PILE LOAD CAPACITY USING STATIC AND DYNAMIC LOAD TEST
Presented by:
ANUP KUMAR HALDERST NO-1009042218(P)
Program: M.Sc. Engineering (Geotechnical)
Supervisor:Dr Mehedi Ahmed Ansary
Date: 30th April 2016.
![Page 2: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/2.jpg)
2
OUTLINE
1. OBJECTIVE OF THE STUDY2. OVERALL METHODOLOGY3. LITERATURE REVIEW4. FIELD INVESTIGATION5. SAMPLE CALCULATIONS6. DATA COLLECTIONS7. CORRELATIONS AMONG DIFFERENT ESTIMATION METHODS8. CONCLUSIONS 9. RECOMMENDATIONS
![Page 3: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/3.jpg)
3
OBJECTIVE OF THE STUDY
To determine the ultimate compressive pile load capacity of precast driven pile using Pile Dynamic Analyzer.
To determine the ultimate compressive pile load capacity of precast pile using SPT value and pile driving records.
To determine the ultimate compressive pile capacity using Static Pile load test.
To compare the pile load capacity obtained from different methods.
![Page 4: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/4.jpg)
4
2. OVERALL METHODOLOGY
ESTIMATION OF PILE CAPACITY
SOIL INVESTIGATION REPORT
DRIVING EQUATION
DYNAMIC LOAD TEST
STATIC LOAD TEST
1. BNBC-20152. AASHTO-1992
1.ENGINEERING NEWS2.GATES FORMULA3.JANBU FORMULA
CAPWAP 1. DAVISSION METHOD
2. BNBC-933. OTHERS
![Page 5: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/5.jpg)
5
3. LITERATURE REVIEW
for clays with for clays with
PILE CAPACITY
DRIVEN PILE CAPACITY
NON-COHESIVE SOIL(β-METHOD)
COHESIVE SOIL(α-METHOD)
STATIC FORMULA
![Page 6: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/6.jpg)
6
3. LITERATURE REVIEW
Sand Non-plastic silt Sand Non-plastic silt
PILE CAPACITY
DRIVEN PILE CAPACITY
NON-COHESIVE SOIL
COHESIVE SOIL USING SPT
![Page 7: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/7.jpg)
7
3. LITERATURE REVIEW
=Undrained shear strength Bearing capacity factor = Friction due to overburden
= Effective vertical stress
PILE CAPACITY
BORED PILE/DRILLED SHAFT CAPACITY
NON-COHESIVE SOIL
COHESIVE SOIL STATIC
![Page 8: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/8.jpg)
8
3. LITERATURE REVIEW
![Page 9: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/9.jpg)
9
3. LITERATURE REVIEW
Sand Non-plastic silt Sand Non-plastic silt
PILE CAPACITY
BORED PILE CAPACITY
NON-COHESIVE SOIL
COHESIVE SOIL USING SPT
![Page 10: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/10.jpg)
10
3. LITERATURE REVIEW
PILE CAPACITY
BORED PILE CAPACITY
NON-COHESIVE SOIL
COHESIVE SOIL AASHTO 1992
![Page 11: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/11.jpg)
11
3. LITERATURE REVIEW
H=height of fall of rams=amount of penetration per blow.
a=104.5e=Point penetration per blowb=2.4
=
s=Pile set
PILE CAPACITY
PRECAST PILE
JANBU FORMULAENGINEERING NEWS
DRIVING EQUATIONS
GATES FORMULA
![Page 12: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/12.jpg)
12
3. LITERATURE REVIEW
1. CONSTANT RATE OF PENETRATION (CRP)
2. MAINTAINED LOAD TEST (ML)EVALUATION METHOD3. DAVISSION4. BS 80045. IS: 29116. BUTLER-HOY7. BRINCH-HANSEN 90%
CRITERION
PILE CAPACITY
LOAD TEST
STATIC(ASTM D1143)
![Page 13: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/13.jpg)
13
3. LITERATURE REVIEWPILE CAPACITY
DYNAMIC LOAD TEST
ASTM D4945-00Force applied=PArea=ALength=LElement length=dlMovement of point X=dd (deformation)Wave speed, c=dl/dtDeformation, dd= P dl/EAParticle velocity, dv=dd/dt=P dl/EAdt=Pc/EAAcceleration of the point, a=dv/dt =Pc/EA dtNewton’s second law, P=mam=dl(A)ρP=dlAρ(Pc/EA dt)Wave speed, c²=E/ρ
P
L
dl
dd
Point, X
![Page 14: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/14.jpg)
14
3. LITERATURE REVIEW (Dynamic load test)
Wave propagation in a pile (Cheney and Chassie, 1993)
![Page 15: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/15.jpg)
15
3. LITERATURE REVIEW (dynamic load test)
STRAIN TRANSDUCERF(t)=EAε(t)E=Elastic modulusA=Cross sectionε=Strain
ACCLEROMETERV(t)=∫a(t)dt
Setting arrangement of strain transducer and accelerometer
![Page 16: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/16.jpg)
16
3. LITERATURE REVIEW (dynamic load test)
Force(+) for Compression Force(-) for Tension
Velocity(+) for Downward Velocity(-) for Upward
Free End Wave Mechanics
![Page 17: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/17.jpg)
17
3. LITERATURE REVIEW (dynamic load test)
Fixed End Wave Mechanics
![Page 18: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/18.jpg)
18
3. LITERATURE REVIEW (dynamic load test)
The displacement at which the soil changes from elastic to plastic behavior is referred to as the soil “quake”.
Typical wave equation model
![Page 19: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/19.jpg)
19
3. LITERATURE REVIEW (dynamic load test CAPWAP method)
Factor Influence CAPWAP matching (after Hannigan, 1990)
![Page 20: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/20.jpg)
20
4. FIELD INVESTIGATION (soil investigation) cont…
PILE TYPE : PRECASTSECTION: 12”x12”(300mmX300mm)LENGTH: 13.7m
PRECAST PILE AT SITE
![Page 21: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/21.jpg)
21
4. FIELD INVESTIGATION (dynamic test) cont…
TEST PILE-1 TEST PILE-2
![Page 22: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/22.jpg)
22
4. FIELD INVESTIGATION (dynamic test) cont…
PILE DRIVING ANALYZER
![Page 23: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/23.jpg)
23
4. FIELD INVESTIGATION (static test) cont…
Design Load 40 Ton
Target test load 2.5XDesign load=100
Ton
Type of pile Reinforced concrete pre-
cast pile
Dimension 300mmX300mm
(12”X12”)
Method of installation Impact hammering
Driving equipment Skid mounted pile driver
Hammer detail Drop hammer
Static Load Test Plan
![Page 24: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/24.jpg)
24
5. SAMPLE CALCULATION (capacity calculation)
PILE TYPE : PRECASTSECTION: 12”x12”(300mmX300mm)LENGTH: 13.7mMETHOD: BNBC 2015 (STATIC FORMULA)
![Page 25: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/25.jpg)
25
5. SAMPLE CALCULATION (capacity calculation)
cont…
• PILE TYPE : PRECAST• SECTION: 12”x12”(300mmX300mm)• LENGTH: 13.7m• METHOD: BNBC 2015 (SPT BASED)
![Page 26: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/26.jpg)
26
5. SAMPLE CALCULATION (capacity calculation) cont…
ENGINEERING NEWS FORMULA
Weight of ram,
Number of blows for last one feet of penetration=40
Penetration of pile under last blow of hammer, s=0.3 in
Height of fall of ram, H=5 ft
Resistance under working load,
R
=13.46 kN FS=6
Ultimate Capacity=804 kN
![Page 27: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/27.jpg)
27
5. SAMPLE CALCULATION (capacity calculation) cont…Pile area, A =144 sq in
Length of pile, L =45 FtWeight of pile, Wp =6.75 kip
Compressive strength of concrete =3500 psiModulus of elasticity of concrete, Ec = 57500√3500
=3401746 psi =3402 ksi
AE =489851kipcd 0.75+0.15(Wp/Wr)
=0.75For drop hammer, eh =0.75
Height of fall =5.00 ftEh =35.00 ft-lb
S =0.30
=3.86
2.61=
=1790 kN (FS=4.5)
JANBU FORMULA
DRIVING OF PILE
![Page 28: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/28.jpg)
28
5. SAMPLE CALCULATION (capacity calculation) cont…
Hammer weight =7 kipDrop of hammer =5 ft
,Eh =35 kip-ft ,eh =0.75
Point penetration per blow, s =0.3 in/blow
=210 kip = 1049 kN
GATES FORMULA
![Page 29: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/29.jpg)
29
5. STATIC LOAD TEST (PRECAST)
Load settlement graph for Pile load test TP-1
![Page 30: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/30.jpg)
30
5. STATIC LOAD TEST (PRECAST)
Load settlement graph for Pile load test TP-2
![Page 31: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/31.jpg)
31
5. SUMMARY FOR STATIC LOAD TEST (PRECAST)
Pile ID Capacity kg(kN)
Davission Offset
BS 8004 IS: 2911 Butler and Hoy Brinch Hansen
TP-1 Out of range Out of range Out of range Out of range Out of rangeTP-2 81 Ton
(807 kN)
88.5 Ton
(881 kN)
78 Ton
(777 kN)
79 Ton
(787 kN)
+90 Ton
(896 kN)
![Page 32: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/32.jpg)
32
5. SUMMARY OF PLILE CAPACITY (PRECAST)
Formulas used Total resistance
TP-1(kN)
Total resistance
TP-2(kN)Engineering News 804 792Janbu 1790 1733
Gates 1049 1026
CAPWAP(Dynamic) 1213 500
Static (Average) 1000 830
![Page 33: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/33.jpg)
33
5. DATA COLLECTION (CAPWAP Analysis PRECAST TP-1 & TP-2)
TIME OF IMPACT
TOE REFLECTION
LARGE SEPARATION BETWEEN FORCE AND VELOCITY INDICATE A LARGE SHAFT RESISTANCE
CONVERGENCE BETWEEN FORCE AND VELOCITY RECORDS BEFORE 2L/C INDICATE SLIGHT PILE DAMAGE
BETA FACTOR=100%
BETA FACTOR=73%
2L/C
2L/C
CAPWAP TP-1
CAPWAP TP-2
Beta Pile Condition
100% OK
60% -80%
Slightly damage
≤60% Damage
![Page 34: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/34.jpg)
34
6. DATA COLLECTION FROM OTHER SOURCES (PRECAST)
SL No Site Pile length
(m)
Pile section(mXm)
Pile IDBNBC Static Bearing (KN)
BNBC SPT Value (KN)
CAPWAP Capacity (KN)
1 PABA_NUR 21.34 0.3mX0.3m P-26(H-07) 750 932 9912 PABA_NUR 21.34 0.3mX0.3m P-04(G-07) 1781 1510 17563 MANIK 13.72 0.3mX0.3m PC-4 P-4 854 894 822
4 MANIK 13.72 0.3mX0.3mPC-8B P-134 854 881 788
5 MANIK 13.72 0.3mX0.3m PC-5 P-67 1054 749 11586 MANIK 13.72 0.3mX0.3m PC-4 P-218 1085 1199 654
7 SHARIAT 16.16 0.35mX0.35m TP-02 776 1241 846
8 SHARIAT 16.16 0.35mX0.35m TP-04 924 1242 8799 TANGAIL 13.72 0.3mX0.3m P-24 849 1224 1214
10 TANGAIL 13.72 0.3mX0.3m P-141 848 1281 50011 Keranigonj 12 0.3mX0.3m TP-2 1125 1378 90512 COXBAZAR 13.5 0.3mX0.3m TP-2 1032 1452 140213 COXBAZAR 13.5 0.3mX0.3m TP-3 1336 994 1192
14 COXBAZAR 13.5 0.3mX0.3m TP-5 1336 1083 1644
15 Borguna 16.7 0.35mX0.35m P-106 1330 1332 1128
![Page 35: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/35.jpg)
35
6. DATA COLLECTION FROM OTHER SOURCES (CAST-IN-SITU)
SL Location
Pile Data Pile capacity (KN)
Dia(m)
Length(m) BNBC-2015
SPT
BNBC-2015 Static bearing CAPWAP AASHTO
1 Basundhara_walton 0.5 28.5 1819 1807 2118 2363
2Titas Railway bridge_comilla 1.2 30.8 6719 5941 5000 6508
3Padma bridge Service area_Naodoba 1.2 29.5 5971 6380 3520 5963
4 Fly_over_Mogbazar 1.2 29.5 7201 5818 5043 77925 Fly_P114_Mogbazar 1.5 44.4 11176 11801 10374 123506 Fly_P180_Mogbazar 1.2 44 9303 7785 7221 9715
7BRRL_P1_Road Research lab 1 22.5 2965 2847 2196 3821
8BRRL_P2_Road Research lab 1 28 4743 2615 4589 4229
9LRP_P3 bridge pier Zinzira_dohar road 1 23.7 4768 4375 3635 4287
10LRP_P4 bridge pier Zinzira_dohar road 1.2 24 5862 3231 3408 4412
![Page 36: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/36.jpg)
36
5. DATA COLLECTION (CAST-IN-SITU)
BRRL_P1_Road Research lab BRRL_P2_Road Research lab
LRP_P3 bridge pier Zinzira_dohar road LRP_P4 bridge pier Zinzira_dohar road
![Page 37: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/37.jpg)
37
7.CORRELATIONS AMONG DIFFERENT ESTIMATION METHODS (PRECAST PILES)
600 800 1000 1200 1400 1600 1800 20000
500
1000
1500
2000
f(x) = 0.879883119535237 x + 123.939630594493R² = 0.506338922471201
CAPWAP capacity (kN)
Stati
c Be
arin
g ca
paci
ty B
NBC
-201
5 (k
N)
![Page 38: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/38.jpg)
38
7.CORRELATIONS AMONG DIFFERENT ESTIMATION METHODS (PRECAST PILES)
700 800 900 1000 1100 1200 1300 1400 1500 16000
500
1000
1500
2000
f(x) = 0.365692528808019 x + 634.473968665097R² = 0.0562779857911625
CAPWAP capacity (kN)
BNBC
201
5 SP
T Ca
paci
ty 9
kN)
![Page 39: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/39.jpg)
39
7.CORRELATIONS AMONG DIFFERENT ESTIMATION METHODS (PRECAST PILES)
600 800 1000 1200 1400 1600 1800 20000
500
1000
1500
2000
f(x) = 0.313620507819001 x + 826.351062724575R² = 0.152860008202632
Static Bearing capacity BNBC-2015 (kN)
BNBC
201
5 SP
T Ca
paci
ty (k
N)
![Page 40: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/40.jpg)
40
7.CORRELATIONS AMONG DIFFERENT ESTIMATION METHODS(BORED PILES)
0 2000 4000 6000 8000 100000
2000
4000
6000
8000
10000
f(x) = 0.864690125251404 xR² = 0.962302298547864
BNBC-2015 Static bearing capacity(kN)
CAPW
AP ca
paci
ty (k
N)
![Page 41: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/41.jpg)
41
7.CORRELATIONS AMONG DIFFERENT ESTIMATION METHODS (BORED PILES)
0 2000 4000 6000 8000 10000 120000
2000
4000
6000
8000
10000
12000
f(x) = 0.840653550924056 x − 377.617318544073R² = 0.877889792900387
BNBC-2015 SPT Capacity (kN)
CAPW
AP C
apac
ity (k
N)
![Page 42: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/42.jpg)
42
7.CORRELATIONS AMONG DIFFERENT ESTIMATION METHODS (BORED PILES)
1000 2000 3000 4000 5000 6000 7000 8000 9000 100000
2000
4000
6000
8000
10000f(x) = 1.27622937776803 xR² = 0.980520050175086
CAPWAP capacity (kN)
AASH
TO C
apac
ity (k
N)
![Page 43: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/43.jpg)
8.CONCLUSIONS
1. In a mega project where pile number is huge it is very difficult to carry out the static load test frequently due to shortage of money or time. Application of dynamic test may be appropriate in those conditions.
2. Considering both soil test report and CAPWAP analysis co-relationships were established for precast and cast-in-situ piles. Further study is necessary in this regard to validate proposed equations of BNBC-2015.
3. During the study it was found that beta value is a very good indicator for pile integrity. This need to be utilized properly by our professionals.
43
![Page 44: Omthesis 30-4-2016](https://reader033.fdocuments.net/reader033/viewer/2022051520/587fd00b1a28ab58248b48b1/html5/thumbnails/44.jpg)
44
9.RECOMMENDATIONS
1. In this study, only the capacity of pile was estimated and compared but the effect of soil ‘set-up’ (change of soil strength and adhesion) was not considered. The effect of soil set-up need to be studied.
2. Proper selection of hammer or study is necessary for driving a pile without damaging it. This can be ensured by using PDA data of energy transfer ratio, pile stress and other indicator for optimize the appropriate diesel hammer.
3. Attention should be given to beta values from the PDA during driving and take necessary action to avoid damage.
4. There is no study for selection of damping factor and quake value for Bangladesh for CAPWAP analysis.
5. Though dynamic analysis is already use in our country there is no guideline in BNBC-2015. There should be a guideline along with standard to use it.