24
Financial Year Project Name Major Activity Project Cost (Kshs) Status (Indicate whether Complete, Ongoing or Intending to tender) Remarks 2013/2014 Kisii Town Dispensary Kisii Town Dispensary 3,000,000.00 New handed over 2013/2014 Nyaura Dispensary Nyaura Dispensary 500,000.00 Ongoing handed over 2013/2014 Boronyi Dispensary Boronyi Dispensary 1,000,000.00 New handed over 2013/2014 Nyangeni Dispensary Nyangeni Dispensary 1,000,000.00 New handed over 2013/2014 Nyamemiso Dispensary Nyamemiso Dispensary 500,000.00 Ongoing handed over 2013/2014 Ibeno Dispensary Ibeno Dispensary 500,000.00 Ongoing handed over 2013/2014 Otamba Secondary Otamba Secondary 500,000.00 New handed over 2013/2014 Nyansancha Primary Nyansancha Primary 300,000.00 New handed over 2013/2014 Irondi secondary Irondi secondary 300,000.00 New handed over 2013/2014 Nyamecheo secondary Nyamecheo secondary 300,000.00 New handed over 2013/2014 Kerera school Kerera school 300,000.00 New handed over NYARIBARI CHACHE CONSTITUENCY PROJECT IMPLEMENTATION STATUS REPORT AS AT MAY 2016

Transcript of NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New...

Page 1: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

Financial Year

Project Name Major Activity Project Cost (Kshs)

Status (Indicate whether Complete, Ongoing or Intending to tender)

Remarks

2013/2014 Kisii Town Dispensary Kisii Town Dispensary 3,000,000.00 New handed over

2013/2014 Nyaura Dispensary Nyaura Dispensary 500,000.00 Ongoing handed over

2013/2014 Boronyi Dispensary Boronyi Dispensary 1,000,000.00 New handed over

2013/2014 Nyangeni Dispensary Nyangeni Dispensary 1,000,000.00 New handed over

2013/2014 Nyamemiso Dispensary

Nyamemiso Dispensary 500,000.00 Ongoing handed over

2013/2014 Ibeno Dispensary Ibeno Dispensary 500,000.00 Ongoing handed over

2013/2014 Otamba Secondary Otamba Secondary 500,000.00 New handed over

2013/2014 Nyansancha Primary Nyansancha Primary 300,000.00 New handed over

2013/2014 Irondi secondary Irondi secondary 300,000.00 New handed over

2013/2014 Nyamecheo secondary Nyamecheo secondary 300,000.00 New handed over

2013/2014 Kerera school Kerera school 300,000.00 New handed over

NYARIBARI CHACHE CONSTITUENCYPROJECT IMPLEMENTATION STATUS REPORT AS AT MAY 2016

Page 2: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2013/2014 Eremo primary Eremo primary 300,000.00 New handed over

2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing handed over

2013/2014 Nyabiosi secondary Nyabiosi secondary 300,000.00 New handed over

2013/2014 Nyamemiso secondary Nyamemiso secondary 300,000.00 New handed over

2013/2014 Nyanko secondary Nyanko secondary 300,000.00 New handed over

2013/2014 Nyosia secondary Nyosia secondary 300,000.00 New handed over

2013/2014 Obwoyo primary Obwoyo primary 300,000.00 New handed over

2013/2014 Nyabiuto-Nyaguta Road

Nyabiuto-Nyaguta Road 1,179,274.00 New handed over

2013/2014 Amariba-Matunwa Road

Amariba-Matunwa Road 2,000,000.00 New handed over

2013/2014 Kabosi-Irungu Road Kabosi-Irungu Road 2,000,000.00 New handed over

2013/2014 Nyansira water Nyansira water 800,000.00 Ongoing handed over

2013/2014 Nyanguru water Nyanguru water 800,000.00 Ongoing handed over

2013/2014 Keumbu water Spring Keumbu water Spring 500,000.00 New handed over

2013/2014 Birongo water Spring Birongo water Spring 500,000.00 New handed over

2013/2014 Ibeno Water Spring Ibeno Water Spring 500,000.00 New handed over

2013/2014 Babaracho Water Spring

Babaracho Water Spring 500,000.00 New handed over

Page 3: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2013/2014 Kiogoro Water Spring Kiogoro Water Spring 500,000.00 New handed over

2013/2014 Otamba Tea Buying Centre

Otamba Tea Buying Centre 100,000.00 New handed over

2013/2014 Nyamwaro Tea Buying Centre

Nyamwaro Tea Buying Centre 100,000.00 New handed over

2013/2014 Irungu TBC Irungu TBC 100,000.00 New handed over

2013/2014 Menyinkwa TBC Menyinkwa TBC 100,000.00 New handed over

2013/2014 Kiogoro TBC Kiogoro TBC 100,000.00 New handed over

2013/2014 Kabosi TBC Kabosi TBC 100,000.00 New handed over

2013/2014 Taracha TBC Taracha TBC 100,000.00 New handed over

2013/2014 Keumbu TBC Keumbu TBC 100,000.00 New handed over

2013/2014 Kionganyo TBC Kionganyo TBC 100,000.00 New handed over

2013/2014 Riomweri TBc Riomweri TBc 100,000.00 New handed over

2013/2014 Emergency Fund Emergency Fund 3,564,466.00 Ongoing handed over

2013/2014 Universities Universities 8,000,000.00 Ongoing handed over

2013/2014 Colleges Colleges 8,145,988.00 Ongoing handed over

2013/2014 Village polytechnics/ECDE

Village polytechnics/ECDE 573,096.25 Ongoing handed over

2013/2014 Administration Administration 4,347,501.00 Ongoing handed over

Page 4: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2013/2014 Constituency Sports Tournament

Constituency Sports Tournament 1,449,167.00 Ongoing handed over

2013/2014 Nyataro Primary School

Nyataro Primary School 300,000.00 New handed over

2013/2014 Otamba Primary School

Otamba Primary School 300,000.00 New handed over

2013/2014 Nyanderema Primary School

Nyanderema Primary School 300,000.00 New handed over

2013/2014 Nyabiosi Primary Nyabiosi Primary 249,167.00 New handed over

2013/2014 Nyosia Primary Nyosia Primary 300,000.00 New handed over

2013/2014 M&E/Capacity Building

M&E/Capacity Building 2,173,751.00 Ongoing handed over

2013/2014 KEUMBU LIBRARY KEUMBU LIBRARY 19,475,982.75 New handed over

2013/2014 Kigoro Health Centre Kigoro Health Centre 1,494,253.00 New handed over

2013/2014 Bobaracho Dispensary Bobaracho Dispensary 1,494,254.00 New handed over

2013/2014 Nyakebako Dispensary

Nyakebako Dispensary 1,494,255.00 New handed over

Page 5: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2014/2015 Employees Salaries,Goods and Services,NSSF,NHIF,Committee Expenses,Goods and Services,Committee Expenses

Payment of staff salaries and gratuity ,Purchase of fuel, repairs and maintenance, printing, stationery, telephone, travel and subsistence, office tea, etc.,Payment of NSSF Deductions,Payment of NHIF Deductions,Payment of Committee sitting allowances, transport, conferences,Purchase of fuel, repairs and maintenance, printing, stationery, Airtime, travel and subsistence, e.t.c,Payment of Committee sitting allowances, transport, conferences,

8,810,609.00 complete awaiting more funds

2014/2015 CDFC/PMC Capacity Building

Undertake Training of the PMCs/CDFCs/school Heads on CDF Related issues

3,144,678.00 complete awaiting more funds

2014/2015 Constituency Audit Constituency Audit 500,000.00 complete awaiting more funds

Page 6: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2014/2015 Emergency To cater for any unforeseen occurrences in the constituency during the financial year

5,400,259.00 complete awaiting more funds

2014/2015 Constituency Sports Tournament

Carry out Constituency Sports tournament and the winning teams/schools to be awarded with trophies, balls, and games kits

2,212,286.00 complete awaiting more funds

2014/2015 Bursary Secondary Schools

Payment of bursary to needy student 4,000,000.00 complete awaiting more funds

2014/2015 Bursary Universities, Colleges & Tertiary Schools

Payment of bursary to needy student 15,000,000.00 complete awaiting more funds

2014/2015 Mocks/CATs Printing and distribution of Mocks and CATs

1,000,000.00 complete awaiting more funds

2014/2015 Kirwa Primary School Installation of lightening arresters 120,000.00 complete awaiting more funds

2014/2015 Kabosi Primary School Installation of lightening arresters 120,000.00 complete awaiting more funds

2014/2015 Irungu Primary School

Installation of lightening arresters 120,000.00 complete awaiting more funds

2014/2015 Chirichiro Prim. School

Flooring of three Classes 300,000.00 complete awaiting more funds

2014/2015 Nyataro Primary School

Construction of two classrooms 500,000.00 complete awaiting more funds

2014/2015 Kisii Primary School Construction of two classrooms 500,000.00 complete awaiting more funds

Page 7: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2014/2015 Rianyamwamu Pr. Sch.

Reroofing & Renovation of four classrooms

500,000.00 complete awaiting more funds

2014/2015 Nyosia Primary school Reroofing of 2 classes 300,000.00 complete awaiting more funds

2014/2015 Nyaura Pimary school Reroofing of 2 classes 300,000.00 complete awaiting more funds

2014/2015 Nyamemiso Pri. School

Flooring of 2 classes 400,000.00 complete awaiting more funds

2014/2015 Kionganyo Pri. School Reroofing of 2 Classes 300,000.00 complete awaiting more funds

2014/2015 Nyanko Primary School

Reroofing of 2 classes 300,000.00 complete awaiting more funds

2014/2015 Nyabiuto Pri. School Reroofing of 2 classes 300,000.00 complete awaiting more funds

2014/2015 Chirenge Pri. School Reroofing of 2 classes 300,000.00 complete awaiting more funds

2014/2015 Kiogoro D.E.B Pri. Sch. Construction of a class 400,000.00 complete awaiting more funds

2014/2015 Nyaguta Pri. School Reroofing of 2 Classes 300,000.00 complete awaiting more funds

2014/2015 Amariba Pri. School Flooring of 3 classes 300,000.00 complete awaiting more funds

2014/2015 Nyanguru Pri. School Reroofing of 2 Classes 300,000.00 complete awaiting more funds

2014/2015 Maburi Primary School

Construction of a class 500,000.00 complete awaiting more funds

2014/2015 Riomweri Pry School Construction of 2 classes 700,000.00 complete awaiting more funds

2014/2015 Nyabiosi Pry School Flooring of 2 Classes 300,000.00 complete awaiting more funds

2014/2015 Bobaracho Pry School Flooring of 6 classes 500,000.00 complete awaiting more funds

Page 8: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2014/2015 Amabiria Pry School Construction of Latrines 300,000.00 complete awaiting more funds

2014/2015 Iberia Primary School Construction of Latrines 300,000.00 complete awaiting more funds

2014/2015 Ibeno Mixed Sec School

Installation of lightning arresters 120,000.00 complete awaiting more funds

2014/2015 Kirwa Mixed Sec School

Installation of lightning arresters 120,000.00 complete awaiting more funds

2014/2015 Kabosi Sec School Construction of science lab 300,000.00 complete awaiting more funds

2014/2015 Masongo Sec School Plastering and placement of windows of computer lab

400,000.00 complete awaiting more funds

2014/2015 Nyataro Sec School Construction of a classroom 500,000.00 complete awaiting more funds

2014/2015 Nyanchwa Boys High School

Plastering and placement of windows of science/comp lab

500,000.00 complete awaiting more funds

2014/2015 Nyanchwa Girls High School

Plastering and placement of windows of dormitory

500,000.00 complete awaiting more funds

2014/2015 Nyanchwa Girls High School

Leveling of school field 1,002,536.00 complete awaiting more funds

2014/2015 Nyaura Sec School Plastering and flooring of science lab

400,000.00 complete awaiting more funds

2014/2015 Nyaura Sec School Leveling of school field 500,000.00 complete awaiting more funds

2014/2015 Nyosia Mixed Sec School

Construction of administration block

500,000.00 complete awaiting more funds

2014/2015 Nyanguru Sec School Construction of a kitchen 500,000.00 complete awaiting more funds

Page 9: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2014/2015 Riabamanyi Sec School

Construction of a kitchen 500,000.00 complete awaiting more funds

2014/2015 Matunwa Sec School Construction of a library 700,000.00 complete awaiting more funds

2014/2015 Amariba Secondary School

Leveling of school field 500,000.00 complete awaiting more funds

2014/2015 Bobaracho Secondary School

Plastering and flooring of dining hall

500,000.00 complete awaiting more funds

2014/2015 Musa Nyandusi Mixed Sec Sch

Flooring of dining hall 500,000.00 complete awaiting more funds

2014/2015 Kerera Mixed Day/ Board Sec Sch

Plastering, flooring and windows placement of the library

500,000.00 complete awaiting more funds

2014/2015 Riondonga Mixed Sec School

Construction of administration block

500,000.00 complete awaiting more funds

2014/2015 Nyabiosi Sec School Flooring of 2 No. classrooms 400,000.00 complete awaiting more funds

2014/2015 Otamba Sec School Purchase of a bus 2,500,000.00 complete awaiting more funds

2014/2015 Nyaguta Sec School Purchase of a bus 2,500,000.00 complete awaiting more funds

2014/2015 Kirwa Sec School Purchase of a bus 2,500,000.00 complete awaiting more funds

2014/2015 Nyamware Sec School Purchase of a bus 2,500,000.00 complete awaiting more funds

2014/2015 Birongo Sec Sch Purchase of a bus 2,500,000.00 complete awaiting more funds

2014/2015 Bobaricho Sec Sch Purchase of a bus 2,500,000.00 complete awaiting more funds

2014/2015 Amariba Sec. School Plastering, flooring and windows and doors placement of library

500,000.00 complete awaiting more funds

Page 10: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2014/2015 Nyanko Sec. School Construction of 1 No. classroom 500,000.00 complete awaiting more funds

2014/2015 Masongo Youth Polytechnic

Construction of 2 classrooms 1,000,000.00 complete awaiting more funds

2014/2015 Otamba TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Masongo TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Menyinkwa TBC. Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Nyakeigorerwa TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Birongo TBC Roofing of the structure 500,000.00 complete awaiting more funds

2014/2015 Getiongo TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Nyamemiso TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Mobaroka TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Nyamwario TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Egemi TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Matibo TBC Roofing of the structure 100,000.00 complete awaiting more funds

2014/2015 Nyaturago Health Center

Construction of staff house 500,000.00 complete awaiting more funds

2014/2015 Masongo Health Center

Construction of maternity wing 500,000.00 complete awaiting more funds

2014/2015 Otamba Health Center Completion of treatment rooms 500,000.00 complete awaiting more funds

Page 11: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2014/2015 Nyosia Health Center Purchase ¼ acre of land 500,000.00 complete awaiting more funds

2014/2015 Birongo Health Center Construction of treatment rooms 500,000.00 complete awaiting more funds

2014/2015 Getungurumu Health Center

Construction of treatment rooms 800,000.00 complete awaiting more funds

2014/2015 Nyansira Water Project

Purchase of water tank/pipes/and tank elevation

603,000.00 complete awaiting more funds

2014/2015 Nyanguru Water Project

Purchase of water tank/pipes/and tank elevation

603,000.00 complete awaiting more funds

2014/2015 Kiogoro - Otamba Road

Opening and Gravelling of 3km 3,000,000.00 complete awaiting more funds

2014/2015 Mwembe – Nyaura – Menyinkwa Road

Opening and graveling of 4km 3,000,000.00 complete awaiting more funds

2014/2015 Kegati – Rianyamwamu Road

Opening and gravelling 3km 3,000,000.00 complete awaiting more funds

2014/2015 Riamabera – Nyabiosi Road

Opening and gravelling 3km 3,000,000.00 complete awaiting more funds

2014/2015 Timani – Nyaguta Road

Murraming and culverting 2km 2,000,000.00 complete awaiting more funds

2014/2015 Nyabiosi - Irondi Construction of a Foot bridge 600,000.00 complete awaiting more funds

2014/2015 Nyamware - Nyanko Construction of a Foot bridge 600,000.00 complete awaiting more funds

2014/2015 Riangombenene Centre

Purchase and installation of transformer

1,000,000.00 complete awaiting more funds

2014/2015 Nyamwario Centre Purchase and installation of transformer

1,000,000.00 complete awaiting more funds

Page 12: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2014/2015 Kegati Market Leveling and murraming of the market

500,000.00 complete awaiting more funds

2014/2015 Keumbu Market Construction of toilets and murraming of the market

1,000,000.00 complete awaiting more funds

2014/2015 Kegati Pry.School Rehabilitation of 2 No. classrooms 250,000.00 complete awaiting more funds

2014/2015 Kisii Campus Pry School

Rehabilitation of 8 No. toilets 237,931.00 complete awaiting more funds

2014/2015 Riabamanyi Pry School

Rehabilitation of 1 No. Classroom 350,000.00 complete awaiting more funds

2014/2015 Keumbu AP Line Construction of Latrine 300,000.00 complete awaiting more funds

2014/2015 Kiogoro Community Resource Centre

Construction of Library Kshs.5,000,000, Construction of Administration Block Kshs.3,000,000, Construction of Computer Lab Kshs.2,000,000

10,000,000.00 complete awaiting more funds

Page 13: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Employees Salaries,Goods and Services,NSSF,NHIF,Committee Expenses,Committee Expenses

Payment of staff salaries and gratuity ,Purchase of fuel, repairs and maintenance, printing, stationery, telephone, travel and subsistence, office tea, etc.,Payment of NSSF Deductions,Payment of NHIF Deductions,Payment of Committee sitting allowances,transport, conferences, Purchase of fuel, repairs and maintenance, printing, stationery, Airtime, travel and subsistence, e.t.c,

8,552,016 new awaiting more funds

2015/2016 CDFC/PMC Capacity Building

Undertake Training of the PMCs/CDFCs/school Heads on CDF Related issues

2,000,000.00 new awaiting more funds

2015/2016 Audit Fee Payment of Audit Fee to KENAO 500,000 new awaiting more funds

2015/2016 Emergency To cater for any unforeseen occurrences in the constituency during the financial year

5,767,647 ongoing awaiting more funds

Page 14: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Constituency Sports Tournament

Carry out Constituency Sports tournament and the winning teams/schools to be awarded with trophies, balls, and games kits

1,500,000.00 ongoing awaiting more funds

2015/2016 Bursary Secondary Schools

Payment of bursary to needy students

6,000,000.00 ongoing awaiting more funds

2015/2016 Bursary Universities, Colleges & Tertiary Schools

Payment of bursary to needy students

13,425,000.00 ongoing awaiting more funds

2015/2016 Mocks/CATs Printing and distribution of Mocks and CATs

999,961 ongoing awaiting more funds

2015/2016 Kiamabundu primary school

Re-roofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Gekomu primary school

Re-roofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Masongo primary school

Flooring and plastering of 1 classroom

200,000 ongoing awaiting more funds

2015/2016 Nyanchwa primary school

Re-roofing of 1 classroom. 300,000 ongoing awaiting more funds

2015/2016 KARI primary school Re-roofing of 2 classrooms. 300,000 ongoing awaiting more funds

2015/2016 Nyamage primary school

Re-roofing of 1 classroom. 200,000 ongoing awaiting more funds

2015/2016 Rianyamwamu primary school

Re-roofing of 1 classroom. 200,000 ongoing awaiting more funds

2015/2016 Mogorora primary school

Renovating 2 classrooms. 300,000 ongoing awaiting more funds

2015/2016 Amariba primary school

Renovating 2 classrooms. 300,000 ongoing awaiting more funds

Page 15: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Chirenge primary school

Renovating 2 classrooms. 300,000 ongoing awaiting more funds

2015/2016 Nyaboribonge primary school

Renovating 2 classrooms. 300,000 ongoing awaiting more funds

2015/2016 Nyataro primary school

Renovating 2 classrooms. 300,000 ongoing awaiting more funds

2015/2016 Nyanguru primary school

Renovating 2 classrooms. 300,000 ongoing awaiting more funds

2015/2016 Nyamecheo primary school

Renovating 2 classrooms. 300,000 ongoing awaiting more funds

2015/2016 Kionganyo primary school

Re-roofing of two classrooms 300,000 ongoing awaiting more funds

2015/2016 Monuri primary school

Reroofing of two classrooms. 300,000 ongoing awaiting more funds

2015/2016 Nyakebako primary school

Flooring and plastering of one classroom.

200,000 ongoing awaiting more funds

2015/2016 Rikendo primary school

Re-roofing of one classroom. 200,000 ongoing awaiting more funds

2015/2016 Irungu primary school

Plastering and flooring of two classrooms

300,000 ongoing awaiting more funds

2015/2016 Riangabi primary school

Plastering and flooring of two classrooms

300,000 ongoing awaiting more funds

2015/2016 Gesere primary school Plastering and flooring of two classrooms

300,000 ongoing awaiting more funds

2015/2016 Inani S.D.A primary school

Flooring of three classrooms. 300,000 ongoing awaiting more funds

2015/2016 Biombe primary school

Construction of latrines. 300,000 ongoing awaiting more funds

2015/2016 Getungurumu primary school

Construction of latrines. 300,000 ongoing awaiting more funds

2015/2016 Amasago primary school

Flooring and re-roofing of 2 classrooms.

300,000 ongoing awaiting more funds

Page 16: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Kisii primary school Walling, plastering, roofing of storey tuition block.

300,000 ongoing awaiting more funds

2015/2016 Ibeno primary school Reroofing of two classrooms. 300,000 ongoing awaiting more funds

2015/2016 Matunwa primary school

Flooring and reroofing of 2 classrooms.

300,000 ongoing awaiting more funds

2015/2016 Nyamagwa primary school

Roofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Maburi primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Taracha primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Otamba primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Intundero primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Boronyi primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Jogoo primary school Flooring and plastering of one classroom.

200,000 ongoing awaiting more funds

2015/2016 Birongo primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Nyansira primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Riondonga primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Kabosi primary school Flooring and reroofing of 2 classrooms

300,000 ongoing awaiting more funds

2015/2016 kiogoro D.E.B primary school

Flooring and reroofing of 2 classrooms

300,000 ongoing awaiting more funds

Page 17: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Bobaracho primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Nyanko primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Riabamanyi primary school

Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Nyosia primary school Reroofing of 2 classrooms 300,000 ongoing awaiting more funds

2015/2016 Otamba secondary school

Construction of girls dormitory. 700,000 ongoing awaiting more funds

2015/2016 Kiamabundu secondary school

Construction of computer laboratory.

800,000 ongoing awaiting more funds

2015/2016 Nyosia secondary school

Construction of administration block 500,000 ongoing awaiting more funds

2015/2016 Boronyi secondary school

Construction of laboratory. 800,000 ongoing awaiting more funds

2015/2016 Nyaguta secondary school

Purchase of beds 1,000,000 ongoing awaiting more funds

2015/2016 Amariba secondary school

Construction of girls dormitory. 700,000 ongoing awaiting more funds

2015/2016 Boruma secondary school

Construction of one classroom 500,000 ongoing awaiting more funds

2015/2016 Matunwa secondary school

Construction of dining hall 800,000 ongoing awaiting more funds

2015/2016 Nyataro secondary school

Renovation of two classrooms. 600,000 ongoing awaiting more funds

2015/2016 Masongo secondary school

Construction of one classroom. 500,000 ongoing awaiting more funds

2015/2016 Nyansira secondary school

Construction of one classroom 500,000 ongoing awaiting more funds

2015/2016 Nyanchwa boys secondary school

Plastering, flooring and fitting of laboratory.

900,000 ongoing awaiting more funds

Page 18: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Nyanchwa boys secondary school

Leveling of playing ground 700,000 ongoing awaiting more funds

2015/2016 Riabamanyi secondary school

Construction of administration block 1,200,000 ongoing awaiting more funds

2015/2016 Nyaura secondary school

Completion of library 500,000 ongoing awaiting more funds

2015/2016 Nyanko secondary school

Plastering of tuition block 1,000,000 ongoing awaiting more funds

2015/2016 Nyamemiso secondary school

Construction of one classroom and lab

1,000,000 ongoing awaiting more funds

2015/2016 Nyaguta secondary school

Purchase of school bus 2,500,000 ongoing awaiting more funds

2015/2016 Kirwa secondary school

Purchase of school bus 2,500,000 ongoing awaiting more funds

2015/2016 Birongo secondary school

Purchase of school bus 2,500,000 ongoing awaiting more funds

2015/2016 Bobaracho secondary school

Purchase of school bus 2,500,000 ongoing awaiting more funds

2015/2016 Nyamagwa SDA secondary school

Purchase of school bus 2,500,000 ongoing awaiting more funds

2015/2016 Keoke secondary school

Construction of one classroom 500,000 ongoing awaiting more funds

2015/2016 Taracha secondary school

Plastering and flooring of tuition block.

500,000 ongoing awaiting more funds

2015/2016 Nyanguru .C.O.G secondary school

Roofing of tuition block 800,000 ongoing awaiting more funds

2015/2016 Nyankororo secondary school

Walling and plastering of laboratory 500,000 ongoing awaiting more funds

2015/2016 St. Augustine Otamba girls high school.

Purchase of school bus 2,500,000 ongoing awaiting more funds

Page 19: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Riondong’a secondary school

Walling, plastering and roofing of the administration block.

800,000 ongoing awaiting more funds

2015/2016 Metengero tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Bobaracho tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Nyakeigorerwa tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Kiogoro tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Rianyamwamu tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Kiemenyinga tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Omwobo tea buying centre

repair of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Rianyiega tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Mobakora tea buying centre.

Construction of tea buying centre. 100,000 ongoing awaiting more funds

2015/2016 Riariga tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Riakonga tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Riobonyo tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Nyaguta tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Kenyerere tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

Page 20: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Rigoko tea buying centre

Construction of tea buying centre 200,000 ongoing awaiting more funds

2015/2016 Inani tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Nyanturago tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Nyangowa tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Matunwa tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Otamba tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Riangabi tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Nyabisabo tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Nyamwario tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Egemi tea buying centre

Construction of tea buying centre 200,000 ongoing awaiting more funds

2015/2016 Matibo tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Gucha tea buying centre

Construction of tea buying centre 200,000 ongoing awaiting more funds

2015/2016 Kionganyo tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Omoturumesi tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Timani tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

2015/2016 Chibwobi tea buying centre

Construction of tea buying centre 100,000 ongoing awaiting more funds

Page 21: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Kianate Youth Polytechnic

Construction of workshop 400,000 ongoing awaiting more funds

2015/2016 Amaiga village Youth Polytechnic

Construction of workshop 400,000 ongoing awaiting more funds

2015/2016 Nyanguru Youth Polytechnic

Construction of workshop 400,000 ongoing awaiting more funds

2015/2016 Irungu Youth Polytechnic

Plastering and flooring of two workshops.

400,000 ongoing awaiting more funds

2015/2016 Riangabi Youth Polytechnic

Construction of administration block.

400,000 ongoing awaiting more funds

2015/2016 Boronyi Youth Polytechnic

Construction of workshop 400,000 ongoing awaiting more funds

2015/2016 Nyabiosi Youth Polytechnic

Construction of workshop 400,000 ongoing awaiting more funds

2015/2016 Boronyi dispensary Plastering and flooring of treatment rooms

500,000 ongoing awaiting more funds

2015/2016 Nyakebako health centre

Plastering of maternity wing. 300,000 ongoing awaiting more funds

2015/2016 Birongo health centre Plastering of treatment rooms. 300,000 ongoing awaiting more funds

2015/2016 Kerera health centre Plastering of treatment rooms 300,000 ongoing awaiting more funds

2015/2016 Rikendo health centre Plastering of treatment rooms 300,000 ongoing awaiting more funds

2015/2016 Taracha dispensary Flooring of treatment rooms. 200,000 ongoing awaiting more funds

2015/2016 Kiogoro health centre Roofing and plastering of treatment rooms

500,000 ongoing awaiting more funds

2015/2016 Bobaracho health centre

Plastering, flooring and painting of treatment rooms

700,000 ongoing awaiting more funds

Page 22: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Nyanko health centre Plastering and flooring of treatment rooms

500,000 ongoing awaiting more funds

2015/2016 Nyamagwa dispensary Plastering of treatment rooms 300,000 ongoing awaiting more funds

2015/2016 Oresi health centre Flooring of treatment rooms 200,000 ongoing awaiting more funds

2015/2016 Ritaro water project Laying of pipes and trenches. 500,000 ongoing awaiting more funds

2015/2016 Kiogoro water project Laying of pipes and trenches. 500,000 ongoing awaiting more funds

2015/2016 Bobaracho water springs

Laying of pipes and trenches. 600,000 ongoing awaiting more funds

2015/2016 Nyansira water project

Laying of pipes and trenches. 500,000 ongoing awaiting more funds

2015/2016 Nyanguru water project.

Laying of pipes and trenches. 600,000 ongoing awaiting more funds

2015/2016 Bwoganda water springs

Spring protection 200,000 ongoing awaiting more funds

2015/2016 Rianyariacha water springs

Spring protection 200,000 ongoing awaiting more funds

2015/2016 Menyinkwa - nyansacha Road

Grading and murraming (3km) 2,000,000.00 ongoing awaiting more funds

2015/2016 Gianchere – biombe – birongo road.

Grading and murraming 3 km 2,000,000.00 ongoing awaiting more funds

2015/2016 Kiogoro – nyanko road

Grading and murraming 2.5 km 2,500,000.00 ongoing awaiting more funds

2015/2016 Keumbu- keboba road Grading and murraming (1.5km) 1,500,000 ongoing awaiting more funds

2015/2016 Kegati – riomasanta road

Grading and murraming 1.5 km 1,500,000 ongoing awaiting more funds

2015/2016 Nyandoche ibere –riakenyoru road.

Grading and murraming 2 km road 2,000,000 ongoing awaiting more funds

Page 23: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Rianyabare bridge Construction of a foot bridge 800,000 ongoing awaiting more funds

2015/2016 Nyaguta – riariga road

Grading and murraming (3km) 1,500,000 ongoing awaiting more funds

2015/2016 Nyabisabo – Nyakebako – riamabusio road

Grading and murraming (2.5km) 2,000,000 ongoing awaiting more funds

2015/2016 Rianyamwamu DEB primary school

Construction of toilets 200,000 ongoing awaiting more funds

2015/2016 Esamba primary school

Construction of toilets 200,000 ongoing awaiting more funds

2015/2016 Nyosia primary school Construction of toilets 200,000 ongoing awaiting more funds

2015/2016 Bobaracho primary school

Construction of toilets 200,000 ongoing awaiting more funds

2015/2016 Nyako primary school Construction of toilets 200,000 ongoing awaiting more funds

2015/2016 Riabamanyi primary school

Construction of toilets 200,000 ongoing awaiting more funds

2015/2016 Ibeeria primary school

Construction of toilets 200,000 ongoing awaiting more funds

2015/2016 Keumbu police line Construction of two police houses. 500,000 ongoing awaiting more funds

2015/2016 Matunwa location chief’s office

Construction of chief’s office 300,000 ongoing awaiting more funds

2015/2016 Birongo location chief’s office

Construction of chief’s office 300,000 ongoing awaiting more funds

2015/2016 Ibeno AP line Construction of two police houses. 300,000 ongoing awaiting more funds

2015/2016 Masongo chief’s office Construction of chief’s office 300,000 ongoing awaiting more funds

2015/2016 Nyanko location chief’s office

Construction of chief’s office 300,000 ongoing awaiting more funds

Page 24: NYARIBARI CHACHE CONSTITUENCY PROJECT … file2013/2014 Eremo primary Eremo primary 300,000.00 New handed over 2013/2014 Amasago secondary, Amasago secondary, 3,000,000.00 Ongoing

2015/2016 Nyaura location chief’s

Construction of chief’s office 200,000 ongoing awaiting more funds

2015/2016 Kiogoro DO’s office Plastering, flooring, painting and fitting.

200,000 ongoing awaiting more funds

2015/2016 Constituency community policing

Buying of uniforms for village elders, torches and gum boots.

800,000 ongoing awaiting more funds

2015/2016 Keumbu AP line Construction of a DCC residence 500,000 ongoing awaiting more funds

2015/2016 Nyaribari chache website

Designing, Installation and hosting of constituency website.

300,000 ongoing awaiting more funds

2015/2016 Nyaribari chache strategic plan

Preparation of constituency strategic plan.

600,000 ongoing awaiting more funds