NY Airport Delay Reduction Presented by Ralph Tamburro.

10
NY Airport Delay Reduction Presented by Ralph Tamburro

Transcript of NY Airport Delay Reduction Presented by Ralph Tamburro.

Page 1: NY Airport Delay Reduction Presented by Ralph Tamburro.

NY Airport Delay ReductionPresented by Ralph Tamburro

Page 2: NY Airport Delay Reduction Presented by Ralph Tamburro.

17 MILE RADIUS, 5 major Airports, 4500 Operations daily

Page 3: NY Airport Delay Reduction Presented by Ralph Tamburro.

Airport delay reduction

My History:

FAA January 1982 through May 2013

Port Authority August 2013

Coordinate with air traffic facilities

Coordinate with the customers

Continue with some of the projects that I began while in the FAA.

TEB advocate

Page 4: NY Airport Delay Reduction Presented by Ralph Tamburro.

LGA 3500’

TEB2000’

TEB1500’

EWR2500’

Proposed Airspace Flow EWR 4R

Page 5: NY Airport Delay Reduction Presented by Ralph Tamburro.

3nm

TEB1500’

EWR 2500’

JFK 3000’

LGA 3500’

LGA 4000’

Proposed Airspace Flow EWR 22L

Page 6: NY Airport Delay Reduction Presented by Ralph Tamburro.

Airport delay reduction

NEXTGEN Implementation Working Group (SURFACE).

Short term recommendations:• Electronic flight strips• Surface management: JFK/EWR• Airports to become CDM members

RTCA Eastern Region Tactical Operations Group.• San Juan and Caribbean Airspace

RTCA national Tactical Operation Group • co lead on Airport construction

Transportation Research Board (TRB)

Member of the SURFACE CDM• Develop operating procedures for surface management

WAKENET

Page 7: NY Airport Delay Reduction Presented by Ralph Tamburro.

Airport delay reduction

NASA AMES RESARCH CENTER

• Terminal Sequencing and Spacing (TSS)• Spot and Runway Departure Advisor (SARDA) • SOAR assists in sequencing departure over the same fix from different airports• Departure Sensitive Arrival Spacing (DSAS)

MITRE Corporation• Research project for surface tool at TEB

Massachusetts Institute of Technology (MIT) ITWS, CIWS, RAPT

Page 8: NY Airport Delay Reduction Presented by Ralph Tamburro.

Time Based Flow Management (TBFM) – (TMA)

ember of the SURFACE CDM

NEXTGEN Implementation Working Group (SURFACE).

Page 9: NY Airport Delay Reduction Presented by Ralph Tamburro.

Terminal sequencing and spacing (TSS)

Page 10: NY Airport Delay Reduction Presented by Ralph Tamburro.

Route Availability Planning Tool (RAPT)