1
NYP BEST PRACTICESCODE REVIEW: LIFE SAFETY
Larry Borsinger, MBADirector, Facilities Operations - Regulatory Compliance
Sukhjit Tom Singh, MHA, MPHField Director, Facilities Operations - Regulatory Compliance
2
Hartford Hospital Fire 1961
http://www.youtube.com/watch?v=76mo_UkGAAM&feature=youtu.be
4
NYP Regulatory Portfolio Profile
• Basic Building Information
• Total # Buildings: 48• Total Square Feet: 7.6 M• Total Beds: 2,331
5
Background & Significance• Safety:
– Vast majority of in-patients are incapable of self-preservation and rely on the building features/systems to protect them from the risks of fire & smoke.
• Regulatory:– Hospitals must be designed to protect patients, staff and visitors.– Requirements are driven by various agencies:
• Centers for Medicare & Medicaid Services (CMS)• New York State Department of Health (DOH)• The Joint Commission (TJC)• Fire Department of New York/White Plains• Department of Buildings (DOB)• Occupational Safety & Health Administration (OSHA)
6
We
Put P
atien
ts F
irst
1. Establish Roles/Responsibilities
2. Define which projects require a life safety code analysis
3. Describe the various life safety elements beyond the typical project envelope
4. Review the process to prepare and submit life safety plans to NYP
5. Understand the importance of delivering a code compliant facility
Objectives
7
We
Put P
atien
ts F
irst PM
(FD&C)
Facilities OperationsRegulatory Compliance
ORPPD
Stonehill Taylor
ArchitectsA/E Team CM/GC
Roles/Responsibilities
8
We
Put P
atien
ts F
irst
• Facilities Design + Construction Management of the projects life safety scope and process Retain consultants
• Facilities Operations Regulatory Compliance Statement of Conditions (SOC) - List of known deficiencies Existing Life Safety Equivalencies/Waivers Review and comment on life safety documents ILSM review and checklist Review and comment
• Stonehill Taylor Architects as agent for NYP Current life safety documents Construction Class Code basis Certificate of Occupancy Review and approval
Roles/Responsibilities
9
We
Put P
atien
ts F
irst
Office of Regulatory Planning & Policy Development (ORPPD) DOH submissions and reviews Existing licensing status Existing Waivers
A/E Team Conduct a life safety code analysis of the project limits
(fire/smoke compartments) as well the egress to the public way Develop Required Waivers and / or Equivalencies Ensure design & construction is according to code taking into
consideration best practice (ie. Suites) Review Existing Conditions and Violations Record documents based on information from the contractor
Contractor Pre-Construction: Probes, testing, etc. Pre Construction Risk Assessment (PCRA) Compliance Post-Construction: “Red line” documents to the AE team in order
to create the record documents
Roles/Responsibilities
10
We
Put P
atien
ts F
irst
1. Applicable Projects
DOH Projects Project limits plus egress path to public way
Non-DOH Projects filed with DOB Project limits
2. Cosmetic Upgrades
Projects not filed with the DOB Code analysis is not required
All elements of the project must meet fire and life safety codes and NYP requirements.
Life Safety Code Analysis
11
We
Put P
atien
ts F
irst
1. Obtain current life safety drawings from NYP document library as a reference only
• www.atginc.com
2. Survey existing conditions relative to the life safety drawings
3. Develop revised life safety drawings and code analysis relevant to the current project
4. Submit for review, comment and sign-off by Stonehill & Taylor with each design phase• Review and comment by Regulatory Compliance.
5. Revise based on comments
6. Submit record life safety drawings and code analysis electronically to the PM
Process
12
We
Put P
atien
ts F
irst
Feasibility
Identify work that will impact cost, schedule, scope in order to develop a project schedule and budget
Deliverables
1. Code Analysis Reconciled matrix of applicable codes/sections including but not limited to:
Occupancy Classification Exit Stairwells (ie. 50/50 Rule) Travel Distance Patient Sleeping/Non-Patient Sleeping Suites Fire/Smoke Barriers/Doors Corridor Walls/Doors
2. Existing conditions assessment Field verification relative to code requirements and current life safety drawings(Note: drawings provided by NYP represent expectations not field conditions. It is the responsibility of the consultant to confirm and determine the scope of work required to meet expectations and modifications to accommodate the project)
3. Life Safety Plan• Compliant Suites
Process
13
We
Put P
atien
ts F
irst
• Schematic Design/Design Development Confirm conditions and detail documents for cost, schedule and scope verification
• Construction Documents Complete life safety and interim life safety documents for agency submission
• Construction Phase Compliance with hospital’s PCRA procedures
• Post Construction Record life safety documents DOH Pre-Occupancy Survey
Process