Offshore Office +91 9884069100 krishna.m ...
Transcript of Offshore Office +91 9884069100 krishna.m ...
![Page 1: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/1.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
7C, Gee Gee Emerald, 312 Valluvarkottam High Road, Nungambakkam, Chennai - 600 034
1
Offshore OfficeIm Brauck 11; 49393 Lohne, Germany
www.provotek.de
+91 9884069100 [email protected] www.minsolar.com
![Page 2: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/2.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com2
MinSolar was founded by KrishnaManoharan. He has a MS degree in ElectricalEngineering from Ohio University, USA andhas vast experience in the field of solar andrenewable energy.
P Mohanraj is JMD and Head of Operations.He is also the co-founder of MinSolar. Hehas over 15 years of experience inindustrial electrical installations.
He headed the solar technology group in hisprevious assignment and is one of the inventors ofthe patented Wind-Solar hybrid technology.
He has been trained in Germany in the field of renewables.
MinSolar is a company committedtowards providing customized highquality turnkey solutions to itscustomers in the field of Solar Energywith an emphasis on Technology, Costcompetitiveness, Quality and Safepracticises.
MinSolar
Our Management Team
![Page 3: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/3.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com3
Our Core Team
P. Kolanchi, B.Tech, M.B.A.
GM, Engineering & Technology
Having 30 years of experience inRenewable energy (Wind, Solar andStorage), Embedded Programming,Electronic circuit Design, PLCautomation, Software programming,Artificial Intelligence and Data science
V. Aravinda, B.com, PGDBA & ICWA
Senior Manager – Finance & Commercial
S. Pugalenthi, BE.
AGM, Quality, SCM & Planning,
Having 15+ years of experience in the field of accounts and Direct taxation
Having 15 Years of Experience inSupply Chain Management, StrategicPlanning, Total Quality Management,Production Management and Safetyin Renewable Industry.
![Page 4: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/4.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
46.2 KW – Roof Top Solar
4
Capacity
46.2 KWp
Project Model
Project Development
Client Name
Hotel Windsor Castle
Project Location
Salem, Tamilnadu, India
Completion Period
2 Months
Execution Year
2019 - 2020
Project Cost
Approx. Euro – 31.800
Co2 Saving
40 Kgs.
Project Key Information
![Page 5: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/5.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
475 KW – Roof Top Solar
5
Capacity
475 KWp
Project Model
Installation & Commissioning
Client Name
Cochin Smart City
Project Location
Cochin, Kerala, India
Completion Period
3 Months
Execution Year
2019 – 2020 (On-Going)
Project Cost
Approx. Euro - 12.750
Co2 Saving
404 Kgs
Project Key Information
![Page 6: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/6.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
20 MW - Ground Mounted Solar
6
Capacity
20 MWp
Project Model
Installation & Commissioning
Client Name
Tata International Ltd
Project Location
Aruppukottai, Tamilnadu, India
Completion Period
6 Months
Execution Year
2019 – 2020
Project Cost
Approx. Euro – 2.54.300
Co2 Saving
17.000 Kgs.
Project Key Information
![Page 7: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/7.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
230 KW – Car Port Solar
7
Capacity
230 KWp
Project Model
EPC
Client Name
Bosch Ltd
Project Location
Coimbatore, Tamilnadu, India
Completion Period
4 Months
Execution Year
2018 – 2019 (On-Going)
Project Cost
Approx. Euro – 1.27.200
Co2 Saving
196 Kgs.
Project Key Information
![Page 8: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/8.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
475 KW – Roof Top Solar
8
Capacity
475 KWp
Project Model
EPC
Client Name
Brookfield Mall
Project Location
Coimbatore, Tamilnadu, India
Completion Period
3 Months
Execution Year
2018 - 2019
Project Cost
Approx. Euro – 47.100
Co2 Saving
404 Kgs.
Project Key Information
![Page 9: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/9.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
2.0 MW – Roof Top Solar
9
Capacity
2.0 MWp
Project Model
Installation & Commissioning
Client Name
Apollo Tyres
Project Location
Oragadam, Chennai, India
Completion Period
6 Months
Execution Year
2018 - 2019
Project Cost
Approx. Euro - 51.000
Co2 Saving
1.700 Kgs.
Project Key Information
![Page 10: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/10.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
400 KW – Roof Top Solar
10
Capacity
400 KWp
Project Model
EPC
Client Name
Bosch
Project Location
Bangalore, Karnataka, India
Completion Period
Months
Execution Year
2017 - 2018
Project Cost
Approx. Euro – 51.000
Co2 Saving
340 Kgs.
Project Key Information
Customized Installation of PV Mounting rails on Non-standard Roofs
![Page 11: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/11.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
620 KW - Roof Top Solar
11
Capacity
620 KWp
Project Model
EPC
Client Name
Vellore Institute of Technology,
Project Location
Vellore, Tamilnadu, India
Completion Period
6 Months
Execution Year
2017 - 2018
Project Cost
Approx. Euro - 1.27.200
Co2 Saving
527 Kgs.
Project Key Information
![Page 12: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/12.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
20 MW - Ground Mounted Solar
12
Capacity
20 MWp
Project Model
Installation & Commissioning
Client Name
Tata International Ltd
Project Location
Sira, Karnataka, India
Completion Period
6 Months
Execution Year
2017 - 2018
Project Cost
Approx. Euro – 3.17.800
Co2 Saving
17,000 Kgs.
Project Key Information
![Page 13: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/13.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
100 KW – Roof Top Solar
13
Capacity
100 KWp
Project Model
EPC
Client Name
Bosch
Project Location
Gopi, Tamilnadu, India
Completion Period
2 Months
Execution Year
2016 - 2017
Project Cost
Approx. Euro – 38.200
Co2 Saving
85 Kgs.
Project Key Information
![Page 14: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/14.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
600 KW – Roof Top Solar
14
Capacity
100 KWp
Project Model
Installation & Commissioning
Client Name
Bangalore International Airport
Project Location
Bangalore, Karnataka, India
Completion Period
2 Months
Execution Year
2016 - 2017
Project Cost
Approx. Euro – 12.800
Co2 Saving
510 Kgs.
Project Key Information
![Page 15: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/15.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
200 KW - Wind-Solar Hybrid Project
15
Capacity
Wind 1.5MW, Solar 200KW
Project Model
EPC
Client Name
ReGen Powertech
Project Location
Dharapuram, Tamilnadu, India
Completion Period
6 Months
Execution Year
2015 - 2016
Project Cost
Approx. Euro – 102.000
Co2 Saving
510 Kgs.
Project Key Information
This is the First attempt to Integrate a MW class Wind turbine with a Solar park
using the Common Resources like a single Inverter, Transformer, Evacuation,
Land and etc., This is a Patented Technology and this is running successfully
Since May 2016.
![Page 16: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/16.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
Thank You
16
+91 9884069100 [email protected] www.minsolar.com
Corporate Office:7C, Gee Gee Emerald, 312 Valluvarkottam High Road, Nungambakkam, Chennai - 600 034
Bangalore Office:460, 1st Main Road, Allalasandra, GKVK Post, Bangalore - 560 065
![Page 17: Offshore Office +91 9884069100 krishna.m ...](https://reader033.fdocuments.net/reader033/viewer/2022052921/629093e5fdafdd7db01f56e8/html5/thumbnails/17.jpg)
SIMPLY SOLAR ENERGYCopyright © Minsolar 2015 - 2016 | www.minsolar.com
100 KW - Wind-Solar Hybrid Project
17
Thank you