Outline
Introduction
RwandaEnergy
Sector
Objectives
2010
to
2015
EvidenceofgeothermalresourcesinRwanda
Current
Status
and
preliminary
findings
Issuesaffecting geothermaldevelopment
Immediate
goals
Whatneedstobedoneandbywho?
RGRES
options,
timing,
costs
etc
TheInstituteofEarthScienceandEngineering
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
3/35
Rwanda Energy Sector Objectives
IncreaseaccesstoElectricity inRwandato35%of
thepopulation
by
2020
Reducecostsofenergyandmakeenergy
services costreflective
DiversifyEnergy
Sources
and
ensure
security
of supply
CurrentGenerationCapacity&Mix
86%
Biomass
11Hydrocarbons
3%electricity(85MWe) 37.8MWefrom diesel,
41.7MWe
from
hydro
and
10.5
MWe
imported
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
4/35
Activity Inputs/Costs
(USD)
Privatesector
contribution
Indicators Timeframe Responsibility
DevelopHydro 200M 10% 60MWe 10MWeby2010 MININFRA,
RECO,RURA,
PrivateSector
Geothermal 75M 20MWe 5wellsby2013,
powerplantby
2015
and
additionalsurface
exploration
MININFRA,
RECO,RURA,
Private
Sector
MethaneGas Privatesector 100MWe 25by2012and75
by2015
MININFRA,
RECO,RURA,
PrivateSector
Additional
Diesel
24M 10MWe 10by2011 MININFRA,
RECO
OffGrid
renewable
sources
50M 50% 5
MWe 5
by
2015 MININFRA,
privatesector
Planned electricity generation mix for Rwanda for
the period 20102015
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
5/35
ImmediateGoals
Securepredictableandadequatefundingforgeothermal
explorationand
development
Capacitybuilding&Equipmenttoensuresustainableutilization
andmanagementofthegeothermalresources
Findhighproductiongeothermalwells Reducerisksandcosts
tomakegeothermaltrulyleastcost
Formulationof
alegal
and
regulatory
frame
work
and
policies
Attractprivatesectorparticipation Expressionofinterest
prepared
Generate20MWe in5years
Earlywellgenerationencouraged
Confirmgeothermal
potential
of
more
300MWe
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
6/35
What is Geothermal energy
Heat Source
Hot Water
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
7/35
Fracture
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
8/35
Fractures & Faults &
Alteration
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
9/35
Hot Springs at 70C
Fault Trace
FaultControlledSurfaceManifestations
Hot Springs with Travertine
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
10/35
How does geothermal compare to mining?
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
11/35
Nyamuragira eruption Jan 2010
Nyiragongo eruption in
2002
Evidence of the Heat Source- It is regional
http://www.airlinesanddestinations.com/wp-content/uploads/2010/07/100724-nyiragongo-01.jpghttp://www.airlinesanddestinations.com/wp-content/uploads/2010/07/100724-nyiragongo-01.jpghttp://en.wikipedia.org/wiki/File:Democratic_Republic_of_the_Congo_location_map.svghttp://www.airlinesanddestinations.com/wp-content/uploads/2010/07/100724-nyiragongo-01.jpg -
8/8/2019 Onacha Rwanda Geothermal Resources Development
12/35
Possible drilling area.
KARISIMBI VOLCANO
Evidence of Heat Source- Rwanda
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
13/35
Current Status- Rwanda Geothermal Area
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
14/35
Conceptual Model for Geothermal System
Fluid-rich, high-permeability fracture/pore zone in subsurface
HeatSource
Recharge
Recharge
zone
Downflow
Z
X
Y
Reservoir
Lateralflow
Fault
Surfaceblanket
Productionzone
Productionwell
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
15/35
GeothermalResourcesAssessment&Development
2main
activities
(in
steps)
GeothermalResourcesExploration(GRE)
Reconnaissance
studies Surfacestudies
Explorationandappraisaldrilling
Prefeasibilitystudies
and
Baseline
EIA
GeothermalResourcesDevelopment(GRD)
Productiondrilling
Powerplantdesign&construction
Powerlineconstruction
Whatis
Rwanda
Geothermal
Resources
Exploration
Strategy(RGRES)?
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
16/35
Stepwiseapproachtogeothermalexplorationanddevelopment
Step 1
Review existing data
Prepare Project Plan
Step 2 Detailed Geoscientific studies in phases
Step 3
Exploration drilling
Field Appraisal conceptual modeling and review meetings
Step 4 Production Drilling and monitoring
Step 5
EIA and Feasibility
Power plant design construction, reinjection strategies
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
17/35
CurrentStatus
Gisenyi
Karisimbi
Kinigi
WesternProvince(900Km2)
Gisenyi
Karisimbi Kinigi
NoSurfaceStudiesDone Area
hasnewspringsafter2008
earthquake
Bugarama(over400km2)
A il bl h i l d t
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
18/35
Available geophysical data
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
19/35
Kiningi
Karisimbi
Gisenyi
Geothermal Areas Karisimbi Target area about 25Km2
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
20/35
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
21/35
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
22/35
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
23/35
SummaryofCurrentStatus
Prospect Inception
Report
Surface
Recon
Studies
Detailed
Surface
Studies
Wells Sited Wells
Drilled
Western
region
Yes Yes Partially
Done
NO NO
Southern
region
NO NO NO
Other Areas NO NO NO NO NO
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
24/35
Issuesaffectinggeothermaldevelopment
Institutional
Inadequatefacilities
Inadequateandwellmotivatedhumanresources
Nospecificdeliverablesandtimelinesforachievinggeothermalexploration
anddevelopmenttargetsintheRNPDP
Inadequateandunpredictablefunding
Local®ionalcollaborationwithallstakeholders
Technical
Dowe
have
geothermal
resources,
how
deep
and
what
is
the
temperature
and
fluid
chemistry? Drillandtestexplorationwells
Inadequatedatatoconclusivelydeterminethegeothermalpotential Drilling+
additionalexploration
Wheredowedrillandwheredowegetwaterfordrilling?
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
25/35
Issuesaffectinggeothermaldevelopment
Legal&Regulatory
Noexistinglegal®ulatoryframeworkforgeothermalexplorationand
development
Noresourcemanagementact Geothermalsameareaasoil&Gas
Mechanismforgivingoutconcessions
Policy
Incentives&
tariffs
How
to
attract
foreign
investors
Foreignexchangeriskmanagement
Localcommunity,localgovernmentsandlocalprivateinvestorsparticipation
Indirectusesofgeothermalresources
Perception Risky,expensive,Nonbelievers
inviability
of
geothermal
energy
Wh t d t b d ?
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
26/35
Whatneedstobedone? Planfor220years
Discuss,involve
&
seek
concurrence
of
all
stake
holders
Have
a
sharedcommitment,vision&missiontoachievegeothermal
Detailedsurfacestudies&explorationdrillinginallthe4
geothermalprospects
Formulatebestandmosteconomicdevelopmentscenarios
Drill3exploration
wells
in
each
of
the
4prospects
after
detailed
studies
Locatedrillingtargets&watersources&EIA
Encourageuse
of
well
head
generating
units
Welltesting&reservoirmodelling
Legal®ulatoryframework
Concessionprocedures DowegiveconcessionsonlytoRwanda
h d b d ?
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
27/35
Whatneedstobedone?
Planfor220years
Sourceforfunding fortraining,equipment&geothermaldevelopment
Prepareexpressionofintereststogaugeinterestinexploration&
developmentofgeothermalresources
Putinplaceincentives&tariffs Howtoattractforeigninvestors
Recruit&Trainstaffbothlocally&overseas(includingonjobtraining)
Engagelocal
communities,
local
governments
and
local
private
investors
participation
Focusonindirectusesofgeothermalresources
Showcase
geothermal
potential
in
Rwanda
through
workshops
&conferences
ChangePerception Shareinformationthroughworksshops,
attendingconferences
for
policy
makers
and
opinion
leaders
A ti iti
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
28/35
Activities
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
29/35
WhoShouldbeinvolved TeamApproach
Governmentalpolicies
&
incentives
MININFRA,
MINECOFIN,
RURA,
RWANDADEVELOPMENTBOARD,MINELA
Treatmentofforeigninvestment RDB,MINECOFIN,
Landconcessions,
landownership
issues,
land
administrative
issues
andutilityregulators MININFRA,MINELA,MINALOC,RURA
Environmentalregulations&licencesforgeothermalexploration
REMA,MININFRA
UtilitiesandRegulators
Transmissioninfrastructure&gridextensionplans RECO&RWASCO
Availabilityofengineering/scientificresources ??KIST??UNR??
Staff Requirements
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
30/35
StaffRequirements
Specialty Cadre Current Additional Remarks
Reservoir
Engineering
Graduate 1 1 SteamfieldandgatheringSystem
Technician 0 2 Well loggingandsteamsystem
Geology Graduate 0 2 Lab,rig&fieldwork
Technician 0 2 Lab&
rig
work
Geophysics Graduate 1 1 Electric, PotentialandSeismology
Technician 0 2 Dataacquisitionandequipment
Geochemistry Graduate 1 1 Lab,field
and
rig
work
Technician 0 2 Dataacquisition,equipment
Environment Graduate 0 1 Liaison onallenvironmentalissues
Technician 0 1 Dataacquisition
and
analysis
Drilling Graduate 0 2 Logistics&drillingoperations
Technician 0 2 Supportdrilling logistics&operations
PowerPlant Graduate 1 1 Operations&maintenance
Technician 0 2
l f d ll f d ff
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
31/35
Exampleofdrillingcostsfordifferentoptions
Welltype Rwandaowned rig
costsX1000(USD)
E.Acontractedrig
costsX1000(USD)
Internationally
contractedrigcostsX
1000(USD)
Exploration(3) 11,100 14,100 22,500
Appraisal(3) 11,100 14,100 22,500
Production
(4) 14,800 18,800 30,000Drillingcostsper
field
37,000 47,000 75,000
Otherfieldcosts 8,000 8,000 25,000
Totalperfield 45,000 55,000 100,000
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
32/35
Summaryofindicativecosts
Description Unitprivate
ratesX1000
(USD)
Privatetotal
costsX1000
(USD)
E.A. Unitcosts
X1000(USD)
TotalE.A.costs
X1000(USD)
Surfacestudies
(4fields)1,890 7,560 900 3,600
Watersupply 2,500 2,500
Infrastructure 5,000 20,000 2,000 8,000Exploration
wells(3wells)
7,500 22,500 4,700 14,100
Welltesting(3
wells)
1,500 4,500 120 360
Next12wells 7,500 90,000 4,700 56,400
Testing12wells 1,500 18,000 120 1,440
165,060 86,400
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
33/35
Description Costs(US$)X1000 Remarks
Surfaceexplorationof
Karisimbi&Bugarama
900 Requiresstrengtheningof
localhumanresourceto
domostofthework
Water&Infrastructurefor
drillingexplorationwells
4,500 Uselocalcontractorsfor
siteconstruction&civil
works.Requires
the
local
privatesectortothe
strengthened
Drill
1
st
3
wells
in
Karisimbi
usingrigsintheEastAfrica
region
14,100 Use
of
rigs
in
the
East
AfricaRegion.Thiscould
involvebilateral
agreementssaywiththe
Ministryof
Energy
in
Kenyarepresentedbythe
GeothermalDevelopment
companyWelltesting&modelling 120
Total 19,620
Required inputs from donors stakeholders
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
34/35
Required inputs from donors , stakeholders,
investment banks etc
(a)Capacity
Building
HumanResource:Trainingof9graduatesand12technicians Equipmentandsoftware: Equipmentandmaterialfor
geothermalexploration
(b)TechnicalAssistance:
Financing ofdetailedgeoscientificstudiesofKarisimbi,Gisenyi,KinigiandBugarama.
Explorationdrillingof threewellsinKarisimbifield Riskmitigationfundforthreeexploratorydrillinginthe
Karisimbiprospect Development explorationpolicyand regulatoryframework Financeforfeasibilitystudy,pilotpowerplantdesignand
construction
-
8/8/2019 Onacha Rwanda Geothermal Resources Development
35/35
MURAKOZE