Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets...
-
Upload
joseph-sutton -
Category
Documents
-
view
220 -
download
0
Transcript of Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets...
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
Module 5Work Zone Plan Sets
Traffic Control Plan Development Course
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
2
Work Zone Workshop
This Workshop Keys on:– Trained Editorial Discussion – Keeping Editorial No-nonsense
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
3
Work Zone Workshop
This Workshop Keys on:– Trained Editorial Discussion – Keeping Editorial No-nonsense
(TED)
(KEN)
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Metro Work Zones and
Pavement Marking
4
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
Work Zone Plan Sets
Some of the sheets found on a TTC plan include, but are not limited to:– Title Sheet
• For Overall Plan• For TC Section
– Pay Item Tabulation Sheet– Traffic Control Tabulation Sheet– Special Signs– Narrative– Advanced Signing– Detours– Traffic Control Staging Sheets (Layout Sheets)– Typical Sheets
5
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
TC Plan Development
General Information– Designers must be aware of the need
for a Traffic Control Plan– Coordination meetings are
recommended– Designer will likely need to provide
construction sheets or general layout sheets
– Traffic Engineering will develop based on:• TEM• MN MUTCD• TMP
6
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
7
Plan Assembly Steps
1. To begin the project, start with ProjectWise
2. Obtain the existing construction plans, including any staging
3. Eliminate levels of detail (buildings, lot lines, etc) on roadway plan sheets
REASON: So placement of signs on roadway sheets are not cluttered by underlying details.
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
8
Plan Assembly Steps
1. To begin the project, start with ProjectWise
2. Obtain the existing construction plans, including any staging
3. Eliminate levels of detail (buildings, lot lines, etc) on roadway plan sheets
REASON: So placement of signs on roadway sheets are not cluttered by underlying details.
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
9
TTC Assembly Steps
4. Organize roadway plan sheets– all mainline roadway comes first with
stationing generally increasing from left to right (include roadway through interchanges for depicting mainline TC through the interchange
– next are interchange/intersection layouts for indicating TC on cross streets and at ramp terminals
REASON: Consistency in design.
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
10
TTC Assembly Steps
5. Place traffic control elements on the roadway plan sheets for each direction of travel
– Refer to the discussions in Chapter 3 (Devices and Materials) and Chapter 4 (Work Zone Applications)
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
11
TTC Assembly Steps
6. Label each type of pavement marking with the following numbering system:
REASON: The uniqueness of each pavement marking material is bid differently by contractors
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
12
TTC Assembly Steps
7. For a detour plan, a circled note below the sign on the layout sheet indicates the action to take with the sign
– Typical notes show include:
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
13
TTC Assembly Steps
8. Prepare list of standard plates applicable to project
9. Prepare list of estimated quantities using the total quantity from each of the data boxes
10.Assemble all necessary typical sheets11.Complete the title sheet12.Assemble ALL of the plan sheets in the
proper order13.Number the roadway sheets
sequentially beginning with the Title Sheet as Sheet TC1
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
14
Metro Checklist
ASSHTOWare
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
15
Clear Zone Requirements
From Road Design Manual– Clear zone is the distance from the edge of the
travel lane which should be free of any non-traversable hazard such as steep slopes or fixed objects
– Targeted towards allowing approximately 80 to 85 percent of all run-off-the-road vehicles to recover or come to a safe stop
– The width of a clear zone along the horizontal alignment is dependent on:
• roadside geometry• design speed• radius of horizontal curve• ADT
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
IssuesDiscussed Later
16
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
17
Construction Plan Title Sheet
Plan Description and LocationPlan Description and Location
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
18
Construction Plan Title Sheet
Project Number(s)Project Number(s)
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
19
Construction Plan Title Sheet
Governing Specifications and Index of Sheets
Governing Specifications and Index of Sheets
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
20
Construction Plan Title Sheet
Plan Preparation Certification NotePlan Preparation Certification Note
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
21
Construction Plan Title Sheet
Project Numbers and Sheet NumbersProject Numbers and Sheet Numbers
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
22
Construction Plan Title Sheet
Signature BlockSignature Block
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
23
Construction Plan Title Sheet
Index MapIndex Map
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
24
Construction Plan Title Sheet
Project LocationProject Location
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
25
Construction Plan Title Sheet
Plan Revisions BlockPlan Revisions Block
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
26
TTC Plan Title Sheet
Traffic Control Plan Title SheetTraffic Control Plan Title Sheet
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
27
TTC Plan Title Sheet
General InformationGeneral Information
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
28
TTC Plan Title Sheet
Signing NotesSigning Notes
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
29
TTC Plan Title Sheet
Pavement MarkingsPavement Markings
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
30
TTC Plan Title Sheet
Barriers and DelineationBarriers and Delineation
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
31
TTC Plan Title Sheet
Construction Information SigningConstruction Information Signing
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
32
TTC Plan Title Sheet
TTC Plan IndexTTC Plan Index
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
33
TTC Plan Title SheetTraffic Control Devices and Symbols LegendTraffic Control Devices and Symbols Legend
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
34
TTC Plan Title SheetStriping Legend KeyStriping Legend Key
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
35
TTC Plan Title Sheet
Title, Signature, Project Number and Sheet Number Block
Title, Signature, Project Number and Sheet Number Block
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
36
Traffic Control Tabulation
AASHTOWare Project List
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
37
Traffic Control Tabulation Charts Sheet
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
Special Sign Details
38
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
Narrative Sheet
39
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
Advanced Signing
40
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
Detour Sheeting
41
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
TC Layout Sheets
42
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
TC Layout Sheets
43
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
TC Layout Sheets
44
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
TC Layout Sheets
45
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
TC Layout Sheets
46
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
47
Typical Drawings
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
TC Layout Sheets
48
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy
TC Layout Sheets
49
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
IssuesThe following is a list of some of
the common issues with TTC plan sets from MnDOT reviewers
These are not in any order of importance
50
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
Issues– The designer uses PLACE instead of
INSTALL– Whenever INSTALL is used by itself it
implies that the material is either salvaged or supplied
– It is preferred to use PLACE, FURNISH AND INSTALL, or CONSTRUCT
51
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
Issues– All of the roadways are not labelled– Ensure to label the mainline and cross
streets
52
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
Issues– There is a beginning SP and no end– A SP is not required on traffic control
plans so it is suggested not to show it at all
53
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
Issues– The legend does not agree with what’s
shown on the plan– Ensure to that the plan and legend
match
54
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
Issues– Pay items do not agree with what’s
shown on the plan– Ensure that they do and that all items
are accounted for
55
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
Issues– Impact attenuators are not paid for
correctly and are shown incorrectly on the plan (e.g. barrels vs systems)
56
Offi
ce o
f Tr
affi
c, S
afe
ty a
nd
Tech
nolo
gy Common TTC Plan Set
Issues– Attenuator test levels are not shown– Show test level on the attenuators and
whether they are permanent or temporary
57