    Development of Oil & Gas Fields

    Tom Mangum, VetcoGraySenior Services Training Manager

    Development Schemes (

  • 8/10/2019 Oil Field Development Schemes

    2/37

    2005 ENSPM Formation Industrie - IFP Training

    Offshore Field Development

    Offshore fields are developped using :

    Fixed platforms (steel or concrete) : > 90%

    Floating platforms : < 10%

    Surface and/or subsea wells

    Comprehensive studies are necessary to select the most appropriate and costeffective field architecture (ref. to Field development process)

    Main field architecture options :

    Wells

    Drilling mode

    Platforms

    Storage and export facilities

  • 8/10/2019 Oil Field Development Schemes

    3/37

    2005 ENSPM Formation Industrie - IFP Training

    Field Architecture Options (1)

    Wells

    Surface wells Single wells (mainly in shallow water) Multi-wells cluster

    Subsea wells Satellite wells Multi-wells cluster

    Combination surface + subsea wells Well profile

    Vertical, deviated

    Horizontal Extended reach Multi-drains

    Selection depends on : Platform type : fixed or floating Reservoir geometry (extended, compact,

    multi-layers, .) Artificial lift and well intervention

    requirements

    Costs

    Extended reach well

    Deviated well

    Subsea satellite well

  • 8/10/2019 Oil Field Development Schemes

    4/37

    2005 ENSPM Formation Industrie - IFP Training

    Field Architecture Options (2)

    Drilling mode (fixed platforms)

    Max water

    depth

    Drilling deck

    ~ 110 m

    Tender Drilling

    Rig

    Compact

    Drilling Rig

    Jack-up

    Drilling Rig

  • 8/10/2019 Oil Field Development Schemes

    5/37

    2005 ENSPM Formation Industrie - IFP Training

    Field Architecture Options (3)

    Platforms

    Fixed Steel

    Structure piled in the seabed Or, self elevated platform

    (rare)

    Concrete Floating Semi-submersible (associated with

    subsea wells only) Tension Leg Platform TLP

    (associated with surface or subsea

    wells)

    Selection depends mainly on : Water depth Type of wells (surface, subsea)

    Environmental conditions (waves, wind,current)

    Topsides equipment (weight, size) Construction strategy & constraints

    (yard availability, ) Costs

    Floating platforms

    Fixed Steel

    Platform

    Fixed Concrete

    Platform

  • 8/10/2019 Oil Field Development Schemes

    6/37

    2005 ENSPM Formation Industrie - IFP Training

    Field Architecture Options (4)

    Onshore storage and loading

    Tanker loading at jetty (case 1)

    Tanker loading from floatingbuoy (case 2)

    Offshore storage and loading

    Floating storage + Tanker loading atbuoy (case 3)

    Floating storage + tandem loading

    (case 4)

    Oil storage and loading

    tanker

    Production

    Plant

    Case 3

    Floating

    storage

    tanker

    Loadin

    g buoy

    Case 4

    Case 2

    Case 1

    Floating

    buoy

    tanker

    storage

    ProductionPlant

    storage

    tanker

  • 8/10/2019 Oil Field Development Schemes

    7/37

    2005 ENSPM Formation Industrie - IFP Training

    Oil Storage And Loading (Examples)

    Tankers loading at jetty (case 1)

    Tanker

    Oil Storage

    Floating storage (cases 3 & 4)

  • 8/10/2019 Oil Field Development Schemes

    8/37

    2005 ENSPM Formation Industrie - IFP Training

    Conventional Development Scheme With Fixed Platforms

    DP2

    TCP2

    TP1

    QP

    Frigg field (UK/Norway)

    DP2

    TP1

    TCP2

    DP1

    QP

    CDP1

    Norway

    UK

    Wells

    Wells

    Gas

    treatment

    Gas treatment

    &

    compression

    Living

    quarters

  • 8/10/2019 Oil Field Development Schemes

    9/37

    2005 ENSPM Formation Industrie - IFP Training

    Oil processingFlare

    Drilling

    Living quarters

    Oil storage

    Mobile drilling rig (jack

    up)

    Conventional Development Scheme With Fixed Platforms

    Ekofisk field (Norway)

  • 8/10/2019 Oil Field Development Schemes

    10/37

    2005 ENSPM Formation Industrie - IFP Training

    Conventional Development Scheme With Fixed Platforms

    Elgin/Franklin field (UK)

  • 8/10/2019 Oil Field Development Schemes

    11/37

    2005 ENSPM Formation Industrie - IFP Training

    Subsea Development Scheme With Floating Platform

    Buchan field (UK)

    Shuttle tanker

    4 wells template

    Loading buoyExplorationwell

    Production semi-

    submersible

    DRILL MASTER

    2 Satellite wells

    Risers

    Development scheme

    7 subsea wells (2 Satellites +

    4 template + 1 explo

    recovered)

    Floating production platform Loading buoy

    Operator : BP Location : North Sea UK

    Water depth : 119 m

    First Prod : 1981

    Reserves : 200 MMBOE

  • 8/10/2019 Oil Field Development Schemes

    12/37

    2005 ENSPM Formation Industrie - IFP Training

    Mixed Development Scheme With Fixed Platforms

    Gullfaks field satellites (Norway)

    (Gullfaks South, Rimfaks, Gullveig) Gullfaks A

    Operator : Statoil

    Location : North Sea Norway Water depth : 315 345 m Discovery : 1979 Sanction : 1996

    Development scheme :

    Subsea wells tiedback toexisting subsea platformGullfaks A

    8 subsea templates, 31 slots Prod capacity : 125 000 b/d

  • 8/10/2019 Oil Field Development Schemes

    13/37

    2005 ENSPM Formation Industrie - IFP Training

    Subsea Development Scheme With Floating Platforms

    Troll C

    Troll B

    Operator : Norsk Hydro

    Location : North Sea Norway

    Discovery : 1979

    Water depth : 315 345 m

    TROLL B

    Oil & gas provinces First oil : 9/1995

    21 subsea oil producers

    24 subsea gas producers

    Oil production : 270 000

    b/d Semi-sub production unit

    TROLL C

    Gas province

    First gas : 1999

    Prod capacity :

    Oil : 190 000 b/dGas : 9 Mm3/d

    Semi-sub production unit

    Troll West field (Norway)

  • 8/10/2019 Oil Field Development Schemes

    14/37

    2005 ENSPM Formation Industrie - IFP Training

    Platform Functions

    Offshore platforms are used for differentfunctions :

    Development drilling

    Fluids processing

    Water, gaz injection

    Utilities

    Functions can be :

    Split (one platform = one function )

    Integrated (one platform = several functions )

    Living quarters

    Flare

    Storage

    Field examples

    ProcessingFlare

    Drilling

    Living

    quarters

    Oil

    storage

    Mobile drilling rig

    (jack up)

    Split

    Integrated

    Integrated

  • 8/10/2019 Oil Field Development Schemes

    15/37

    2005 ENSPM Formation Industrie - IFP Training

    Fixed Platform Concepts

    Two main concepts of fixed platform

    Gravity based platforms

    Platform stability is provided by onecompartment, filled with sand, locatedat the base

    Concept used for concrete platforms Very limited number of applications :

    less than 30 out of 20 000 platformsworlwide

    Tubular steel frame platforms Structure (Jacket) piled in the seabed Deck(s) supported by the piles

    Specific concepts Self installed platform Recent design, few applications so far

  • 8/10/2019 Oil Field Development Schemes

    16/37

    2005 ENSPM Formation Industrie - IFP Training

    Fixed Steel Platform : Vocabulary

    Lifted deck

    Boat landing

    Cut piledafter setting

    Jacket

    Anodes

    Seabed

    Pile anchored

    In seabed

    Sea level

    Horizontal brace

    Barge bumper

    Conductor area

    Deck

    Jacket

    Bracing stub

    Vertical diagonal

    Jacket leg can

    Jacket walkwayHorizontal diagonal

    Boat landing

    Jacket leg

    PILE

    SKIRT PILE

    LAUNCH TRUSS

    Launch runner

    Skirt pile sleeve

  • 8/10/2019 Oil Field Development Schemes

    17/37

    2005 ENSPM Formation Industrie - IFP Training

    Types Of Riser

    Side View

    Top View

    Riser : vertical section of sealine between seabed and surface

  • 8/10/2019 Oil Field Development Schemes

    18/37

    2005 ENSPM Formation Industrie - IFP Training

    Platform Loads

    Wind

    Waves

    Current (surface)

    Tide

    Totalweight

    Topsides load

    Water depth

    Environ. conditions

    Weights

    Lower deck

    Drill ing Rig

    Area

    Storm gap

    Example

    Upper deck

    + Marine Growth, Corrosion

  • 8/10/2019 Oil Field Development Schemes

    19/37

    2005 ENSPM Formation Industrie - IFP Training

    Installation And Transport Loads

    Transport

    !

    Lifting

    !

    Launch stresses may controldesign of some structural

    members

    Launching

    !

  • 8/10/2019 Oil Field Development Schemes

    20/37

    2005 ENSPM Formation Industrie - IFP Training

    Piling

    F wind

    F wave +current

    Piles

    Forces on piles at

    seabed level

    Soil reactions

    SoilSoilSoil

    WaterWaterWater

    Classical

    pile

    Insert pile Skirt pile

    Different types of pileForces

    The insert pile allows to increase the driving

    depth

    The skirt pile allows to reduce the diameter

    of the jacket legs

  • 8/10/2019 Oil Field Development Schemes

    21/37

    2005 ENSPM Formation Industrie - IFP Training

    Pile Installation

    Drillpipe

    Drilled hole

    Drill bit

    Jacket leg

    Drilling rig

    Drillingplatform

    Cementedpile

    Soil

    Installation barge

    Mainbattered pile

    Main

    battered pile

    Drilling

    Subsea

    hammer

    Skirt pile

    Installation barge

    Hammering

    Barge

    SubseaHammer

    Skirtpile

  • 8/10/2019 Oil Field Development Schemes

    22/37

    2005 ENSPM Formation Industrie - IFP Training

    Pile Driving

    Piles

    Pile Driving Operation

    Hammers

  • 8/10/2019 Oil Field Development Schemes

    23/37

    2005 ENSPM Formation Industrie - IFP Training

    Pile Driving

    Pile Drive Hammer

    Pile Driving Operation

  • 8/10/2019 Oil Field Development Schemes

    24/37

    2005 ENSPM Formation Industrie - IFP Training

    Installation Of Jacket By Launching Installation Of Self-floating Jacket

    Jacket Installation

    Installation of jacket by lifting

    Vertical Lift Horizontal Lift

  • 8/10/2019 Oil Field Development Schemes

    25/37

  • 8/10/2019 Oil Field Development Schemes

    26/37

    M d l S F (MSF)

  • 8/10/2019 Oil Field Development Schemes

    27/37

    2005 ENSPM Formation Industrie - IFP Training

    Module Support Frame (MSF)

    Jacket piles

    MSF : Interface structure between jacket and topsides equipment

    D illi Pl tf T id

  • 8/10/2019 Oil Field Development Schemes

    28/37

    2005 ENSPM Formation Industrie - IFP Training

    Drilling Platform Topsides

    P d ti Pl tf T id

  • 8/10/2019 Oil Field Development Schemes

    29/37

    2005 ENSPM Formation Industrie - IFP Training

    Production Platform Topsides

    Topsides Drilling & Production Platform

  • 8/10/2019 Oil Field Development Schemes

    30/37

    2005 ENSPM Formation Industrie - IFP Training

    Topsides Drilling & Production Platform

    DRILLING DECK & MAIN

    RIG

    1. Export pipeline

    2.Mud mat3. Skirt pile sleeve

    4.Skirt pile

    5. Anodes6. Conductors

    7. Export riser

    8. Jacket leg

    9. Barge bumper

    10.Boat landing

    11.Riser guard12.Motor control center &

    switchgear control building13.Escape capsule

    14.Living quarters

    15.Helicopter pad

    16.Bulk storage

    17.Mud pump package

    18.Derrick

    19.Flare boom20.Lift gas compression

    PRODUCTION DECK

    21. Water injection pump

    22. Generator23. Deaerator

    24. Waste heat recovery unit

    25. Firewall26. Diesel storage

    27. Wellheads28. Chemical injection skid

    29. Production manifold

    30. Production separator

    31. Crude oi l heater32. Test & cleanup separator

    33. Injection gas compressor

    CELLAR DECK

    34. Potable water storage

    35. Emergency generator

    36. Water injection charge pump

    37. Media filter

    38. Cooling water cooler

    Cooling water surge drum

    Cooling water pumps39. Air compressor

    40. Sea water pumps

    41. Gas lift & water injection manifold

    42. Fire water pump

    43. Crude oil cooler

    44. Crude oi l pipeline pump

    45. Electrostatic treater

    46. Inlet dehydration filter separatorGlycol contactor

    Outlet dehydration filter separator

    47. Production water treating48. Glycol regenerator

    49. Slug catcher

    50. Plated deck

    51. Flare scrubber

    Concrete Platforms

  • 8/10/2019 Oil Field Development Schemes

    31/37

    2005 ENSPM Formation Industrie - IFP Training

    Concrete Platforms

    BERYL A

    118 m

    1975

    Drill & Prod

    40

    150 000

    0.9

    28 000

    BRENT B

    140

    75

    Drill & Prod

    38

    160 000

    1.0

    24 000

    FRIGG TCP2

    104

    77

    Gas treatment

    -

    -

    -

    21 000

    BRENT D

    140

    76

    Drill & Prod

    48

    160 000

    1.2

    24 000

    STATFJORD A

    145

    77

    Drill & Prod

    42

    300 000

    1.3

    50 000

    STATFJORD B

    145

    81

    Drill & Prod

    42

    180 000

    1.9

    50 000

    STATFJORD C

    145

    84

    Drill & Prod

    42

    200 000

    2.0

    50 000

    Water depth (m)

    Year installed

    Function

    Nb well slots

    Peak production (bopd)

    Storage capacity (Mb)

    Max deck weight (tons)

    Concrete platforms are gravity based

    Their use has been limited essentially to the North Sea & North Atlantic(Canada)

    They are used for very large fields in severe environment necessitating

    heavy topsides equipment

    They also provide large oil storage capacity at the base

    First concrete platforms

    Concrete Platform Concepts

  • 8/10/2019 Oil Field Development Schemes

    32/37

    2005 ENSPM Formation Industrie - IFP Training

    Concrete Platform Concepts

    MultipodMonopod

    The Different Types Of Sealines

  • 8/10/2019 Oil Field Development Schemes

    33/37

    2005 ENSPM Formation Industrie - IFP Training

    The Different Types Of Sealines

    Flowlines

    Transport the fluids from the wells, located on a surface wellheadplatform or on the seabed, to the production platform

    Generally small diameter (4 to 12) and short length ( up to ~10 km )

    Pipelines (or trunk lines) Transport the fluid from the production platform to the export terminal

    (onshore of offshore) for loading oil tankers or to the gas utilizationcenter (LNG plant, power plant,)

    Generally large diameter ( up to 36) and long length (several hundredsof km)

    Loading lines

    Transport the fluid from the storage facility to a nearby loading facility

    (buoy or other)

    Generally large diameter (20 to 40)

    Sealine : General Description

  • 8/10/2019 Oil Field Development Schemes

    34/37

    2005 ENSPM Formation Industrie - IFP Training

    Sealine : General Description

    A sealine generally consits in :

    A steel pipe

    An anti-corrosion protection (coating)

    An external concrete layer to provide mechanical protection andweight

    Pipe characteristics :

    Steel grade : X + (ex. : X65)

    External diameter OD (ex. : 32)

    Wall Thickness WT ( 0.75)

    Chemical composition

    Resilience

    Dimensional tolerances

    Steel pipe

    Concrete layer

    (1 to 5 thick)

    Anti-corrosion coating

    WTOD

    Sealine Installation Method (Logigram)

  • 8/10/2019 Oil Field Development Schemes

    35/37

    2005 ENSPM Formation Industrie - IFP Training

    Sealine Installation Method (Logigram)

    Pipe Welding

    Offshore Onshore

    Pipe preparation in standard lenght :

    12 m joints 24 m double joints

    Transport to site : Supply vessel Barge

    Welding and laying : Barge 1st generation Barge 2nd generation Barge 3rd generation

    Conventional S lay

    Shallow water< 200 m

    J laywater depth

    > 200 m

    Pipe preparation in long sections (up to

    several km)Transport to site :

    Surface tow (with buoyancy modules) Bottom tow Spooled (small diameter, short

    lenght)

    A few connections toperform offshore

    S-lay And J-lay Methods

  • 8/10/2019 Oil Field Development Schemes

    36/37

    2005 ENSPM Formation Industrie - IFP Training

    S lay And J lay Methods

    S-lay J-lay

    Pipe Lay Barges

  • 8/10/2019 Oil Field Development Schemes

    37/37

    2005 ENSPM Formation Industrie - IFP Training

    Pipe Lay Barges

    Brown & Root Semac 1

    Allseas Lorelay Stena Apache

    Sapem Castoro Sei