CN )OCDCD,-SO 0, N. co o< • oi 6 -

uJ

CN

CLI 0 5 re

u. -1 0 >- Z < 0 2 „9 0 N

M IL < o z CeZo4re

r

_1 N z -n0x z

z 0 3 z -;

Le• re0>-co 0 CO Z

r-UZ • Z to o. NOW- ca

<

Dis

trib

utio

n P

ayro

ll

01003034 4- 00 ,- 0000)03 • 0, 03 01 LO (0

Oi op ei •cr ts or CO

03 0 O, CN U5 Cr; 6 A

CV 000,1`.-00 ,-o N .. .....

- Ci N-- ; oi ..- N- CO (0 C.- ,- 0 N- r... 0 at 0 0 0 0. CV tcl: .0. , CI' 0'," 0 t- a 03

uJ

co o CV Is

CN (N

00 0 }- t: -.I _1 55 -1 1- co

Cti

CV 0 0) 03 ch 0 0 v- o CO VI 0 0, 0, CO CV 0 N. CD

6 6 N: r<4 oi 6 .- ro •cr N- N- 0, CO 03 0

N: 6 A

0, (,) 1.-- 0 0 4--

c:,°' A Q . 0, a 3 41 14 cci ..- 4: N. CO

tS 6 ce

co to a, eo N. .- co .-- N- o I

0,C00,00-1.7.0 , <I' •t-

115 (0 oi cf oi vi .- d

Is 03

CN `';' O ç 9

_

Sub

tota

l 581

-589

Ope

ratio

n S

uper

visi

on a

nd

Eng

inee

nng

O

'

E 01°) u?

fla) t g or: ri i

E' 1 g,

65 -e g I,' a.

E w-...Ea, ,7-, a" I') -E u) m z , g; a LT, 15

-. 1- 2 6

tu

r

c

E

:I

iit

t

t,

;,,,

22

i

rg Al' il i 2 "f3

15".513-515-51545 . (0 z

1,1111 IT:513 'V ' i

it"Pa''sgt"E"gt UC 1

2 g 2 3 g 3 3 g g g O uJ

.-010) ,01.0U3N-0341, 03030303003c9,0303

25 12 112 4̀c'

.4-0103.0404.0N-00 CY, 0, 0, CD 0, 0, 0, 0, 00000000 U) < < < < < < < <

0101.0 0 C0N-030,0.c-01C0.1. 00 N-c00, 0.-CV CN 04 0.1 CN 01 CV 04 CV CV 04 CV 03 0) CO 01

4504