15
Public Sector Near Zero Energy Building ( NZEB ) Case Study – Office Building NZEB and RER ENGINEERING DESIGN PARTNERSHIP TM Presentation by David Walshe Technical Director IN2 Engineering Design Partnership

Transcript of NZEB Office Building by David Walshe

Page 1: NZEB Office Building by  David Walshe

Public Sector Near Zero Energy Building (NZEB) Case Study – Office Building NZEB and RER

ENGINEERING DESIGN PARTNERSHIP

TM

Presentation by David WalsheTechnical Director

IN2 Engineering Design Partnership

Page 2: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

Overview IN2 Engineering Design Partnership

01. Building Introduction02. Previous Energy Improvements03. NZEB 2017 Analysis04. RER Applications

Page 3: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

• ABK Architects

• 35,000m2

• 8 / 6 storeys over Grd Flr

• Open Plan Office

• Spec Development – A/C

• Planning Summer 2016

• Tender Summer 2017

1.0 Building Introduction IN2 Engineering Design Partnership

Page 4: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

• TAS Dynamic Simulation Model

• NZEB Reference Building (40% Glaz)

• NZEB Actual Building (typically 60% Glaz + Shading)

• Fabric, Leakage, Services, Lighting as NZEB spec

• Air Conditioned (FCU)

1.0 Building Introduction IN2 Engineering Design Partnership

Page 5: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

Summary

• Daylighting - Photocell Control / Lighting – Best Saving!!

• Natural Ventilation Penalised Under NZEB?

• PV / Glazing Small Savings

• Insulation / Infiltration Negligible Impact

• But!.... NZEB Rating requires combination of technologies

2.0 Previous Energy Improvements

Insulation

Infiltration

Glazing

Natural Ventilation

Lighting

Lighting Control

Base

PV

50%40%30%20%10%0% 60%

Insulation Infiltration Glazing Nat Vent Lighting Ltg Controls PVImprovement 6% 5% 12% 15% 36% 53% 12%

Page 6: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

Reference NZEB v Reference 2008

• 60% Reduction (approx) below 2008

• Reductions across each category

3.0 NZEB 2017 Analysis IN2 Engineering Design Partnership

Energy Type HTG HWS CLG AUX LTG Renewables GAS ELEC TotalReference 2008 10.7 9.2 16.8 22.6 51.6 0 21.9 199.4 221.3

Reference NZEB 4.6 4.3 5.6 10.2 21.1 0 9.8 80.9 90.7

% Reduction: 59% EPC 0.41

HTG HWS

GAS ELEC

CLG AUX LTG

Primary Energy (kWh/m2)

Building Energy (kWh/m2)50250

200150100500 250

10075 125

Reference 2008

Reference NZEB

Reference 2008

Reference NZEB

Page 7: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

Actual v Reference 2008

• 65% Reduction (approx) below Part L 2008

3.0 NZEB 2017 Analysis IN2 Engineering Design Partnership

Energy Type HTG HWS CLG AUX LTG Renewables GAS ELEC TotalReference 2008 9.4 9.2 17.4 22.6 51.6 0 20.46 200.69 221.15

Actual 3.8 4.6 5.1 9.5 16.2 0 9.26 67.60 76.86

% Reduction: 65% EPC 0.35

HTG HWS

GAS ELEC

CLG AUX LTG

Primary Energy (kWh/m2)

Building Energy (kWh/m2)50250

200150100500 250

10075 125

Reference 2008

Actual

Reference 2008

Actual

Page 8: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

Actual v Reference NZEB

15% Reduction (approx) below Part L 2008

• Lighting Increased Glazing Daylighting ADF 2.7% v 2.2%

• Heating Heat Recovery

• Cooling and Auxiliary Small Plant Improvements

3.0 NZEB 2017 Analysis IN2 Engineering Design Partnership

Energy Type HTG HWS CLG AUX LTG Renewables GAS ELEC TotalReference NZEB 4.6 4.3 5.6 10.2 21.1 0 9.77 80.94 90.71

Actual 3.8 4.6 5.1 9.5 16.2 0 9.26 67.60 76.86

% Reduction: 15% EPC 0.85

HTG HWS

GAS ELEC

CLG AUX LTG

Primary Energy (kWh/m2)

Building Energy (kWh/m2)50250

200150100500 250

10075 125

Reference NZEB

Actual

Reference NZEB

Actual

Page 9: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

4.0 RER Applications IN2 Engineering Design Partnership

12% Only Heating and Water! (Gas)

GASELEC

78%

12%

Page 10: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

4.0 RER Applications IN2 Engineering Design Partnership

20% Renewable Energy Provision

• Thermal Options – 12% Max! 0% 5% 10% 15% 20%

Solar Thermal (50% HWS)

Biomass (75% HTG/HWS)

ASHP (100% HTG/HWS)

CHP (Offset 10% ELEC)

RER Technology

Page 11: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

4.0 RER Applications IN2 Engineering Design Partnership

20% Renewable Energy Provision

• ELEC Options – Wind

74no. 15m Helical Wind Turbines

1no. 35m / 25m diam

Page 12: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

4.0 RER Applications IN2 Engineering Design Partnership

20% Renewable Energy Provision

• ELEC Options – PV

2,400m2 PV required

1,000m2 PV area available

Recogniseddifficulty– 20% RER being reviewed

Possiblyoffsetother Primary Energy reduction?

15% below NZEB? 5% RER?

Page 13: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

Coda IN2 Engineering Design Partnership

Kylemore Monastery• ABK Architects

• Nuns Accommodation

• 2,000m2 approx

• Bedrooms

• Refectory

• Kitchen

• Common Areas

Page 14: NZEB Office Building by  David Walshe

ENGINEERING DESIGN PARTNERSHIP

TM

Coda IN2 Engineering Design Partnership

Kylemore Monastery• Heating and Hot Water Energy High

• Electrical Energy Low No Cooling Low Mech Vent Low Illumination requirements

• ASHP

• 50% RER!

Energy Type HTG HWS CLG AUX LTG Renewables GAS ELEC TotalReference 60.9 36.4 0.0 1.3 9.2 0 107.0 22.9 129.9

Actual 26.1 12.5 0.0 1.2 11.4 0 0.0 112.4 112.4

Improvement on Part L NZEB: 14% EPC 0.86

HTG HWS

GAS ELEC

CLG AUX LTG

Primary Energy (kWh/m2)

Building Energy (kWh/m2)50250

100500 150

10075 125

Reference

Actual

Reference

Actual

Page 15: NZEB Office Building by  David Walshe

Public Sector Near Zero Energy Building (NZEB) Case Study – Office Building NZEB and RER

ENGINEERING DESIGN PARTNERSHIP

TM

Presentation by David WalsheTechnical Director

IN2 Engineering Design Partnership