nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/12…  · Web view ·...

313
North Western Railway mRrj if’pe jsyos RATE ADVICE No 1 OF 2009 nj lwpuk dzekad ƒ & „009 t;iqj …ƒ ekpZ ] „009 th-,y-ehukk eq[; okf.kT; ÁcUèkd Jaipur, 31 st MARCH , 2009 G. L. MEENA CHIEF COMMERCIAL MANAGER 1

Transcript of nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/12…  · Web view ·...

________________________________________________________________

North Western Railway

mRrj ifpe jsyos

RATE ADVICE No 1 OF 2009

nj lwpuk dzekad & 009

t;iqj ekpZ ] 009

th-,y-ehukk

eq[; okf.kT; cUkd

Jaipur, 31st MARCH , 2009

G. L. MEENA

Chief Commercial Manager

RATE ADVICE ASSURANCE SHEET

Rate advice received on date______________________________________

We, the following staff have gone through the Rate Advice No. ...................... and Noted the content of the same.

Sr. No.

Name

Designation

Signature

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

(Note: This sheet is to be signed by all the concerned Supervisors and Staff for having understood the contents.)

INDEX

CL

No

Subject & Authority

Page No.

THROUGH RATE CIRCULAR (COACHING)

1

Re-Opening of Rasidpur Khori (RDK) halt station.

(Authority: CCM/NWR No.C.171/Uneconomic Halt station /Jp of dt.23.1.09)

24

THROUGH RATE CIRCULAR (GOODS)

1

Opening of Sheodas Padampura (SAS) station for Inward and Outward traffic for rake load traffic.

(Authority:1. CCM/NWR No.C.498/1/Vol.II/loose of dt.06.1.2009)

2. Sr.DCM/JP No. C-180/Goods shed SAS of date 17.12.08)

26

2

Opening of Adani Logistic Limited ICD Jaipur Division.

(Authority:1. CCM/NWR No.C.541/9/1 Vol.II of dt.12.1.2009)

26-27

3

Addition /Correction /Deletion in the Numerical Code list of NWR.

(Authority:SAO /NWR No.HQ/NWR/Stats/STN Code/NWR of date 19/1/09)

(Authority:. CCM/NWR No.C.3/IRCA/2/Part II dated 19.01.2009)

27-28

4

Opening of FL-RGS-RE section of Jaipur division for goods traffic originating or terminating on FL-RGS-RE section.

(Authority:1. COM/NWR No.T-5/PLG/183/GC/RE-RGS-FL/RVNL/Vol.I of date 13/1/09)

2. CCM/NWR No. C-541/9/1 Vol.II of date 27/1/09)

28-29

5

Extension of opening of Asalpur Jobner Station of jaipur division for inward traffic of Clinker.

(Authority: -CCM/NWR No. C-498/1/Vol.II of date 22/1/09)

29

6

Notification of distance for Rewari-Ringas Phulera Section after gauge conversion.

(Authority: -CCM/NWR No. C-541/9/1 Vol . II of date 27/1/09)

29-30

7

Notification / de-notification of CRTs.

(Authority: -CCM/NWR No. C-387/PCO/Container II of date 09/2/09)

30-33

8

Round the clock working at Alwar, Khori, Bhattu and Jamsar goods shed .

(Authority: -CCM/NWR No. C-491/B&W Hrs Vol-I of date 12/2/09)

33

9

Opening of Satrod Station for outward and Inward traffic both in trainload.

(Authority: -CCM/NWR No. C-498/4/BKN of date 12/2/09)

33-34

10

Opening of Pali Station for outward and Inward traffic both in rakes.

(Authority:- Sr DCM/JP letter no.C-498/Goods shed pali of date 20.02.09)

(Authority: -CCM/NWR No. C-498/I/Vol.II of date 9/3/09)

34

11

Corrigendum to TRC 20 (Goods) of 2008 - Addition / Correction/Deletion in the Numerical Code list of NWR.

(Authority: -CCM/NWR No. C-3/IRCA/02/Part II of date 27/3/09)

34

12

Closure of Hisar Station for all commodities except POL.

(Authority: -CCM/NWR No. C-498/4/BKN of date 27/3/09)

35

LRA COACHING

1

Earmarking of Ladies Quota in modified high capacity sleeper class coaches . (Commercial circular No.65 of 2008 )

(Authority: Rly Boards No.2007/TG-1/20/P/Pt-II of dt 16.12.2008)

(Authority: CCM/NWR No. C-436/Resvn.Quota/ Policy/08 of dt 02.01.2009)

37

2

Updating of Duty Pass waiting against vacant accommodation available in the train. (Commercial Circular No. 62 of 2008 )

(Authority: Rly Boards No.2008/TG-1/9/P of dt.26.12.2008)

(Authority: CCM/NWR No. C-436/Resvn.Quota/ Policy/08 of dt 07.01.2009)

37-38

3

Charging of fares for high capacity coaches /conventional coaches and other matters.(Commercial Circular No. 73 of 2008)

(Authority: Rly Boards No.TCII/2910/2008 of dt.10.12.2008)

(Authority: CCM/NWR No. C-436/Resvn.Quota/ Policy/08 of dt 08.01.2009)

38-39

4

Charges for special train/Special coach.

(Authority: Rly Boards No.TCII/2033/2007/Review of dt.06.01.2009)

(Authority: CCM/NWR No. C-436/Special train of dt 08.01.2009)

39-40

5

Eligibility criteria for allotment of bookstalls at the railway stations to the philanthropic and social organizations clarification thereof.(COMMERCIAL CIRCULAR NO. 4 OF2009) (clarification to comml,Cir. No. 88 of 2006 )

(Authority:Railway Boards letter No.2008/TG-III/462/03 of dated 22.01.2009)

(Authority :CCM/NWR No.C-21/0 Vol. II of date 2-02-09)

40-41

6

System of issue of cash Receipts for booking Retiring Rooms/ Dormitories- amendment to sub-para (c) of para 1232 of commercial Manual.

(Authority:Railway Boards letter No.2008/TG-IV/15/1/SR of dated 25.11.2008)

(Authority :CCM/NWR No.C-4/PA/Retiring Room/ 08 of dt 5.02.2009)

41

7

Revision of charges for Hospital- on wheels organized by Impact India Foundation, Mumbai

(Authority:Railway Boards letter No.TC II/2221/2007/IIF of dt 22.01.2009)

(Authority :CCM/NWR No.C -156/Fare/09 of dt 5.02.2009)

41-42

8

Tax Deduction at Source

(Authority:Railway Boards letter No.2005/AC-II/1/5(Pt.) of dt 5.03.08)

(Authority :CCM/NWR No.C.481/TDS/07 of dt 20.02.2009)

42-44

9

Tax deduction at source in respect of Railway Payments.

(Authority:Railway Boards letter No2005/AC-II/1/5(Pt.) of dt 5.03.08)

(Authority :CCM/NWR No.C .481/TDS/07 of dt 20.02.2009)

44-46

10

Appointment of Jan Sadharan Ticket Booking Sewak (JTBS).

(Authority:Railway Boards letter No2007/TG-I/20/JTBS of dt27.01.2009)

(Authority :CCM/NWR No.C .436/JTBS/08 of dt 20.02.2009)

46-52

11

Running of parcel Van (VP) coach vice Inspection Carriage as 25th coach in passenger carrying trains.

(Authority:Railway Boards letter No2008TC(FM)/10/12. of dt 12 .02. 2009.)

(Authority :CCM/NWR No.C .375/6/Vol-II of dt 24.02.2009

52

12

Specification of Parcel Way Bill (PWB)/Luggage ticket and Gate pass to be used in Parcel Management System for Computerization of parcel business over Indian Railways.(FREIGHT MARKETING CIRCULAR NO. 2 of 2009)

(Authority:Railway Boards letter No2005/TC(FM)/11/2. of dt 04 .02. 2009)

(Authority :CCM/NWR No.C .375/7/PMS 08 of dt 25.02.2009)

53-55

13

Amendment in Tatkal Scheme. (Commercial Circular No. 9 of 2009 )

(Authority:Railway Boards letter No2007/TG-I/20/P/Tatkal of dt 16 .02. 2009)

(Authority :CCM/NWR No.C .436/Resvn. Quota/ Policy/09 of dt 26.02.2009)

55

14

Procedure and schedule of payment of catering bill of Rajdhani and Shatabdi Trains and payment by IRCTC to zonal railways of share of revenue from other Mail/ Express trains and static catering units.

(Authority:Railway Boards letter No2008/TG-III/645/10 of dt 30.01. 2009)

(Authority :CCM/NWR No. C.45/O/Part-IV of date 4-3-09 )

55-57

15

Transfer of catering licence to the legal heir ;

(Authority:Railway Board letter No.2003/TG III/600/5 dt 23.2.09)

(Authority : CCM NWR No.C.45/O /Part IV of date 13..3.2009)

57-58

16

Revision of Passenger Fares- Railway Budget 2009-10 (Commercial circular No. 10 of 2009)

(Authority : Railway Boards letter No. TC II/2910/09 of date 05.03.2009)

(Authority : CCM/NWR No. C.156/Fare/09 of date 18.3.09)

58-60

17

Rationalization of rates for parcel traffic Methodology for reckoning the percentage utilisation of SLR to determine categorization of each train for the purpose of charging freight for parcel and luggage traffic.(Freight Marketing Circular No. 04 of 2009)

(Authority : Railway Boards letter No. TC II/2046/06/1 of date 25.02.2009)

(Authority : CCM/NWR No. C.-375/06/Vol.II of date 18.3.09)

60-61

18

Policy for leasing of parcel space of Brakevans (SLRs), Assistant Guards Cabin (AGC) and Parcel Vans (VPHs/VPs/VPUs) Clarification to leave/ non-loading rules. (FREIGHT MARKETING CIRCULAR NO. 05 of 2009)

(Authority : Railway Boards letter No.2007/TC(FM)/10/12 of date 25.02.09)

(Authority : CCM/NWR No. C.-375/06/Vol.II of date 18.3.09)

61-62

19

Policy for running of Parcel Express trains (non-leased) (Freight Marketing Circular No.06)

(Authority : Railway Boards letter No.2005/TC(FM)/11/4 of date26.02.2009)

(Authority : CCM/NWR No.C-375/06/Vol.II of date 20.3.09)

62-63

20

Collection of penalty from persons found loitering in platform without platform ticket/travel authority. (Commercial Circular No. 2 of 2009)

(Authority : Railway Boards letter No.2008/TG-V/5/1 of date12.01.2009)

(Authority : CCM/NWR No.C-549/TC/Policy of date 30.3.09)

63

LRA GOODS

1

Transportation of rail coaches owned by Delhi metro Rail Corporation Ltd.(DMRC) from Mundra Port ( Gujarat) to Shahdara (Delhi ) and from Baroda to shahdara (Delhi ) : Special lump sum haulage charges .(Rate circular No. 77 of 2008)

(Authority: Railway Boards letter No.TCR/2217/2002/1 of date 19/12/08)

(Authority: CCM/NWR No.C-176/2 of date 01/01/2009)

65-66

2

Charges for haulage for empty wagons on private account. (Rate Circular No.76 of 2008).

(Authority: Railway Boards letter No.TCR/2205/96/1 of date 15/12/08)

(Authority: CCM/NWR No.C-176/5 of date 01/01/2009)

66-67

3

Charges for the transport of consignment by Special Trains.(Rate circular No. 71 of 2008).

(Authority: Railway Boards letter No.TCR/2206/96/1 of date 11/12/08)

(Authority: CCM/NWR No.C-176/5 of date 02/01/2009)

67-68

4

Freight concession for Iron-Ore traffic (class 200X ) from Mysore Division of SW Railway to Panambur.(Rate circular No. 72 of 2008)

(Authority: Railway Boards letter No.TCR/1618/2007/10 of date 11/12/08)

(Authority: CCM/NWR No.C-493/6/431 of date 05/01/2009)

68

5

Freight concession for Iron-Ore traffic (class 200X ) from SW Railway.(Rates circular No. 74 of 2008)

(Authority: Railway Boards letter No.TCR/1618/2007/10 of date 11/12/08)

(Authority: CCM/NWR No.C-493/6/431 of date 05/01/2009)

68-69

6

Freight concession for Iron_Ore traffic (Class 200X) from East coast Railway.(Rate circular No. 75 of 2008)

(Authority: Railway Boards letter No.TCR/1618/2008/15 of date 12/12/08)

(Authority: CCM/NWR No.C-493/6/431 of date 05/01/2009)

69-70

7

Procedure for dealing with off-loaded consignment.

(Authority: Railway Boards letter No.TC-I/2006 /108/4 of date 18/12/08)

(Authority: CCM/NWR No.C-611/0 of date 05/01/2009)

70-71

8

Revision of miscellaneous charges (Rates circular No.78 of 2008)

(Authority: Railway Boards letter No.TCR/2201/2004/1 of date 22/12/08)

(Authority: CCM/NWR No.C-176/5 of date 07/01/2009)

71-73

9

Freight Concession for Iron Ore (Class 200X) from West Central Railway (Rates Circular No. 80 of 2008)

(Authority: Railway Boards letter No.TCR/1078/2008/ 29 of date 24.12.08 )

(Authority: CCM/NWR No.C-493/6/431 of date 07/01/2009)

73-74

10

Two point combinations for steel traffic and composition of CONCORD rake.

(Authority: Railway Boards letter No.TCR/1078/2008/15 of date 05/01/2009)

(Authority: CCM/NWR No.C-429/0 of date 07/01/2009)

74-75

11

Transportation of Wagons by Rail Vikas Nigam Limited one each from Sahibabad (NR) to Barang (E.CoR), Guntakal (SCR), Khurja (NCR) and Kosi Kalan (NCR) (Rate circular no. 01 of 2009)

(Authority: Railway Boards letter No.TCR/2217/2002/1 of date 06/01/2009)

(Authority: CCM/NWR No.C-176/5 of date 08/01/2009)

75

12

Transportation of Relief Material/Fodder to notified flood affected districts of Bihar State: free of charge. (Rates Circular No.79 of 2008)

(Authority: Railway Boards letter No.TCR/1147/2008/2 of date 22/12/2008)

(Authority: CCM/NWR No.C-174/1 Vol.II of date 12/01/2009)

75-76

13

Haulage charges recoverable for movement of containers in privately owned wagons.

(Authority: Railway Boards letter No.2008/TT-III/73/8 Pt.I of date 24/12/2008)

(Authority: CCM/NWR No.C-78/1/54/CONCOR Vol.II of date 16/01/2009)

76

14

Payment of freight through Credit Note cum Cheque (CNCC) facility at the booking point.

(Authority: Railway Boards letter No.TC-1 / 2005/104/1-Pt. of date 07/01/09)

(Authority: CCM/NWR No.C-291 / 0 of date 16/01/2009)

76-77

15

Corrigendum No. 2 to Rates Circular No. 56 of 2008-Charging for privately owned BCBFG wagons.

(Authority: Railway Boards letter No.TCR/1394/of date 13/01/2009)

(Authority: CCM/NWR No.C.176/4 Vol.II of date 16/01/2009)

77-78

16

Commencement of movement of goods traffic in tank and flat wagons between India and Nepal.

(Authority: Railway Boards letter No.2006/TT.III(F)/NPL/04 of date 26/12/2008)

(Authority: CCM/NWR No.C-249/0 of date 16/01/2009)

78

17

Freight concession for Iron ore traffic (Class 200X ) from E.Co. Railway. (Rates Circular No. 81 of 2008)

(Authority: Railway Boards letter No.TCR/1618/2008/15 of date 30/12/2008)

(Authority: CCM/NWR No.C-493/6/431 of date 19/01/2009)

78-79

18

Freight concession for Iron ore traffic (Class 200X ) from S.E Railway. (Rates Circular No. 83 of 2008)

(Authority: Railway Boards letter No.TCR/1618/2008/14 of date 31/12/2008)

(Authority: CCM/NWR No.C-493/6/431 of date 19/01/2009)

79

19

Freight concession for Iron ore traffic (Class 200X ) from S.E.C Railway. (Rates Circular No. 84 of 2008)

(Authority: Railway Boards letter No.TCR/1618/2008/18 of date 31/12/2008)

(Authority: CCM/NWR No.C-493/6/431 of date 19/01/2009)

79-80

20

Opening of Bhagega Station and Narnaul station of Jaipur Division.

(Authority: Sr. DCM/JP No. C-498/BAGA/2009 of date 15/1/09)

(Authority : CCM/NWR No. C-498/1/II Vol. loose of date 20/1/09)

80-81

21

Corrigendum No. 08 to Rates Circular No. 25 of 2008-Standard rake size of BG wagons for grant of trainload rate benefit .

(Authority :CCM/NWR No.C-429/0 of date 21-01-09)

81

22

Liberalization of Siding Rules - Amendment.

(Authority:Railway Boards letter No.99/TC(FM)/26/1of dt 14.01.2009)

(Authority :CCM/NWR No.C-491/1 Vol.III of date 27-01-09)

81-82

23

Corrigendum No. 09 to Rates Circular No. 25 of 2008-Policy Guidelines -Freight Incentive Schemes and Transportation products .

(Authority:Railway Boards letter No.TCR/1078/2008/15 of dt 21.01.2009)

(Authority :CCM/NWR No.C-429/0 of dated 27-01-09)

82-83

24

Adjustment in classification of commodities (Rate Circular No. 3 of 2009)

(Authority:Railway Boards letter No.TCR /1015/2008/4 of dated 27.01.2009

(Authority :CCM/NWR No.C-70/1 Vol. II of date 29-01-09)

83

25

Chargeable weight for DAP ( Di Ammonium Phosphate) on CC + 8 routes when loaded in BCNA / BCNAHS wagons.( Corrigendum to Rates Circular No. 59 of 09)

(Railway Boards Authority No. TCR / 1394/2004/2 dated 16.01.2009)

(CCM / NWR Authority No. C-176/4 Vol. II dated 02.02.2009.)

84

26

Amendment No.1 to Corrigendum No. 05 to Rates Circular No.25 of 2008-Standard rake size of BG wagons for grant of trainload rate benefit.

(Railway Boards Authority No. TCR /1078/2008/15 dated 05.12.2008)

(CCM / NWR Authority No. C-429/0 dated 02.02.2009.)

84-86

27

Freight concession for Iron ore traffic (Class 200X) from S.W Railway. (Rates Circular No. 82 of 2008)

(Railway Boards Authority No. TCR /1618/2007/10 dated 30.12.2008)

(CCM / NWR Authority No. C-493/6/431 dated 03.02.2009.)

86-87

28

Freight concession for Iron ore traffic (Class 200X) from S.C Railway. (Rates Circular No. 02 of 2009)

(Railway Boards Authority No. TCR /1618/2008/16 dated 21.01.2009)

(CCM / NWR Authority No. C-493/6/431 dated 04.02.2009.)

87-88

29

R3i Railways, Infrastructure for industry Initiative- attracting private sector participation in rail connectivity projects.

(Railway Boards Authority No.2008/PL/9/16 Of dt 28.11.2008)

(CCM / NWR Authority No. C-387/2/WH/2 Vol II of dt 24.12.08)

88-93

30

-Permissible Carrying Capacity (PCC) and standard rake size of BOXNHL wagon.

(Railway Boards Authority No.TCR/1394/2009/1 of dt 03.02.09)

(Authority: CCM / NWR No. 176/4 Vol.II of dt 06.2.09)

93-94

31

Amendment -Permitting running of freight trains on CC+6 routes Universalisation. (Amendment No. 5 to Rates Circular No. 76 of 2007)

(Railway Boards Authority No.TCR/1394/2009/1 of dt 03.02.09)

(Authority: CCM / NWR No.C- 176/4 Vol.III of dt 06.2.09)

94-95

32

Levying of Wagon Registration fee (WRF) (Rates Circular No. 13/2009)

(Railway Boards Authority No 99/TC-1/101/2 of Dt 06.02.2009)

(Authority: CCM / NWR No. C-249/0I Dt. 10.02.2009)

95

33

Loading of edible oils- Charging of freight.

(Railway Boards Authority No TCR/1078/2007/1 Dt 03.02.2009)

(Authority: CCM / NWR No. C- 423/1 Vol.III Dt.10.02.2009)

95-96

34

Name and Code initials of stations, Sidings, etc. Sanctioned to be adopted.

(Authority: IRCA No..AL-89/B/I of Dt 20 Oct 2008)

(Authority: CCM / NWR No. C/3/IRCA/2/Part II Dt. 11.02.2009)

96-101

35

CORRIGENDUMAcceptance of weightometer/Belt Weigher at par with weighbridges. (Corrigendum No.1 to Rates Circular No. 50/2008.)

(Authority: Railway Board No.TC -1/2002/109/5-Pt Dt 03-02-2009)

(Authority: CCM / NWR No C-.616/0 Dt. 17.02.2009)

101

36

Freight concession for Iron ore traffic (Class 200 X ) (Rates Circular No.4 of 09)

(Authority: Railway Board No.TCR/1618/2008/14 Dt 30-01-2009

(Authority: CCM / NWR No C-.493/6/431 Dt. 17.02.2009)

101-103

37

Revision of rates on Mumbai Port Trust Railway. (Rates Circular No. 09 of 2009)

(Authority: Railway Board No.TCR/1055/95/1 Dt 04-02-2009)

(Authority: CCM / NWR No. C-176/9 Dt. 17.02.2009)

103-104

38

Shunting Charge. (Rates Circular No. 14 of 2009).

(Authority: Railway Board No.TC-I/2008/214/1 Dt 06-02-2009)

(Authority: CCM / NWR No. C-491/4 Dt. 17.02.2009)

104-106

39

Clarification regarding Brake Van for wagons under WIS

(Authority: Railway Board No. 2007/TC(FM) /4/3 Dt 29-01-2009)

(Authority: CCM / NWR No C- 88/0 (Policy) Dt. 17.02.2009)

106

40

Revision of Haulage charges payable to Port Trusts. ( Rates Circular No.08 of 09)

(Authority: Railway Board No. TCR/1055/95/1 Dt 14-02-2009)

(Authority: CCM / NWR No.C-176 /9 Dt. 19.02.2009)

106-107

41

Corrigendum- Revision of Haulage charges payable to Port Trusts. (corrigendum to Rates Circular No.08 of 2009)

(Authority: Railway Board No. TCR/1055/95/1 Dt 16-02-2009)

(Authority: CCM / NWR No C-176 /9 Dt. 19.02.2009)

108

42

Revision of Charges payable to Tuticorin Port Trust Railway.(Rates Circular No. 10 of 2009.)

(Authority: Railway Board No. TCR/1055/95/1 Dt 04-02-2009)

(Authority: CCM / NWR No. C-176 /9 Dt. 19.02.2009)

108-109

43

Weighment of molasses and edible oils when loaded in Tank wagons. (Rates circular No. 12 /2009)

(Authority: Railway Board No.TC-I/2007/108/4 Dt 06-02-2009)

(Authority: CCM / NWR No. C-611/0 Dt. 20.02.2009)

109-110

44

Haulage Charges of Brake Van utilized by Container Train Operators. (Rates Circular No. 15 of 2009)

(Authority: Railway Board No. TCR/2201/2006/1 Dt 12-02-2009)

(Authority: CCM / NWR No C-78/1/54/CONCOR Vol.II Dt. 20.02.2009)

110

45

Rates for Automobile Traffic carried on NMG and BCACM wagons. (Rates Circular No. 16 of 2009)

(Authority: Railway Board No. TCR/1015/2008/2 Dt 13-02-2009)

(Authority: CCM / NWR No. C-70/1 Vol.II Dt. 20.02.2009)

110-111

46

Rate of terminal charges to be collected by Port Trust Railways directly from customers from 01.04.2009 to 31.03.2011.( RATES CIRCULAR NO.17 OF 2009)

(Authority: Railway Board No. TCR/1543/89/1 Dt 16-02-2009)

(Authority: CCM / NWR No. C-176 /9 Dt. 20.02.2009)

111-112

47

Tare-weighment of empty wagons supplied to steel plants. (Rates Circular No. 19 of 2009)

(Authority: Railway Board No. TCR/1394/83/6 Pt. Dt 17-02-2009)

(Authority: CCM / NWR No C- 611/0 Dt. 20.02.2009)

112-114

48

Transportation of Relief Material /Fodder to notified flood affected districts of Bihar State: free of charge.(Rate Circular No. 18 of 2009)

(Authority: Railway Board No. TCR/1147 /2008/2. Dt 16-02-2009)

(Authority: CCM / NWR No.C- 174/1 Vol.II Dt. 20.02.2009)

114

49

Implementation of CNCC facility with FCI.(Rates Circular No. 11/2009)

(Authority: Railway Board No. TC-!/95/104/3 Vol.I Dt 04-02-2009)

(Authority: CCM / NWR No. C- 291/0 Dt. 20.02.2009)

114-115

50

Amendment -Permitting running of freight trains on CC+6 routes Universalisation. (Amendment No. 6 to Rates Circular No. 76 of 2007)

(Authority: Railway Board No. TCR/1394/2004/2 Dt 16-02-2009)

(Authority: CCM / NWR No. C-176/4 Vol.III Dt. 20.02.2009)

116-117

51

Hub & Spoke system. (Rates Circular No.6 of 200)

(Authority: Railway Board No. 2007/TC-I/302/1 Dt 04-02-2009)

(Authority: CCM / NWR No. C-78/1/54/CONCOR Vol .II Dt. 25.02.2009)

117

52

Operation of Merry-Go-Round (MGR) System by Railways.(Rates Circular No.07 of 2009 & Corrigendum to R.C. No. 07 of 2009)

(Authority: Railway Board No. TCR/1078/2008/1 dt 04-02-2009 &18.02.09)

(Authority: CCM / NWR No. C-.423/1 Vol.III Dt. 25.02.2009)

118-120

53

Corrigendum No. 10 to Rates Circular No.25 of 2008-Policy Guidelines Freight Incentive Schemes and Transportation product.

(Authority: Railway Board No. TCR/1078/2008/15 Dt 24-02-2009)

(Authority: CCM / NWR No. c.429/0 Dt. 25.02.2009)

121

54

Tareweighment of empty wagons supplied to colliery sidings. (R.C NO. 20 of 2009).

(Authority: Railway Board No. TCR/1394/83/6 Pt. Dt 17-02-2009)

(Authority: CCM / NWR No.611/0 Dt. 25.02.2009)

121-123

55

Notification of changes in distances for charges for levy of fare and freight.

(Authority: Railway Board Letter No. TCR/2043/2006/4 . Dt 12-02-2009)

(Authority:CCM/NWR No. C-541/9/1 Vol .II Date 27.02.09)

123-124

56

Guidelines for E-payment system. (Corrigendum no.2 to Rates Circular No. 39/2008)

(Authority: Railway Board Letter No. TC-I/2004/104/1 Pt. Dt 23-02-2009)

(Authority: CCM / NWR No. C-291/0 Date 27.02.2009)

124-125

57

Notified stations.

(Authority: Railway Board Letter No. TC-I/2001/223/1 Pt.C Dt 23-02-2009)

(Authority: CCM / NWR No. C-494/1 Date 05.03.2009)

125-126

58

Permissible Carrying Capacity (PCC) and standard rake size of BCNHL wagon .(R.C.No. 21 of 2009)

(Authority: Railway Board Letter No. TCR/1394/2009/3 Dt 09.03.2009)

(Authority: CCM / NWR No. C-176/4 Vol.III Date 18.03.2009)

126

59

Dynamic Pricing Policy-Levy of Busy Season Charge and Congestion Charge.(Freight Rate Circular No.22 of 2009)

(Authority: Railway Board Letter No. TCR/1078/2008/11 Dt 19.03.2009)

(Authority: CCM / NWR No. C-423/1 Vol.III Date 24.03.2009)

126-127

60

Corrigendum to Rates circular No20 of 2009- Tare weighment of empty wagons supplied to colliery sidings.

(Authority: Railway Board Letter No. TCR/1394/83/6 Pt. Dt 05.03.2009)

(Authority: CCM / NWR No. C-611/0 date of 24.03.2009)

127-128

61

Corrigendum No. 11 to Rates Circular No. 25 of 2008- Standard rake size of BTAP,BTCS,BTAL and BTFLN wagons.

(Authority: Railway Board Letter No. TCR/1078/2008/15 dated 26.03.2009)

(Authority: CCM / NWR No. C-429/0 date of 30.03.2009)

129

62

Corrigendum No. 12 to Rate Circular No. 25 of 2008- Policy Guidelines- Freight incentive Schemes and Transportation Products.

(Authority: Railway Board Letter No. TCR/1078/2008/15 dated 26.03.2009

(Authority: CCM / NWR No. C- 429/0 date of 30.03.2009)

129-130

63

Haulage Charge recoverable for movement of containers in privately owned wagons. (R.C No. 24/2009)

(Authority: Railway Board Letter No. 2007/TC-I/302/I Pt.H of dt 31.03.2009)

(Authority: CCM / NWR No. C- 78/1/54/CONCOR Vol II of dt 31.03.2009)

130

SORTRC COACHING

1

Opening of BG line between Nanjangud Town Chamarajanagar over Mysore Division.

(Authority:CCM/S.W Rly No. C.215/CMNR-NTW/SWR/08 of date 10/11/08)

(Authority: C C M/NWR No. C 436/Opening /closing /station/section of date 02.01.09)

132

2

Opening of new Passenger Halt at Mohapani Mal (MPML) at Nagpur division in SECR.

(Authority:CCM/S.E.C Rly No. /BSP/CRC/3471 of dt. 11.06.2008 )

(Authority: C C M/NWR No. C 436/Opening /closing /station/section of date 05.01.09)

132

3

Opening of new Passenger Halt at KHAIRRANJI (KRRI) at Nagpur division in SECR.

(Authority:CCM/S.E.C Rly No. /BSP/CRC/3695 of dt. 27.06.2008 )

(Authority: C C M/NWR No. C 436/Opening /closing /station/section of date 05.01.09)

132-133

4

Re-opening of Chandresal (CDSL ) halt station for passenger traffic.

(Authority:CCM/W C. Rly No. WCR/HQ/C/Cog/637/Halt station of dt. 15.10.2008 )

(Authority: C C M/NWR No. C 436/Opening /closing /station/section of date 06.01.09)

133

5

Opening of Passenger halt at Govindpur between Asanboni and Tatanagar station over Kharagpur Division at Km. 242/25-27.

(Authority:CCM/S.E. Rly No.RG.46/4217/1. of dt 12.11.08)

(Authority: C C M/NWR No. C 436/Opening /closing /station/section of dt 19.01.09)

133-134

6

Corrigendum to SORTRC 202 (Goods) of 2008 - Chargeable distance of Nanjangud Town and Chamarajanagar over Mysore Division.

(Authority: CCM/SW Rly No. C.215/CMNR-NTW/SWR/08 of date 31.10.08)

(Authority: C C M/NWR No. C .543/16/16 Part-II 04/2/2009)

134-135

7

Conversion of Bhanaur and Dwarkganj Flag stations in to contractor operated halts.

(Authority:CCM/N.R .Rly. C.1329-R/Opening/Closing/Pt-XII/NDBH, dt 25.02.2009)

(Authority :CCM/NWR No. C.-171/Upgradition/Downgradation of Halt of dt 10.03.2009 )

135

8

Opening of new Passenger Halt at CHANGOTOLA(CGLA) at Nagpur division in SECR.

(Authority:CCM/SEC.Rly/BSP/CRC/3688 dt 27.06.2008)

(Authority :CCM/NWR No. C.-436/Opening Closing of station/section of dt10.03.09)

136

9

leLrhiqj eaMy ds lgjlk&Qkjfclxat [kaM ij ljk;x46/1306/KGT/3 of date 29.10.2008)

(Authority. CCM NWR No. C/543/1/11/SE Rly Dt 05.01.09)

155-156

7

Opening of Bankata station in full rake for outward Goods traffic

(Authority- CCM/NE Rly No: C/147/0/3/Pt.X/T.L. /RG /Loose of dt 15.07.08)

(Authority. CCM NWR No. C/543/1/7 / NE Rly Dt 8.1.09)

156

8

1.Opening of Bagalkot (BGK) station for handling goods traffic.

2.Opening of Navalur (NVU) station for handling goods traffic.

(Authority- CCM/SW Rly No: C.208/TL/08-09 Vol.V of dt 03.12.08)

(Authority. CCM NWR No. C/543/1/13 /SW Rly Dt 5/12/08)

156

9

Closure of stations for goods traffic over Bhavnagar Division.

(Authority- CCM/W Rly No: C.498/1/13 Vol.II of dt 21.11.08)

(Authority. CCM NWR No. C/543/1/14 /W Rly Dt 30/12/08)

156-157

10

List of CRT handling stations,

(Authority:CCM/West Central Railway No. WCR / HQ/ C / G-356 / CONCOR of Dated 16.12.2008.)

(Authority. CCM NWR No. C/543/1/15/W C Rly of Dt 08.01.09)

157

11

Notification regarding opening of M/s Gateway Rail Freight Ltd Siding at Sanehwal Station.

(Authority: CCM/N.Rly No. 1-AC/481 of Dated 19.12.2008)

(Authority. CCM NWR No. C/543/1/5/N Rly of Dt 08.01.09)

157-158

12

1.Updated list of Advance Payment Scheme for issue of To Pay RRs.

(Authority:CCM/SEC.RlyNo.C/SECR/BSP/BKG/Coal/4411ofDated 05.08.08)

2. Extension of permission for outward booking of non programmed Coal from goods sheds/sidings.

3.- Opening of Bishrampur for outward loading of Bauxite. Ref:-

(Authority: CCM/SEC.Rly No. C/SECR/BSP/BKG/Coal/6812of Dated 08.12.08)

4-Opening of private siding of M/s Vimla Infrastructure (India) Pvt. Ltd.

Served by Bhupdeopur.

(Authority: CCM/SEC.Rly No. C/SECR/BSP/SDG/VIIPL/BEF/6684of Dated 02.12.08)

5- Opening of Saragbundia station for inward Coal traffic .

(Authority: CCM/SEC.Rly No. C/SECR/BSP/O&C/GT/Pt.-I/3808 of Dated 03.07.2008)

(6) 6- Opening of Pvt.Siding of M/s. HEG Ltd. Served by Murhipar station .

Re (Authority: CCM/SEC.Rly No. C/SECR/BSP/Sdg./HEG/3809 of Dt 03.07.08)

(7) 7-Opening of Manikpur Colliery siding served by Korba for Public use.

(Authority: CCM/SEC.Rly No. C/SECR/BSP/O&C/GT/Pt.I/3653 of Dated 26.06.08)

8-Opening of Pvt. Siding of Sipat Super Thermal Power Plant of M/s.NTPC

served by Gatora station.

(Authority: CCM/SEC.Rly No. C/SECR/BSP/SDG/GTW/3004 of Dated 15.05.08)

(Authority. CCM NWR No. C/543/12/1/SEC Rly of Dt 12.01.09)

158-161

13

1-Opening of Kotarlia station for goods traffic.

(AuthorityCCM/SEC Rly No. C/SECR/BSP/SDG/RICPL/MDH/2941 dtd 12/5/08)

2.- Operations of Pvt. Siding of M/s Raipur Infrastructure Co. Pvt. Ltd. Served by Mandhar station.

(AuthorityCCM/SEC Rly No. C/SECR/BSP/SDG/RICPL/MDH/2554 dtd 17/4/08)

3.Opening of Khaperkheda Thermal Power House siding served by Kalumna for outward loading of Fly Ash.

(AuthorityCCM/SEC Rly No. C/SECR/BSP/Sdg/KPKD/2445/ dtd 12/4/08)

4. Opening of Anuppur Station for Outward Traffic.

(AuthorityCCM/SEC Rly No. C/SECR/BSP/O&C/GT/Pt-1 /2277 dtd 08/4/08)

5.Change in the name of Pvt. siding of M/s Dharmsi Morarji Chemicals Co. Ltd. to M/s Chidambara Chemicals & Fertilizers Ltd./ Kumhari.

(AuthorityCCM/SEC Rly No. C/SECR/BSP/SDG /CCFL/3400 dtd 06/06/08)

6. Re-opening of Bhilai Refractories Plant / Marauda.

(AuthorityCCM/SEC Rly No. C/SECR/BSP/SDG /BRP/MXA dtd 17/07/08)

(Authority. CCM NWR No. C/543/12/1/SEC Rly of Dt 09.01.09)

161-163

14

1. alphabetical and Numerical Code for new siding M/s Penna Cements Industries Ltd siding served by Juturu station.

(Authority:CCM/SC Rlys Commercial Circular No. 283 of 2008 dt. 23.9.08)

(Authority:CCM/W Rly No. 543/1/8/1 SC Rly of 24/12/2008)

2. Nomination of Rayanpadu shops (RYPS) for handling inward Steel Traffic in full rakes.

(Authority:CCM/SC Rly No. C.473/990/TL/2008/Vol.XV /Part of date 16-10-08)

3.Opening of Venkatachalam Road Junction and Nidiguntapalem stations for handling goods traffic in Train loads/Wagon loads.

(Authority:CCM/SC Rly No. C.473/990/TL/2008/Vol.XVI Part of date 19-11-08)

4.Opening of Gurujala Mid Section Siding (GZA) for handling both inward and outward good traffic for all commodities except Steel and POL in train loads & Wagon loads.

(Authority: CCM/SC Rly No. C.473/990/TL/2006/Vol.XVI Pt. of date 31.10.08)

5. Opening of Washim station of NED Division for handling Goods traffic in Train loads/wagon loads.

(Authority:CCM/SC Rly No.C.473/990/TL/2008/Vol.XVII Pt. of date 24.10.08)

6. Nomination of Stations as CRTs for handling container traffic of Private Container Operators.

(Authority:CCM/SC Rly No.C. 307/CONCOR/05 of date 08.10.08)

(Authority. CCM NWR No. C/543/12/1/SEC Rly of Dt 09.01.09)

163-165

15

Updated list of Goods sheds and sidings Capable for handling full rake/half rake and two point combination for outward booking in covered wagons.

(Authority. CCM N.E Rly NO.C/147/0/3/PT.X/T.load/RG of dt.17.11.2008)

(Authority. CCM NWR No. C/498/6/Vol.II of Dt 21.01.09)

165-172

16

The updated list of Full/half rake goods shed/sidings two point combination (originating) for outward loading in Jumbo & Coal in BOXN Wagons on C Railway.

(Authority: C. Rly No.473/990/TL/OR/03/Vol.XVII of date 11-7-08)

(Authority:CCM/SCRlyNo.C.473/990/TL/OR/03/Vol.XVIIof dt 21.11.2008)

(Authority. CCM NWR No. C/498/6/Vol.II Rly of Dt 22.01.09)

172-180

17

1. Opening of Venkatachalam Road Junction and Nidiguntapalem stations for handling Goods traffic in Train loads/ wagon loads.

(Authority: CCM/SC Rly No. C.473/990/TL/2008/Vol.XVI Pt. of date 24.10.08)

2. 1) Opening of Purna Hingoli Akola Section for Goods traffic routing via Purna over Nanded Division.

2 ) Opening of Purna Hingoli Section for passenger traffic over Nanded Division.

(Authority: CCM/SC Rly No. C.37/DEV/NED/G.C of date 24.10.08)

3.Closure of M/S Nuclear Fuel Complex, siding served by Moula- Ali Station.

(Authority: CCM/SC Rly No. C.490/SCZ/SC/37 of date 22.10.08)

4. Closure of Manikgarh (MAGH) station for handling inward goods traffic .

(Authority:CCM/SC Rly No.C.473/990/TL/99/Vol.XI Part 15-12-2008)

5.Opening of Sivni Shivapur station for handling both Inward and Outward Goods traffic in Trainloads for all Commodities except POL & Coal for both local and Foreign traffic.

(Authority:CCM/SC Rly No.C.473/990/TL/2006/Vol.VXI Pt. of date 08-12-2008)

6. Opening of Shadnagar station for handling both Inward and Outward Goods traffic in Trainloads and wagon loads for both local and foreign traffic for all commodities except POL and Coal.

(Authority:CCM/SC Rly No.C.473/990/TL/2006/Vol.VXI Pt. of date 08-12-2008)

(Authority. CCM NWR No.543/10/1 (S.C. Rly ) of Dt 22.01.09)

180-181

18

1. Opening of MEDCHAL (MED) station for handling both inward and outward goods traffic in Train Load

(Authority:CCM/SC Rly No. C.473/990/TL /2006/Vol.VXI /Pt of dt 17-12-08)

2. Opening of Veldurthi (VDI) station for handling inward and outward steel traffic in train loads.

(Authority:CCM/SC Rly No. C.473/990/TL /86/Vol.XVII of date 1-12-08)

3. Opening of Rajura (RJUA) station for handling Inward Goods traffic for all commodities except Steel, POL and Coal.

(Authority:CCM/SC Rly No. C.473/990/TL/2008/Vol.VXI Pt. of date 10-12-08)

(Authority. CCM NWR No. SC Rly No. C.543/1/10/SC Rly Dt 22.01.09)

181-182

19

1.Permission to use Mangalore chemical and Fertilizers Ltd siding served by Panamburu by Indian Farmers Fertilizers Co-Operative Ltd over S.Rly.

2.The updated list of stations/sidings having rake /half rake handling capacity and two point combination for booking of rakes of covered wagons at trainload class rates on Southern Railway.

(Authority. CCM/ S Rly No. C.RA.42/5//Pt.XV of date 19.11.08 )

(Authority. CCM NWR No. SC Rly No. C.543/9/1/SC Rly Dt 23.01.09)

182-183

20

1.Full rake handling capacity of Khalari siding of Lemos Cements Ltd. for both Inward and outward traffic.( Rate Circular (Goods) 25 of 2008 )

(Authority No. ECR/ CRM /Opening siding/007 dated 11.11.08)

2.Opening of Lemos Cement Siding, Khelari (KLRE) for outward booking of Non Programmed Coal .(Rate circular (Goods) 26 of 2008.

(Authority No. ECR /CRM/FMS/2/RB dated 11.11.2008)

3.Opening of Goods Shed/Sidings for outward booking of Non Programmed Coal. (Rate circular (Goods) 27 of 2008 dated 11.11.2008)

(Authority No. ECR/CRM/FMS/2/RE dated 11.11.2008

(Authority No.CCM/NWR/NO>C/543/1/EC RLY dated 29.01.09)

183-185

21

1.Opening of Sitapur station(MG) for rake handling of goods traffic.

(Authority:-No C/147/0/3/Pt. X/ Train Load / Loose RG dated 28.08.2008).

2-Re-opening of Bankata station in full rake for outward Goods traffic

(Authority No. C/147/0/3/Pt. X/ Train Load /RG Loose. Dated 20.10.2008)

3-Closure of Kusmhi (KHM) and Nakaha Jungle (JEA) Goods sheds for certain commodities. (RATES CIRCULAR (Goods) No. 155 OF2008)

(Authority No. C/147/0/3/Pt.X/T.Load/Loosew/RG dated 05.09.200

4-Opening of Katka (KFK) station (BG) for outward goods traffic.

(Authority:CCM/NE Rly No. C/147/0/3/Pt.X/Train Load /RG/Loose of date 22-10-08)

(Authority NWR / CCM / No. C / 543/ 1 / 7 / NE dated 02.02.2009

185-186

22

1- Opening of Gadag- Bagalkot section over Hubli division for handling goods traffic as CC+6 route.

(Authority: CCM/SW Rly No. C.37/Carrying Capacity Vol.III of date 29.12.2008)

2- List of CRT handling stations.

(Authority: CCM/SW Rly No. C.450/CONCOR Vol. II dated 17.12.2008)

3- The updated list of Stations/Sidings having Full/Half handling capacity on

South Western Railway.

(Authority: CCM/SW Rly No. C.206/TL/08-09 Vol.V dated 05.12.2008)

4- Closure of M/S NGEF Ltd, Extra High Voltage Transformer Factory siding

served by Baiyyappanahalli station over SBC Division.

(Authority CCM/SW RLY No. C.490/Sdg/NGEF(High Voltage ) BYPL/SBC /08 dated 06.01.2009)

5- Closure of M/s NGEF Ltd, siding served by Baiyyappanahalli station over SBC Division.

( Authority CCM/SW RLY No. C.490/Sdg/NGEF/ BYPL/SBC /08 dated 06.01.09)

6- Closure of Public Oil siding served by Baiyyappanahalli station over SBC Division.

(Authority CCM/SW RLY No. C.490/public oil siding / BYPL/ SBC /08 dated 07.01.09)

7 Closure of M/s Indian Telephone Industries (ITI) , siding served by Krishnarajapuram station over SBC Division.

(Authority CCM/SW RLY No. C.490/Sdg/ ITI / KJM /SBC/ 08 dated 07.01.2009)

(Authority NWR / CCM / No. C / 543/ 1 / 13 / SW RLY dated 03.02.09.)

186-188

23

1- Opening of the private siding of M/s Adhunik Metaliks Ltd near Kuarmunda station served by Rourkela station.

(Authority No. CCM/SE/Special Rates Circular No. RG.46/4389 dated 28.11.2008)

2- Opening of Bandhdih (BDIH) station for outward booking of goods trffic in favour of M/s Electrosteel Integrated Limited.

(Authority No. CCM/SE Rates Circular No. RG.46/1306/ADRA PT. I dated 01.12.2008)

3- Opening of Bandhdih (BDIH) station for inward booking of goods traffic .

(Authority No CCM/SE Rates Circular No. RG.46/1306/ADRA/ Pt. I dated 02.12.2008. )

4-Opening of the private siding of M/s Adhunik Metaliks Ltd. near Kuarmunda served by Rourkela station .

(Authority No. CCM/SE Special Rates Circular No. RG .46/4389 dated 18.11.2008)

.(Authority NWR / CCM / No. C / 543/ 1 / 11/ SE RLY dated 05.02.2009.)

188-189

24

Opening of stations for booking of goods traffic in Adra Division

(Authority SER No. Rate Circular No. RG-46/1306/ADRA/Pt. 1 of date 16.12.2008.

(Authority NWR / CCM / No. C / 543/ 1 / 11/ SE RLY dated 12.02.2009.)

189

25

Opening of Bonakalu ( BKL) station for handling inward RMC traffic , Steel traffic in Train Loads.

(Authority SCR No. C 473/990/TL/2006/Vol.VXI/Pt. dated 24.12.2008)

(Authority NWR / CCM / No. C / 543/ 1 / 10/ SC RLY dated 12.02.2009.)

190

26

1. Opening of new BG line between stations TVR-NGT for Goods traffic.

2.Opening of Nagappattinam station for Full rake goods traffic.

(Authority S.Railway No. C.37/II/148/Vol V dated 20.11.2008)

3 Closure of Palakkad (PGT) Pollachi (POY) section due to Gauge Conversion.

(Authority:CCM/S.Rly NO. C.478/XIV/8/Vol.V of date 3112.08)

(Authority: CCM/ NWR No. C. 543/1/9/S Rly dated 18.02.2009.)

190-191

27

1- Operation of container trains by PCOs in Railway owned terminals Notification of Amgaon goods shed as Container Rail Terminal ( CRT)

(Authority CCM/SEC RLY No. Rates Circular No. 223(G) / 2008 dated 02.12.2008)

2- Route KM from Dadhapara (DPH) Uslapur (USL) of SEC Rly.

(Authority No.- CCM/S.E.C. Rly letter No. KVA / S.E.C. Rly / BSP/ CRC/1880 dt. 14.03.2008.)

(Authority No. CCM/N. Rly No.2509-R/SEC /09 of date 09.01.2009)

3- Opening of Naila Goods Shed for Outward Traffic.

(Authority No. C/SECR/BSP/O&C/G.T./657 dated 29.01.2009

4. Sub:- Opening of WRS Goods Shed Complex served by Raipur Store Depot (RSD)

(Authority No. C/SECR/BSP/O&C/G.T./229dated 12.01.2009)

5. Sub:- Opening of private siding of M/S NSPCL/Bhilai served by Kumhari.

(Authority No. Rates Circular No. 03(G)(G)/2009 No.C/SECR/BSP/SDG/NSPCL/BIA/38 dated 02.01.2009)

6.Permission for outward booking of non - programmed Coal from NTPC Exchange yard /Gevra Road .

Authority No. Rates Circular No. 07(G)/2009No. C/SECR/BSP/BKG/COAL/107 dated 06.01.09.)

(Authority No. CCM/ NWR /C/543/1/12 dated 19.02.2009)

191-193

28

Opening of shunting neck of FCI siding at Jharsuguda as a public siding.

(Authority:CCM/SE Rly No. RG.46/2007/1 of date 16/01/2009)

(Authority: CCM/ NWR No. C. 543/1/II/SE Rly dated 20.02.2009.)

193

29

1.-Opening of Jaggayyapeta Town ( JPTN) station for handling inward RMC Steel traffic in Train Loads.

(Authority No. SCR/C-473/990/TL/2006/Vol.VXI/Pt dated 2.01.2009

2- Notification of Kakinada Port (COA) station as CRT for container traffic .

(Authority No. SCR /C-307/CONCOR/05/II dated 28.1.2009)

3.- Notifying Shankarpalli station for handling traffic in Half rakes.

(Authority No. SCR No. 473/990/TL86/Vol.XVII dated 19.1.2009.)

(Authority: CCM/ NWR No. C. 543/1/10/SC Rly dated 26.02.2009.)

193-194

30

Rounding of Chargeable distance in case of siding notified for through distance .

(Authority:CCM/N.C.Rly.No.2008/comml./M&R/409/IBP.Sdg of dt.18.12.08)

(Authority: CCM/ NWR No. C.543/16-Part-II dt 02.03.2009)

194-195

31

Chargeable distance in Kms. Between station on the Alipurduar jn.Bamanhat (BG) section for booking of Passenger, Parcel, Luggage and Goods traffic.

(Authority:CCM/N.F.Rly.No,2532-R/N.F.Rly./08,N.R/B.H.NDLS,dt 2.12.2008)

(Authority: CCM/ NWR No. C. 543/16-Part-II Dt 02.03.2009.)

195-196

32

1- Introduction of Round the Clock working hours of koderma Goods shed.

(Authority:CCM/E.C Rly No,ECR/CRM/FMS/2/Open Goods/DHN of dt 30.01.2009)

2- Closure of Goods shed.

(Authority:CCM/E.C.Rly.No.E.C.R /CRM/FMS/2DNB of dt 09.01.2009)

(Authority:CCM/ N.R Rly/No.2509/R/E.C. Rly/N.Rly of dt 17.02.2009)

(Authority: CCM/ NWR No. C. 543/1/3/E.C.Rly of Dt 02.03.2009.)

197

33

Stations capable of handiling rake.

(Authority: CCM/W.Rly No.c. 70/1/107 Half rake /Full rake of date 29/12/08)

(Authority: CCM/ NWR No. C. 543/1/4/W.Rly of Dt 03.03.2009.)

197

34

1-Notification of Container Rail Terminal (CRT)

(Authority No. C-307/OR/CRTs/07 dated 21.01.2009

2- Opening of Kurduwadi (KWV) Usmanabad(UMD) section for Goods traffic .

(Authority No.RA.42/10/Pt..VIII /8 dated 28.11.2008)

3- Opening of Karnataka Emta Coal Mines Ltd. ,Private siding at Majri station for outward Coal traffic, over C.Rly.

(Authority No. C.Rly ARN No. 103of 2008(Goods), File No. C/698/M/1001 dt 12.08.2008

(Authority No. C/386/2/41/08/C. Rly/RCL dated 7.11.2008)

4-Opening of Kherwadi Goods Shed as full rake dealing point

(Authority No. CCM/C.Rly file No. C.RB.205.TL-Cdt. 10.09.2008,under ARN No. 129 oof 2008(Goods).

5. Opening of New Private Siding for M/S Innovative B2B Logistic Pvt. Ltd. At Kalamboli in CWC Complex on Diva Panvel Section.

(Authority No. CCM/C.Rlys File No. C/698/M/999 dt. 03.10.2008 under ARN No. 141 of 2008 (Goods)

(Authority: CCM/W.Rly No.c. 70/1/107 Half rake /Full rake of date 29/12/08)

(Authority: CCM/ NWR No. C. 543/1/1/C.Rly of Dt 04.03.2009.)

198-199

35

List of CRT handling stations.

(Authority: CCM/W.C.Rly No.C/WCR/HQ/C/G-356/CONCOR dated 21.01.2009)

(Authority: CCM/ NWR No. C. 543/1/15/ W.C.Rly of Dt 04.03.2009.)

199

36

1-Opening of a new private siding for M/S Jai Prakash Associates Ltd, Cement siding Chunar, served by Chunar Railway Station,Distt. Mirzapur ( U.P ) .

(Authority No 2008/Comml./M&R/413/Cement Sdg/CAR dated 10.12.2008

2- Opening of a new private siding for M/S Jai Prakash Associates Ltd, Cement siding Chunar ,served by Chunar Railway Station,Distt, Mirzapur ( U.P ) .

(Authority No 2008/Comml./M&R/413/Cement Sdg/CAR , Subedarganj, Allahabad , dated 23.12.2008)

3-Operation of Container by private container operator (PCO) in Railway owned terminal as Container Rail Terminals (CRTs)

(Authority No. C /Cont./HQ/ALD-97Pt. II dated 29.12.2008)

(Authority: CCM/ NWR No. C. 543/1/6/ N.C.Rly of Dt 09.03.2009.)

200-203

37

1- Opening of Bommidi (BQI) station for outward Goods Traffic.

(Authority No. C.37/11/150/Vol.I dated 29.12.2008)

2- Renaming of Varkala Railway station as Varkala Sivagiri Railway station.

(Authority No CCM/S.Rly No.C.155/P/Misc. dated 30.01.2009)

(Authority : CCM/NWR No. C/543/1/9/S.Rly dated 12.03.2009)

203

38

Re-Opening of Bhilai Retractories Plant siding Served by Marauda station.

(Authority No. CCM/SEC Rly No. C/SECR/BSP/SDG/BRP/MXA and R.C No. 107 (G) /2008 dt. 17.7.08)

(Authority No.CCM N.Rly No.2509-R/S.E.C.Rly./09,N.R.B.H.NDLS,dt. 3.2.2009)

(Authority No.CCM/NWR C- 436/Opening closing of station/Section dated 12.03.2009 )

203-204

39

1- Opening of Bokajan (BXJ) Rly station for inward booking coal traffic.

(Authority CCM/NF Rly No. C.407/RD-109/Pt.XII/LMG dated 29.10.2008 )

2-Opening of Jogbani ( JBN) and Purnea (PRNA) Station for O/I goods traffic

(Authority CCM/NF Rly No. C.407/RD-109/Pt.XII (NORTH) dated 27.10.2008)

3- Two Point combination for Bamboo traffic.

(Authority No. COM / Maligaons File No. T/195/7/Pt./XIII/TG dated 27.11.2008 )

(Authority No.CCM/NWR C- 543/1/NF Rly dated 18.03.2009 )

204-205

40

Closure of Subzi Mandi Goods Shed.

(Authority:CCM/N.Rly No. 1329-R/Opening /closing Pt-XII/NDBH of date 16/1/09)

(Authority No.CCM/NWR C- 543/1/5/N Rly dated 18.03.2009 )

205

41

Withdrawal of inflation in distance between Khandwa-Hingoli Section in Nanded Division on South Central Railway with effect from 1.4.2009.

(Authority:CCM/W Rly No. C-543/1/8/1 SC Rly of date 29/12/08)

(Authority No.CCM/NWR C- 543/ 16/Inflation dated 20.03.09 )

205-209

42

Opening of newly converted BG Section between GUNTAKAL KALLURU of GTL Division for handling Goods Traffic .

(Authority:CCM/SC Rly No. C-37/DEV/GTL/G.C of date 06/10/08)

(Authority No.CCM/NWR C- 543/10/1 (S.C. Rly) dated 25.03.09 )

210

43

1. Operation of container trains by PCOs in Railway owned terminals- Notification of Goods sheds as Container Rail Terminals (CRTs).

(Authority No. Rates Circular No. 24 (G) / 2009 C- /SECR/ BSP/CRT/ Pt. / 791 dated 4.2.2009)

2.Allotment of Alpha and Numerical Codes to The private Siding of M/s Vimla Infrastructure (India) Pvt Ltd. Served by Bhupdeopur.

(Authority No. Rates Circular No.32 (G) / 2009 C- /SECR/ BSP/Sdg/VIPL / Pt. / 921 dt. 10.2.2009)

3. Freight concession for Iron Ore traffic (Class200x) from S.E.C Railway

(Authority No. Rates Circular No. 28 (G) / 2009 C- /SECR/ BSP/Iron Ore/Policy/832 dated 5.2.2009)

(Authority No.CCM/NWR C- 543/1/13/SEC Rly dated 25.03.2009 )

210-211

44

1-Opening of a new private siding for M/S Jai Prakash Associates Ltd, Cement siding, Chunar, served by Chunar Railway station, Distt. Mirzapur (U.P.)

(Authority No. 2908/Comml/M&R/413/Cement sdg. CAR dated 12.01.2009)

2- Opening of a new private siding for M/S Jai Prakash Associates Ltd, Cement siding , Chunar, served by Chunar Railway Station, Distt. Mirzapur (U.P.)

(Authority No. 2008/Comml/M&R/413/Cement sdg. CAR dated 06.01.2009)

(Authority No.CCM/NWR C- 543/1/6//N.C. Rly dated 26.03.2009 )

211-213

45

1- Opening of Hassan (HAS) station for Container traffic .

(Authority No. - 206/TL/08-09 Vol.V date 16.01.2009)

2- Notification of rakes from two originating terminals.

(Authority No C-206/TL/08-09 Vol.V dated 04.03.2009)

(Authority No.CCM/NWR C- 543/1/13//S.W. Rly date30.03.2009 )

213

THROUGH RATE CIRCULAR COACHING

________________________________________________________________

Para for THROUGH RATE CIRCULAR 1 (COACHING) of 2009

_______________________________________________________________

Sub :-Re-Opening of Rasidpur Khori (RDK) halt station.

The competent authority (GM) has approved the proposal of re-opening of Rasidpur Khori halt station, situated on SIKR-CUR (MG) section of JP Division at KMs 15.24 Kms from Sikar station & 12.13.Kms from Laxmangarh Sikar station, for passenger service, on an experimental basis for a period of 6 months. Stoppage of train no. 165/166 JP-CUR-JP & 485 /486 JP-CUR-JP Passenger will be provided w.e.f 01.02.2009.

The timing of above trains at Rasidpur Khori will as under:-

Train No.

486 CUR-JP

Pass

166 CUR-JP

Pass.

Station

485 JP-CUR Pass.

165 JP-CUR Pass

Arr.

14.43

07.12

Rasidpur Khori

09.05

20.00

Dep.

14.44

07.13

09.06

20.01

Sale of ticket work will be done as per Railway Board Policy (Guard Booking /Halt Contractor), Serving station will be Laxmangarh Sikar Station.

(Authority: CCM/NWR No.C.171/Uneconomic Halt station /Jp of dt.23.1.2009)

THROUGH RATE CIRCULAR

GOODS

________________________________________________________________

Para for THROUGH RATE CIRCULAR 1 (GOODS) of 2009

________________________________________________________________

Sub :-Opening of Sheodas Padampura (SAS) station for Inward and Outward traffic for rake load traffic.

The competent authority has given the approval for opening of Sheodas Padampura (SAS) station in JP-SWM section on Jaipur Division of North Western Railway for rake load traffic of following descriptions :

a) In ward Coal traffic

b) All Other commodities both for outward & inward including Iron & Steel except POL & live stock

These instructions are valid for a period of one year w.e.f 17.12.2008

(Authority:1. CCM/NWR No.C.498/1/Vol.II/loose of dt.06.1.2009)

2. Sr.DCM/JP No. C-180/Goods shed SAS of date 17.12.08)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 2 (GOODS) of 2009

________________________________________________________________

Sub :-Opening of Adani Logistic Limited ICD Jaipur Division.

1.

The competent authority has given the approval for opening of Adani Logistics Ltd - ICD served by Kishangarh station on Jaipur Division of North Western Railway as private siding for both inward & outward container traffic in train load when consigned to & by M/s. Adani Logistic Limited siding at Kishangarh.

2. In case of train load traffic which are entering directly into the siding without terminating at the serving station duly fulfilling the requisite condition, freight for traffic moved to and from the siding will be charged on through distance basis. The chargeable distance from serving station Kishangarh (KSG) to Adani Logistic Ltd ICD (ALIK) is 6.370 Km.

3.For any shunting done on partys account, Separate shunting charges are leviable as per extant rules.

4. This ICD will function round the clock.

5. The alpha code and numerical code of the siding would be as under

Name of Station/Siding /CBA

Numerical Code

Alpha Code

Gauge

Division

ADANI LOGISTICS LTD-ICD served by Kishangarh

11308113

ALIK

BG

JP

5. All instructions on this subject should be followed rigidly.

(Authority:1. CCM/NWR No.C.541/9/1 Vol.II of dt.12.1.2009)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 3 (GOODS) of 2009

________________________________________________________________

Sub :- Addition /Correction /Deletion in the Numerical Code list of NWR.

The following addition/correction/deletion may please be made in the station code list (coding & decoding section) of North Western Railway.

Addition:-

Name of Station/siding/CBA

Numerical Code as reported

Numerical code as should be

Alpha Code

Gauge

Division

Remarks

PALI

11706408

11306412

PALI

BG

JP

Gauge Conversion

KUND

11706407

11306413

KUND

BG

JP

Gauge Conversion

KATHUWAS

11706406

11306414

KTWS

BG

JP

Gauge Conversion

ATELI

11706405

11306415

AEL

BG

JP

Gauge Conversion

MIRZAPUR BACHHAUD

11706404

11306416

MBV

BG

JP

Gauge Conversion

NARNAUL

11706403

11306417

NNL

BG

JP

Gauge Conversion

AMARPUR JORASI

11706402

11306418

APJ

BG

JP

Gauge Conversion

NIZAMPUR

11706401

11306419

NIP

BG

JP

Gauge Conversion

DABLA

11708158

11308191

DBLA

BG

JP

Gauge Conversion

JHILO

11708157

11308192

JLLO

BG

JP

Gauge Conversion

MAONDA

11708156

11308193

MADA

BG

JP

Gauge Conversion

NIM-KA-THANA

11708155

11308194

NMK

BG

JP

Gauge Conversion

BHAGEGA

11708154

11308195

BAGA

BG

JP

Gauge Conversion

KANWAT

11708153

11308196

KAWT

BG

JP

Gauge Conversion

KACHERA

11708152

11308197

KHRA

BG

JP

Gauge Conversion

SHRI MADHOPUR

11708151

11308198

SMPR

BG

JP

Gauge Conversion

RINGAS JN

11708150

11308199

RGS

BG

JP

Gauge Conversion

KISHAN-MANPURA

11708149

11308200

KMNP

BG

JP

Gauge Conversion

BADHAL

11708148

11308201

BDHL

BG

JP

Gauge Conversion

PACHAR-MALIKPURA

11708147

11308202

PCMK

BG

JP

Gauge Conversion

RENWAL

11708146

11308203

RNW

BG

JP

Gauge Conversion

MINDHA

11708145

11308204

MNHA

BG

JP

Gauge Conversion

BHESLANA

11708144

11308205

BILA

BG

JP

Gauge Conversion

SANODIYA

11708143

11308206

SFE

BG

JP

Gauge Conversion

KHANDEL

11708142

11308207

KNDL

BG

JP

Gauge Conversion

PEEPLEE-KA-BAS

11708141

11308208

PKBS

BG

JP

Gauge Conversion

(Authority:SAO /NWR No.HQ/NWR/Stats/STN Code/NWR of date 19/1/09)

(Authority:. CCM/NWR No.C.3/IRCA/2/Part II dated 19.01.2009)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 4 (GOODS) of 2009

________________________________________________________________

Sub:- Opening of FL-RGS-RE section of Jaipur division for goods traffic originating or terminating on FL-RGS-RE section.

1.On gauge conversion, the competent authority has opened the FL-RGS-RE (BG) section for goods traffic originating or terminating to /from over this section. Due to yard remodeling of Rewari station, FL-RGS-RE (BG) section is not opened for through traffic till further notification.

2. Distances on FL-RGS-RE (BG) section is as under:

Ex. Phulera Jn to Bhagega = 104.39 Km

Ex. Rewari Jn to Bhagega = 110.73 Km

Ex. Rewari Jn to Phulera Jn = 215.12 km

3. Earlier TRC No. 28,29,30 of 2008 (Goods) shall stand modified and traffic originating or terminating over this section shall be booked as per rating routing rules i.e via RE or FL whichever is applicable.

(Authority:1. COM/NWR No.T-5/PLG/183/GC/RE-RGS-FL/RVNL/Vol.I of date 13/1/09)

2. CCM/NWR No. C-541/9/1 Vol.II of date 27/1/09)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 5 (GOODS) of 2009

________________________________________________________________

Sub:- Extension of opening of Asalpur Jobner Station of jaipur division for inward traffic of Clinker.

Ref:- TRC 3,7 & 10 of 2008 (Goods) of date 07/2/2008 , 31/3/2008 &

30/6/2008 respectively.

The Competent authority has approved for extending the opening of Asalpur Jobner station of Jaipur Division for inward clinker traffic in rake load beyond 29.12.08 to till notification of commissioning of FL-RGS-RE section on gauge conversion and opening of Bhagega station for handling inward clinker traffic.

Extant rules relating to the matter inforce, must be followed strictly.

(Authority: -CCM/NWR No. C-498/1/Vol.II of date 22/1/09)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 6 (GOODS) of 2009

________________________________________________________________

Sub:- Notification of distance for Rewari-Ringas Phulera Section after

gauge conversion.

Rewari-Ringas-Phulera section on Jaipur Division of North Western Railway has been converted into BG.

The chargeable distance of this section is as follows:

SN

NAME OF STATIONS

DISTANCE AFTER GAUGE CONVERSION EX. REWARI

(In Kms)

1

REWARI

0.00

2

KHORI

10.723

3

PALI

16.098

4

KUND

22.780

5

KATHUWAS

27.730

6

ATELI

37.345

7

MIRZAPUR BACHHOD

44.440

8

NARNAUL

51.550

9

AMARPUR JORASI

59.490

10

NIZAMPUR

65.960

11

DABLA

77.120

12

JILO

84.880

13

MAONDA

92.310

14

NIM-KA- THANA

101.580

15

BHAGEGA

110.730

16

KANWAT

121.972

17

KACHERA

128.950

18

SHRI MADHOPUR

138.330

19

RINGAS JN

148.390

20

KISHAN MANPURA

158.25

21

BADHAL

166.130

22

PACHAR MALIKPURA

173.480

23

RENWAL

180.815

24

MINDHA

186.150

25

BHESLANA

191.555

26

SANODIYA

197.750

27

KHANDEL

204.770

28

PEEPALEE KA BAS

209.731

29

PHULERA JN

215.12

This has the approval of the competent authority.

Distance Tables /Softwares etc. be updated accordingly.

(Authority: -CCM/NWR No. C-541/9/1 Vol . II of date 27/1/09)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 7 (GOODS) of 2009

________________________________________________________________

Sub:- Notification / de-notification of CRTs.

Ref:- 1.Railway Boards Rate Circular No. 21,49 of 2008

2.TRC 08, 11, & 21 dated 15.4.08, 1.7.08 & 07.10.08 respectively.

(a) Stations notified as CRT:

The competent authority has given approval for notification of the following stations of this Railway as CRT with immediate effect

S.No.

Division

Name of Group III station /Siding notified as CRT

1

Ajmer

Marwar Junction

2

Keshavganj

3

Jawai Bandh

4

Sirohi Road

5

Hamirgarh

6

Fatehnagar

7

Gangrar

8

Bhilwara

9

Khemli

10

Jaipur

Sheodaspura Padampura

11

Sanganer

12

Bikaner

Sadulpur

13

Sriganganagar

14

Mandidabwali

15

Sangaria

16

Hansi

17

Bhiwani

18

Anupgarh

19

Pilibanga

20

Mandi-adampur

21

Suratgarh

22

Lalgarh

23

Kolayat

24

Satrod

25

Raman

26

Kalanwali

27

Shri Vijay-Nagar

28

Jodhpur

Bhagat Ki Kothi

29

Merta City

30

Govindi Marwar

31

Sambhar

32

Barmer

33

Samdari Jn

34

Palimarwar

35

Deshnoke

36

Phalodi

37

Merta Road

38

Pokaran

39

Kuchaman city

40

Balotra Jn

(b) Stations not notified as CRT:

The competent authority has also given approval for de-notifying the following stations of this Railway as CRT with immediate effect

S.No.

Division

Name of Group III station /Siding denotified

1

Ajmer

Debari

2

Dungarpur

3

Rupaheli

4

Mandpiya

5

Jaipur

Bansthali Niwai

6

Bhankri

7

Bikaner

Dhirera

8

Kanasar

9

Ram Singhpur

10

Loharu Jn

11

Mahendra garh

12

Raisingh nagar (MG)

13

Gajsinghpur (MG)

14

Sri Karanpur (MG)

15

Kesarisinghpur (MG)

16

Hanumangarh Town(MG)

17

Ellenabad (MG)

18

Tehsilbadra (MG)

19

Churu (MG)

20

Sadul shahar (MG)

21

Nohar (MG)

22

Jodhpur

Banar

23

Nagaur

24

Nokha

25

Ramdevra

26

Ashapura Gomat

27

Odhaniya chacha

28

Shri Bhadriya lathi

29

Kharia Khangar

30

Bhimarlai

31

Utarlai

32

Kawas

33

Baytu

34

Marwar Mundwa

35

Pipar Road

36

Degana

37

Marwar Chhapri

38

Rajkiawas

39

Bomadra

40

Rohat

46

Sujangarh (MG)

47

Ladnun (MG)

48

Didwana (MG)

49

Jalore (MG)

50

Marwar Bhinmal (MG)

This notification is valid upto 30.09.2009 unless modified earlier

Other terms and conditions issued by Rly Board vide R.C No. 49 of 2008 referred above and modification/amendments thereto issued from time to time will be inforce.

(Authority: -CCM/NWR No. C-387/PCO/Container II of date 09/2/09)

_______________________________________________________________

Para for THROUGH RATE CIRCULAR 8 (GOODS) of 2009

________________________________________________________________

Sub:-Round the clock working at Alwar, Khori, Bhattu and Jamsar goods

shed .

Ref:- TRC 3, 28, 29, 30 of 2008 (Goods) of 2008

The competent authority has given approval for the following goods shed of North Western Railway for introducing round the clock working :

S.No.

Division

Name of goods sheds

1

Jaipur

Alwar

2

Jaipur

Khori

3

Bikaner

Bhattu

4

Bikaner

Jamsar

As requested by Jaipur Division, Post facto approval has accorded for KHORI station for introducing round the clock.

Necessary Steps should be taken to introduce round the clock working at all these stations.

All relevant instructions on this subject should be complied with.

(Authority: -CCM/NWR No. C-491/B&W Hrs Vol-I of date 12/2/09)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 9 (GOODS) of 2009

_______________________________________________________________

Sub:-Opening of Satrod Station for outward and Inward traffic both in trainload.

Ref:- TRC 26 (Goods) of 2008

Satrod station on Bikaner Division of North Western Railway was opened for Outward and Inward FCI goods traffic in trainload for three months with effect from 30.10.2008.

Now It has been decided to open Satrod station for outward and Inward goods traffic in trainload for all commodities except Coal, POL and live stock on permanent basis with effect from 30/1/2009

(Authority: -CCM/NWR No. C-498/4/BKN of date 12/2/09)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 10 (GOODS) of 2009

________________________________________________________________

Sub:-Opening of Pali Station for outward and Inward traffic both in rakes.

The competent authority has sanctioned the opening of Pali (PALI ) station in RPC section of Jaipur Division of North Western Railway for all description of Goods traffic (except Coal, POL, live stock & Motor vehicle) both for outward and inward in rakes on permanent basis w.e.f 20.02.2009.

(Authority:- Sr DCM/JP letter no.C-498/Goods shed pali of date 20.02.09)

(Authority: -CCM/NWR No. C-498/I/Vol.II of date 9/3/09)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 11 (GOODS) of 2009

_______________________________________________________________

Corrigendum to TRC 20 (Goods) of 2008

Sub:- Addition / Correction/Deletion in the Numerical Code list of NWR.

Ref:- TRC No. 20 (Goods) of date 29.09.2008.

In reference to above, the Numerical Code of Suratpura Jn between HSR SDLP section was indicated as 11208182 in TRC 20 (Goods) of 2008 of date 29/09/2008

This should be corrected as under:

Name of Station /siding /CBA

Numerical code as reported

Numerical

al Code as should be

Alpha code

Gauge

Division

Remarks

SURATPURA JN

11608161

11208181

SURP

BG

BKN

Gauge conversion

(Authority: -CCM/NWR No. C-3/IRCA/02/Part II of date 27/3/09)

________________________________________________________________

Para for THROUGH RATE CIRCULAR 12 (GOODS) of 2009

________________________________________________________________

Sub:- Closure of Hisar Station for all commodities except POL.

Ref:- TRC 3 & 4 (Goods) of 2008 of date 07/2/08

The competent authority has given approval to close Hisar station of Bikaner Division of North Western Railway for all commodities except POL with effect from 06/04/09 to till further advice. Freight traffic of Hisar station can be handled at adjoining station SATROD, which is already opened for goods traffic.

(Authority: -CCM/NWR No. C-498/4/BKN of date 27/3/09)

LOCAL RATE ADVICE

COACHING

________________________________________________________________

Para for LOCAL RATE ADVICE 1 of 2009 (COACHING)

________________________________________________________________

Sub:- :Earmarking of Ladies Quota in modified high capacity sleeper class coaches . (Commercial circular No.65 of 2008 )

1. As per extant practice, in sleeper class a compartment of six berths in a coach or in some trains one compartment each in two coaches are being earmarked for Women irrespective of their age and /or travelling alone or in group.

2. Central Railway has suggested that the number of berths to be earmarked for ladies quota in the modified high capacity sleeper class coaches be increased to 9.

3. The matter has been examined and it has been decided that existing practice of earmarking six berths compartment in sleeper class coaches as mentioned in para 1 above will continue even in modified high capacity sleeper class coaches and these berths should be earmarked in the third day of the coach.

(Authority: Rly Boards No.2007/TG-1/20/P/Pt-II of dt 16.12.2008)

(Authority: CCM/NWR No. C-436/Resvn.Quota/ Policy/08 of dt 02.01.2009)

________________________________________________________________

Para for LOCAL RATE ADVICE 2 of 2009(COACHING)

________________________________________________________________

Sub :- Updating of Duty Pass waiting against vacant accommodation available in the train. (Commercial Circular No. 62 of 2008 )

Please refer to this office letter No.98/TG-1/9/P dated 29.03.2001 (Commercial Circular No.16.of 2001) circulating therewith detailed policy instructions of Rajdhani/Shatabdi Express trains. As per these instructions, separate Duty Pass quota has been earmarked in all Classes in Rajdhani/Shatabdi Express trains and AC Chair Car class in Jan Shatabdi Express trains for providing accommodation to serving/retired Railway servants. These Railway servants who have been issued waiting list tickets against Duty Pass quota on the authority of privilege/Duty/post retirement complimentary passes,has to approach the emergency quota controlling authority for releasing of berths out of Duty Pass Holders quota set apart in the train.

2 Instances have come to notice that after preparation of charts , some of the pass holders remain on waiting list while the accommodation is vacant in the train after clearing Waiting List/RAC Passengers of other categories.

3 Some of the Railways have represented that in such situations , the pass holders on waiting list should be considered for providing accommodation against the vacant seats.

4 Accordingly,the matter has been examined and it has been decided that at the time of preparation of charts of Rajdhani/Shatabdi/Jan Shatabdi Express trains, after adjusting RAC/Waitlisted passengers and upgrading the Passengers of lower class, if any, if the accommodation is still vacant, the system will automatically update the Duty Pass waiting list and remaining vacant accommodation, if any will be offered for booking at the current booking counter as is presently being done.

5 CRIS will make necessary modification in the software and advise date of implementation to Zonal Railways as well as this office

(Authority: Rly Boards No.2008/TG-1/9/P of dt.26.12.2008)

(Authority: CCM/NWR No. C-436/Resvn.Quota/ Policy/08 of dt 07.01.2009)

_______________________________________________________________

Para for LOCAL RATE ADVICE 3 of 2009(COACHING)

_______________________________________________________________

Sub:- Charging of fares for high capacity coaches /conventional coaches and other matters.(Commercial Circular No. 73 of 2008)

Zonal Railway have sought clarifications regarding charging of fares for high capacity coaches /conventional coaches and other matters. The clarifications on the issues raised are given below:-

i) Vide Boards Commercial Circular No.53 of 2008, it was instructed that high capacity coaches should not be introduced in piece meal i.e.in one train for one class, the coaches should be either conventional or high capacity coaches and not a combination thereof. However, in the case of exigency of service, if a high capacity coach is replaced by a conventional coach, in that case passenger is not liable to pay the difference of fare between the high capacity coach &the conventional coach.

ii) In the case of exigency of service, if a conventional coach is replaced by a high capacity coach, the passenger will be entitled to get the difference of fare between the conventional coach &high capacity coach as per Refund Rules.

iii) CIRS has already made arrangements in the system for recognizing high capacity coaches and charging of fares accordingly. It may be ensured that actual type of coach running on the train is fed in the system.

iv) In case journey involves travel in high capacity coach for one leg and in conventional coach for another leg or vice versa , the fare shall be the sum of the fares in respective high capacity coach and conventional coach on telescopic basis. However, if the chargeable fare thus arrived at is higher than the fare for conventional coach for the entire distance, the fare for conventional coach will be charged.

In case the first leg of journey is by high capacity or conventional coach and type of coach for second leg of journey is not known, the entire fare should be charged on the basis of first leg of journey giving the telescopic benefit to the passenger.

v) Ordinary passenger trains having high capacity coaches for Sleeper classes can be charged at lower rates as long as the reservation is through PRS. If that is not so, then the existing fare (fare for conventional coaches) is to be charged for high capacity coaches of Sleeper classes for ordinary passenger trains.

vi) The discounts shall be applicable to all high capacity coaches of all classes, irrespective of whether newly manufactured high capacity coaches or conventional coaches whose capacity has been increased through retro-fitment. This discount shall not be admissible in LHB coaches of any class.

This issues with the concurrence of the Finance Directorate of the Ministry of Railways.

(Authority: Rly Boards No.TCII/2910/2008 of dt.10.12.2008)

(Authority: CCM/NWR No. C-436/Resvn.Quota/ Policy/08 of dt 08.01.2009)

________________________________________________________________

Para for LOCAL RATE ADVICE 4 of 2009(COACHING)

________________________________________________________________

Sub:- Charges for special train/Special coach.

Reference Boards Telemax of even number dared 03.07.2008 (Commercial Circular No.47 of 2008 ) wherein validity of the instructions issued vide Boards letter of even number dated 28.09.2007 & 09.10.2007 (commercial Circular No.87 & 89 of 2007) were extended for a period up to 31.12.2008. Ministry of Railways have now decided that for the present status-quo may be maintained till 30.06.2009 refund if any, due to over charging may be granted for booking of special train/special coaches for the period 01.01.2009 to 06.01.2009. This issues with the concurrence of the Finance Directorate of the ministry of Railways.

(Authority: Rly Boards No.TCII/2033/2007/Review of dt.06.01.2009)

(Authority: CCM/NWR No. C-436/Special train of dt 08.01.2009)

______________________________________________________________

Para for LOCAL RATE ADVICE 5 (COACHING) of 2009

_______________________________________________________________

Sub:- Eligibility criteria for allotment of bookstalls at the railway stations to the philanthropic and social organizations clarification thereof.(COMMERCIAL CIRCULAR NO. 4 OF2009) (clarification to comml,Cir. No. 88 of 2006 )

Ref: - Boards letter No. 2000/ TG-III / 464/18/Policy dated 18.10.2006.

Instructions have been issued to Zonal Railway for allotment of bookstalls at the railway stations to the philanthropic and social organizations vide Boards letter dated 18.10.2006 mentioned above.

However , some zonal railways have sought clarification regarding the eligibility criteria of philanthropic and social organizations for allotment of bookstall. Board have approved the following criteria for identification of philanthropic and social organizations for the purpose of allotment of bookstalls:-

(i)The philanthropic and social organizations must have their own publication of books and periodicals for promoting social and cultural values of the society .

(ii)Such organization should be registered as Society or Trust or Company i.e. Society registered under Societies Registration Act, 1860; or (ii) Trust formed under Trust deed or registered with Income Tax Authority ; or (iii) Limited Company incorporated for charitable purpose under section 25 of the Companies Act , 1956 and in support to their such claim they should submit their registration certificate while applying to railways

(iii) The application of such organizations to Zonal Railways for allotment of bookstalls under the category of philanthropic and social organization should be accompanied with the following certificates in addition to the above:

a) Certificate of registration of organization with Income Tax Deptt. regarding its registration under section 12 (A) of Income Tax Act, 1961 ; and

b) Gazette Notification ( for Section 35 AC) or Exemption Certificate (for Section 80G ) from the Income Tax Deptt. such that the donations made to the organization are exempted under either Section 35AC or 80G of Income Tax Act, 1961 or both.

The above registration / exemption certificates should be valid during the tenure of the licence.

(Authority:Railway Boards letter No.2008/TG-III/462/03 of dated 22.01.2009)

(Authority :CCM/NWR No.C-21/0 Vol. II of date 2-02-09)

_______________________________________________________________

Para for LOCAL RATE ADVICE 6 (COACHING) of 2009

_______________________________________________________________

Sub :System of issue of cash Receipts for booking Retiring Rooms/ Dormitories- amendment to sub-para (c) of para 1232 of commercial Manual.

Ministry of Railways have decided that sub para ( c) of para 1232 of Commercial Manual may be revised as per the correction slip enclosed.

Correction Slip to the Indian Railways Commercial Manual.

Sub-Para (c) of Para 1232 : Other Miscellaneous Traffic of Commercial Manual

(c) At stations where UTS is available, the passengers may be issued such tickets. At station where printed retiring room tickets are stocked, the passengers may be issued printed tickets on recovery of prescribed charges. The amount thus collected is to be accounted for in the daily trains cash-cum-summary book and this is to be reflected in the monthly local passenger classification returns. At other stations, passengers may be issued money receipts in form Com./M-2 and a separate money receipt book is required to be kept for the purpose. The charges thus received are to be accounted for in daily trains cash- cum summary book under head retiring Room Charges.

(Authority:Railway Boards letter No.2008/TG-IV/15/1/SR of dated 25.11.2008)

(Authority :CCM/NWR No.C-4/PA/Retiring Room/ 08 of dt 5.02.2009)

_______________________________________________________________

Para for LOCAL RATE ADVICE 7 (COACHING) of 2009

_______________________________________________________________

Sub : Revision of charges for Hospital- on wheels organized by Impact India Foundation, Mumbai

.

Further to the Ministry of Railways Instructions issued vide circular letter of even number dated 08.01.2008 on the above subject, the Ministry of Railways have revised various charges to be levied for movement of Hospital- on Wheels as follows:-

I ) Haulage Charges : Haulage charges will be recovered at 25% of the actual coat of movement of AC Sleeper Class coaches. These charges will be Rs. 5.66 per vehicle (bogie ) Km. for 2008-2009. The charges should be recovered in advance before the movement takes place.

ii) Maintenance Charges : Maintenance Charges for the year 2008-2009 will be as follows :-

(a ) for non- AC coaches - Rs. 2,93,135/- per coach.

(b ) for AC Coaches - Rs. 5,86,269/- Per coach

.

iii) Detention Charges : detention charges will continue to be collected at the rate of Rs.5.00 per 8- Wheeler vehicle per day.

iv ) A revolving lumpsum deposit of Rupees One lakh sixty thousand (Rs. 1,60,000/-) will be maintained with the Central Railway to meet contingent expenses arising on run such as electricity, water, sanitation expenses, etc. Central railway will deduct these charges on the basis of advice received from the concerned Railway and pass on the credit to them. The Foundation will on demand replenish the amount to the extent required. No other deposit will be collected from the foundation.

POH interval may continue to be two years to ensure safety.

Other terms and conditions will remain the same.

This issues with the concurrence of the Finance Directorate of the Ministry of Railways.

(Authority:Railway Boards letter No.TC II/2221/2007/IIF of dt 22.01.2009)

(Authority :CCM/NWR No.C -156/Fare/09 of dt 5.02.2009)

_______________________________________________________________

Para for LOCAL RATE ADVICE 8 (COACHING) of 2009

_______________________________________________________________

Sub:- Tax Deduction at Source

Recently a reference was made to Central Board of Direct Taxes to clarify applicability of TDS provisions in the Income Tax Act in respect of certain transactions/payments made by Railways.

The matter was accordingly examined by Department of Revenue (Ministry of Finance) and a list of relevant provisions and applicable tax rates is as below for information and strict compliance.

S No

Issues on transactions dealt with on Railways- Some of these were also raised at training programme at NADT/Nagpur.

Relevant % of deduction and provisions of Income Tax

1

Advertisement-tenders, contracts,

Introduction of trains, opening ceremony

Advertising contract 1%

2

Leasing of sigh board illumination, hoarding etc

Advertising contract 1%If paid by Railways No TDS on payments to Railways

3

Works contract

S.194C-2%

4

Fabrication contracts specifically categorized as works contract like wagon fabrication contracts, where Railways give materials or advance payments for wagon building, manufacturing of points and crossing

S.194C-2%

5

Commission payments to Rail Travel agents

S.194H-10%

6

Clean stations-Contracts for clearing of train stations, platforms ect.

S.194C-2%

7

Hospitals-payment of employee bills (including cost of medicines )to approved hospitals

S.194J-10%

8

Taxability of medical bills- reimbursement in the hands of employee

Exempt if treatment taken in any hospital maintained by the Government or any local authority or any other hospital approved by the Government for the purposes of medical treatment of its employees

9

Consulting Railways Doctors

If employed by Railways (including part time employment)-u/s 192-As applicable on salary/Others u/s S.194)-10%

10

Payments to consultants-architects, advocates, lawyers on Railway panel

S.194)-10%(On Gross payments including reimbursements)

11

Payments to Foreign consultants

S.195-rfer to DTAA

12

Scrap sale

TCS-1%

13

Parking lot contracts

TCS-2%

14

Railways land leased for parking

TCS-2%

15

Interest on delayed payments (including employees claim DCRG)

S-194A-10%

20%In case of compensation

16

Liquidated Damages

S.194A-10%

17

Interest awarded by Claims tribunals, Consumer Courts

S.194A-10%

20% in case of compensation

18

Arbitration Award

S.194A-10%

19

Electricity charges paid to State Electricity Boards for Railway operation etc.

Not covered under TDS

20

Electric energy charges paid in pursuance to contract or agreement with entities other than State Electricity Boards including unbundled corporate entities of SEB, if the energy is consumed for executing any work or service contract

S-194(c )-2%

21

Honorarium paid to staff

S.192-salary

22

Interest paid to parties on their deposits with Railways

S.194A-10%

20%-Co

23

Amount received for use of Building

Payment to Railway not taxable

(Authority:Railway Boards letter No.2005/AC-II/1/5(Pt.) of dt 5.03.08)

(Authority :CCM/NWR No.C.481/TDS/07 of dt 20.02.2009)

_______________________________________________________________

Para for LOCAL RATE ADVICE 9 (COACHING) of 2009

_______________________________________________________________

Sub :Tax deduction at source in respect of Railway Payments.

It has been observed by Ministry of Finance that the Tax deducted/collected at source in the Ministry of Railway is not commensurate with the budget estimates. The bill drawing and accounts officers must familiarise themselves of the provisions of the Income Tax Act and associated responsibilities specially about getting the TAN allotted and e-filing of TDS returns Complexity of legal provisions also constrains correct appreciation of the nature of transaction resulting in non- deduction of TDS in cases where deduction is warranted.

2 In view of the above, following instruction are issued in consultation with Ministry of Finance/Department of Revenue to clarify such doubts and to facilitate improved compliance of legal requirements.

3The Income Tax Act has entrusted the Drawing and Disbursing officers (Chapter XVII-B) to.

* Deduct Tax at Source at the time of payment,

* Adjust tax at deducted in Government account through book entry

* Issue TDS