CAMP SIX - ALTERNATIVE CONCEPT #5 PROVIDE A TWO-WAY PRIMARY ACCESS DRIVEWAY FROM SENTINEL CROSSOVER. REDESIGN PARKING AREA TO PROVIDE A BUFFER OF 150 FEET FROM THE RIVER. RESTORE WETLANDS AND MEADOW IN THE 150-FOOT BUFFER. PROVIDE 750 PARKING SPACES FOR DAYTIME USE. DESIGN PLANTERS TO RETAIN LARGE NUMBERS OF TREES WITHIN LANDSCAPE, INCLUDE BIOSWALES AND ELIMINATE POLLUTANTS FROM SURFACE PARKING AREA. DESIGN AND CONSTRUCT A ROUNDABOUT TO MINIMIZE TRAFFIC CONGESTION AT INTERSECTION OF NORTHSIDE DRIVE, INDIAN CREEK ROAD AND SENTINEL CROSSOVER. DESIGN A SECOND ROUNDABOUT AT THE CAMP SIX DRIVEWAY, VILLAGE DRIVE AND NORTHSIDE DRIVE. CREATE A SYSTEM OF PEDESTRIAN PATHWAYS TO DRAW VISITORS INTO YOSEMITE VILLAGE. CONSTRUCT A NEW COMFORT STATION AT A CENTRAL LOCATION THAT IS CONNECTED TO A PEDESTRAIN CONCOURSE. ELIMINATE CONCESSIONAIRE’S GENERAL OFFICE AND AUTO MAINTENANCE GARAGE LOCATED BETWEEN VILLAGE STORE AND AHWAHNEE MEADOW. MAINTAIN EXISTING SHUTTLE STOPS ON VISITOR CENTER LOOP DRIVE. REPLACE VILLAGE SPORT SHOP WITH VISITOR CONTACT STATION. ELIMINATE EXISTING ART ACTIVITY CENTER. CONSTRUCT A PEDESTRIAN UNDERPASS TO MINIMIZE CONFLICT WITH AUTOMOBILES ON NORTHSIDE DRIVE. IMPROVE PEDESTRIAN CONNECTIONS AND BIKE PATHS. 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 3 4 5 6 7 8 8 9 10 12 11 Church Bowl Picnic Area C o o k ' s Me a d o w B oardw a lk Va l l e y L o o p T ra i l Yosemite Wilderness Superintendent's Footbridge Ah w a hne e R oa d Se n t i n e l R oad N o r t h s ide D r ive Yosemite Village Camp 6 Day Use Parking The Ahwahnee (National Historic Landmark) Sentinel Bridge Sentinel Meadow Cook's Meadow V a ll e y L o o p Trai l Housekeeping Camp Footbridge Stoneman Bridge (Raft put in) Ahwahnee Bridge Ahwahnee Meadow Housekeeping Camp N o r t h s ide D riv e Ho u s e k e e pin g B r idge Tr a il Camp Curry Village (Historic District) Lower Pines Campground North Pines Campground Upper Pines Campground Stoneman Meadow Clarks Bridge Tenaya Bridge Sugar Pine Bridge Happy Isles Bridge Former Happy Isles Footbridge Yosemite Lodge Wi ld an d S c e nic R i ve r C o r r ido r Bo u n d ary Boystown Swinging Bridge Lower Yosemite Fall Picnic Area Yosemite Creek Bridge M e rc e d R i ve r M e r c ed R iv er Swinging Bridge Picnic Area S out hside D r iv e Leidig Meadow Yosemite Wilderness Backpackers Campground Union Point Moran Point Royal Arches Glacier Point Staircase Falls Lower Yosemite Fall 0 0.25 Miles 7. 8. 8. 9. 9. 10. 11. 12. 13. 13. 6. CONCEPT 5: DIVERSIFIED VISITOR EXPERIENCES AND SELECTIVE RIVERBANK RESTORATION P UBLIC A CCESS AND U SER C APACITY Allows for increased peak visitor use levels v Yosemite Valley Peak Daily Visitation: 24,000 people (17% increase) v Day-use Peak Visitation: ~15,500 people (6% increase) v Overnight Peak Visitation: ~8,500 people (118% increase) v Management tools v Re-design parking, trails, and viewing areas v Phase in progressively restrictive management actions (parking and transportation fees, traffic diversions, and other measures) when future demand begins to exceed parking supply v Use Intelligent Transportation Systems to inform visitors of real-time traffic conditions v Allow limited private use on stretches of the river within all segments. Allow commercial paddling on extended stretch of river in the Valley. Designate formal river access sites and redirect use to more stable river access points. L AND U SE Expanded facilities and services with largest increase in camping v Expansion and retention of commercial services to accommodate visitor use levels v Expand Yosemite Lodge by approximately 200 units v Retain existing number of units at Housekeeping Camp v Retain all units in Curry Village except those in the rockfall zone v Parking capacities for day and overnight visitors, residents, and administrative personnel v Yosemite Valley Parking: ~6,500 spaces (19% increase) v Wawona Parking: ~670 spaces (6% decrease) v El Portal Parking: 1,800 spaces (84% increase v Campsites added and relocated from sensitive areas to more resilient locations. v Yosemite Valley Camping: ~860 sites (84% increase) v Wawona Camping: ~80 sites (18% decrease) R IVER V ALUES AND E NHANCEMENT Limited restoration within 100 feet of the river v Preserve exceptional water quality throughout the river corridor v Remove approximately one mile of revetment to improve free-flowing conditions v Restore 168 acres to natural conditions within the river corridor v Remove campsites, informal trails, and non-essential roads from culturally sensitive areas National Park Service U.S. Department of the Interior MERCED RIVER PLANP ROVIDING A CCESS AND P ROTECTING R ESOURCES Improved riparian, meadow, and woodland conditions would provide habitat for a variety of wildlife, including bobcats, coyotes, mule deer, monarch butterflies, and various amphibians. Preliminary design for day-use parking area at Camp 6

Transcript of onCept 5: DiversifieD visitor experienCes seleCtive ... › ... ›...

Page 1: onCept 5: DiversifieD visitor experienCes seleCtive ... › ... › MRP-board-concept-5-reduce.pdf · ConCept 5: DiversifieD visitor experienCes anD seleCtive riverbank restoration

CAMP SIX - ALTERNATIVE CONCEPT #5

PROVIDE A TWO-WAY PRIMARY ACCESS DRIVEWAY FROM SENTINEL CROSSOVER.

REDESIGN PARKING AREA TO PROVIDE A BUFFER OF 150 FEET FROM THE RIVER. RESTORE WETLANDS AND MEADOW IN THE 150-FOOT BUFFER.

PROVIDE 750 PARKING SPACES FOR DAYTIME USE. DESIGN PLANTERS TO RETAIN LARGE NUMBERS OF TREES WITHIN LANDSCAPE, INCLUDE BIOSWALES AND ELIMINATE POLLUTANTS FROM SURFACE PARKING AREA.

DESIGN AND CONSTRUCT A ROUNDABOUT TO MINIMIZE TRAFFIC CONGESTION AT INTERSECTION OF NORTHSIDE DRIVE, INDIAN CREEK ROAD AND SENTINEL CROSSOVER.

DESIGN A SECOND ROUNDABOUT AT THE CAMP SIX DRIVEWAY, VILLAGE DRIVE AND NORTHSIDE DRIVE.

CREATE A SYSTEM OF PEDESTRIAN PATHWAYS TO DRAW VISITORS INTO YOSEMITE VILLAGE. CONSTRUCT A NEW COMFORT STATION AT A CENTRAL LOCATION THAT IS CONNECTED TO A PEDESTRAIN CONCOURSE.

ELIMINATE CONCESSIONAIRE’S GENERAL OFFICE AND AUTO MAINTENANCE GARAGE LOCATED BETWEEN VILLAGE STORE AND AHWAHNEE MEADOW.

MAINTAIN EXISTING SHUTTLE STOPS ON VISITOR CENTER LOOP DRIVE.

REPLACE VILLAGE SPORT SHOP WITH VISITOR CONTACT STATION.

ELIMINATE EXISTING ART ACTIVITY CENTER.

CONSTRUCT A PEDESTRIAN UNDERPASS TO MINIMIZE CONFLICT WITH AUTOMOBILES ON NORTHSIDE DRIVE.

IMPROVE PEDESTRIAN CONNECTIONS AND BIKE PATHS.

1

2

3

4

5

6

7

8

9

10

11

12

1

2

3

3

4

5

6

7

8

8

9

10

1211

Church BowlPicnic Area

Coo k' s Meadow Boardwalk

Va ll ey Loop Trail

Y o s e m i t e W i l d e r n e s s

Superintendent'sFootbridge

Ahw ahnee Road

Sent

inel Road

Northside Drive

YosemiteVillage

Camp 6 DayUse Parking

The Ahwahnee(National Historic Landmark)

SentinelBridge

SentinelMeadow

Cook'sMeadow

Va lley Loop Trail

Housekeeping Camp

Footbridge

Stoneman Bridge(Raft put in)

Ahwahnee Bridge

AhwahneeMeadow

HousekeepingCamp

Northside DriveHou sekeeping Bridge Trail

Camp Curry Village

(Historic District)

Lower PinesCampground

North PinesCampground

Upper PinesCampground

StonemanMeadow Clarks

Bridge

Tenaya BridgeSugar Pine

Bridge

Happy Isles Bridge

FormerHappy Isles Footbridge

Yosemite Lodge

Wild and Scenic River Corridor Boundary

Boystown

SwingingBridge

Lower Yosemite FallPicnic Area

Yosemite Creek Bridge

Mer

ced

River

Merced River

Swinging BridgePicnic Area

Sout

hsid

e Dr

ive

LeidigMeadow

Y o s e m i t e W i l d e r n e s s

BackpackersCampground

Union Point

Moran Point

Royal Arches

Glacier Point

Staircase Falls

Lower YosemiteFall

Stream100 ft.ContourCalculated Rockfall Hazard LineInferred Rockfall Hazard LineRoad BridgeFoot Bridge100 Year FloodplainMeadow & Riparian VegetationValley Oak Vegetation

Surfaced AreaDesignated WildernessMerced River (Rafting Prohibited)Merced River (Rafting Permitted)Restoration

Visitor Use and Capacity

Visitor Experience

Boating

User Capacity/Amounts of Use

Management Tool

Picnicking

Parking

Circulation

Services

Camping

Lodging

Housing

Operations

Land Use Management

Wild & Scenic River Classification

Recreational SegmentWild SegmentScenic Segment

Parking AreaExisting CampgroundRanger StationPicnic AreaTrailheadTrailInformal TrailBoardwalkBike Path

River Values

Meadow & Riparian Restoration

Cultural Resource Protection

Free Flow

Water Quality

0 0.25 Miles

7.

8. 8. 9.

9.

10.

11.

12.

13.

13.

6.

ConCept 5: DiversifieD visitor experienCes anD seleCtive riverbank restoration

Public Access And user cAPAcityAllows for increased peak visitor use levels

v Yosemite Valley Peak Daily Visitation: 24,000 people (17% increase)

v Day-use Peak Visitation: ~15,500 people (6% increase)

v Overnight Peak Visitation: ~8,500 people (118% increase)

v Management tools

v Re-design parking, trails, and viewing areas

v Phase in progressively restrictive management actions (parking

and transportation fees, traffic diversions, and other measures)

when future demand begins to exceed parking supply

v Use Intelligent Transportation Systems to inform visitors of real-time traffic conditions

v Allow limited private use on stretches of the river within all segments. Allow

commercial paddling on extended stretch of river in the Valley. Designate

formal river access sites and redirect use to more stable river access points.

lAnd useExpanded facilities and services with largest increase in camping

v Expansion and retention of commercial services to accommodate visitor use levels

v Expand Yosemite Lodge by approximately 200 units

v Retain existing number of units at Housekeeping Camp

v Retain all units in Curry Village except those in the rockfall zone

v Parking capacities for day and overnight visitors, residents, and administrative personnel

v Yosemite Valley Parking: ~6,500 spaces (19% increase)

v Wawona Parking: ~670 spaces (6% decrease)

v El Portal Parking: 1,800 spaces (84% increase

v Campsites added and relocated from sensitive areas to more resilient locations.

v Yosemite Valley Camping: ~860 sites (84% increase)

v Wawona Camping: ~80 sites (18% decrease)

river vAlues And enhAncementLimited restoration within 100 feet of the river

v Preserve exceptional water quality throughout the river corridor

v Remove approximately one mile of revetment to improve free-flowing conditions

v Restore 168 acres to natural conditions within the river corridor

v Remove campsites, informal trails, and non-essential roads from culturally sensitive areas

National Park ServiceU.S. Department of the InteriorMerCeD river plan…Providing Access And Protecting resources

Improved riparian, meadow, and woodland conditions would provide habitat for a variety of wildlife, including bobcats, coyotes, mule deer, monarch butterflies, and various amphibians.

Preliminary design for day-use parking area at Camp 6