On-Going Research

15
1980 1985 1990 1995 2000 2005 2010 2015 2020 On-Going Research 2008 Golden, CO - HAWK 1

description

On-Going Research. 2008 Golden , CO - HAWK. On-Going Research. 2009 Oakland Co, Michigan – Maple & Drake. North. Oakland County, MI Study. ADA Study phases Ph I – pre-installation of the HAWK or RRFB - PowerPoint PPT Presentation

Transcript of On-Going Research

Page 1: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

On-Going Research2008 Golden, CO - HAWK

1

Page 2: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

On-Going Research

North

2009 Oakland Co, Michigan – Maple & Drake

2

Page 3: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

Oakland County, MI Study• ADA Study phases

– Ph I – pre-installation of the HAWK or RRFB– Ph II – shortly after HAWK or RRFB installation

(Maple/Drake August 2009, Maple/Farmington, Feb 2010)

– Ph III – 3-6 months after installation.

3

Page 4: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

HAWK Conceptual View

4

Page 5: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

2010 – Maple & Farmington

5

Rectangular Rapid Flash Beacon (RRFB)

Oakland County, MI Study

Page 6: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

Design Approach for Pedestrian Safety & Accessibility

• Eliminate/ Reduce Conflict Points– Grade Separation– Simplify Geometry

• Eliminate or reduce entry/exit lanes• Reorient pedestrian networks away from Roundabout

6

Page 7: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

Design Approach for Pedestrian Safety & Accessibility

• Reducing/Minimizing Pedestrian Exposure– Simplify Roundabout Geometry– Geometric Improvements

• Bulb outs• Raised cross walks

– Ped Signalization– ITS Solutions– Police Enforcement

7

Page 8: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

Design Approach for Pedestrian Safety & Accessibility

• Improve Gap Detection for Visually Impaired Pedestrians

– ITS Solutions– Noise Producing Solutions to Provide Audible Cues– Minimize Crossing Distances– Shift Crossings away from Roundabout

8

Page 9: On-Going Research

9

Fewer Conflict Points

Page 10: On-Going Research

10

Practical Applications• Separate Motorized & Non Motorized

MovementsPedestrian Tunnel (Bad Aibling, Germany)

Page 11: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

Practical Applications

11

Simplify Geometry at Towson Roundabout

Page 12: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

Practical Applications

12

Geometry at Maple & Drake Roundabout

Page 13: On-Going Research

1980 1985 1990 1995 2000 2005 2010 2015 2020

On-Going Research2008 Swaunee, GA -

HAWK

13

Page 14: On-Going Research

14

ITE Roundabout Taskforce• Major updates to FHWA Guide, MUTCD,

AASHTO Greenbook, and HCM all due within next year.

• Goal - “One-Stop Shop” for Roundabout Info

• Wiki site, similar to Ped/Bike site, to be operational by early 2010.

• Toolbox

Page 15: On-Going Research

15

ITE Roundabout Taskforce• ITE Roundabout Task Force:

http://www.ite.org/councils/Safety/roundabout.asp

• Secretary & Local Task Force Coordinator: – Michael P. Mastaglio, PE

[email protected]

• Task Force Technical Advisor: – Andrew T. Duerr, PE

[email protected]