October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe...

18
Kelley Square Improvement Project Worcester | Project File No. 609226 PUBLIC WORKSHOP White Room - Crompton Collective Oct 10, 2018 | 6:00 pm

Transcript of October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe...

Page 1: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square

Improvement Project

Worcester | Project File No. 609226

PUBLIC WORKSHOP White Room - Crompton Collective

Oct 10, 2018 | 6:00 pm

Page 2: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Presenters & Facilitators Mass DOT • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost

VHB • Don Cooke • Erin Thompson • Tracie Lenhardt • Scott Brunner

RVA • Kate Barrett • Emily Christin • Amanda Poggenburg

Page 3: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Project Area

Page 4: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Project Need and Goals • Safety issues for pedestrians, bicyclists and motor vehicles

– Highest crash location in the Commonwealth – Improve ADA / Accessibility

• Manage a complex network of roads located in a vibrant andgrowing neighborhood – Comprised of a series of unsignalized intersections including

Madison, Green, Harding, Water, Millbury and Vernon Streets. – I-290 ramp intersections with Vernon Street adds to the congestion

and the complexity of traffic flow

The purpose of the project is to improve safety for all users

Page 5: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Other Projects

Page 6: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Crash Summary (2013 – 2016) Collision Type Madison St.

Washington to Green

Kelley Square

I-290 Interchange

Other Total

Angle 49 80 61 0 190

22*

Head-On 0 0 0 1 1

Rear-End 13 49 32 0 94

Sideswipe 3 1 4 0 8(Opp. Direct.)

Sideswipe 6 27 34 0 67(Same Direct.)

Single Vehicle 6 25 12 0 43

Non Motorist 4 13 5 0(Bike/Pedestrian)

81 195 148 1Total 403 * The non-motorist crashes are also accounted for in the crash totals.

Page 7: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Crash locations

7 crashes with parked cars

8 crashes involving pedestrians

27 angle collisions

51 crashes with left-turns to/from ramps

14 side-swipe collisions

4 pedestrian crashes

Pedestrian fatality

10 crashes exitinggas station

18 crashes with vehicles turning to/from Washington St.

13 rear end collisions

53 angle collisions

Page 8: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Existing Issues

Non-ADA compliantwheelchair ramps with detectable warning panels

Little or no crosswalk striping

High number of crashes involving vehicles exitingWashington St. and the Gulfstation/Dunkin Donuts

No delineated bike accommodations

Poor sight lines exiting Washington St. on both sides of Madison St.

Page 9: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Existing Issues

Page 10: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Existing Issues

Poor traffic control and right of way allocation at approaches to the intersection

Poor line of sight from Harding St.looking south into Kelley Square due to the building

Wide pavement width with little to no delineation for traffic movements

No clear bike accommodations within Kelley Square

Non-ADA compliant wheelchair ramps and cut-thru islands with no detectable warning panels

Apex wheelchair ramps

High number of rear end crashes

High number of crashes where vehicles try crossing Kelley Square via Harding St. and Millbury/WaterSt.

Multiple pedestrian crashes at crosswalks

Long uncontrolled crosswalks

Page 11: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Daily Volumes

Page 12: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Kelley Square Traffic AM

Source: Google Maps Traffic screen capture, October 10, 2018

Page 13: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Kelley Square Traffic PM

Source: Google Maps Traffic screen capture, October 3, 2018

Page 14: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Potential Improvement Alternatives

• Signalization

• Unsignalized with Geometric Improvements

• Roundabout(s)

• Potential change in directionality of streets

Not included in this project: • Pedestrian/Bike bridges or tunnels

• Vernon St Bridge modifications

Page 15: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Outreach • Previous Outreach

– Canal District Farmers Market – Sept 8, 2018

– stART on the Street – Sept 16, 2018

. – Green Island Neighborhood Alliance Meeting – Oct 2, 2018

• Additional community/business meetings to come

– MassDOT 2nd Public Workshop – Oct 24, 2018

– MassDOT Public Information Meeting – Nov 15, 2018

Page 16: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

Project Schedule

25% Design Submittal 100% Design Submittal Jan 2019 May 2019

Design Public Hearing Construction Starts February/March 2019 Oct 2019

Page 17: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Kelley Square Improvement Project Worcester | Project File No.609226

- Mail-in comment sheets

- Project Email Address: [email protected]

– Project website: https://www.mass.gov/worcester-kelley-square-improvement-project

Page 18: October 10 Public Workshop - Mass.Gov...2018/10/12  · • John Bechard • Tom Emerick • Joe Frawley • Muazzez Reardon • James Robida • Barry Lorion • Arthur Frost VHB

Thank You Next Meeting:

October 24, 2018

PUBLIC WORKSHOP White Room - Crompton Collective

Oct 10, 2018 | 6:00 pm