BOARDS AND DIRECTORS THE POLITICAL MECHANISMS OF CORPORAT GOVERNANCE CHAPTER 2.
OFFICE OF THE MAYOR - | US Department of Transportation · s are a test or Corporat elated to Ch o...
Transcript of OFFICE OF THE MAYOR - | US Department of Transportation · s are a test or Corporat elated to Ch o...
OFFICE OF THE MAYORMary Casillas Salas
February 2, 2016
U.S. Department of Transportation (USDOT)Federal Highway Administration (FHWA)Office of Acquisition and Grants Management1200 New Jersey Avenue, SEMail Drop: E62-204Washington DC 20590Attn: Sarah Tarpgaard, HCFA-32
RE: Beyond Traffic: The Smart City Challenge - Smart City Chula Vista
Dear Ms. Tarpgaard,
I am pleased to present the "Smart City Chula Vista" application submission which includes ourCity's vision to move beyond traffic and address the City's most significant traffic related challenges.Chula Vista is uniquely positioned through our dynamics in people, land-use, infrastructure, andexperience in smart growth development to deliver a successful demonstration project to theUSDOT. Chula Vista is recognized as a worldwide leader in environmental initiatives and climateaction plan efforts.
The challenge in Chula Vista is to connect the east and west urban cores in the City and encourageresidents to use alternative modes of transportation and mass transit in lieu of the single occupantvehicle. Our proposal includes a shared fleet of autonomous automobiles and transit vehicles toattract ridership. This will also help bridge the socio-economic gap between the east and west urbancores. While our residents may still own a vehicle, through this project their dependence on it wouldbe greatly reduced.
As required by the Notice of Funding Opportunity (NOFO), our application includes high-levelstrategies that address Chula Vista's challenges and the 12 Priority Vision Element challenges.These high level actions are made possible through the collaborative efforts of more than 10partnerships with private industry and State and local agencies. The extent of this collaboration issignificant; it shows that we have reached a new era in Smart Cities, one that promises todemonstrate innovative solutions in Chula Vista to solve National transportation challenges.
The real challenge lies ahead in detailing cur high-level vision and solutions presented in thisdocument. With strong, unanimous support from our City Council, the benefits of this proposal arefar reaching and it is my hope that Smart City Chula Vista will be recommended for selection• As atestament to our own local government commitment, please find our attached resolution.
Sincerely,
MARY ASILLAS SALASMayorCity of Chula Vista
• I .276 Fourth Avenue . ChulaVista Calilbrnia91910 (619) 691-5044.Fax(619)476-5379msalas @chulavistaea.gov
( Pu i-f J+mum r RtcI c] d J'apr
TABLE O 1 Int
1.1 1.2 1.3 1.4
2 Ch3 Ch
3.1 3.2 3.3 3.4 3.5
4 Pr5 Ho
5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 Technol5.12
6 Ris7 Th
7.1 8 Tra9 Da
9.1 9.2 9.3 9.4
10 En10.1 10.2
11 Pe12 Ca
12.1 12.2 12.3 12.4
13 Le LIST OF FIGFigure 1: P
F CONTENTS
troduction .....Vision ............Challenge ......Technical AppProject Manag
hula Vista Popuhula Vista CharPublic TranspoConducive DeLeadership CoCommitment Commitment eliminary Site olistic ApproacVision ElemenVision ElemenVision ElemenVision ElemenVision ElemenVision ElemenVision ElemenVision ElemenVision ElemenVision ElemenVision Elemeogy (ICT). .......Vision Elemensk Mitigation .he SCCV Team .Governing Proansportation Iata Collection .Data Use .......Data IntegratiExisting Data PInformation S
ngineering AppStandards andCertification P
erformance Meapacity............Executive ComWorkforce ....InfrastructureData and Perfveraging Fund
GURES reliminary Site
S
....................................................................proach .............gement Approulation Characracteristics Aligortation Systemmonstration Eontinuity .........to Shared Econto Open AccesMap .............ch to Vision Elent #1 Urban Aunt #2 Connectent #3 Intelligennt #4: Urban Annt #5: User‐Focnt #6: Urban Dent #7: Strategicnt #8: Smart Grnt #9: Connectent #10: Architecnt #11: Low‐.......................nt #12: Smart L............................................ocesses ...........nfrastructure .............................................on ..................Policy .............haring Agreemproach ............d Architecture Processes ........easures ................................mmitment ..............................e Readiness .....formance Mands ...................
e Map .............
.....................
.......................
.......................
.......................ach .................cteristics ........gnment .........m ....................nvironment ...........................nomy ..............ssible Data ...........................ement Alignmeutomation .......ed Vehicles ......t, Sensor‐Basenalytics. ..........cused Mobility elivery and Logc Business Modrid, Roadway Eed, Involved Cicture and Stan‐Cost, Efficien.......................Land Use. .........................................................................and System .............................................................................................
ments .................................................................................................................................................................................................agement ..............................
.......................
...................................................................................................................................................................................................................................................................................................ent ..............................................................ed Infrastructur.......................Services and Cgistics. ............dels and PartneElectrification, aitizens ............ndards ............t, Secure, an...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
.......................
.....................
.......................
.......................
.......................
.......................
.....................
.....................
.......................
.......................
.......................
.......................
.......................
.....................
.....................
.......................
.......................re ..........................................Choices. .................................ering Opportunand Electric Ve..............................................nd Resilient In...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
.......................
Smar
......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................nities. ..............ehicles.............................................................nformation an........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
........................
rt City Chula
P
......................
.......................
.......................
.......................
.......................
......................
......................
.......................
.......................
.......................
.......................
.......................
......................
......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................nd Communic...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
.......................
Vista
Page i
....... 2 ........ 2 ........ 3 ........ 5 ........ 7 ....... 9 ...... 10 ...... 10 ...... 10 ...... 11 ...... 11 ...... 11 ...... 11 ...... 13 ...... 15 ...... 15 ...... 16 ...... 17 ...... 17 ...... 18 ...... 18 ...... 19 ...... 19 ...... 20 cations ...... 20 ...... 21 ...... 21 ...... 22 ...... 22 ...... 22 ...... 25 ...... 25 ...... 25 ...... 26 ...... 27 ...... 27 ...... 27 ...... 27 ...... 27 ...... 28 ...... 28 ...... 28 ...... 28 ...... 28 ...... 29
...... 12
1 In
The City vision of City’s chinitiativethat mov
1.1 V
Smart CiLyft, Car2system tAutonomtrolley st
Smart Cicommutiprovides informattechnolonetwork.commungreenhouof travel The city ethe transsmall audevelopineeds ofthe socioeast andwe want The policnow deliv
ntroductio
of Chula Visa 21st centaracter, risis. At the coves the City’s
Vision
ty Chula Vis2Go and othto our citizmous Vehicletop.
+ity Chula Ving in a bumaximum
ion promotiogy and info. The benefity will be cuse gasses, including m
envisions prsit stations, utonomous vng. Enhancf the resideno‐economic west urbanto focus on
cy changes hvering many
on
sta is poised tury Smart Cng to new core of this vs lifeblood, o
sta will workhers to provens and toes in the pro
+ista seeks tbble to onesafety anding multi‐mormation to fits of this prconnected aimprove pubotorists, bic
oviding alteand would vehicles woing existing nts without gap between cores as wfor the gran
have led to Cy initiatives.
to embark uCity – “Smarchallenges wvision is a roour citizens,
k with the “vide a seamo our guestoject area fr
+to change te of commud efficiency odal opportconnect ouroject are sigand this will blic health, yclists, pede
rnatives to tbenefit bot
ould providelocal transitdependenceen east and well as the Bant.
Chula Vista b A sample o
upon the nert City Chulawith recognobust, technsafely and e
“first and lasless, moderts. In addiom neighbo
+the pattern uting in an and empounities. Thir City, both gnificant; veincrease puand increaseestrians, tran
the shorter rth east and e this type t overall woe on their owest by proayfront deve
becoming a sf Chula Vista
ext chapter ia Vista”. Thized leadersnically advanefficiently th
st mile servin and respoition, Chulaorhoods and
+of the typopen envir
owers the pis project prgeographic
ehicles and tublic safety,e mobility ansit, freight,
routine dailywest side rof service,
ould be beneown vehicle. oviding convelopment. T
smarter city,a’s smarter c
Smar
n its historyhis vision is ship in execnced transpohrough the C
ice provideronsive public Vista will d centers to
+ pical commuronment whpublic with roposes to ucally and ontraffic signal, shorten cot intersectioand emerge
y trips, whicresidents. Abut this teeficial. This This could venient servThis concept
, with develocity initiative
rt City Chula
P
y, implementembodied icuting Smartortation netCity.
r” companiec/ private trprovide elethe nearest
ute from onhere connecchoice thr
utilize Smart the informs throughouommutes, reons for all mency vehicle
h include triA shared fleechnology iswould servalso help b
vice betweet is another
opment praces include:
Vista
age 2
ting a n the t City twork
s like ransit ectric t bus/
ne of ctivity rough t City ation ut the educe modes s.
ips to eet of s still e the bridge n the item
ctices
The BefficiCoast
One o
One o
And tservic
AccoladeCenter fdirectly r Central ttransportpeople, transporttechnolo
South
Mode
Baysh
Expancomm
No longebecome includingpedestriabeen wous not on
1.2 C
Historicacore tharesidentimixed laautomobfreeways Then abimplemewould coquality omore of
Bayfront Smency and sut,
of the larges
of the most
the ACT Chuces creating
es are a testor Corporatrelated to Ch
to Chula Visttation systeand informtation infraogy elements
h Bay BRT de
ernization of
hore Bikewa
nsion and munications,
er will Chua championg: high denans and bicyorking smartnly Smarter,
Challenge
lly, the Cityt are characal uses. Zoand‐uses. Tbile and bus, large arter
out 30 yeanting smartontribute to of life, a planthe city exp
art City brinustainability
st Neighborh
dense netw
ula Vista cita web‐base
tament to ote Leadershhula Vista’s S
ta’s commitem that leveation acrossstructure as are current
edicated Bus
f the trolley
ay class 1 bik
modernizat, and expand
la Vista emn of Smart Gnsity commyclists, and tly, we do febut also Wi
’s planning cterized by oning ordinaThis “conveuilding autorials, wide lo
ars ago, the growth polthe charactn for smart panded to th
gs the latesty outcomes t
hood Electric
orks of Elect
tizen web ped connected
our success hip, Climate Smart City in
ment to plaerages infras all modesand systemstly underway
s Rapid Tran
network in t
ke path cons
tion of theding and mo
mbrace tradGrowth and unities, mixransit orientel that succse.
model spurseparated lnces createentional” plaomobile‐centocal roads, an
e City of Clicies and prter of the citgrowth washe unincorpo
t in infrastruto the larges
c Vehicle (NE
tric Vehicle (
portal conned community
and as a hiLeadership
nitiatives.
n and execustructure ans. The Citys. Major iy in Chula V
nsit guideway
the City incl
truction,
e City’s fibodernizing th
itional autoexact policixed use deted developess in the S
red the devand uses, ed barriers toanning modtric transpond large par
Chula Vista ractices. Nety while mais adopted. orated porti
ucture technst waterfron
EV) roadway
(EV) chargin
ecting citizey platform.
ighlight the p Award for
ute smarter,nd smart tey directs siginfrastructurista includin
y constructio
uding vehicl
ber optic he existing T
o‐centric dees that embevelopmentment. So, amart Cities
velopment oespecially beo protect redel of sepaortation infrrking areas.
became a eeding a visiintaining a dThe policieions east of
Smar
nology for mnt developm
y networks i
g stations in
ns with eac
City receiver exemplary
, is a diverseechnology tognificant invre projects ng:
on,
les, stations,
network foTraffic Manag
evelopment, brace urban , active traalthough weChallenge, w
of suburbs oetween residesidential coration was rastructure.
pioneer in ion of how ndesirable levs were refinf the origina
rt City Chula
P
maximum enment on the
n the Count
n the Countr
h other and
ed the 2014y climate ac
e state‐of‐tho move vehvestment towith signif
, and track,
or traffic sgement Cen
the City wdesign pracansportation believe we will help to m
utside the udential and ommunities enabled by This incl
developingnew subdivivel of servicened as morel city limits.
Vista
age 3
nergy West
ry,
y,
d City
4 EPA ctions
he‐art hicles, oward ficant
signal nter
would ctices n for have make
urban non‐from y the luded
g and isions e and e and The
newer eaurban cooutset tothe InterCity’s vis In fact thinitially wdemand into hightypical otransit fonetwork. The challuse the m The City Blue Linemuch lowsocio‐eco Promotinwould he Our publtwo carspopulatiofrequentautomobroadwaytravel mo The typicommuteneighborbeyond tmorning frequentcontaine The undeand regiincome h
ast side comore. The villo be connecrnational Mion of transi
he rapid buswas plannedadditional sher density nf everyday lor trips acro.
lenge for themass transit f
of Chula Vise trolley. Ridwer incomeonomic divid
ng and provielp the econo
lic still needs for work on centers at local trips bile manifests: the singleode of choic
cal travel se and the rhoods ontothe City. Thand evenin
t non‐work rd within the
erserved coonal transphouseholds,
mmunities wage centerscted togetheexican Bordt oriented p
that is currd for a lightservice areasneighborhooife. The visss the city a
e newer comfacilities to/
sta’s traditioership on the demographde between
iding safe anomic vitality
ds their carsrelated tripand regionasuch as ruts into the lae occupant ae is our City
scenario in non‐comm
o the local hese trips arng. The norelated trip. e City primar
mmunities tportation sysenior citize
ere develops included mer with a Buder and nortplanning con
rently undert rail systems, the west ods that masion is that band meld th
mmunities is/from work i
onal older wehe Blue line ihic. The citthe East and
nd efficient y of the city.
. The typicaps twice a dal employmenning erranargest segmautomobile. ’s most serio
Chula Vistamute. The
roadway, re regular aon‐commute These tripsrily on local a
that do not stem and cens, adolesce
ped with higmajor transis Rapid Tranth to the Satinues, and t
r constructiom. As the usside will alsoake mass traboth sides we west and
s to get the rinstead of th
est side alsois very high ty then hasd West side
transit betw
al householdday to coment centers. nds and recent of trans Overcominous transpor
a consists ocommute
arterial netnd occur due representss are typicaland arterial
own a car aconnected lents, and pe
h density viit centers thnsit (BRT) lian Diego cethe BRT is n
on has a 5‐mse increaseso see changansit more awill eventualeast side in
residents in he single occ
o has an urbfor commuts been challresidents.
ween the two
d in Chula Vmute the d The cars acreational acsportation ing the single rtation chall
of two typerepresents
twork, regiouring two tos the irregully errand baroadways.
and have diand use atersons with a
Smar
llage centerhat were pne that wouentral busineow under co
mile dedicates and more ges as theseappealing anlly have easto one effic
these areascupancy vehi
ban core andter trips. Thlenged with
o urban core
Vista requiredistance betare also necctivities. Thnfrastructureoccupant aenge.
es of automs the workonal freewao three hourular, shorterased or recr
minished actractions. a disability.
rt City Chula
P
rs and an ealanned fromuld lead souess district. onstruction.
ed guidewayand more areas redevnd become y access to cient mass tr
s to embraceicle trip.
d is served be west side h filling the
es is a vision
es a minimutween the cessary for his need foe demand outomobile a
mobile tripsk trip fromay network,r windows ir distance, reational an
ccess to the This affects
Vista
age 4
stern m the uth to The
y that users velop more mass ransit
e and
by the has a large
n that
um of City’s more r the n our as the
: the our , and n the more d are
local s low
There is area of thand urbaconnectiv
1.3 T
Our techprojects demonst
Projeand t
Projeto the
Existishare
Existiservintechn
The Ctransbicycappli
The Cintere
Several cfor Smart
Chulademowill b
SouthbetwFigurartersigna$113
Conn
Procuvehic
The rvehic
also a geoghe City is nean with lowvity in the ov
echnical Ap
hnical approto incorpo
tration that a
ects currentlytechnology.
ects earmarke demonstra
ing roadwayed use lanes
ing roadwayng autononology.
City will prosportation inle share secations for e
City will promest and part
currently idet City Chula
a Vista Bayfronstrate freqbe dedicated
h Bay BRT ween the Ote 2). The pial transit‐onl priority, anmillion.
nected infras
urement of cle technolog
route will becles.
graphic dichower and subwer incomeverall transp
pproach
oach seizes orate the Uaddresses Ch
y under con
ked for Smaation.
ys will be refor autonom
y infrastructmous, con
ovide new sncluding an ervice, discoease of servi
mote the chicipation.
entified, fundVista includ
ront Shuttle quent autond.
– Phase 1 tway Mesa project will nly lanes (dend enhance
structure tec
new vehiclegy.
e designated
otomy betwburban with e. This dispportation sys
on the oppUSDOT 12 vhula Vista’s
struction wi
rt City const
edesigned pmous vehicle
ture will be nnected, an
ervices promautonomouounted farece use.
hoices in a p
ded, and/ oe:
Service – thnomous shu
currently inPort of Entinclude sevedicated guidd customer
chnology wil
es will incor
d shared use
ween the eashigher incomparity has pstem betwee
portunity of vision elemereal‐world is
ill be change
truction wil
roviding dees.
outfitted wnd machin
moting the us vehicle ses for senio
ublic outrea
r under con
his downtowttle service
n constructitry and Dowen stations,deway and bamenities.
l be implem
porate auto
e with high
st and west me and the perpetuateden east and
these localents for a ssues.
ed to incorp
l be advanc
dicated and
with new eqe data co
shared ecohare serviceors and yo
ach campaig
struction pr
wn circulatortransit vehi
on and incwntown San, a Direct Abus on shouThis phase
mented along
onomous an
occupancy
Smar
areas of thwest area od in part dwest Chula
lly and regiocomprehen
orate Smart
ed for imple
d limited
uipment ollection
nomy in e, smart outh, and w
gn to genera
rojects that
r service wilcles. A port
ludes a 12‐n Diego (seeAccess Rampulder), transiis estimate
g the route.
d connected
autonomou
rt City Chula
P
he City. Thef the City is ue to a lacVista.
onally signifnsive Smart
t City innova
ementation
web portals
te a high lev
will be adva
l be advanction of the r
‐mile transite p, t s
d
s
Vista
age 5
e east older ck of
ficant t City
ations
prior
and
vel of
anced
ed to route
t line
Bayshtechn
Otay Vehic
TelegprimaIntellsystebe deauton
We offerproject in
All claooo
Light
Bus r
Freew
Toll r
Bicyc Chula Viscurrent p
Comm
A reg
Regioregio
A citvolum
Adap
Trans
Emer This is ttesting/ d The exiscommuntechnoloMachineincluding
hore Bikewanology.
Ranch NEV cle program.
graph Canyoary arterialsigent Transpms, adaptivesignated a nomous veh
r the City’s ncluding:
assifications Local. Collector. Primary a
rail transit.
apid transit.
ways.
oads.
cle and pede
sta currentlproven techn
munication c
gional fiber o
onal Arteriaon.
tywide netwme, speed, a
ptive Traffic S
sit signal prio
rgency Vehic
he ultimatedata gatheri
sting systemicate to the
ogy to provid readable dag autos, buss
ay – This reg
– The City w. The new p
on Road Sms connectingportation Sye signal systSmart Corridicles and co
diverse infra
s of roadway
. arterial.
.
strian facilit
y operates nical tools to
connectivity
optic commu
l Manageme
work of maand travel tim
Signal system
ority system
cle signal pri
multi‐modng platform
ms howevee vehicle onde communiata generatises, trucks, t
gional dedica
will reinstituprogram veh
mart Corridog east and ystem deploytems, and higdor with infrnnected veh
astructure fo
ys:
ies.
an Advanceo manage th
y between th
unication sys
ent System
chine monime.
m.
ms.
ority system
al petri‐dish. A project s
er, have inn the roadwication betwing sensors trolleys, freig
ated bike pa
te the succeicles will be
or – Telegrawest. Thisyments inclugh speed corastructure hicles and in
or all mode
ed Traffic Me traffic sign
he traffic sign
stem.
which inter
toring syste
ms.
h for a comsite map is p
nherent limway or vice vween vehiclewill be implght, and bike
ath will be o
essful Otay Ran autonom
aph Canyons corridor huding: machommunicatioupgrades fofrastructure
s of transpo
Management nal system in
nals and TM
rlinks transp
ems providi
mprehensive provided on
mitations. versa. At tes and vehiclemented ones (both aut
Smar
utfitted with
Ranch Neighmous fleet.
n Road is ohas an extenhine readablon systems. or the purpoe.
ortation to d
System proncluding:
MC.
portation as
ng readable
Smart CityFigure 1 Sec
They do he center ocles and infran infrastructtonomous an
rt City Chula
P
h connected
hborhood Ele
one of the nsive numbe data colleThis corridoses of prom
demonstrate
oviding the
ssets around
e data inclu
y demonstraction 4.
not intelligof our solutiastructure (ture and vehnd connecte
Vista
age 6
d bike
ectric
City’s er of ection or will oting
e this
most
d the
uding
ation/
gently ion is V2X). hicles ed) to
probe anThis will be provisignal anprocess. connectetechniquapproachsystem.
1.4 P
SCCV is lefirms; locand expcomplex developm
1.4.1 P
A Projectinitial acton the Gand the Project Mrespect governm The PMPsupport tof the pr
Projeproje
Projebudg
Projeelem
Projeprogr
Projedesig
The CityManagemDevelopm
nd collect dprovide theded on an nd vehicle co Ultimately
ed vehicles es to affecth is the nex
Project Man
ed by the Cical manufacerienced inprojects.
ment metho
roject Mana
t Managemetivities on thGuide to theGovernmen
Managemento the app
ment contract
P will detail the deliveryoject. These
ect Initiationect.
ect Planninget, mileston
ect Executioents.
ect Control ress reportin
ect Closing –gn, and imple
y of Chula ment Plan (Sment of the
ata. Cellula maximum aopen sourceontrol messay the resuland infrastt both the vxt major ad
nagement A
ty of Chula Vturers; and project mThis expe
dologies and
agement
ent Plan (PMhe Safety Pie Project Mant Extensiont Institute (Pplication of ts.
how each oy of the proje major proc
n – Steps to
g – Arrangemnes and deliv
n – Arrange
and Monitng and the u
– Arrangemeementation
Vista will rSEMP) as a nSEMP will fo
ar phone apamount of de platform ages for implt will be aructure in tvehicle opevancement
Approach
Vista in partUniversity Tanagement,ertise reducd mitigation
MP) will be cilot Model Danagement Bn to the PMPMI). These proven ind
of the five mect under thess groups a
be taken an
ments for plverables.
ements for m
toring – Arrse of PERT a
ents for closiand operati
retain responecessary fuollow the IEE
pplications wdata acquisitto analyze, plementatioa system cathe field anrations andin achieving
tnership withTransportatio systems eces project strategies.
created and Deployment Body of KnoMBOK Guidedocuments dustry best
major projehe Systems are as follow
nd procedur
lanning the
managing th
rangementsand financial
ing each staons phases o
onsibility founction of plEE Standard
will be utiliztion possiblecorrelate, t
on in real timapable of gnd exchangi traffic signg a safer m
h local and ron Centers.engineering, risks thro
agreed upoproject. Th
owledge (PMe, Third Editrepresent tpractices i
ct managemEngineering
ws:
res to be pu
project in t
he implemen
s for monitol manageme
ge of the prof the Safety
or producinanning for a for Applicat
Smar
ed to read e. The systetabulate andme. This wigathering inng informatnal system omore efficien
regional age This team iand succeugh applica
on with USDOe PMP will MBOK Guidetion, both pthe state of tn project m
ment phasesg life‐cycle d
ut in place at
terms of sch
ntation of th
oring and cent tools.
roject includy Pilot Mode
g the Systeand executiotion and Ma
rt City Chula
P
pedestrian em wide datd develop tll be an iternformation tion and cooperations. nt transport
encies, consus highly quassful deliveation of pr
OT as part odraw extense), Fourth Edpublished bythe practicemanagemen
s will be useduring the co
t the start o
hedule, activ
he major pr
control inclu
ing the planel Deployme
ems Engineon of the proanagement o
Vista
age 7
data. a will traffic rative from ontrol This tation
ulting alified ry of roven
of the sively dition y the e with nt for
ed to ourse
of the
vities,
roject
uding
nning, ent.
eering oject. of the
Systems to guide SEMP de
1.4.2 E
The Citycomplianwill help project msystem hbeen estwell as h
1.4.3 M
The Masphases owill be reRe‐basel
1.4.4 P
The Propequipmespecify tused witinformatadherencplanning
1.4.5 R
Risk mitestablish
Engineeringproject devvelopment p
arned Value
y of Chula Vnce with themeasure, mmanagemenhas been utiablished thaelp identify
Master Proje
ter Project of the projeceviewed witining will oc
roperty and
perty and Coent and softwhe Configurthin the conion on assetce to legal .
Risk Manage
igation for hed practice
g Process [IEelopment. Aphase.
e Manageme
Vista will ue guidelines monitor, and nt team haslized for yeaat will generpotential ris
ect Schedule
Schedule wct highlighteh SCCV memcur only wit
d Configurat
onfiguration ware. The ration Manantext of the t configuratobligations
ment Plan
the projectes. The risks
EE‐1220], wAnnex B of I
ent System (
utilize an Eain ANSI/EIAreport proje developed ars and has rate charts tsks early on t
e
ill be compled in the mambers on a mh USDOT inp
ion Manage
ManagemenProperty anagement Datproject to ion states; iunder the
t will be cos associated
hich focusesEEE‐1220 w
(EVMS)
arned ValueA Standard 7ect progressfor trackinevolved to ahat can comthe project.
eted using anagement monthly basput and appr
ement Plan
nt Plan will knd Configurata Base or Aminimize thimprove theproject; an
onducted ad with the
s on the engill be presen
e Managem748. The pros. Our team g large proa robust repmmunicate th
Microsoft Papproach asis after the roval.
keep track oation ManagAsset Manahe impact oe security ofnd help with
according toplanning, d
Smar
gineering actnted upon c
ment Systemoject contro will utilize agrams for tporting tool.he progress
roject. Durbove, Criticabaseline ha
of all procuregement Plangement Datof changes; pf asset distrih financial
o recognizeddesign, impl
rt City Chula
P
tivities neceompletion o
m as requireols in this sya system thatheir clients. Templates of the proje
ring the firstal Path elems been capt
ed and contrn will be useta Base, whprovide accibution; faciand expend
d principleslementation
Vista
age 8
essary of the
ed in ystem at the . The have ect as
t four ments ured.
rolled ed to ich is urate litate diture
s and n and
operatiomitigatio
1.4.6 Sy
ConcurreInteropeoverall tefield elem
1.4.7 M
The Progleads. Hereport fSharePoi
1.4.7.1 M
The City earned vUSDOT. M
Projetotal
Upco
Mileswill b
Risk m
Outre
1.4.8 U
Project scentral rmonitorithe teamon a wee
2 C
Chula VispopulatioSan Dieg(1/1/2018% of thebuildout Growth 345,586,
n of the SCCon strategies
ystem Intero
ent with therability Test echnical appments for th
Management
gram Manage will coordfor delivery nt/Dashboa
Monthly Prog
of Chula Vvalue reportMonthly rep
ect financial budget, com
oming‐month
stone analysbe clearly ide
managemen
each activity
Updated Proj
schedules weporting to ng and repo
m, these will ekly basis thr
Chula Vista
sta is and wion was 243,go Region. 15) from the e Region’s 3conditions Forecast, th compared
CV project ws will be deve
operability T
e delivery oplan which proach above pre‐mode
t Reporting
er will direcdinate this ito the US
rd Tools for
gress Report
Vista will cret. Briefings porting will in
status – Mammitments,
h tasks and a
sis – Currententified, incl
nt summary –
y summary.
ject Schedu
will be updathe program
orting progrebe referencrough a web
a Populatio
ll remain th916, which The most California S
3,227,496 DOwithin the his general to the Regio
will be ideneloped.
Test Plan
of the PMPwill describeve. This test l deploymen
t his staff tonto the moSDOT. Thethis purpose
ts and Quart
eate monthwill be givenclude the fo
ajor budget and expend
action items
t or projecteuding task c
–Risks will b
les
ated bi‐weem manager.ess as reflectced directly b based port
on Charact
e second laramounted trecent avai
State DepartOF populatioRegion, as relationshipon’s at 4,06
tified and a
P, the City oe our propoplan will cant testing.
o collect repoonthly progre City of Ce.
terly Review
hly progress en at quarteollowing key
categories itures, as we
s and schedu
ed progress ompletion a
e identified
kly by task . Task and ted in sub‐leinto the maal.
teristics
rgest City in to 7.9% of thilable officiament of Finaon figure. Fderived fromp remains w68,759; or 8
assessed, an
of Chula Vised testing all out in det
orting informress reports,Chula Vista
s
reports therly programy areas:
as defined ell as estima
ule adjustme
against the and mitigatio
and tracked
team leadsub‐task leaevel schedulster project
the San Diehe Census’ 3al populatioance (DOF) From the stam SANDAG’with Chula .5%. Using
Smar
d a series o
sta will subactivities, astail the plan
mation from, invoices aa will prop
at will inclum reviews co
in the WBS ate‐at‐comp
ents, if any.
budget or son/recovery
d.
s and orgaaders will beles. Based ot schedule. T
go Region. 3,095,313 poon estimateis 257,989, wandpoint of ’s recent SeVista’s 205g these figur
rt City Chula
P
of avoidance
bmit our Sys described ined testing
m each of thend earned vose the us
ude the moonducted by
will indicatletion.
chedule basy plans.
nization thre responsiblon feedback This will be
Our 2010 Ceopulation fo for Chula which reprefuture proje
eries 13 Reg50 populatiores, and our
Vista
age 9
e and
ystem n the of all
e task value se of
onthly y the
e the
seline
rough le for from done
ensus or the Vista sents ected gional on at r City
area of 5mi. in 20 As can blargest insize of thsize of otthe Los Afor examCensus rexceed tcharacte
3 C
3.1 P
Chula VisSoutherndown toStreet, an
3.2 C
The City initiative
The BThe S
One o
50.9 sq. mi.,15, and will
be seen, althn the Regionhe San Diegother Census Angeles Regimple, the soregions acrohe 15% leveristics for a S
Chula Vista
Public Trans
sta’s public n San Diego the US‐Mend Palomar
Conducive D
of Chula Vis include:
Bayfront SmSmart City pl
of the dense
, our City pobe 6,790/sq
hough Chula behind the o Region, anregions acroon. While southern half oss the Couel referencedSmart City a
a Character
sportation S
transportatCounty, runexico BorderStreet.
Demonstrat
ista is a Sma
mart City whlan for this d
est networks
opulation deq. mi. at build
a Vista is laCity of San d the City ooss the Countatistical setof the San
untry), the Cd. Chula Visnd is highly
ristics Alig
System
ion system nning betwer. Chula Vis
tion Enviro
art City initi
ich is the ladevelopmen
s of Electric V
ensity was 4dout.
rge and groDiego, we af San Diego ntry. By obsts were not r Diego RegChula Vista’sta’s charactcommitted t
gnment
is shown been San Diegta has thre
nment
iative leade
argest watert will be the
Vehicle (EV)
4,792 person
owing City, are disadvantwithin the Rervation, a sreadily availion (compa’s representteristics stroto the Smar
elow. The Mgo's Old Towe trolley sta
r. A sample
rfront devel model for t
charging sta
Smar
ns/sq. mi. in
and consistetaged by theRegion, in cosimilar situaable, if one rable in sizetative popuongly align wt City Chula
MTS Trolley wn and Downations: Bayf
e of Chula V
opment on the entire Ci
ations in the
rt City Chula
Pag
n 2010, 5,06
ently the see extremely omparison ttion exists wwere to cone to many olation woulwith the USDVista projec
Blue Line sntown San Dfront/E Stre
Vista’s smar
the West Cty.
e Country.
Vista
ge 10
68/sq.
econd large o the within nsider other d far DOT’s ct.
erves Diego et, H
rt city
Coast.
The Cfor ex
Chulainfrasmodebicyc
Chulacurre
3.3 Le
The City demonstsupport f
3.4 C
Smart Citby the Cprogram locationsservice in
3.5 C
The Citydiscovera
4 P
The SCCVthe prop
City receivedxemplary cli
a Vista offstructure anes. This incle and pede
a Vista curreent proven te
eadership C
of Chula Vitration throufrom our Ma
Commitmen
ty Chula Visity’s supporfor City sta
s including tn the City.
Commitmen
y of Chula Vable and usa
Preliminary
V Preliminarosed project
d the 2014 Emate action
fers a divend smart teccludes roadwstrian facilit
ently operateechnical too
Continuity
ista has conughout the ayor and City
nt to Shared
ta is commirt of the recff located attransit cente
nt to Open
Vista is comable by the p
y Site Map
ry Site Map t site and loc
EPA Center fs directly re
erse state‐ochnology to ways, light ies.
es an Advanls to manag
tinuity of coperiod of py Council, pa
d Economy
tted to intecent Car2Got City Hall aers and recr
Accessible
mmitted to public to fue
p
is shown oncations of ke
for Corporatlated to Chu
of‐the‐art tmove vehicrail transit,
ced Traffic Me the traffic
ommitted leperformanceassing the SC
y
grating with pilot progrnd has recereational fac
Data
making opl entreprene
n Figure 1 oney project im
e Leadershipula Vista’s Sm
transportatiocles, peoplebus rapid t
Managemensignal syste
eadership ane. This is dCCV Council
h the Sharingam. The Cintly initiatedcilities. Ube
pen, machineurship and
n the followmplementati
Smar
p, Climate Lmart City init
on system e, and informtransit, free
nt System prem including
nd capacity demonstrateResolution
g Economy ty also operd a bike shaer and Lyft
ne‐readable innovation.
ing page. Thions.
rt City Chula
Pag
eadership Atiatives.
that levemation acroways, toll r
roviding the .
to carry oued by the stunanimously
as demonstrates a car sare programare also pro
data acces
he map iden
Vista
ge 11
Award
rages oss all oads,
most
ut the trong y.
rated share with ovide
sible,
ntifies
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
��������� ��� � �������
�����������
Civic DistrictTransit StopTransit RouteIngress/EgressPublic FacilityP=ParkF=Fire StationL=LibraryS=Potential SchoolC=CPF*Per Millenia Project, Otay Ranch
Lomas Verdes Station
Heritage Rd Station
Santa Venetia Station
Otay Ranch Town Center Station
Millenia Station
Otay Mesa InternationalTransit Center
E Palomar St Station
E St Station
H St Station
Palomar St Station
Palm Ave Station
Smart City Chula Vista Project AreaElectric Vehicle Charging StationBlue Line Light Rail StationSouth Bay BRT StationProposed Downtown CirculatorChula Vista ConnectorSouth Bay BRTOtay Ranch Circulator
EV Electric Vehicle Charging Station
Blue Line Light Rail StationSouth Bay BRT StationProposed Downtown CirculatorChula Vista ConnectorSouth Bay BRTOtay Ranch Circulator
City of Chula Vista
Figure 1: Smart City Chula Vista Preliminary Site Map
5 H
Chula Visand lacksignal mtechnolo Smart Citvarious mThe routholistic aElementsfollowing
In theStreeTrolle
Two portioo T
OcoSt
o TInse
The Ocente
These rosystem. transit, Aall Vision
A den
A den
Share
Dedic
“Bus
Dedic
Trans
Tollin
Port f
Holistic App
sta is challenof analytic
managementogies to migr
ty Chula Vistmodes, Conntes consist oapproach ints into one cg route desc
e west urbaet and shareey stations a
transit servon of the Cithe Chula ViOtay Ranch Tontinue bettation. he South Bnternational ervice runs b
Otay Ranchers connecti
outes serve hSmart City
AV automobn Elements:
nse downtow
nse suburba
ed lanes test
cated arteria
on Shoulder
cated pedes
sit facilities (
ng plazas and
facilities.
proach to
nged by ines. From ovt center, torate its curre
ta will implenected Vehiof a combintegrates thecomprehensriptions.
an core, the d lanes alonat E and H St
vices will opty): ista ConnectTown Centeween the E
Bay BRT wiTransit Cenbetween the
Circulator ng with the
high demanChula Vista
biles, Connec
wn urban te
n neighborh
t bed.
al guideway
rs” freeway
trian and bik
(LRT and BRT
d facilities.
Vision Ele
fficient use versized buso proprietaent transport
ement on thcles (V2V anation of moe various rosive demons
Downtownng the remareets and at
perate betw
tor will oper and the EEast Palomar
ll operate anter with Doe Otay Ranch
will operateOtay Ranch
d destinatiodemonstratcted Vehicle
st bed with
hood test be
lanes.
lanes.
keway facilit
T).
ment Align
of the transses to antiqry toll chatation to sm
e designatend V2I), andode specific oadway and stration plat
Circulator inder of thet the H Stree
ween the urb
erate on theast Palomarr Street Stat
along its enwntown Sanh Town Cent
e along neigTown Cente
ons and maktes advantaes (CV), Inte
dedicated la
d.
ties.
nment
sportation syquated parkiarging, Chulmart transpor
ed corridors: Intelligent and shared modal typetform. Refe
will operatee route. Theet South Bay
ban core an
e South Bay r Street Stattion and th
ntire route n Diego. Witer and the E
ghborhood er Station.
ke it convenges throughlligent Sens
anes.
Smar
ystem (roading meters, la Vista is rtation.
AutomatedSensor Based use lanes es and comer to Figure
e on dedicatere will be sy BRT Transit
nd Otay Val
BRT guidewtion. Connee H Street
connecting ithin the proEast Paloma
roadways in
nient for travhout the proor Based Inf
rt City Chula
Pag
dway and traoutdated tready for
d Vehicles (Aed Infrastrucand roads.
mbines the Ve 1 to orien
ted lanes alotops at Bluet Center.
lley (the ea
way betweenector serviceBlue Line Tr
the Otay oject corridor Street Stat
n the east u
velers to usoject area fofrastructure
Vista
ge 13
ansit) traffic new
AV) of cture. This Vision t the
ong F e Line
stern
n the e will rolley
Mesa or the tions.
urban
e the or AV e, and
5.0.1 T
In order underlyin
Conn
Data and a
Contrcontr
Once theoperatiotransport Our holiElementsdiagram.
In the Vehicle/ connecteroads (Vare the transportwould begiving thwhile inby exploi Moving communenablemurban an In the grefor bringother qu Addressiapproachpossible,technolo
echnology,
to provideng technolog
nectivity – co
platform – analysis.
rol and Autrol and auto
e Smart Citnally optimtation netwo
istic view os is represen
orange quRoadway, ted vehicles ision Elemebaseline entation. Exe Vision Elemhe citizens creasing deiting the unu
to the Cications tecent. Citizennalytics (Visio
een quarter ging innovatiadrants in te
ng the nexth to smart t make themogy while ext
Urban Trans
this holistigies that nee
ost effective
common ba
tomation – mation holis
ty is synergmized to pork.
of all 12 Vnted on the S
uarter circlethe autonomwith electrnts #1, 2 annabler for stension of ment #5 andmobility chelivery efficiused capacit
ommunicatihnology (Visns (Vision Eleon Element #
circle, partnive technoloerms of requ
t‐generationtransportatiom smart antending budg
sportation, a
ic approached to be inte
and persiste
ackend data
the entire tstically.
ized, all of rovide our
Vision SCCV
e of mous, rified nd 8) smart that
d 6 in oices iency ty.
ions quartesion Elemenement #9) w#4) will find
nership and ogy into realuirement fee
n of urban on means wnd multi‐pugets for furt
and Smart C
h to smart tegrated:
ent network
platform an
transportati
the vision citizens t
er circle, nts #3 and 1will benefit fra home to f
standards (Vity, as well aedback and t
transportatwe re‐imaginrpose. Thiher improve
City Element
transportati
k wide wirele
nd format fo
on network
elements cthe most
intelligent 11) form therom the infofeed the info
Vision Elemeas interopertechnology d
ion is our Sne and use eis provides ements.
Smar
ts
on, there a
ess and wire
or collection
k should be
an be whoefficient an
sensors ane basis of daormation proormation int
ents #7 and rability. Thidevelopmen
Smart Landexisting infrathe necess
rt City Chula
Pag
are a numb
ed connectiv
n, display, co
integrated
lly analyzednd high qu
nd informaata and anaovided, whilto the system
10) are esses ties in witnt.
Use goal. astructure wsary advanc
Vista
ge 14
er of
ity.
ontrol
with
d and uality
ation/ alytics e the m.
ential h the
Our where es in
All of thethe ChuTransporcreating produce.
5.1 V
Solutionsapproachurban cocommunthe AV cavision is t The circu
existing v
with the
the AERI
environm
The City private aor no paon desigretrofit Cgoal is to
5.2 V
e Vision Elemla Vista wirtation Centstrong linka.
Vision Eleme
s to make ph to urban aores will beicate with capabilities ato have the
ulators will r
vehicles to s
University o
IS program
mentally frie
will encourutonomous rking fee (cnated routeCity fleet veho demonstra
Vision Eleme
ments will levll host the er (UTC) pages betwee
ent #1 Urba
ublic transitutomation. e outfitted connected inre still emercirculators o
educe opera
save cost an
of California
will be key
ndly service
rage privatevehicle ownoordinated es, and reduhicles and opte 15 Auton
ent #2 Con
verage the SSCCV, how
rtners at UCn the data a
an Automa
t more attraThe previouwith latera
nfrastructurerging. The coperate as fu
ational com
nd quickly ac
a at Riversid
ys to achiev
in our east
AV ownersners to rechwith the Citced local saperate a Cityomous Vehi
nected Veh
SCCV commowever thereC Berkeley aand the Inno
ation
active, ubiquusly identifieal and longe [V2I] alongcirculators wully autonom
plexity by fo
chieve the re
e [UC CERT]
ving the vis
and west ur
ship by explarge at a redty’s new smales tax as ay AV car sharcles for Sma
hicles
on data infrae are scenaand Riversideovation Engi
uitous, and sed circulatorgitudinal cog the fixed rwill be NHTSAmous vehicle
ollowing a fix
equired flee
] and the fe
ion of SCCV
rban cores.
oring policyduced rate aart parking n incentive re program aart City Chul
Smar
astructure. arios wheree may betteines that Ac
smart are ats in the eastontrol. Theroute. SCCVA Level 3 AVes.
xed route. S
et. Our strat
derally fund
V to provid
y options incat charging ssystem), deto purchaseat City ownea Vista.
rt City Chula
Pag
We envisione our Univeer serve the ademic Rese
t the core otern and wee circulatorsV recognizesV’s. The ulti
SCCV will re
tegic partne
ded research
e a reliable
cluding: allostations, rededicated lanee. SCCV wiled locations.
Vista
ge 15
n that ersity role, earch
of our estern s will s that mate
etrofit
ership
h into
e and
owing duced e use l also . Our
To accomConnecte The SCCVoperatiothrough SCCV wilUSDOT oapplicatio
Our ecosand commandateecosystephone se
5.3 V
The City transportsignals.
mplish the ed Vehicle e
V project winal environmmultiple com
ll deploy a objectives fons include;
Traffic Sigoffer dynfreeway recommearterial upedestriadirections
Advance approachincident b
Transit Awith V2X transit‐batransactio
Emergencemergencsame EVAof way at
Cell phondegree opreferredsocial, con
system will imercial), 5,0e phase of thm by: provervice, and d
Vision Eleme
of Chula Vistation data fTo be mor
challenge gcosystem th
ll deploy V2Xment where mmunication
set of innovfor smart t
gnal Operatnamic actuaon‐ramps, ended speedusers and tn warningss based on t
Incident waing a locatiobeyond the l
pplications:devices for ased probe ons and inte
cy Vehicle Acy vehicle bA message cintersection
ne applicatioof penetratid. This will pnsumer, and
nclude 10,0000 connecthe project, tviding discoudiscounted b
ent #3 Inte
sta collects dfor the purpre informed
goal (Sectiohat will prom
X technologintersectionns mediums
vative appliransportatio
tions: SCCV ation of signtransit signd along a buto enhance will be dehe walk/don
arning and won with limiine of sight.
SCCV transtransit relatdata. Th
ractions am
Applicationsby utilizing tcan be used ns along the
ons: SCCV won with thprovide an od commercia
00 connecteted cell phothe City of Cunted transbike shares.
lligent, Sen
data, as maposes of monand increa
n 1.1.3), thmote safe, co
y for both Ans, roadway.
cations andon; safety,
traffic signanal timing, nal priority, usy arterial, eco‐driving
elivered to n’t walk sign
work zone ated sight dis
it vehicles ated applicatihese vehicleong multiple
s: Vehicles cthe Emergenfor Emergenemergency
ill enable DShe general open platformal apps supp
ed vehicles (nes, and 15Chula Vista sit passes, n
nsor‐Based
ny cities do,nitoring the se the agili
he SCCV proonvenient, e
AV and CV. Ts, and vehic
services, wmobility, a
als will be inestimating emergency in order tog at the arvehicles tral state at a
alerts: Throstance are g
nd route infions includines will gene modes, an
can be alertncy Vehicle ncy Vehicle route.
SRC on cell ppublic as cm for app dorting the S
(transit, eme50 connectedwill incentivnew toll tra
Infrastruct
, on its primefficiency oty and effic
Smar
oject envisifficient tran
The project cles are able
which will adnd the env
ntegrated wiqueue leng
y vehicle po optimize trterial levelraveling in n intersectio
ough a V2X igiven advanc
frastructureng transit signerate a ricd enhance t
ted to clearAlert (EVA)Preemption
phones. Thicell phone evelopers toCCV project
ergency, vand traffic signvize participansponders,
ture
mary arterialof the operatciency of th
rt City Chula
Pag
ons deploysit service.
area providto commun
ddress all ovironment.
ith solutionsgths at metre‐emption,the speed ols. In addthe appropon.
interface, drce warning
will be outfgnal prioritych set of transit safety
r the path o) messages. n to provide
s provides aapplicationso develop sa.
n pools, car nals. At thispation in our discounted
s. It collecttions at its the transport
Vista
ge 16
ing a
es an nicate
of the The
s that tered and of the ition, priate
rivers of an
fitted y, and DSRC y.
of an The right
a high s are afety,
pools s pre‐r V2X d cell
s this traffic tation
system, tthe proje SCCV is (pedestrioccupanc The SCCVcapture bthat succCommer
5.4 V
Althoughused to idevices twith befo The urbastrategieestablishto providto privatGovernmthird parand uniq
5.5 V
The wesHoweverexcept fnecessity A more purban coupcominneed.
the SCCV neect corridors
going to uians, bicyclicy, speed, tr
V will work tboth the process of thescial‐Off‐The‐
Vision Eleme
h SCCV has ts advantagthat will genore. Our pro
an analytics es. SCCV’s phed an existide analyticalte public anment develorty providersue solutions
Vision Eleme
tern urban r the easteror the masy and now ne
personalizedore residentg options an
eeds a mores.
use intelligests, transit,ravel time, o
to deploy inoject baseline intelligent‐Shelf (COTS
ent #4: Urb
good insighe. The Visionnerate large oblem then i
are neededparticipationng level of ffeedback. Td academiaped standars with expers for public c
ent #5: Use
core transitrn urban cos transit eleew choices a
d mobility ses to shift tond teach the
e robust und
ent sensors autos, freorigin/ destin
telligent senne, as well at sensors woS), proven te
ban Analyti
ht into our on Elements famounts ofis the possib
to help SCCn in the Regfamiliarity wThe Smart Ca. We will rds and indurtise in data consumption
er‐Focused
t system is ore is a plaement. Foare coming o
ervice and goward a car‐em to look f
derstanding
s to recordight, and enation, and p
nsors along s aid in tracould lead toechnology, a
cs.
operations efrom #1 to #f new data, tble underutil
CV predict fugion’s Integrwith sharing City Chula Visleverage ouustry best pfusion. SCn.
Mobility Se
one of thenned smartlks have beonline, howe
reater choic‐lite lifestylefor the choi
of the mov
trip informemergency vparking.
all project ccking projecto citywide dnd readily a
environmen#3 establishethe likes of lization of th
uture conditated Corridodata for extsta project wur strategic practices to CCV’s approa
ervices and
e most sustat growth coeen conditioever old hab
ces are reque. Communce before d
Smar
vements of
mation on vehicles) inc
corridors. Tt performandeployment.vailable.
t, but the des a foundatwhich the Chis data.
tions and asor Managemternal stakewill provide opartnershipprovide ouach will prov
d Choices.
ainable in tommunity thoned to usebits die hard
ired in ordenicating to teciding to u
rt City Chula
Pag
all modes w
multiple mcluding: vol
hese sensornce. SCCV ex. All sensor
data hasn’t tion of intellCity has not
ssess operatment Systemholders/paropen data as, utilize Fer data openvide new ins
the MTS syshat has mate the car o.
er for the eathe residentuse the car i
Vista
ge 17
within
modes lume,
rs will xpect rs are
been ligent dealt
tional m has rtners ccess ederal nly to sights
stem. tured ut of
stern ts the is the
SCCV wilprogram Diego. Tthe new transit sebe coachexpress integratevehicle, and the asystem. The visioCirculatoindicate highlight
5.6 V
The City ports of traffic crostrategic concentrexchange SCCV wilservices operatioAdvanceto arrang
5.7 V
Smart Citwireless located hutilize thSmart Cit SCCV aTransporUniversitAdvanceCenter fo
ll work withconnecting
The buses wSouth Bay Bervice will mh oriented wand non‐stoed real time estimated tability to giv
n includes imor service wa sustainabling the new
Vision Eleme
of Chula Ventry in Sanossing the bpartnership
rate on Visioe.
l conduct ou(UPS, Fedexns more effs Transportage and sched
Vision Eleme
ty Chula Vistindustry. here in the heir expertisty Challenge
also bringsrtation Centy of Califod Transportaor Environm
h our strategg the easterwill be renteBRT servicesmatch the eawith modernop. Informaapp for smime of arrivve a full mult
mplementinith Uber/ Lyle demand.
w smart integ
ent #6: Urb
ista is locatn Ysidro andborder is elevp with SANDon Element #
utreach to thx, US Mail) ficient throuation Informdule pick up/
ent #7: Stra
ta is locatedWith manyregion SCCV
se to impleme.
s highly rnters to ornia (UC) ation Technoental Resea
gic transit pn urban cored during ths commenceast core clienn CV vehicleation systemart phones val and duratimodal view
g first and layft/ Tango c SCCV will pgrated trans
ban Deliver
ted adjacentd Otay Mesavated GHG’sDAG and the #4 and bene
he local busand exploreugh programmation Syste/drop off.
ategic Busin
within the Sy global heV is well poment our vis
recognized our teamBerkeley Pology (PATHrch and Tech
partner to rere and dowhe interim pes. The newntele. The ses. The servms will incluto indicate ation and cow of the tran
ast mile stracar sharing spromote thesit option.
y and Logis
t to the Woa. A byprods. SCCV will goods movefit freight sp
iness comme opportunitms similar tm) smart ph
ness Mode
San Diego Readquarters ositioned to sion for the
University including artners for
H) and UC Rivhnology (CE‐
einstitute thntown San period until w rapid bus service will vice will be ude a fully location of ost of ride nsportation
tegies by suservice and e service in a
stics.
orld’s busiesduct of the work throuement progpecific inform
munity and dties to maketo FRATIS (Fhone apps a
ls and Part
egion which
y r verside’s Bo‐CERT). We
Smar
he successfu
pplementingbike sharesa public mar
st land freight ugh our ram to mation
elivery e their Freight allowing frei
tnering Opp
h is an innov
urns College are also exc
rt City Chula
Pag
ul pilot rapid
g the Otay Rs where anarketing camp
ight and veh
portunities.
ation hub fo
e of Engineecited to have
Vista
ge 18
d bus
Ranch alytics paign
hicles
.
or the
ring ‐ e San
Diego StMachine
5.8 V
Chula VisAssemblymeeting higher Gtargets is Most recinfrastrucurrentlytechnoloand rene Chula Vispropertywireless charging CV use o Chula Viscitywide outfit theThe Smasensors, and smaabsence light sysgateway
5.9 VCitizens
The Citycommunportal. Tproblemsis reviewaction. archived
ate Univers Interface (H
Vision Eleme
sta is commy Bill (SB) 3the require
GHG reductios required.
cently, the cture initiaty investigatogies, includewable energ
sta has the y in the Coucharging systations andnly, are also
sta was the on our roade street lightrt Grid Streetransmittingrtphone basof detectionstem will alocations fo
Vision Elem
y of Chula ity through The ACT systs and feed wed and rouOnce the isand used to
ity on boardHMI) program
ent #8: Sma
mitted to con75 which seements of SBon goals. C
City in contive to addting the teing energy gy generatio
highest denntry. SCCV ystems for Ad transit stato candidate l
first in the dways. We ats with commet Light Systg data genesed pedestrn and returnalso serve or V2X comm
ment #9: Co
Vista is cthe ACT Chtem is a toolin informatited to the assue is resoo generate re
d to providem.
art Grid, Ro
nservation aet GHG emiB 375 the CContribution
nsultation wress needs echnical anefficiency, don options, a
nsity Electricvision inclu
AV and CV tions. Routeocations for
region to imare now wormunication tem will comrated by therian pushbut to full luminwireless n
munication.
onnected,
connected hula Vista cit for citizenson. The infappropriate olved it is cleports and s
e the Institu
oadway Ele
and meetingssions reduCity enactedn by the tra
with Black &for advancd economidemand resand microgri
c Vehicle (Eudes installapassenger ves with dedir wireless ch
mplement Lrking with Hand sensor tmmunicate we Sensys detton apps. nance whennode and
Involved
with the tizen web to report formation party for osed and statistics rela
utional Revi
ectrification
g California’sction targetd a Climate Aansportation
& Veatch hced energyc feasibilitysponse, storids.
EV) chargingation of highvehicles at ecated lanes arging in mo
ED lighting tHolophane atechnology twirelessly wetectors, bicyThe street
n detection o
ated to City
Smar
iew Board (
n, and Elect
s targets stits statewideAction Plan n system to
as kicked oinfrastructuy of a varage, non‐re
g station neh efficiency existing EV for AV and otion.
technology nd Cisco to to make the
with the connycle and pedlights will aoccurs. The
service.
rt City Chula
Pag
IRB) and Hu
tric Vehicle
pulated by e. In additio(CAP) whic
o GHG redu
off a Smart ure. The Criety of enenewable en
etwork on p
e system “smnected intelldestrian senadapt and dsmart grid s
Vista
ge 19
uman
es.
State on to ch set uction
Grid ity is nergy nergy
public
mart”. ligent nsors, im in street
Part of tsentimenThe City will beco Our tranmessage
5.10 V
As USDOan overvstandardaddition,get invinfrastrucould beConnecteand qualthe envir Our Teamwill contstandard“Standarunderstaapplicatioto enable
5.11 VCommu
The SCCboundariwhile woassessmeour contcollectionit is unavBoard (IRclosely wenvironmOrganizadevelopm
he work cont data. Thewill also inc
ome a venue
sit partner s on regular
Vision Eleme
OT’s connectview of the ds, operatio, the coursevolved bycture (V2I) e used to soed vehicles wity of life ofronmental im
m will not otribute to tds. Additionrds and Aranding and ons as well ae deploymen
Vision Elemnications T
CV vision foies will be torking on thent, based otinuing efforn of Personavoidable so tRB) only neewith the USment. We tions, until ment of the
nducted une City will wocentivize inf for innovat
MTS currenr cell phones
ent #10: Ar
ed vehicle einfrastructns and ma will discussy considercommunica
olve their trawill ultimatef all citizens,mpact of sur
only use thethe editorianally, team chitecture” replication
as current annt and intero
ent #11: LoTechnology
or ensuring to conduct ahis project won ISO 26262rt to ensureally Identifiathat the coned to be appSDOT and fwill continsuch time SCMS.
der Vision Eork with ACTformation dive ideas ap
tly is provids and via the
rchitecture
effort movesure requireaintenance s recent ITS‐ring how ations and ansportationely enhance while helpirface transpo
e SET‐IT 2.1 al content partners wpublication
n of the Snd anticipatoperability.
ow‐Cost, Ef(ICT).
affordabilita Title IV anwith the USD2 to identifye that systemble Informanfidentiality plied to a mfollow it’s gue to take as the USD
Element #4 T developersistribution iplied to SCC
ding GPS bas MTS Go app
and Standa
s from reseaments beinimplications‐JPO activitivehicle‐to
applicationn challengesthe mobilitng to reducortation.
tool but wof emerginill develop n to enablSmart Citieed standard
fficient, Se
ty of ICT snalysis of anDOT. Furthy hazards, asm compromtion (PII) wiprotection r
minimum subguidance oninput and
DOT has co
Urban Anals and to enannovation w
CV.
sed real timp on smartp
ards
arch to realitg developeds, and upces and oppoo‐ns s. ty e
e g a e es ds
ecure, and
solutions deny new intehermore, SCssess risks, a
mise is manall be minimirequirementbset of the dn integratingadvice frompleted th
Smar
ytics is to fable open acwith challen
me bus arrivphones.
ty, participad, includingcoming poliortunities fo
Resilient In
eployed witellectual proCV will condand examinaged gracefuzed to the sts of the Instdata. CVVS g the SCMSm Standardeir contract
rt City Chula
Pag
use more cccess to city nge awards.
al times via
ants will alsog communiccy decisionor participan
nformation
thin the property develduct a high‐e safety goaully. In addsituation in wtitutional Revision is to S into our d’s Developt with CAM
Vista
ge 20
itizen data. This
SMS
o gain cation ns. In nts to
n and
roject loped ‐level als, in ition, which eview work DSRC ment
MP on
5.12 V
Chula Visplanning scale malast 30 ycompactcomplemschools, preservestreet pedesignedof whichThat 21internatiOur smaCO2 Redwalkablemeaningour Genemphasisuse mix afuture exaccomplimyriad oconferenSpecific Pgrowth u Continuinwith oucommunliving inieffort to 101), into
6 R
Risk mitestablishoperatio
Vision Eleme
sta is and coand develoster plannedyears we ha, walkable, t
ment and bacommercias among otedestrian ad and organizh is currently‐mile routeonal border rt planning cduction Plane mixed‐use fully reduceeral Plan ins on the renand density xpansion of tish connectiof existing sonce center dPlan adopteurban renew
ng our progr Healthy City partnerstiatives. Threconfigureo a bicycle fr
Risk Mitiga
igation for hed practicen of the Sm
ent #12: Sm
ontinues to opment pracd communitve evolved transit‐orienalance of ual services hers. Thesend bicycle zed along a y under cone will serviand major econtinued tos in the natdevelopmene greenhousen 2005 is funewal of thein select focthe BRT systion of our nocial and comevelopmented in 2006 uwal efforts.
gressive smaChula Vista to promotehis includes e one of our riendly boule
tion
the projectes. The risksart City Chu
mart Land U
be a recognctices datingties commenthe newer
nted mixed uses includinand emploe are connepaths. Malocal and regnstruction wice 8 neighemploymento evolve durtion, which nt, and focue gas emissundamentallye older, wescus areas tietem and a lonewer eastemmunity sert that will geutilizes a con
art planning program e and achievrecent adooldest nortevard.
t will be cos associatedula Vista pro
Use.
nized and awg back to thnced, includieastern poruse neighborng a broad oyment, pacted by an ny of thesegional Bus Rwith in‐servichborhood/vit, cultural anring the 199further ems on multi‐mions. More y organizedstern portioed to both thoop shuttle sern communrvices, as weenerate a signtemporary
reputation,in cooperatve a full comption of a Ch‐south stre
onducted ad with the oject will be
warded leadhe mid‐1980ing the 9000rtion of our rhoods and range of hrks and mextensive ne neighborhRapid Transitce operatioillage areasnd other use90’s with ourphasized oumodal transprecently, th
d around smn of our cohe existing Bservice. Thanities with oell as to our egnificant regform‐based
, we are cution with aplement of Complete Seets, Broadw
according toplanning, didentified a
Smar
der in smart 0’s when pla0 acre Otay community“villages” coousing type
multiple‐specetwork of bhoods and t (BRT) systen scheduleds and connes in Downtor adoption our commitmportation ophe comprehmart growthmmunity thBlue Line Troat BRT systeour historic emerging Bagional draw. d code to gu
rrently undea broad‐bashealthy plantreets Policway (historic
o recognizeddesign, impland assessed
rt City Chula
Pag
growth landanning for lRanch. Ovey into a seriontaining a bes and denscies open sboth on‐ andvillages areem, the backd for early 2nect them own San Diegof one of thement to comptions in ordensive upda principles, rough increolley systemem expansiocivic core, aayfront hote Our Urban
uide these sm
erway in eased coalitionning, eatingy, and a cucally our Hig
d principleslementationd, and a seri
Vista
ge 21
d use arge‐er the es of broad sities, space d off‐ also kbone 2018. with go. e first mpact, der to ate of with
easing m, and n will and a el and Core mart‐
rnest on of g and urrent hway
s and n and ies of
avoidancwill be to• Sy• Sa• O• D• C Key techrated and
7 T
The SCCVon the foPart 2.
7.1 G
SCCV haswill condgovernanestablish
8 T
Chula Vis A. T
uwthfo
B. T
toRce
FIna
ce and mitigo manage risystem Interoafety/ThreatObtaining HuDevelop Trainoordination
hnical, policyd shown in t
The SCCV T
V Team Orgaollowing pag
Governing P
s establishedduct the pronce of the ah a Program
Transporta
sta’s existing
he existing Cnder local c
with SANDAGhe city limitor Interstate
he city roadotal 58.25 cesidential stenterline mi
reeway milenterstate‐5 hnd the State
ation strategsk on the prooperability Tt Plan man Use Apning Materia and Prepara
y, and institthe Part 2.
Team
anization Chge. Letters o
Processes
d a strong poject. This agreement, aManagemen
tion Infras
g transportat
Chula Vista tcontrol, 10 sG for operats, but operae‐5, Interstat
dway netwocenterline mtreets and oles.
es through thas 3.67‐milee Route‐125
gies to be doject througTest Plan
pproval throals, and ation of Veh
tutional risks
art showingof Support a
partnership aagreement and provident Council, re
structure a
tion infrastr
transportatiignals operating the Statated by the te‐805 and S
ork totals 46miles and thother minor
the city limes, InterstatToll Road ha
eveloped prh the delive
ugh UTC Inst
hicle Fleets a
s associated
g our commitand Commit
and will devwill cover t
es a structurepresenting
and System
ucture and s
on system inated by the te Route 125California D
State Route 5
63.30 centere collector r roadways
its total 15.te‐805 has 4as 6.14‐mile
rior to contrry of;
titutional Re
and Drivers
d with the S
tted partnerment from
velop a Chartthe roles ofre for movin the City of C
m
system featu
nfrastructurcity of Chul5 Toll Road Department 54.
rline miles oroadways tmake up th
.29 miles of.78‐miles, Sts.
Smar
ract executio
eview Board
SCCV deploy
rs and stakeare partner
ter for the kf the differeng forward. Chula Vista a
ures are des
re includes 2la Vista undand 25 trafof Transpor
of streets, ototal 76.85 he remainde
f which theytate Route‐5
rt City Chula
Pag
on. The appr
(IRB)
yment vision
eholders is shs are includ
key partnersent partnersThe Charteand partners
cribed below
274 traffic sier an agreeffic signals wrtation (Calt
of which artcenterline mer of almost
y are as fol54 has 0.70‐
Vista
ge 22
roach
n are
hown ed in
s that s, the er will s.
w:
gnals ment within trans)
erials miles. t 330
lows: miles
)))
SANDAG CALIFORNIA PATH5D ROBOTICS
METROPOLITAN TRANSIT SYSTEM UC RIVERSIDE CE-CERTCOMMUTER CARS TANGO
CALTRANS SAN DIEGO STATE UNIVERSITYDENSO
CHULA VISTA ELEMENTARY SCHOOL DISTRICTMCCAIN
UNIFIED PORT OF SAN DIEGOPROTERRA
QUALCOMM
SECURITY INNOVATION
SENSYS NETWORKS
STC TRAFFIC
TRANSDEV
VERIZON
UNIVERSITY TRANSPORTATION CENTERSPUBLIC PARTNERSPRIVATE PARTNERS
USDOT
CITY OF CHULA VISTA
C. T
sebcoo
D. C
AiC
E. In
F. T
odMlecoSareimcu2MTCapfiinfoco
G. Tnco
ransit servicervice withinusiest light orridor fromf approxima
ity Chula haAccess to CoCommute pr
Citizens cpartners van leasin
Provides unschedu
Provides who atten
nformation a
he San Diegf innovativeemand man
Metropolitaneading‐edge ooperative pan Diego Region’s traffmplementaturrently in 005, the RManagementransportatioorridor Manlso deployedricing for hnancial incenformation soundation fompelling ca
he City of Cetwork on ompanies, o
ces are provin the city limrail trolley
m the internaately 14‐mile
as several shoordinated Trovides the f
can access online. Offeng costs.
the Guaranuled overtim
a special ridnd the same
and commun
o region hase approachenagement. Tn Planning Otransportatpartnershipsegion has afic signals, ion of a numoperation, egional Artt System (Ron Managemnagement (ICd ITS demanhigh occupaentives for rsystem – its for intelligease for SCCV
Chula Vista public prop
offers CNG at
ided by 7 locmits. In addsystem, theational bordes. The Blue
hared use mTransportatfollowing pro
RideMatcheers up to $4
nteed Ride e.
de matchinge school.
nication tech
s long been es to transpThe San Diegrganization ftion deployms with local already depramp mete
mber of regioincluding thterial ManaTMS). Connment SysteCM) Systemnd managemncy toll lanridesharing, 511 systemnt transporV’s selection
has the higperty in thet 12 municip
cal routes adition, the ce Blue Line Tder with Mex Line LRT av
obility servicion (FACT) ograms:
er for a sim400 in Vanp
Home progr
g service cal
hnology (ICT
a national leortation issgo Associatifor the San Dments and a and regionloyed stateers, freewayonal or modhe freeway gement Sysnecting thesm (IMTMS)
m in the natioment tools sunes, a smarand an aut. These deplrtation in tas the host
ghest densite Country. pal sites thro
nd 2 regionacity is servedTrolley, whixico to dowerages almo
ces includinprogram, a
mple and sool Incentiv
ram in case
led School P
T)
eader in theues, includiion of GoveDiego regionproven trac
nal transport of the artys, and trane‐specific mmanagemestem (RAMse individua) and the on along theuch as the Frtcard paymtomated muloyments hathe San Diethe Smart C
ty Electric VThe City,
oughout the
Smar
al routes totd by the Sanch parallelsntown San Dost 50,000 da
g: Uber andnd Ridesha
secure way ves per mon
e of a fami
Pool for par
e design andng, for examernments (SAn, have a lonck record of tation agenct systems fonsit servicesmanagement ent system S), and a l systems ismost advae I‐15 corridFasTrak® sysment systemulti‐modal adave helped tego RegionCity Challeng
Vehicle (EV) in partnersCity.
rt City Chula
Pag
taling 79 min Diego Cou the InterstDiego, a distaily passeng
d Lyft, Facilitre. Additio
to find canth to help o
ly emergenc
rents of chil
d implementmple, trafficANDAG) andng track recoinstitutionacies. As a reor managings as well assystems thaknown as ARegional Trs the Intermnced Integdor. SANDAGstem for dynm for transitdvanced trao develop a and provige project.
charging sthip with pr
Vista
ge 24
les of unty’s tate‐5 tance gers.
tating onally
rpool offset
cy or
dren,
tation c and d the ord of al and esult, g the s the at are ATMS ransit modal rated G has namic t and aveler solid ide a
tation rivate
Must A
9 D
The City and servQuality, Recreatio
9.1 D
The Citydepartm
9.2 D
Existing dbe compquantitatpromotereanalysi Transporprivate tequipmedata streand arch
9.2.1 T
The City devices p
Vehic
Volum(SCATdata
Real‐inters
Our regiReports.
Members of tse their cretreamline th
A number of
Data Collec
of Chula Visvices for quaFinance, Poon, Water, S
Data Use
y has existients and age
Data Integra
data and nepared, tabulatively deter advances tois and fine tu
rtation data transit provient and vehiceams comingived enablin
ransportatio
of Chula Visproviding a r
cular volume
me, OccupanTS). The Smcollection an
time CCTV csections.
ional agenc The perfor
the public caedit cards fohe payment p
City facilitie
ction
sta collects ality of life olice/ Fire aSewer, Drain
ng proceduencies/ entit
ation
ew data colleated, correlmine improo implemenuning of the
will be shaders (Lyft, Ucle manufacg from CCTVng retrieval f
on Data
sta currentlyrich source o
e counts from
ncy, and Speart City Chund signal op
camera imag
cy partner Srmance mon
an access thor paymentprocess.
s utilize sola
extensive Gindicators. and Emergeage, and Tra
ures and pties through
ected for thated and anovements ant in the seleresults.
ared with EmUber and otturers (and V camera vidfor analysis t
y operates aof traffic data
m Sensys Ne
eed data throla Vista projtimization a
ges to monit
SANDAG conitoring repo
he City's alte. EV owne
ar panels and
rowth ManaThese mon
ency Medicaaffic.
ractices in out the Reg
e SCCV (Smnalyzed by Und areas nected demon
mergency Sthers), parkiall entities pdeo will be athroughout t
robust systa including:
etworks devi
ough the Citect will utilizlong the pro
or the state
ollects data orts are pub
ernative fuelers can also
d City buildin
agement danitored resoal Services,
place to sion.
mart City ChuUC Berkeleyeeding imprnstration are
ervice proving operatoparticipatingaccessible inthe study pe
tem of mach
ices and Ind
ty’s Adaptiveze the adaptoject routes.
of traffic on
to generatlic informat
Smar
l stations 24 join the B
ngs are LEED
ata to monitources and sSchools, Li
share this d
ula Vista) dey PATH and rovement. ea for furthe
iders, MTS, ors, AV mang in this dem real‐time aeriod.
hine readabl
uction Loop
e Traffic Signtive traffic si.
n the City’s r
te Performaion docume
rt City Chula
Pag
4 hours a dayLINK netwo
D certified.
or city resoservices arebraries, Par
data within
emonstrationUCR CE/CERThe results
er data gathe
Caltrans, Pufacturers,
monstration).nd also reco
le data colle
p Detectors.
nal System ignal system
roadways an
ance Monitents and des
Vista
ge 25
y and ork to
urces : Air rks &
n city
n will RT to s will ering,
olice, DSRC . The orded
ection
m for
nd
toring scribe
and tracdata collChula Vis
Week
Perce
versu
Trave
serve
Comm
(carp
Auto
Trave
by fr
(estim
The Quaproductiv
Oper
Passe
Reve
Fareb
9.2.2 N
Chula Vis“quality controlleand Recrare identeach incmeasure1. An es
and E2. A rat3. A qua
9.3 E
Existing departm
k the perforection and sta. The info
kday freewa
ent of roadw
us local road
el by transit
ed areas.
mute mode
pool/vanpoo
and transit
el delay – ho
reeway dur
mated).
rterly Transvity of trans
ating cost pe
engers per re
nue hours p
box recovery
Non‐Transpo
sta maintainof life” ind
ed topics (Aireation, Sewtified in thecludes a gos. They fall stablished pEmergency Rio of facilitiealitative stan
xisting Dat
data is owents, SANDA
rmance of tmonitoring ormation inc
y miles trav
ways traveled
s).
– transit, rai
shares – dr
l, public tran
passenger t
ours of traffi
ring commu
it Performait operating
er passenge
evenue hour
er employee
y rate.
ortation Data
ns its excelleicators for ir Quality, Dwer, and Trafe city’s Threoal, objectivinto one of tperformanceResponse Sees to populatndard is esta
a Policy
ned by theAG, Caltrans,
the transporis extensivecludes:
eled per per
d (freeways
il, and bus ri
rive alone m
nsit, walk, bi
ravel times a
ic delay per
ute periods,
nce Monitoservices by
r and per re
r and per rev
e.
a
nt quality ofeleven pub
Drainage, Emffic) and twoshold Standves, one or three generae standard mrvices, and Ttion is estabablished for A
e departmen, and the pu
rtation systee and includ
rson.
versus local
idership, ann
mode share,
ke, telework
and travel vo
traveler, pe
, freeway d
ring Report service type
venue hour.
venue mile.
f life by careblic facility amergency Reo sister agendards Policy more thre
al categoriesmeasuring ovTraffic; blished for LiAir Quality,
nt that collblic.
em throughdes all signif
roads) vers
nual transit
Alternative
k, other).
olumes on k
eak period d
delay by m
includes me. These indi
.
efully monitand service esponse Serncies (Schoo(adopted beshold stans: verall level
braries and Fiscal, Schoo
lects it and
Smar
out San Dieficant mode
sus total lane
boardings, t
Transportat
key corridors
elay during
major corrid
monitoring thcators includ
oring threshtopics, incvices, Fiscalols and Watey City Coundards, and
of service fo
Parks and Rols, and Wat
d is shared
rt City Chula
Pag
ego County. s for travele
e miles (free
transit use in
tion Mode s
s.
weekends,
dor per tra
he efficiencyde:
hold standarluding nine , Libraries, er). These tncil in 1987)implement
or Drainage
ecreation; ater.
with other
Vista
ge 26
The ers in
eways
n well
share
delay
aveler
y and
rds or city‐Parks topics , and tation
, Fire
and
r City
9.4 In
There areSANDAG
10 E
Please se
10.1 S
Please se
10.2 C
Chula Visstandardin IEEE 8CVRIA‐coproposedstandard With regoriented Group. TperformaunderstaChula Visof incipapplicatio In summcertificatcertificatVehicle a
11 P
SCCV wiinteropeabout thencountetheir impin this tacomplete
nformation
e existing infand others
ngineering
ee section 5.
tandards a
ee section 5.
Certification
sta Smart Citds and certifi802.11, IEEE ompliant and standards.ds bodies to a
gard to certWi‐Fi AllianThis in‐deptance can imand the stresta Smart Ciient Conneons.
mary, our tetion. This ption ecosysteand Smart Ci
Performanc
ll prepare rability testhe performered, both tplications forask, to allowed by the req
n Sharing Ag
formation shagencies/ en
g Approac
10 Vision Ele
nd Architec
10 Vision Ele
n Processes
ty will leveraication from1609 WG,
nd documen For proposadvocate fo
tification, tence’s DSRC h interactiomprove curngths and lty, Qualcomected Vehic
eam partnepositions weem to the bties deploym
ce Measur
a System Iing for all eance of alltechnical anr the Model w time for required miles
greements
haring agreentities.
h
ement #10:
cture
ement #10:
s
age our teamm around theSAE DSRC Tnted architesed standardr and develo
eam partnerMarketing Tn has enablrrent certifiimitations o
mm will transle certificat
rs have leaell to collabenefit of ouments in Chu
res
nteroperabielements wil the subsyd proceduraDeploymeneview by USstone 20 bus
ements acro
Architecture
Architecture
m’s significae world – wiTC – to ensuectures are ds, our Teamop standards
r QualcommTask Group ed us to unication effoof the emergslate this untion to foc
adership poborate in allr project apula Vista and
ility Test reithin the Smystems, desal, and concnt. The outliSDOT, so thasiness days a
oss the board
e and Standa
e and Standa
nt participaith particulaure that ouror can be
m will use kns as appropr
m has a leadand Automderstand hoorts; moreoging Certificderstandingcus and m
sitions in s aspects of pproach and d across the
eport that mart ecosystscriptions ofclusions draine of the reat the prepaafter the com
Smar
d between C
ards
ards
tion in and uar use of Quar National Acompliant owledge anriate.
d position inmotive Markeow fundameover, it hascation Operag of the capamature cert
standards df the familiato the beneUnited State
will presentem, with qf any probwn from theport will bearation of thmpletion of t
rt City Chula
Pag
City departm
understandialcomm US Architecture‐to existingd participati
n the PHY/Met Segment ental over‐ths allowed uating Councabilities andification of
evelopmentar standardsefit of Connees.
t the resulquantitative blems that ese results, e developed he report cathese tests.
Vista
ge 27
ments,
ing of work ‐ and g and ion in
MAC‐Task
he‐air us to il. In gaps f the
t and s and ected
ts of data were with early an be
12 C
SCCV is pworkforccapabilit
12.1 E
The City demonstsupport f
12.2 W
The City City is abexperts designatemembers
12.3 In
Chula VisCity’s infvision an
12.4 D
ImplemeVista hasapply sucfinal profield datsystem fmarketinand partreach ou Collect ainteractiounderpincollection Adopt ananalysis publicallytransit d
Capacity
prepared to ce capacity, ies.
xecutive Co
of Chula Vitration throufrom our Ma
Workforce
has assembble to pool in ITS, thated in the Ts.
nfrastructu
sta has madrastructure d goals of SC
Data and Pe
ent result‐ors had substach experienduct of the ta for data functions shng success thnering with t to resident
and archive on data is ens the Smartn of both sm
nd develop tools have y funded wata. Smart C
demonstratdegree of
ommitmen
ista has conughout the ayor and City
led a team ofrom our bet will help Tier 1 positi
re Readine
de exceptionis diverse anCCV and the
erformance
riented manantial experce to the mChallenge wconsistencyhould equiphrough its seSANDAG thts of Chula V
high qualityessential fo Cities initiat
mart (integra
tools for dabeen develo
work will be City Chula V
e the Smartinfrastructu
t
tinuity of coperiod of py Council, pa
of experts toench of supscope the on on the
ess
nal commitmnd includes ae USDOT’s 12
e Managem
agement, efience in con
managementwill be data,and quality
pment failureat wrap in trough the FVista as well
y vehicle mor continuingtive. Smart Cted) and du
ata reductiooped by UCfurther en
Vista will de
t City Challenre readines
ommitted leperformanceassing the SC
o guide SCCVporting conproject effeorganization
ments in preall modes ne2 Vision Elem
ent
fficient test nducting largt and suppothe team wy and will pres occur. Staxi caps, sigastrak Newsas to its ann
ovement dag success oCity Chula Vimb (HIA) in‐
on and pre‐pR‐CERT, PAThanced for fine data pr
nge throughss, data and
eadership ane. This is dCCV Council
V through plsultants, incectively. Onal chart m
eparing the ecessary to sments.
support andge scale fiert of the Smwill focus onprovide timSmart City gns on busess Letters, etcnual tourist p
ata: The reliaf the Conneista will prop‐vehicle dev
processing: TH, and othpreprocessrocessing ne
Smar
h our executd performan
nd capacity demonstrateResolution
anning workcluding natioOur lead coanaging all
City for Smasuccessfully
d outreach: ld operationmart City Chn constant mely test supChula Vistas, tourist infoc. Smart Citypopulation.
able captureected Vehicpose requireices.
Various dater Smart Ciing of V2V,eeds and de
rt City Chula
Pag
ive commitmnce manage
to carry oued by the stunanimously
k in Phase 1.onally renowonsultant wiadditional
art Growth. demonstrat
Smart City Cnal tests andhula Vista. Amonitoring opport to reca has had ormation boy Chula Vist
e of V2V ancle programements to en
a processingity partners. V2I, trafficevelop addit
Vista
ge 28
ment, ment
ut the trong y.
. The wned ill be team
The te the
Chula d will As the of the cover great ooths, a will
d V2I that nable
g and . This c and tional
tools forquality metc. Smart Ciwork plaDeploym
13 L
Several cfor Smart
Chulademowill b
Southbetwwill iguideThis criter
Bus Oproje
Mode
r preprocessmonitoring, v
ty Chula Visn in this pro
ment.
everaging
currently idet City Chula
a Vista Bayfronstrate freqbe dedicated
h Bay BRT ween the Otanclude seveeway and buphase is esria.
On Shoulderect.
ernized Traff
sing, such avehicle trajec
sta is confidoposal offers
Funds
entified, fundVista includ
ront Shuttle quent autond. The City h
– Phase 1 ay Mesa Porten stations, us on shouldstimates $11
rs – Approxim
fic Managem
as data corrctories reco
ent that ous the best op
ded, and/ oe:
Service – thnomous shuhas designate
currently int of Entry ana Direct A
der), transit 13 million.
mately $10
ment Center
relation, minstruction fr
r team, thepportunity fo
r under con
his downtowttle service ed $250,000
n constructind DowntowAccess Rampsignal prior Numerous
Million in fu
r ‐ $200,000.
ining, filterirom historic
e site, the teor a very suc
struction pr
wn circulatortransit vehi0 for this ser
on and incwn San Diegop, arterial trity, and en deploymen
unding could
.
Smar
ng, cleaningcal data and
echnical appccessful Sma
rojects that
r service wilcles. A portvice.
ludes a 12‐o (see Figureransit‐only hanced custnts will acco
d be designa
rt City Chula
Pag
g and reducscenario pa
proaches andart City Chal
will be adva
l be advanction of the r
‐mile transite 2). The prlanes (dedictomer amenommodate
ated for the
Vista
ge 29
ction, rsing,
d the lenge
anced
ed to route
t line roject cated nities. SCCV
SCCV