Alaska Gasline Development Corporation Observation on Current Plant Design Revised - June 22, 2018 Keiji Akiyama

Transcript of Observation on Current Plant Design€¦ · • Process scheme • Gas turbine and compressor...

  • Alaska Gasline Development Corporation

    Observation on Current Plant Design

    Revised-June22,2018

    KeijiAkiyama

  • Discussion topics

    1. Project Economics Improvement - OPEX2. Plant Cost Optimization - CAPEX3. LNG train layout – Observation and Potential Issues

    2

  • Project Economics Improvement - OPEX

    1. Minimize natural gas consumption- GHG emission• Process scheme• Gas turbine and compressor scheme and model selection• Waste heat recovery2. Improve plant availability• Gas turbine and compressor maintenance3. Increase LNG production capacity• Effectively use large temperature difference.• Consider production reduction during summer.

    3

  • Temperature Distribution Profile – Nikiski Airport4

    Summeranda*ernoononly

    Wholeyearround

    AirCoolerdesign

    Hydraulicdesign

  • Ambient Temperature Profile – Nikiski Airport5

    SummerandA+ernoononly

    Wholeyear

    AirCoolerdesign

    HydraulicDesign Average

  • GHG Emission Comparison – without Native CO26

    ton-CO2/ton-LNG

    Industrial GT

    Aero-derivative GT

    Steam Turbine

    GTP

    LNG

    Pipeline

  • Waste Heat Recovery to improve energy efficiency

    • Fuel gas consumption is a major portion of plant running cost.

    • Wrt fuel consumption of entire plant, major consumers are Ref. comp. GT (< 70%), notpower gen. GT (< 30%). Waste heat recovery from the latter is less effective.

    • Waste heat recovery unit on Ref. comp. GT may have modularization issue.

    • Usage of recovered energy from waste heat will be limited.

    7

  • Plant Cost Optimization - CAPEX

    To optimize module fabrication and site construction cost,• Minimize large bore piping quantity• Minimize height of pipe rack and steel structure• Minimize site integration work volume (carry over work), particularly

    • Electrical and instrument cable installation and termination• Piping/equipment cold insulation and painting• Minimize hydrostatic test of pipe loops at site

    8

  • Modularization for on-shore LNG

    • Modularization of on-shore LNG plant is different from off-shore application. Recognize“particulars”

    • Incorporate uniqueness of module approach from early stage of project, e.g. concept andprocess design phase.

    9

  • Module experience of LNG project to dateProject Country Liquefaction Process

    CapacityMTPA Trains Operator Status

    NWS #5 Australia C3MR 4.2 1 Woodside In operation

    Pluto Australia C3MR 4.9 1 Woodside In operation

    Gorgon Australia C3MR 5.2 3 Chevron In operation

    Ichthys Australia C3MR 4.5 2 INPEX Under construction

    Yamal Russia C3MR 5.5 3 Novatek In operation

    GLNG Australia Cascade 3.5 2 Santos In operation

    QCLNG Australia Cascade 4.3 2 BG In operation

    APLNG Australia Cascade 4.5 2 CoP In operation

    Wheatstone Australia Cascade 4.5 2 Chevron Under construction

    PFLNG1 Malaysia Nitrogen 1.2 1 Petronas In operation

    PFLNG2 Malaysia Nitrogen 1.5 1 Petronas Under construction

    Prelude Australia Shell DMR 3.6 1 Shell Under construction

    Coral Mozambique APCI DMR 3.3 1 ENI Just started

    10

    Issues

    Cost over run and schedule delay

    Cost over run and schedule delay

    Cost over run and schedule delay

    Cost over run and schedule delay

    Cost over run and schedule delay

    Onshore

    Offshore

  • Modularization – Key points

    • Modularize large bore piping around refrigerant compressors. Don’t use “stick built” of gas turbines and compressors.

    • Re-visit gas turbine driver model to facilitate modularization

    • Review module transportation route and sequence of erection

    • Review electrical cable route from substation to large motors

    • Ensure proactive project management of module fabrication at yard

    • Ensure flexibility of ocean transportation schedule

    11

  • • Current design assumes stick built of refrigerant compressor/gas turbine driver, not module.Majority of large bore piping installation & test will also stick built accordingly.

    • Optimize layout to minimize large bore piping quantity.• Provide maintenance access, particularly for air cooled exchanger bundles.• Consider cable route from substation to large motors – Location of substations• Consider module transportation route and sequence• To minimize adverse impact due to hot air re-circulation,

    • Evaluate distance between LNG trains• Evaluate direction of LNG trains to lined up with prevailing wind.• Evaluate gap between main piperack and tall equipment modules and columns

    LNG train layout - Observation12

  • MR 1st stage suction line

    Optimize large bore, cryogenic piping – MR circuit13

  • C3 1st stage suction line

    Optimize large bore, cryogenic piping – Propanecircuit

    14

  • Optimize large bore, cryogenic piping – MR circuit15

    Pipe rack will be necessary forsuction/discharge piping, isolationvalves, and safety relief valves.

    Crane access will be difficultfor these air cooler bundles.

  • GTP layout - Observation• Recommend grouping together all TG compressors, CO2 compressors and power

    generators respectively considering operation and sparing philosophy• Recommend not to rotate 1st train only. Use same design and direction for all trains.• Make sure if AGRU absorber can be integrated in module. Absorber is the heaviest vessel

    in LNG plant.

    16

  • GTP Site Layout17

    CO2 Comp 3

    CO2 Comp 2

    CO2 Comp 1

    TG Comp2

    TG Comp3

    TG Comp1

    Power Gen Power Gen Power Gen

    AGRU2

    AGRU3

    AGRU1

  • GTP Site Layout – Recommended Concept18

    CO2Comp 2

    CO2Comp 3

    CO2Comp 1

    TG Comp2

    TG Comp1

    TG Comp3

    PowerGen

    PowerGen

    PowerGen

    Dehyd.1

    Dehyd.2

    Dehyd.3

    AGRU 3 AGRU 2 AGRU 1

    • RecommendgroupingtogetherallTGcompressors,CO2compressorsandpowergeneratorsrespec;velyconsideringopera;onandsparingphilosophy

  • How hot air recirculation occurs?

    Hot Air Recirculation will be problematic when• Ambient temperature is high, and• Wind direction is perpendicular to ACHE bank (cross

    wind), and• Wind speed is high, say above 3 m/sec.

    Propane condenser and sub-cooler will be mostseriously impacted.

    19

  • Prevailing Wind Direction20

    PrevailingWind

    WholeYear

    Whole Year Whole Year

  • 21Prevailing Wind

    Whole Year

  • Monthly Prevailing Wind Direction - Nikiski NKTA2 Buoy22

    From May to August

  • Prevailing wind - May to August and Afternoon only23

    Prevailingwind

    directionduringsummer

    Prevailingwind

    directionduringsummer

  • 24

    Too close each other. Combinethese two banks and line up

    parallel to prevailing wind

    Too close each other. Combinethese two banks and line up

    parallel to prevailing wind

    Compressor shelter should notbe taller than ACHE banks

    Ensure sufficient air flow pathbehind tall columns and structures.

    Increase gap between mainpiperack and tall equipment and

    module

    Prevailingwind

    directionduringsummer

    LNG Train Layout – Potential Issues

  • Maintenance Access25

    How to access tothese ACHE?

    TheseACHEshouldnotbelocatedhereconsideringHAR

    Crane

  • Thank you