Olivier Labasse Ecr France

32
© ECR France 2009 The 2012 supply chain is sustainable and starts today Massification, Mutualisation, Multimodality

Transcript of Olivier Labasse Ecr France

Page 1: Olivier Labasse   Ecr France

© ECR France 2009

The 2012 supply chain is  sustainable and starts today

Massification, Mutualisation, Multimodality

Page 2: Olivier Labasse   Ecr France

© ECR France 2009

People quality of life

4 ECR France objectives until 2012

Environmental

impacts

Logistics

costs

Service levelto consumer

Page 3: Olivier Labasse   Ecr France

© ECR France 2009

Our future supply chain is a mosaic of  solutions, of best practice implementations, 

of companies’

initiatives in a continuous  improvement approach

Page 4: Olivier Labasse   Ecr France

© ECR France 2009

21 ECR France supply

chain

best practices «

blue

books

» and recommandation to Public Authorities

including

Page 5: Olivier Labasse   Ecr France

© ECR France 2009

ECR France  Project organisation

Supply Chain 2012: common languageDefinition, optimization levers, KPI, mutualisation

specifications

Products typology Road workshop Rail workshop River workshop

High volumes 

(beverages, 

petfoods, milk 

…)

Road transport 

optimisation

Tools:–Cartography–Ecometer

Ecosimulators–Transport 

shortage –ECR Europe 

sustainable 

transport 

radmap–…

Speed dating 

of road 

transport

With rail transport 

providers

Short best by 

date (yogurt, 

ham …)

Controlled 

temperature 

to 22°

(chocolate, 

biscuits …)

Others 

products

Committee work

Implementation Pilots 

Page 6: Olivier Labasse   Ecr France

© ECR France 2009

5 tools

to support initiatives

ECRTransport Web dating

ECRTransport Web dating

Page 7: Olivier Labasse   Ecr France

© ECR France 2009

How to identify easily potential  manufacturers or retailers partners 

in order to optimize together the road transport?

ECRTransport Web dating

ECRTransport Web dating

ECRTransport Web dating

ECRTransport Web dating

Page 8: Olivier Labasse   Ecr France

© ECR France 2009

63 companies  and 343 distribution centres

20TH CENTURY FOX HOME VIDEO, AUCHAN, BARILLA, BEIERSDORF, BÉNÉDICTA, BIC, BLEDINA, BONCOLAC, BONGRAIN SOPARIND, Brasseries

KRONENBOURG, CADBURY, CARREFOUR CASCH, CARREFOUR 

SPC, CASINO, COCA‐COLA, COLGATE PALMOLIVE, CORA, DANONE EAUX, DANONE France, DOUWE EGBERTS, DR. OETKER, ECKES GRANINI, FERRERO, FLEURY MICHON, FROMAGERIES BEL, GEMEY MAYBELLINE GARNIER, GENERAL MILLS, GEORGIA PACIFIC, HEINEKEN, HENKEL, ITM, KELLOGG'S, KRAFT FOODS, L’OREAL, LASCAD, LESIEUR, LOTUS, LU, LUSTUCRU Frais, MARIE, MARIEBEL, MARS, MC CORMICK, MCBRIDE, MERALLIANCE, METRO CASH AND CARRY, MHD, NESTLE, ORANGINA‐SCHWEPPES, PIERRE HENRY, SAINT HUBERT, SAUPIQUET, SCA, SCACHAP,SCAPARFUMERIE, SDV Les marchés

du monde, SOCAMIL (CENTRALE

LECLERC), SODIAAL, SODEBO, SOLINEST, SYSTEME U, UNILEVER, VANIA EXPANSION

ECRTransport Web dating

ECRTransport Web dating

ECRTransport Web dating

ECRTransport Web dating

Page 9: Olivier Labasse   Ecr France

© ECR France 2009

2 speed datings

a year

Which have lead to better 

optimizations of load capacity – Between manufacturers 

Upstream transport mutualisation•

…– Between retailers 

Backhauling•

…– Between manufacturers and retailers

Backhauling•

Page 10: Olivier Labasse   Ecr France

© ECR France 2009

How to measure the environmental impacts  reduction and choose the best solution?

Page 11: Olivier Labasse   Ecr France

© ECR France 2009

Liters of 

gasoline

Tons of CO2 

saved

Vehicles x km

Multiplayer optimisations

to diminish greenhouse gas  emissions, oil consumption and road congestion

Page 12: Olivier Labasse   Ecr France

© ECR France 2009

Page 13: Olivier Labasse   Ecr France

© ECR France 2009

Current

Network: non performant network

Plant A DC 

manufacturer A  DC 

Retailer

X

PoS

DC Retailer

X

DC Retailer

YPlant B DC 

manufacturer B

DC 

manufacturer

A

Local suppliers

PoS

PoS

PoS

PoS

Page 14: Olivier Labasse   Ecr France

© ECR France 2009

The potential optimized networks

Selection of the target network(s) depending on product types 

(rotation, use by date …), store formats …

Page 15: Olivier Labasse   Ecr France

© ECR France 2009

Plant A DC Manufacturer A  

DC Retailer

X

DC Retailer

X

DC Retailer

YPlant B DC 

Manufacturer B

Network B: MdC

PoS

DC 

Manufacturer A

PoS

PoS

PoS

PoS

PoS

Multipick

variant, Multidrop

variant

Page 16: Olivier Labasse   Ecr France

© ECR France 2009

Nouveaux entrepôts

Direct Service Delivery

‐ List of hypermarkets

‐ Skus

(full pallets)

‐ Frequency and lead time

‐ Optimized network for the 3 partners

Page 17: Olivier Labasse   Ecr France

© ECR France 2009

Direct Service Value:  added value and key factors of success

Added value:

•Save one stop at Retailer Distribution 

Centers

•Reduce level of stocks on important skus

•Reduce kms

: +/‐

20% (France vision)

•Reduce CO2 emission

•Reduce total delivery costs

•Accelerate reactivity and new innovation 

presence

Added value:

•Save one stop at Retailer Distribution 

Centers

•Reduce level of stocks on important skus

•Reduce kms

: +/‐

20% (France vision)

•Reduce CO2 emission

•Reduce total delivery costs

•Accelerate reactivity and new innovation 

presence

Key factors of success:

•Maintain a right delivery frequency  (it’s a 

store !)

•Be able to order full trucks from different 

suppliers

Stock vision‐

Anticipation

•100% quality of service in physical delivery

•The right specifications between partners 

and an agreed governance

•A permanent link with Business teams and 

stores management

Key factors of success:

•Maintain a right delivery frequency  (it’s a 

store !)

•Be able to order full trucks from different 

suppliers

‐ Stock vision‐ Anticipation

•100% quality of service in physical delivery

•The right specifications between partners 

and an agreed governance

•A permanent link with Business teams and 

stores management

A win win

situation (Share savings)

Information flows are the key issues

A win win

situation (Share savings)

Information flows are the key issues

Page 18: Olivier Labasse   Ecr France

© ECR France 2009

Plant A DC 

Manufacturer A  

DC Retailer

X

DC Retailer

X

DC Retailer

YPlant B DC 

Manufacturer B

Network C : Plant – RdC

DC 

Manufacturer A

PoS

PoS

PoS

PoS

PoS

Multipick

variant, Multidrop

variant

Page 19: Olivier Labasse   Ecr France

© ECR France 2009

I. Optimized

network before

/ after

Plant A DC Retailer

X

DC Manufacturer A

PoS

PoS

Page 20: Olivier Labasse   Ecr France

© ECR France 2009

PoSPlant A DC Retailer

X

DC Manufacturer A

PoS

II. Optimized

network before

/ after

Page 21: Olivier Labasse   Ecr France

© ECR France 2009

III. ResultsBefore

After

Liters of 

gasoline

Tons of CO2 

saved Vehicles x km

Liters of 

gasoline

Tons of CO2 

saved

Vehicles x km

Page 22: Olivier Labasse   Ecr France

© ECR France 2009

Plant A DC 

Manufacturer A  

DC Retailer

X

DC Retailer

X

DC Retailer

YPlant B DC 

Manufacturer B

Network D : « Plant – Store »

DC 

Manufacturer A

PoS

PoS

PoS

PoS

PoS

Multipick

variant, Multidrop

variant

Page 23: Olivier Labasse   Ecr France

© ECR France 2009

Plant A DC Retailer

X

DC Retailer

X

DC Retailer

YPlant B

Network E : « Shared MdC »

DC 

Manufacturers

A & B

PoS

PoS

PoS

PoS

PoS

Multipick

variant, Multidrop

variant

Page 24: Olivier Labasse   Ecr France

© ECR France 2009

Summary

and results

The mutualisation

isn’t just a customer answer but is the result of a 

company’s strategy 

It requires large concertation

between partners in order to share a plural 

future

Competition is not inside the lorry…

&…

what about saving the planet !!!

1 000 a year

Litre of gasoline kg CO2 Vehicles.km

Initial situation 753 598 2 005 890 1 902 413

Multiplayer solution 618 278 1 645 703 1 426 632

Savings 135 320 360 187 475 781

% of savings 18% 18% 25%

Page 25: Olivier Labasse   Ecr France

© ECR France 2009

Plant A DC 

Manufacturer A  

DC Retailers

X & Y

Plant B DC 

Manufacturer B

Network F : «

Shared

RdC

»

DC 

Manufacturer A

PoS

PoS

PoS

PoS

PoS

Multipick

variant, Multidrop

variant

Page 26: Olivier Labasse   Ecr France

© ECR France 2009

Plant A

DC multi 

manufacturers

and multi retailers

Plant B

Network G : Shared

MdC

& RDC

PoS

PoS

PoS

PoS

PoS

Multipick

variant, Multidrop

variant

Page 27: Olivier Labasse   Ecr France

© ECR France 2009

I. Optimized

network before

/ after

Page 28: Olivier Labasse   Ecr France

© ECR France 2009

II. Optimized

network before

/ after

Page 30: Olivier Labasse   Ecr France

© ECR France 2009

Key Factors of Success

For each problem, one solution

Collaboration– New mindset: don’t wait for the future, act now!

– Clear specifications and governance

Commitment– CEOs support– Trust in your partner(s)

Page 31: Olivier Labasse   Ecr France

© ECR France 2009

Conclusion

Don’t wait for the big picture, built it up 

Every little helps

The best solution for tomorrow is not the one of  today. Have a continuous improvement approach

The toolbox is available (best practices,  measurement tools, “dating”

website, EDI messages 

…). Pick the ones adapted to your current situation  

Collaboration is the output of a supply chain  strategy 

Our challenge is sustainable development:  consumers’

satisfaction, citizens’

wellness, planet 

protection and durability of our industry

Page 32: Olivier Labasse   Ecr France

© ECR France 2009

For more information 

www.ecr‐france.org