On Track at the National Railway Museum

download On Track at the National Railway Museum

of 38

Transcript of On Track at the National Railway Museum

  • 8/14/2019 On Track at the National Railway Museum

    1/38

    OnTrack

    at the

    Updated: 22/10/07 1

  • 8/14/2019 On Track at the National Railway Museum

    2/38

    Your guide to starting work at the NRM

    Welcomeand congratulations you have now joined the National RailwayMuseum team. This On Track pack has been put together to help you settle in to yournew role here at the museum.

    The pack includes a timetable for you to meet different people, to tour themuseum and to experience some of the attractions that make the NRMone of the major tourist attractions in Yorkshire, as well as holding an

    unrivalled collection of locomotives, rolling stock, railway equipment,documents and records.

    The information is this pack is organised into 5 sections:

    The Museum

    Whos Who and Communication

    Health and Safety

    Policies

    Training

    Updated: 22/10/07 2

  • 8/14/2019 On Track at the National Railway Museum

    3/38

    Dont worry that theres a lot of information to get through. The On TrackChecklist will guide you through the information in stages.

    Your Line Manager will have given you your On Track Pack at yourWelcome meeting.

    Over the page, you will find a list of documents included in the pack.

    If you find that any of the documents are not in the pack, or you would likefurther information, please contact the Human Resources Department onext. 287.

    Updated: 22/10/07 3

  • 8/14/2019 On Track at the National Railway Museum

    4/38

    Documents Within the Pack

    The MuseumA map of NRMCurrent leafletsRecent Press Releases

    Whos Who and CommunicationNRM Organisation Chart

    NMSI Organisational ChartVolunteers their role Telephone user guideFriends of the NRM

    PoliciesEnvironmental StatementFree Entry into other Museums

    Front of House Code of Practice

    Health and SafetyLocation of the Health and SafetyPolicy (now on the Intranet)List of First Aiders by dept.Fire ProceduresEvacuation Procedure

    Updated: 22/10/07 4

  • 8/14/2019 On Track at the National Railway Museum

    5/38

    Other documents as requested by the Line Manager:

    __________________________

    __________________________

    __________________________

    Contents of this pack checked by _________________________(HRAdministrator)

    Updated: 22/10/07 5

  • 8/14/2019 On Track at the National Railway Museum

    6/38

    On Track Check List

    New Starter Name: _______________________

    Job Title: _______________________

    Line Manager: _______________________

    Date of Joining: _______________________

    Please use the On Track Checklist to record what you have learnt and whoyou have met in the first 4 weeks in your new role.

    Once you have completed all sections you should make a copy of thechecklist and return it to the Human Resource Department.

    Updated: 22/10/07 6

  • 8/14/2019 On Track at the National Railway Museum

    7/38

    Day One

    Please complete the following sections on your first day.

    If there is a document related to the information then the columnDocument will tell you in which section of the On Track Pack to find theinformation.

    What? Whichdocuments?

    Who? Where?When?

    Pleasesign oncecomplete

    Welcome - Line Manager

    About NRM(History,Organisation Chart,objectives,the future).

    On Track The Museum,Whos WhoandCommunications sections.

    Otherinformationcan be foundon the Intranet

    Line Manager

    Updated: 22/10/07 7

  • 8/14/2019 On Track at the National Railway Museum

    8/38

    Meet yourteam(whos who,what aretheirroles?)

    - Line Manager

    Updated: 22/10/07 8

  • 8/14/2019 On Track at the National Railway Museum

    9/38

    Your workstation (setup youremail,networksand theintranet)

    - Line Manager

    EvacuationProcedures

    On Track Line Manager

    Restaurant/Shop /Kitchenfacilities(toilets,where to buylunch and tomake teaetc.)

    - Line Manager

    Car parking,(securitycodes, whichentrance touse).

    - Line Manager

    First AidProcedures(who is thefirst aider foryour area).

    On track Health andSafety section

    The Intranet

    Line Manager

    How torespond tovisitorqueries orcomplaints.

    - Line Manager

    Lockerfacilities (if applicable).

    - Line Manager

    Updated: 22/10/07 9

  • 8/14/2019 On Track at the National Railway Museum

    10/38

    No smoking /no alcoholpolicyexplained.

    This is on theintranet.

    Line Manager

    Staff communication (Staff Briefing)

    - Line Manager

    At the end of Day One it may help to read over the above section andmake a few notes.

    My thoughts after day one: ___________________________________________________________________

    Things I need to ask:

    Updated: 22/10/07 10

  • 8/14/2019 On Track at the National Railway Museum

    11/38

    Week One

    Meet the teamBy the end of week one you should have not only met everyone in yourdepartment, but also everyone with whom you will be working on aregular basis.

    Your manager will help you make a list of everyone you will work with on aregular basis. You may want to use your job description to help make this

    list.

    Who? Job Title Where / when? Please signonce complete

    Updated: 22/10/07 11

  • 8/14/2019 On Track at the National Railway Museum

    12/38

    Updated: 22/10/07 12

  • 8/14/2019 On Track at the National Railway Museum

    13/38

    Updated: 22/10/07 13

  • 8/14/2019 On Track at the National Railway Museum

    14/38

    Role Specific Information and Health and Safety Training

    During your first week your manager will also talk to you about completingthe Health and Safety E-learning session:

    Heath and Safety Learning completed on: .2007

    Updated: 22/10/07 14

  • 8/14/2019 On Track at the National Railway Museum

    15/38

    Your line manager will also work with you to list any role specific newstarter information that you will need, such as budgets or proceduresspecific to your role.

    At this point your manager will also discuss with you any Health andSafety related training you should undertake.

    During your first week you should make a list of these role specific needsbelow, and aim to complete these by the end of week 4.

    For all Health and Safety related training a supporting document such as acertificate must be completed and returned to HR with this checklist.

    Role specific

    information / HS Training

    Where?

    When?

    Who? Please sign once

    completed.

    Updated: 22/10/07 15

  • 8/14/2019 On Track at the National Railway Museum

    16/38

    Human Resources InformationDuring your first week the HR Advisor, Carolyn Fletcher, will contact you toarrange a meeting.

    Updated: 22/10/07 16

  • 8/14/2019 On Track at the National Railway Museum

    17/38

    At this meeting the HR Advisor will:

    Check that you have completed / signed and returned the followingdocuments:

    Job DescriptionContractVetting FormMedical Clearance FormBank details formNext of kin formIT Communication form

    The HR Advisor will also discuss with you:

    Your contract and job description contentProbationary periods

    The role of HRStaff Benefits (Discounts etc) Policy / InfoPension Scheme

    Trade UnionHealth & Safety Policy & Statement On the intranet.

    Time SheetsExpenses ClaimsLeave and Leave procedures

    The Performance Development ProcessSite Inductions In Sight DayAny other HR issues you wish to discuss

    The HR Advisor will also explain where you will find the following policieson the Intranet.

    You may want to print off these policies so you can refer to them.However, please remember that the policies may change and so youshould bear this in mind when consulting printed copies. If in doubt, speakto the HR Advisor.

    The HR Advisor will show you the location on these policies:

    Principles of Conduct PolicyEqual Opportunities Policy

    Updated: 22/10/07 17

  • 8/14/2019 On Track at the National Railway Museum

    18/38

    Harassment PolicyAlcohol & Drugs PolicyDisciplinary ProceduresGrievance ProceduresSickness and Absence PolicyManaging Under Performance PolicyHealth and Safety Policy

    Once you have all this information, please sign below.

    Signed (Job Holder) ____________________ Date: ____________________

    Signed (HR Advisor) ___________________ __ Date: ___________________

    Updated: 22/10/07 18

  • 8/14/2019 On Track at the National Railway Museum

    19/38

    Site TourAs early as possible during your first week your Line Manager will take youon a tour of the site. You will find a site map within the Museum sectionof the induction pack.

    As well as non public areas such as the Admin Block , the Peter Allen

    Building and The Sidings (where HR are based) this tour will includethe following public areas:

    The Station Hall

    The Thomas Shop

    The Shop

    The Great Hall

    The Footbridge

    The Works

    The Warehouse

    Updated: 22/10/07 19

  • 8/14/2019 On Track at the National Railway Museum

    20/38

    The Model Railway

    The Interactive Learning Centre

    The Yorkshire Railway Academy

    Search Engine

    During your first week you should also:

    Listen to a Shinkansen Talk - Date completed: ______________

    Ride the Road Train - Date completed: ______________

    Updated: 22/10/07 20

  • 8/14/2019 On Track at the National Railway Museum

    21/38

  • 8/14/2019 On Track at the National Railway Museum

    22/38

    Hint Plan ahead!

    At this point you may want to look forward in this pack to Week 4, andwork with your Line Manager to plan time to meet the people listed.

    Updated: 22/10/07 22

  • 8/14/2019 On Track at the National Railway Museum

    23/38

    Other informationBy the end of Week One you should also have completed the followingsection.

    What? Document

    Who Where?When?

    Please signoncecomplete

    Job specificinformation / Healthand Safety

    TrainingNeeds

    Withinthechecklist.

    Line Manager

    Use of thetelephonesystem

    On TrackWhosWho andComm.

    Line Manager

    MuseumRole andObjectives

    TheIntranet

    Line Manager

    Performance ReviewProcess overview.

    On TrackTrainingSectionand theIntranet

    Line Manager

    IndividualObjectives(ReviewSection 1)

    TheIntranet

    Line Manager

    Individual Traininganddevelopmental needs(ReviewSection 2)

    TheIntranet

    Line Manager

    Reportingproceduresfor first aid

    incidents/damage/hazards.

    On TrackHeathand

    Safetysection.

    Line Manager

    Updated: 22/10/07 23

  • 8/14/2019 On Track at the National Railway Museum

    24/38

    Financial Training(raisingorders,budgetsetc).

    - Finance Team

    Policies,InductionCheck, Payand otherHR issues.

    TheIntranetor

    TheHandbook

    HR Advisor

    Updated: 22/10/07 24

  • 8/14/2019 On Track at the National Railway Museum

    25/38

    At the end of Week One it may help to read over the above section andmake a few notes.

    My thoughts after Week One.

    ____________________________________________________________________

    ____________________________________________________________________

    Things I need to ask:

    Updated: 22/10/07 25

  • 8/14/2019 On Track at the National Railway Museum

    26/38

    Weeks 2 - 4

    Meet other departmentsBy the end of your first 4 weeks at the museum you should have met withsomeone (usually the Head of the Department) from each of thedepartments, who will introduce you to their team, and explain the workcarried out in each department. This may be part of your site tour.

    You may find that you have already met with some of these teams in yourfirst week.

    Your Line Manager will have helped you to arrange the meetings belowduring your first week.

    Department Heads are shown in Bold.

    Updated: 22/10/07 26

  • 8/14/2019 On Track at the National Railway Museum

    27/38

    Who? Department Where? When? Please sign oncecomplete.

    Andrew Scott Director, NRM

    John Bull Head of Estates(North)

    Tom Griffin Security ManagerNorth

    Claire Castle Finance OfficeManager

    Sue Fisher Head of Development

    Jim Lowe Visitor Experience

    Emma Farley Marketing

    Updated: 22/10/07 27

  • 8/14/2019 On Track at the National Railway Museum

    28/38

    StephenRichards

    Head of CreativeDevelopment

    JudithWhitaker CommercialDevelopment and IP

    MargaretAndrews/Harriet Hudson

    Retail Manager

    Helen Ashby Knowledge andCollections

    EdBartholomew

    Collections

    Richard Taylor Collections Access

    Annie Devitt Learning Manager

    Updated: 22/10/07 28

  • 8/14/2019 On Track at the National Railway Museum

    29/38

    Updated: 22/10/07 29

  • 8/14/2019 On Track at the National Railway Museum

    30/38

    By the end of week 4 your Line Manager will have also discussed with you:

    What? Document Who Where?When?

    Please signoncecomplete.

    Employee /EmployerH/Sresponsibilities

    On Track -Health andSafety

    Your LineManager

    Clubs /SocialCommittee

    s

    Whos WhoandCommunicatio

    ns

    Your LineManager

    Policies The Intranet Job Holder take time tocheck that youknow where toaccess thepoliciesrelevant toyouremployment.

    Energy

    Saving

    Policies Your Line

    Manager

    You should also have completed all the Role Specific items that yourecorded in Week One.

    At the end of Week 4 please make an appointment to meet with the HRAdvisor.

    Updated: 22/10/07 30

  • 8/14/2019 On Track at the National Railway Museum

    31/38

  • 8/14/2019 On Track at the National Railway Museum

    32/38

    Signed (HR Advisor) : ________________________________

    6 Month On Track Review

    The HR Advisor will also contact you when you have been at the museumfor 6 months. At this meeting we will look back on your first 6 months anddiscuss how you feel you are fitting into your new role and the NRM.

    You may want to use the space below to record any issues you may wantto discuss.

    Some of these issues will be the same as those you discuss with yourmanager at your Review meeting.

    Updated: 22/10/07 32

  • 8/14/2019 On Track at the National Railway Museum

    33/38

    Updated: 22/10/07 33

  • 8/14/2019 On Track at the National Railway Museum

    34/38

    Action required: ___________________________________________________

    Date action taken: ___________________________________________________

    Updated: 22/10/07 34

  • 8/14/2019 On Track at the National Railway Museum

    35/38

    Signed (Job Holder): ___________________________________________________

    Signed (HR Advisor): ___________________________________________________

    On Track Feedback

    We have recently reviewed the induction process here at NRM and wouldlike to know how you found the new On Track pack.

    We would be most grateful if, during your first few months, you could thinkabout how the induction has helped you settle into your new role and theNational Railway Museum, and if theres anything we could do better.

    The HR Advisor will contact you once you have been in your role for a fewmonths, to discuss your thoughts.

    Thanks

    Updated: 22/10/07 35

  • 8/14/2019 On Track at the National Railway Museum

    36/38

    Carolyn FletcherHR Advisor NRM

    Thoughts and comments during the On Track process:

    ___________________________________________________________

    _____________________________________________________________________

    Updated: 22/10/07 36

  • 8/14/2019 On Track at the National Railway Museum

    37/38

    _____________________________________________________________________

    Updated: 22/10/07 37

  • 8/14/2019 On Track at the National Railway Museum

    38/38