of the Divača–Koper railway LINE 6,724,354 t 10,147,776 t ...

2
* Including the constructed second track between the Dekani power sub-station and Koper * Including the constructed second track between the Dekani power sub-station and Koper 85 trains/day 15.2 million net tonnes/year 102 trains/day 17.7 million net tonnes/year 222 trains/day 43.4 million net tonnes/year 120 trains/day 25.7 million net tonnes/year Modernised existing line* Modernised existing line* Modernised existing line* Modernised existing line* New single -track line New single -track line 518,900 vehicles 674,033 TEU Cars Containers MARIBOR TRIESTE LJUBLJANA VENICE KOPER RIJEKA GRAZ ZAGREB VIENNA BUDAPEST Line type: Single-track Length: 27.1 km Maximum speed: 160 km/h Clearance: GC Maximum longitudinal gradient: 17‰ Load: 225 KN/axle or 80 KN/m (category D4) Rails: 60 E1 Track superstructure: Mostly balastless Haulage system: Electrical (3 kV DC) Traffic management system: ERTMS (GSM-R/ETCS level 2) TRANSPORT CAPACITY THROUGHPUT CAPACITY THE CAPACITY OF DIVAČA–KOPER LINE Throughput at the cargo port of Koper To provide modern and efficient railway link between the cargo port of Koper and the rail network in the Republic of Slovenia, and consequently also the wider European rail network; To finally abolish all limitations of throughput and transport capacity of the railway line from Koper to the junction in Divača; To increase reliability of the operation of the railway line from Koper to Divača; To increase the level of traffic safety and to shorten travel times; To reduce environmental impacts and risks to the environment; To additionally increase the proportion of cargo transported by rail; To enable and to increase the use of environmentally friendly modes of transport. After the construction of the second track the throughput capacity of the existing line will increase from 85 to 102 trains per day and the transport capacity from 15.2 to 17.7 million net tonnes per year due to the modified organisation of traffic flow. Taking into account the journeys of freight trains only in the Koper–Divača direction (on the new line), the expected load of freight trains and on the basis of calculated tracking intervals, the capacity of the new line is 120 trains per day or 25.7 million tonnes per year; the capacity of both lines (the existing line and the second track) is 222 trains per day or 43.4 million tonnes per year. www.drugitir.si Cars 763,621 t 1,081,276 t General cargo 1,643,552 t 3,007,757 t Liquid cargo 3,073,620 t 3,813,721 t Bulk cargo 6,724,354 t 10,147,776 t Containers 6,760,204 t 17,239,593 t Total 18,965,351 t 35,290,123 t 2014 Long-term forecast for 2030** 2014* THROUGHPUT BY GROUPS OF GOODS 2009‒2014 8 7 6 5 4 3 2 1 0 2009 2010 2011 2012 2013 2014 Million tonnes References: * Luka Koper, d. d. ** Study »Evaluation of measures regarding the future Slovenian transport network, Divača–Koper Project« (PNZ svetovanje projektiranje d.o.o., November 2014). Baltic-Adriatic corridor Mediterranean corridor The purpose of the second track of the Divača–Koper railway CARS GENERAL CARGO LIQUID CARGO CONTAINERS BULK CARGO of the Divača–Koper railway LINE

Transcript of of the Divača–Koper railway LINE 6,724,354 t 10,147,776 t ...

Page 1: of the Divača–Koper railway LINE 6,724,354 t 10,147,776 t ...

* Including the constructed second track between the Dekani power sub-station and Koper

* Including the constructed second track between the Dekani power sub-station and Koper

85

trains/day

15.2

million net tonnes/year

102

trains/day

17.7

million net tonnes/year

222

trains/day

43.4

million net tonnes/year

120

trains/day

25.7

million net tonnes/year

Modernised existing line*

Modernised existing line*

Modernised existing line*

Modernised existing line*

New single-track line

New single-track line

518,900

vehicles

674,033

TEU

Cars Containers

MA

RIB

OR

TR

IEST

E

LJU

BLJ

AN

A

VE

NIC

E

KO

PE

R

RIJ

EK

A

GR

AZ

ZA

GR

EB

VIE

NN

A

BU

DA

PE

STLine type: Single-track

Length: 27.1 km

Maximum speed: 160 km/h

Clearance: GC

Maximum longitudinal gradient: 17‰

Load:225 KN/axle or 80 KN/m (category D4)

Rails: 60 E1

Track superstructure: Mostly balastless

Haulage system: Electrical (3 kV DC)

Traffic management system: ERTMS (GSM-R/ETCS level 2)

TRANSPORT CAPACITY

THROUGHPUT CAPACITY

THE CAPACITY OF DIVAČA–KOPER LINE

Throughput at the cargo port of Koper

• To provide modern and efficient railway link between

the cargo port of Koper and the rail network in the

Republic of Slovenia, and consequently also the

wider European rail network;

• To finally abolish all limitations of throughput and

transport capacity of the railway line from Koper to

the junction in Divača;

• To increase reliability of the operation of the railway

line from Koper to Divača;

• To increase the level of traffic safety and to shorten

travel times;

• To reduce environmental impacts and risks to the

environment;

• To additionally increase the proportion of cargo

transported by rail;

• To enable and to increase the use of environmentally

friendly modes of transport.

After the construction of the second track the

throughput capacity of the existing line will

increase from 85 to 102 trains per day and the

transport capacity from 15.2 to 17.7 million net

tonnes per year due to the modified organisation

of traffic flow. Taking into account the journeys of

freight trains only in the Koper–Divača direction

(on the new line), the expected load of freight trains

and on the basis of calculated tracking intervals,

the capacity of the new line is 120 trains per day or

25.7 million tonnes per year; the capacity of both

lines (the existing line and the second track) is 222

trains per day or 43.4 million tonnes per year.

www.drugitir.si

Cars 763,621 t 1,081,276 t

General cargo 1,643,552 t 3,007,757 t

Liquid cargo 3,073,620 t 3,813,721 t

Bulk cargo 6,724,354 t 10,147,776 t

Containers 6,760,204 t 17,239,593 t

Total 18,965,351 t 35,290,123 t

2014

Long-term forecast for 2030**2014*

THROUGHPUT BY GROUPS OF GOODS 2009‒2014

8

7

6

5

4

3

2

1

0

2009 2010 2011 2012 2013 2014

Million tonnes

References: * Luka Koper, d. d. ** Study »Evaluation of measures regarding the future Slovenian transport network, Divača–Koper Project«

(PNZ svetovanje projektiranje d.o.o., November 2014).

Baltic-Adriatic corridor

Mediterranean corridor

The purpose of the second track of the Divača–Koper railway

CARS

GENERAL CARGO

LIQUID CARGO

CONTAINERS

BULK CARGO

of the Divača–Koper railway LINE

Page 2: of the Divača–Koper railway LINE 6,724,354 t 10,147,776 t ...

second track of the Divača–Koper railway LINE

T8 T7 T2

B1

G

B2

T1

T6

T5

T8

T7

T6

T5

B2

G

B1

V2

V1

T4

T3

8 TUNNELS

T2

T1

T4

T3

V2 V1

Total length of tunnels:

20.5 kmTotal length of viaducts:

1.1 km

Scale 1 : 50 000

Issu

ed a

nd

pu

blis

hed

by:

Slo

ven

ian

Infr

astr

uc

ture

Ag

en

cy

∞ P

rod

uct

ion

: D

RI u

pra

vlja

nje

inve

stic

ij, d

. o. o

. ∞ D

esig

n:

Son

ja E

rže

n ∞

Map

: G

eo

de

tska

dru

žba

d. o

. o. ∞

Pri

nt:

Tis

karn

a Ja

nu

š, M

iran

Jan

s. p

. ∞ L

jub

ljan

a, J

un

e 2

015

6,714 m

6,017 m

330 m

1,954 m

128 m

358 m

1,163 m

3,808 m

452 m

647 m

70 m

45 m

100 m

The relocation of the existing track

The second track between the Dekani power sub-station and Koper, approx. 1.2 km

2 BRIDGES 1 GALLERY

2 VIADUCTS