Number of Consumers NoCapacity of Distribution Whether ...
Transcript of Number of Consumers NoCapacity of Distribution Whether ...
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage1 ROHITASH NAGAR EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GOVT OF N C T OFFICE‐KASHMERE GATE CCK 1059 990 KVA UNPLANNED 30‐06‐2018 11:23:28 30‐06‐2018 12:10:45 0:47 0.00005222 MUs
2LALKUAN BAZAR‐SIKRIWALAN‐ NEW HAUZ QAZI, AJMERI GATE‐CHANDNI CHOWK, KHARI BAWLI‐NAYA BANS‐ LAHORI GATE, LALKUAN BAZAR‐FRASH KHANA, MOSQUE‐LAL KUAN BAZAR CCK 7180 4590 KVA UNPLANNED 14‐06‐2018 20:02:35 14‐06‐2018 20:50:00 0:47 0.00228472 MUs
3MAIN BAZAR‐KHUSH DIL, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, CHAWRI BAZAR‐KHUSH DIL, LALKUAN BAZAR‐SIKRIWALAN‐ NEW HAUZ QAZI, HAUZ QAZI‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 2883 2970 KVA UNPLANNED 15‐06‐2018 12:22:36 15‐06‐2018 13:09:52 0:47 0.00005222 MUs
4
ZEENAT BARI‐MORI GATE, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, ROHITASH NAGAR EAST‐SILAMPUR, MAIN MARKET‐KATRA DHOBI, OLD DELHI RAILWAY STATION‐CHANDNI CHOWK, KASHMIRI GATE‐MORI GATE, NAYA BAZAR‐CHANDNI CHOWK, GOVT OF N C T OFFICE‐KASHMERE GATE, SHIVAJI PARK‐BALBIR NAGAR, FATEHPURI‐KHARI BAOLI, TIS HAZARI SADAR BAZAR‐RAJENDRA MARKET CCK 6314 4950 KVA UNPLANNED 29‐06‐2018 05:52:00 29‐06‐2018 06:45:00 0:53 0.00023556 MUs
5
FATEHPURI MASJID‐CHANDNI CHOWK, KHARI BAWLI‐NAYA BANS‐ LAHORI GATE, LALKUAN BAZAR‐FRASH KHANA, RAILWAY STATION‐CHANDNI CHOWK, KATRA BARYAN‐BARA DARI, LALKUAN BAZAR‐SIKRIWALAN‐ NEW HAUZ QAZI, AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 7180 4590 KVA UNPLANNED 30‐06‐2018 09:55:00 30‐06‐2018 10:53:00 0:58 0.00132111 MUs
6 TOWN HILL‐KATRA NEEL, NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA CCK 1250 990 KVA UNPLANNED 17‐06‐2018 12:39:09 17‐06‐2018 13:14:14 0:35 0.00001944 MUs
7
RED FORT‐CHANDNI CHOWK‐RED FORT, LAJPAT RAI MARKET‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK, TOWN HALL‐KUCHA NATWA, BARA MORE SARAI‐CHANDNI CHOWK, MOR SARAY COLONY‐CHANDNI CHOWK, GURUDWAR SHAB LAND‐CHANDNI CHOWK, DELHI PUBLIC LIBARARY‐KUCHA NATWA CCK 2387 2610 KVA UNPLANNED 20‐06‐2018 18:54:33 20‐06‐2018 19:42:00 0:47 0.001175 MUs
8NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA, MAIN BAZAR CHANDANI CHOWK‐SISGANJ, GURUDWAR SHAB LAND‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK CCK 1832 990 KVA UNPLANNED 23‐06‐2018 19:27:00 23‐06‐2018 20:25:00 0:58 0.00153056 MUs
9
RED FORT‐CHANDNI CHOWK‐RED FORT, DARYA GANJ, LAJPAT RAI MARKET‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK, BARA MORE SARAI‐CHANDNI CHOWK, BHAGIRATH PLACE‐CHANDNI CHOWK, MOR SARAY COLONY‐CHANDNI CHOWK CCK 2103 4360 KVA UNPLANNED 25‐06‐2018 00:04:25 25‐06‐2018 00:58:02 0:53 0.00002944 MUs
10
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, UNION CLUB OF INDIA‐KATRA NEEL, DELHI PUBLIC LIBARARY‐KUCHA NATWA, FATEHPURI‐KUCHA HASIRAM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PARKING AT FLTLT JERRY MARG FATEH PURI FOR SCOOTER & CARS‐KUCHA HASIRAM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, OLD DELHI RAILWAY STATION‐CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, OLD DELHI BUS STOP‐KUCHA HASIRAM, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, DELHI VIDHYUT BOARD‐KATRA NEEL, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TOWN HILL‐KATRA NEEL, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B CCK 1285 990 KVA UNPLANNED 27‐06‐2018 11:48:00 27‐06‐2018 13:18:00 1:30 0.00115 MUs
11
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, RED FORT‐VIJAY GHAT, NIGAM BODH GHAT CEMETRY‐KASHMERE GATE, LIG/MIG RES/NON COMM AREA‐VIJAY GHAT DRG, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, SWATRANTATA SAINANI SMARAK‐CHANDNI CHOWK‐RED FORT, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐CHANDNI CHOWK‐RED FORT, LIG/MIG RES/NON COMM AREA‐VIJAY GHAT, LIG/MIG RES/NON COMM AREA‐KASHMERE GATE, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, RED FORT‐CHANDNI CHOWK‐RED FORT, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B CCK 802 1630 KVA UNPLANNED 28‐06‐2018 08:03:00 28‐06‐2018 09:01:00 0:58 0.00032222 MUs
12NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAZAR CHANDANI CHOWK‐SISGANJ, GURUDWAR SHAB LAND‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK CCK 455 990 KVA UNPLANNED 30‐06‐2018 14:01:36 30‐06‐2018 14:48:48 0:47 0.00005222 MUs
13 DDA FLATS‐SILAMPUR DGN 35 630 KVA UNPLANNED 16‐06‐2018 08:03:21 16‐06‐2018 08:38:41 0:35 0.00001944 MUs14 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 10 630 KVA UNPLANNED 19‐06‐2018 09:05:00 19‐06‐2018 09:45:00 0:40 0.00002222 MUs15 RAM NAGAR‐SILAMPUR, BLOCK H‐MANSAROWAR PARK, BLOCK E‐MANSAROWAR PARK DGN 192 990 KVA UNPLANNED 19‐06‐2018 09:06:01 19‐06‐2018 09:40:00 0:33 0.00001833 MUs
16
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIVVIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DGN 1506 4230 KVA UNPLANNED 20‐06‐2018 07:40:00 20‐06‐2018 08:39:00 0:58 0.00104722 MUs
17
DAMODER PARK‐DILSHAD GARDEN, BLOCK A‐MANSAROWAR PARK, NEAR SHADARA RAILWAY GODOWN‐SHAHDARA DGN, BLOCK B‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, RAM NAGAR‐SILAMPUR, SANSAR COMPOUND‐DILSHAD GARDEN, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, BLOCK E‐MANSAROWAR PARK, SACHDEVA INDUSTRIES‐RAM NAGAR EAST, BLOCK F‐SHRI RAM NAGAR, BLOCK H‐MANSAROWAR PARK, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, JINDAL BHAWAN‐RAM NAGAR EAST, BLOCK F‐MANSAROWAR PARK, BLOCK C‐MANSAROWAR PARK, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK G‐MANSAROWAR PARK, BLOCK M‐SHRI RAM NAGAR DGN 4391 3600 KVA UNPLANNED 25‐06‐2018 18:46:30 25‐06‐2018 19:34:23 0:47 0.001175 MUs
18
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SHRI RAM NAGAR, BLOCK S‐PRATAP PURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI TRANSPORT‐WELCOME COLONY, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK M‐SHRI RAM NAGAR, BHAGAT NAGAR‐DAYALPUR, INDIAN GAS‐SHAHDARADGN, DWARKAPURI‐NAVIN SHAHDARA, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SHAHDRA METRO STATION‐SHAHDARA DGN, PKT R‐BLOCK D, KABUL NAGAR‐ROHITASH NAGAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK F‐SHRI RAM NAGAR, BLOCK R‐PRATAP PURA, BLOCK H‐BHAGIRATHI VIHAR, OLDANPUR‐NAVIN SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DGN 2123 4630 KVA UNPLANNED 27‐06‐2018 23:17:37 28‐06‐2018 00:05:00 0:47 0.00092694 MUs
19
BLOCK A‐MANSAROWAR PARK, BLOCK B‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, RAM NAGAR‐SILAMPUR, DDA FLATS‐SILAMPUR, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, KABUL NAGAR‐ROHITASH NAGAR, BLOCK E‐MANSAROWAR PARK, GOVT SCHOOL NO‐2‐DDA FLATS, BLOCK H‐MANSAROWAR PARK, BLOCK F‐MANSAROWAR PARK, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK C‐MANSAROWAR PARK, DELHI JAL BOARD‐DDA FLATS, BLOCK G‐MANSAROWAR PARK DGN 7100 7110 KVA UNPLANNED 28‐06‐2018 02:25:36 28‐06‐2018 03:15:00 0:49 0 MUs
20BLOCK B‐NEW MODERN SHAHDARA, BLOCK 1‐RAM NAGAR, BLOCK D‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NEW MODERN SHAHDARA, BLOCK C‐NEW MODERN SHAHDARA, BLOCK B‐JAGAT PURI DGN 4067 2610 KVA UNPLANNED 28‐06‐2018 05:13:38 28‐06‐2018 05:55:00 0:41 0.002255 MUs
21 BLOCK 1‐RAM NAGAR DGN 132 990 KVA UNPLANNED 29‐06‐2018 14:33:34 29‐06‐2018 15:05:41 0:32 0.00002667 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
22
BLOCK A‐DILSHAD COLONY, BLOCK A‐OLD SIMAPURI, BLOCK K‐LEPROSY COLONY, BLOCK B‐PREM NAGAR DGN, M.C.P. SCHOOL‐POCKET O, SHANTI KUSTH ASHRAM‐RAJIV NAGAR DGN, HANSRAJ SCHOOL‐POCKET H, DDA FLATS‐RAJIV NAGAR DGN, BLOCK E‐DILSHAD COLONY, J.J.C.‐KALANDER COLONY, DELHI JAL BOARD‐POCKET I, BLOCK B‐DILSHAD COLONY, DDA FLATS‐BLOCK A, BLOCK F‐OLD SIMAPURI, BLOCK D‐DILSHAD COLONY, BLOCK A‐RAJIV NAGAR DGN, BLOCK A‐PREM NAGAR DGN, GANDHI KUSTH ASHARAM‐LEPROSY COLONY DGN 5466 3280 KVA UNPLANNED 15‐06‐2018 01:03:00 15‐06‐2018 01:50:00 0:47 0.00195833 MUs
23 BLOCK A‐ RESI FLATS‐POCKET A DGN 75 990 KVA UNPLANNED 16‐06‐2018 08:02:01 16‐06‐2018 08:37:39 0:35 0.00001944 MUs24 MCD‐OLD SIMAPURI DGN 40 990 KVA UNPLANNED 17‐06‐2018 07:54:05 17‐06‐2018 08:37:00 0:42 0.00002333 MUs
25
MIG FLATS‐POCKET F & E, DELHI JAL BOARD‐ PKT A‐JANTA FLATS‐PKT A, POST OFFICE‐DILSHAD GARDEN, GTB MIG FLATS‐POCKET D, NAGAR NIGAM PUBLIC SCHOOL‐POCKET C, BLOCK D‐JANTA FLATS‐PKT A, M.C.D. HOUSE‐POCKET B, BLOCK R‐ AADINATH BHAWAN‐POCKET R, DELHI JAL BOARD‐POCKET C, GROUP 4‐POCKET B, GROUP I FLATS‐JANTA FLATS‐PKT A DGN 1028 1260 KVA UNPLANNED 21‐06‐2018 12:04:34 21‐06‐2018 12:40:00 0:35 0.00220694 MUs
26
DELHI JAL BOARD‐ PKT A‐JANTA FLATS‐PKT A, HANSRAJ SCHOOL‐POCKET H, GTB MIG FLATS‐POCKET D, BLOCK D‐JANTA FLATS‐PKT A, BLOCK R‐ AADINATH BHAWAN‐POCKET R, DDA MARKET PKT B & E‐POCKET F & E, DELHI JAL BOARD‐POCKET C, FLORA DALE SECONDARY SCHOOL‐POCKET R, GROUP I FLATS‐JANTA FLATS‐PKT A DGN 712 5660 KVA UNPLANNED 26‐06‐2018 03:38:31 26‐06‐2018 04:27:00 0:48 0.00157333 MUs
27MENTAL HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, DELHI JAL BOARD‐POCKET C, FACTORY‐DILSHAD GARDEN, BLOCK B‐ GROUP I FLATS‐POCKET B DGN 602 3000 KVA UNPLANNED 27‐06‐2018 07:44:35 27‐06‐2018 08:35:00 0:50 0.001375 MUs
28 BLOCK J & K‐POCKET J&K, DELHI JAL BOARD‐POCKET I DGN 1115 2250 KVA UNPLANNED 27‐06‐2018 07:57:35 27‐06‐2018 08:50:00 0:52 0.00115556 MUs
29
BLOCK E‐NEW SIMAPURI, J.J.C.‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, BLOCK G‐DILSHAD COLONY, BLOCK B‐NEW SIMAPURI, BLOCK D‐NEW SIMAPURI, BLOCK J‐DILSHAD COLONY, NEAR JIVAN CLINIC‐DILSHAD COLONY, SHIV MANDIR‐NEW SIMAPURI, BLOCK B‐DILSHAD COLONY, BLOCK F‐OLD SIMAPURI, MCD PRIMARY SCHOOL‐NEW SIMAPURI, JJC‐DILSHAD COLONY, SIMAPURI BUS DEPOT‐DILSHAD COLONY, BLOCK D‐DILSHAD COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐NEW SIMAPURI, BLOCK F‐DILSHAD COLONY DGN 4132 1260 KVA UNPLANNED 28‐06‐2018 08:59:35 28‐06‐2018 10:50:00 1:50 0.00250556 MUs
30 BLOCK R‐PRATAP PURA, KABUL NAGAR‐ROHITASH NAGAR DGN 1687 630 KVA UNPLANNED 14‐06‐2018 08:52:34 14‐06‐2018 09:48:00 0:55 0.00010694 MUs31 NEW JAFFRABAD‐GORAKH PARK DGN 801 990 KVA UNPLANNED 23‐06‐2018 00:50:37 23‐06‐2018 01:12:00 0:21 0.00104417 MUs
32GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BABARPUR WEST‐BABAR PUR, NEW JAFFRABAD‐GORAKH PARK, SUBHASH PARK‐GORAKH PARK DGN 1980 1980 KVA UNPLANNED 25‐06‐2018 10:05:30 25‐06‐2018 10:45:17 0:39 0.00080167 MUs
33GOPAL K.OIL DEPO.‐PRATAP PURA, BLOCK 1‐BALBIR NAGAR, BLOCK R‐PRATAP PURA, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK D‐PRATAP PURA, BLOCK A‐PRATAP PURA, KABUL NAGAR‐ROHITASH NAGAR DGN 9205 4630 KVA UNPLANNED 30‐06‐2018 10:52:40 30‐06‐2018 11:38:00 0:45 0.00085 MUs
34SUBHASH PARK EXTN.‐GORAKH PARK, DELHI TRANSPORT‐WELCOME COLONY, NEW JAFFRABAD‐GORAKH PARK, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 1977 3010 KVA UNPLANNED 30‐06‐2018 19:01:39 30‐06‐2018 19:42:59 0:41 0 MUs
35 DARYA GANJ, HAPPY PUBLIC SCHOOL‐PARDA BAGH DRG 55 990 KVA UNPLANNED 20‐06‐2018 12:06:00 20‐06‐2018 12:15:24 0:9 0.0000175 MUs
36
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DDA FLATS‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, CHITTLI QABAR‐CHANDNI CHOWK, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, CHANDANI MAHAL‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, VISHWAS NAGAR, BLOCK F‐SHIV VIHAR, DELHI POLICE BHAVAN‐PAHARI BHOJLA, JHILMIL INDUSTRIAL AREAJHILMIL COLONY, PKT A‐BLOCK B DRG 7734 4590 KVA UNPLANNED 23‐06‐2018 10:09:37 23‐06‐2018 11:27:52 1:18 0.00320667 MUs
37DDA FLATS‐ROUSE AVENUE, UNIVERSITY GRANT COMMISSION‐ITO, BLOCK E‐CONNAUGHT PLACE DRG, BAR COUNSIL OF INDIA‐ROUSE AVENUE, MEDICAL COUNCIL OF INDIA‐BAL BHAWAN DRG 168 630 KVA UNPLANNED 24‐06‐2018 13:03:15 24‐06‐2018 13:49:25 0:46 0 MUs
38
VISHWAS NAGAR‐SHAHDARA, BLOCK A‐VIVEK VIHAR PHASE II, NAYA VISHWAS NAGAR‐SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐JHILMIL COLONY BLOCK E, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, GOVT GIRLS SECONDARY SCHOOL‐DDA FLATS, PKT R‐BLOCK D, GEETA COLONY, VIVEKANAND FLATS‐DISTICT PARK, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NEW VISWAS NAGAR‐SHAHDARA, BLOCK F‐SHIV VIHAR, ESI HOSPITAL‐JHILMIL COLONY BLOCK C, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B JLM 3459 5890 KVA UNPLANNED 15‐06‐2018 18:17:37 15‐06‐2018 19:45:00 1:27 0.00229583 MUs
39AMBEDKAR NAGAR‐SHAHDARA, BLOCK_B‐VIVEK VIHAR PHASE II, DDA MIG FLATS‐VIVEK VIHAR PHASE II, JAWALA NAGAR‐SHAHDARA JLM 1306 990 KVA UNPLANNED 22‐06‐2018 11:18:41 22‐06‐2018 11:53:20 0:34 0 MUs
40 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR‐SHAHDARA, SHAHDARA JLM, EAST ROHTASH NAGAR‐SHAHDARA JLM 1342 4590 KVA UNPLANNED 25‐06‐2018 18:30:00 25‐06‐2018 19:20:00 0:49 0.00133389 MUs
41BIHARI COLONY‐SHAHDARA, TELIBARA‐SHAHDARA, VISHWAS NAGAR, BHOLA NATH NAGAR‐SHAHDARA, EAST ROHTASH NAGAR‐SHAHDARA, MAHARAM NAGAR‐SHAHDARA, SUNDER PARK‐SHAHDARA JLM 6328 4000 KVA UNPLANNED 27‐06‐2018 23:21:36 28‐06‐2018 00:52:49 1:31 0.00442361 MUs
42
BHAGAT NAGAR‐DAYALPUR, VISHWAS NAGAR‐SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, SHAHDARA JLM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NEW VISWAS NAGAR‐SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B JLM 1555 4830 KVA UNPLANNED 28‐06‐2018 01:48:34 28‐06‐2018 02:33:00 0:44 0.00083111 MUs
43 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR‐SHAHDARA, SHAHDARA JLM, EAST ROHTASH NAGAR‐SHAHDARA JLM 443 4590 KVA UNPLANNED 29‐06‐2018 06:48:00 29‐06‐2018 07:45:50 0:57 0.000665 MUs44 ANAND VIHAR BLOCK A JLM 20 990 KVA UNPLANNED 12‐06‐2018 09:00:00 12‐06‐2018 09:37:06 0:37 0.00005139 MUs45 VIGYAN LOK‐ANAND VIHAR JLM 23 630 KVA UNPLANNED 12‐06‐2018 09:00:00 12‐06‐2018 09:35:57 0:35 0.00004861 MUs46 SAINI ENCLAVE‐ANAND VIHAR JLM 36 630 KVA UNPLANNED 19‐06‐2018 12:31:11 19‐06‐2018 13:00:00 0:28 0.00038889 MUs47 AGCR ENCLAVE‐ANAND VIHAR JLM 49 990 KVA UNPLANNED 22‐06‐2018 02:01:44 22‐06‐2018 02:41:30 0:39 0.00054167 MUs48 ARYA NAGAR‐ANAND VIHAR JLM 166 990 KVA UNPLANNED 27‐06‐2018 10:06:58 27‐06‐2018 10:50:15 0:43 0.00059722 MUs49 VILL KARKARDOOMA‐KARKAR DUMA JLM 214 990 KVA UNPLANNED 30‐06‐2018 12:10:00 30‐06‐2018 12:54:00 0:44 0.00006111 MUs50 BLOCK_C‐SAVITA VIHAR JLM 94 990 KVA UNPLANNED 14‐06‐2018 14:00:00 14‐06‐2018 14:45:00 0:45 0.0000625 MUs
51
BLOCK_45‐KRISHNA NAGAR, VISHWAS NAGAR‐SHAHDARA, BLOCK_47‐BEADON PURA, JAWALA NAGAR‐SHAHDARA, KASTURBA NAGAR‐SHAHDARA, AMBEDKAR NAGAR‐SHAHDARA, BLOCK_34P‐KRISHNA NAGAR, MAHARAM NAGAR‐SHAHDARA JLM 5853 3600 KVA UNPLANNED 15‐06‐2018 18:17:38 15‐06‐2018 19:45:00 1:27 0.00009667 MUs
52YAMUNA SPORTS COMPLEX‐VIVEK VIHAR, BLOCK E‐JHILMIL COLONY BLOCK E, SURAJMAL VIHAR‐VIVEK VIHAR, ESI HOSPITAL‐JHILMIL COLONY BLOCK C JLM 1295 400 KVA UNPLANNED 17‐06‐2018 15:06:00 17‐06‐2018 16:05:00 0:58 0.00241667 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
53
VIVEK VIHAR BLOCK C, BLOCK A‐VIVEK VIHAR PHASE II, JHILMIL COLONY BLOCK B, JHILMIL COLONY BLOCK A, BLOCK E‐JHILMIL COLONY BLOCK E, GOVT GIRLS SECONDARY SCHOOL‐DDA FLATS, ESI HOSPITAL‐JHILMIL COLONY BLOCK C, BLOCK D‐JHILMIL COLONY BLOCK D, VIVEKANAND FLATS‐DISTICT PARK, BLOCK C‐JHILMIL COLONY BLOCK C JLM 2974 3870 KVA UNPLANNED 17‐06‐2018 22:19:41 17‐06‐2018 23:22:00 1:2 0.00203222 MUs
54 BLOCK B‐SURAJMAL VIHAR JLM 34 990 KVA UNPLANNED 28‐06‐2018 06:38:29 28‐06‐2018 07:26:13 0:47 0.00019583 MUs
55VIVEK VIHAR BLOCK C, BLOCK D‐VIVEK VIHAR, BLOCK B‐VIVEK VIHAR, SUPER BAZAR‐VIVEK VIHAR BLOCK A, TELEPHONE EXCHANGE‐TELEPHONE COLONY, BLOCK A‐VIVEK VIHAR, JANTA COLONY‐VIVEK VIHAR JLM 1790 2350 KVA UNPLANNED 28‐06‐2018 06:43:34 28‐06‐2018 07:24:35 0:41 0.00009111 MUs
56 BLOCK B‐VIVEK VIHAR JLM 15 990 KVA UNPLANNED 29‐06‐2018 10:39:18 29‐06‐2018 11:02:00 0:22 0.00003056 MUs57 BLOCK 18‐GEETA COLONY KRN 92 990 KVA UNPLANNED 15‐06‐2018 09:06:00 15‐06‐2018 09:51:25 0:45 0.0000375 MUs58 JHEEL‐JHEEL KHURENJA KRN 20 630 KVA UNPLANNED 15‐06‐2018 17:21:54 15‐06‐2018 17:42:46 0:20 0.00001111 MUs
59 NEW LAHORE EXTENTION‐SHASTRI NAGAR, NEW LAHORE EXTENTION‐SAROJINI PARK, NEW LAHORE‐SUNDER PARK KRN 333 990 KVA UNPLANNED 16‐06‐2018 09:37:17 16‐06‐2018 10:33:29 0:56 0.00001556 MUs60 BLOCK 10‐GANDHI NAGAR, BLOCK 8A‐GEETA COLONY KRN 192 630 KVA UNPLANNED 26‐06‐2018 14:05:05 26‐06‐2018 14:38:16 0:33 0.00001833 MUs61 BLOCK B‐SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, BLOCK D‐SOUTH ANARKALI COLONY KRN 87 990 KVA UNPLANNED 16‐06‐2018 09:40:52 16‐06‐2018 10:18:13 0:37 0.00001028 MUs62 RASHID MARKET‐JAGATPURI, SHIVPURI‐JAGATPURI KRN 526 990 KVA UNPLANNED 28‐06‐2018 10:57:59 28‐06‐2018 11:24:05 0:26 0.00000722 MUs
63
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAHILA COLONY‐SEELAMPUR, BLOCK 10‐GANDHI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 9‐GANDHI NAGAR, BLOCK 9‐GANDHI NAGAR, GANDHI NAGAR‐KAILASH NAGAR, BLOCK M‐SHIV VIHAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, BLOCK 9‐SUBHASH MOHALLA_I, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK 9‐RAGHUBARPURA, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KRN 5880 5940 KVA UNPLANNED 17‐06‐2018 08:18:39 17‐06‐2018 08:38:27 0:19 0.00013194 MUs
64 RAGHUBARPURA NO 2‐SEELAMPUR, OLD SEELAMPUR KRN 4763 3240 KVA UNPLANNED 24‐06‐2018 19:25:40 24‐06‐2018 20:10:00 0:44 0.00113667 MUs
65LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHANKAR NAGAR EXTN‐AZAD NAGAR, OLD SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK X‐RAJGARH COLONY KRN 5100 3960 KVA UNPLANNED 27‐06‐2018 23:23:37 28‐06‐2018 00:14:00 0:50 0.00161111 MUs
66
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, RAGHUVIR PURA‐SHANKAR NAGAR, RAGHUVIR PURA‐KANTI NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK 5‐TRILOKPURI PHASE I, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KRN 2948 2610 KVA UNPLANNED 28‐06‐2018 01:55:00 28‐06‐2018 03:20:00 1:25 0.00141667 MUs
67LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHANKAR NAGAR EXTN‐AZAD NAGAR, OLD SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK X‐RAJGARH COLONY KRN 5100 3960 KVA UNPLANNED 28‐06‐2018 01:57:34 28‐06‐2018 02:45:00 0:47 0.00121417 MUs
68LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHANKAR NAGAR EXTN‐AZAD NAGAR, CHAND MOHALLA‐RAJGARH COLONY, JHEEL‐JHEEL KHURENJA, BLOCK X‐RAJGARH COLONY KRN 4887 2970 KVA UNPLANNED 28‐06‐2018 05:59:00 28‐06‐2018 06:33:38 0:34 0.00086889 MUs
69 BLOCK X‐RAJGARH COLONY KRN 360 990 KVA UNPLANNED 29‐06‐2018 15:59:22 29‐06‐2018 16:17:22 0:18 0.00001 MUs
70
BLOCK A‐ARJUN NAGAR WEST, BLOCK C‐ARJUN NAGAR WEST, BLOCK E‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR EAST, SHANKAR NAGAR WEST‐AZAD NAGAR, AZAD NAGAR EAST, RADHEY PURI EXTENSION‐ARJUN NAGAR WEST, SUNDER PARK‐SHAHDARA, JHEEL‐KRISHNA NAGAR BLOCK B, BLOCK G‐ARJUN NAGAR WEST, SHALIMAR PARK‐SHAHDARA,ARJUN NAGAR EAST‐ARJUN NAGAR WEST, BLOCK C‐RADHEPURI EXTENSION KRN 2890 3010 KVA UNPLANNED 19‐06‐2018 23:06:00 19‐06‐2018 23:53:07 0:47 0.00092694 MUs
71 BLOCK B‐BLOCK K KRN 229 990 KVA UNPLANNED 26‐06‐2018 14:02:20 26‐06‐2018 14:39:58 0:37 0.00003083 MUs72 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, AZAD NAGAR EAST, BLOCK E‐KRISHNA NAGAR KRN 112 990 KVA UNPLANNED 27‐06‐2018 09:51:02 27‐06‐2018 10:23:05 0:32 0.00002667 MUs73 BLOCK H‐KRISHNA NAGAR, BLOCK B‐RADHEPURI EXTENSION KRN 152 630 KVA UNPLANNED 27‐06‐2018 10:01:48 27‐06‐2018 10:54:29 0:52 0.00002889 MUs
74BLOCK B‐RADHEPURI EXTENSION, BLOCK H‐KRISHNA NAGAR, BLOCK E‐KRISHNA NAGAR, BLOCK F‐KRISHNA NAGAR, BLOCK D‐KRISHNA NAGAR, BLOCK C‐KRISHNA NAGAR KRN 1958 1260 KVA UNPLANNED 29‐06‐2018 17:53:00 29‐06‐2018 18:52:00 0:58 0.00124056 MUs
75 BLOCK A‐ARJUN NAGAR WEST, BLOCK G‐ARJUN NAGAR WEST KRN 14 630 KVA UNPLANNED 30‐06‐2018 09:54:18 30‐06‐2018 10:44:09 0:49 0.00002722 MUs76 BLOCK B‐GOVIND VIHAR, BLOCK C‐GOVIND VIHAR KWN 222 990 KVA UNPLANNED 12‐06‐2018 08:27:13 12‐06‐2018 09:01:16 0:34 0.00004722 MUs77 BLOCK E‐GANGA VIHAR KWN 102 990 KVA UNPLANNED 12‐06‐2018 09:58:31 12‐06‐2018 11:38:46 1:40 0.00013889 MUs78 BLOCK B‐GANGA VIHAR, BLOCK F‐GANGA VIHAR, BLOCK E‐GANGA VIHAR KWN 457 990 KVA UNPLANNED 12‐06‐2018 10:01:21 12‐06‐2018 11:40:29 1:39 0.0001375 MUs
79
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, TUNDA NAGAR‐BHAGIRATHI VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 1376 6215 KVA UNPLANNED 20‐06‐2018 02:26:32 20‐06‐2018 03:55:00 1:28 0.00202889 MUs
80BHARAT‐AMBEDKAR NAGAR, LAXMI GARDEN‐AMBEDKAR NAGAR, AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI VIHAR KWN 96 990 KVA UNPLANNED 24‐06‐2018 11:45:39 24‐06‐2018 12:33:00 0:47 0.00208889 MUs
81
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 29‐06‐2018 19:58:00 29‐06‐2018 20:56:00 0:58 0.00248111 MUs
82
PKT C‐BLOCK E, BLOCK A‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT A‐BLOCK E, BLOCK C‐SADAT PUR, BLOCK D‐WEST KARAWAL NAGAR, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK K‐WEST KARAWAL NAGAR KWN 1584 0 KVA UNPLANNED 18‐06‐2018 01:36:00 18‐06‐2018 02:30:00 0:54 0 MUs
83
PKT C‐BLOCK E, BLOCK A‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT A‐BLOCK E, BLOCK C‐SADAT PUR, BLOCK D‐WEST KARAWAL NAGAR, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK K‐WEST KARAWAL NAGAR KWN 1584 0 KVA UNPLANNED 18‐06‐2018 23:39:00 19‐06‐2018 00:10:53 0:31 0 MUs
84
BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK C‐SADAT PUR, PKT E‐SADATPUREXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, PKT B‐BLOCK B, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK D‐WEST KARAWAL NAGAR, WEST KARAWAL NAGAR KWN 5685 1660 KVA UNPLANNED 19‐06‐2018 15:21:00 19‐06‐2018 17:20:00 1:59 0.00033056 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
85
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐MUSTAFABAD (DAYALPUR), LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK A‐RAMA GARDEN, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK A‐KHAJURI KHAS, BLOCK D‐TUKMIRPUR, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 525 5530 KVA UNPLANNED 24‐06‐2018 05:34:39 24‐06‐2018 07:06:00 1:31 0.00207278 MUs
86 BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI) KWN 222 630 KVA UNPLANNED 25‐06‐2018 17:05:14 25‐06‐2018 17:40:49 0:35 0.00029167 MUs
87
FACTORY (KHASRA)‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR KWN 862 1620 KVA UNPLANNED 26‐06‐2018 12:33:00 26‐06‐2018 13:22:00 0:49 0.00121139 MUs
88BLOCK B‐KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR, BLOCK K‐KARAWAL NAGAR (DEHROTI) KWN 862 1620 KVA UNPLANNED 27‐06‐2018 06:47:00 27‐06‐2018 07:40:00 0:53 0.00080972 MUs
89
ARVIND NAGAR‐GHONDA, PKT F‐BLOCK B, BLOCK F‐WEST KARAWAL NAGAR, BLOCK E‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK H‐GHONDA PATTI, BLOCK I‐BHAGAT SINGH COLONY, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK F‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BHAGAT NAGAR‐DAYALPUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK C‐JAI PRAKASH NAGAR, BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK K‐WEST KARAWAL NAGAR, BLOCK C‐GHONDA PATTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK D‐WEST KARAWAL NAGAR, GHONDA PATTI, BLOCK D‐DLF ANKUR VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., WEST KARAWAL NAGAR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK C‐BHAGAT SINGH COLONY KWN 5976 5360 KVA UNPLANNED 27‐06‐2018 07:17:33 27‐06‐2018 08:04:49 0:47 0.00096611 MUs
90
BLOCK R‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK C‐PATEL VIHAR, BLOCK A‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, BLOCK C‐PRAKASH VIHAR, BLOCK B‐PATEL VIHAR, BLOCK B‐BHAGAT SINGH COLONY KWN 1941 2415 KVA UNPLANNED 28‐06‐2018 04:27:40 28‐06‐2018 05:36:00 1:8 0.00190778 MUs
91 BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI) KWN 68 630 KVA UNPLANNED 28‐06‐2018 13:18:59 28‐06‐2018 13:35:18 0:16 0.00006667 MUs92 BLOCK D‐PREM VIHAR, BLOCK C‐MAHALAXMI ENCLAVE, BLOCK C‐PREM VIHAR KWN 65 990 KVA UNPLANNED 29‐06‐2018 08:48:32 29‐06‐2018 10:06:00 1:17 0.00010694 MUs93 BLOCK B‐KARAWAL NAGAR (DEHROTI) KWN 23 630 KVA UNPLANNED 29‐06‐2018 08:54:30 29‐06‐2018 10:06:00 1:11 0.00009861 MUs
94
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND
ANDH KANYA MAHAVIDYALAYA, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK A‐JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, YAMUNA RIVER, JAFFRABAD‐MAUJ PUR, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 0 900 KVA UNPLANNED 05‐06‐2018 21:13:00 05‐06‐2018 22:12:00 0:58 0 MUs
95 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 241 630 KVA UNPLANNED 16‐06‐2018 09:15:37 16‐06‐2018 10:01:43 0:46 0.00006389 MUs
96
PKT F‐BLOCK B, BLOCK A‐MUSTAFABAD (DAYALPUR), PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK E‐INDIRA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK U‐SHIV VIHAR, PKT A‐BLOCK B, BLOCK 3A‐BLOCK B, BLOCK 5B‐SADAT PUR, PKT E‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 3B‐SADAT PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK 6C‐SADAT PUR, BLOCK 4C‐SADAT PUR, BLOCK 4A‐SADAT PUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK F‐SADAT PUR, PKT B‐BLOCK A, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, BLOCK F‐SHIV VIHAR, GEETA COLONY, BLOCK C2‐NEW CHAUHAN PUR, BLOCK H‐BHAGIRATHI VIHAR, PKT 1‐BLOCK A, BLOCK B‐NEW CHAUHAN PUR, PKT EA‐BLOCK B, BLOCK C1‐SADAT PUR, BLOCK 1D‐SADAT PUR, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., PKT G‐BLOCK A, BLOCK 3C‐SADAT PUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK 2C‐SADAT PUR, PKT E‐BLOCK A, BLOCK 1B‐SADAT PUR, BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK 3A‐SADAT PUR, BLOCK 4B‐SADAT PUR, BHAJANPURA‐DAYALPUR, BLOCK N‐SHIV VIHAR, BLOCK A‐SADAT PUR, PKT 2A‐ KWN 6065 4000 KVA UNPLANNED 16‐06‐2018 18:09:00 16‐06‐2018 19:05:00 0:56 0.00256667 MUs
97BLOCK C‐TUKMIRPUR, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, BLOCK D‐TUKMIRPUR, BLOCK D‐SHERPUR, BLOCK D‐KHAJURI KHAS, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK B‐CHANDU NAGAR KWN 928 1260 KVA UNPLANNED 17‐06‐2018 15:18:42 17‐06‐2018 17:00:00 1:41 0.00036472 MUs
98
BLOCK D‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐NEHRU VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A1‐MUNGA NAGAR, BLOCK 9‐GANDHI NAGAR, BLOCK B‐CHANDU NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK C‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 7559 3870 KVA UNPLANNED 19‐06‐2018 14:59:00 19‐06‐2018 16:35:00 1:36 0.00309333 MUs
99BLOCK B‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, BLOCK D‐TUKMIRPUR, BLOCK D‐SHERPUR, BLOCK D‐KHAJURI KHAS, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK B‐CHANDU NAGAR KWN 928 1260 KVA UNPLANNED 20‐06‐2018 19:12:33 20‐06‐2018 19:30:00 0:17 0.00064694 MUs
100
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK A‐PRAKASH VIHAR, BLOCK C‐KARAWAL NAGAR, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, PKT B‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PHASE I‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK B‐MAN SINGH NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 2799 800 KVA UNPLANNED 24‐06‐2018 04:54:00 24‐06‐2018 06:50:00 1:56 0.00283556 MUs
101
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐MUSTAFABAD (DAYALPUR), LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 3236 2060 KVA UNPLANNED 24‐06‐2018 07:41:00 24‐06‐2018 08:35:00 0:54 0.001725 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
102
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐OLD MUSTAFABAD, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK T‐NEHRU VIHAR, BLOCK B‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK A‐RAMA GARDEN, PKT M‐BLOCK D, BLOCK N‐SHIV VIHAR, BLOCK G‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, BLOCK T‐NEHRU VIHAR, BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BLOCK B‐NEW CHAUHAN PUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK A‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK M‐OLD MUSTAFABAD, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 10712 6530 KVA UNPLANNED 24‐06‐2018 12:54:00 24‐06‐2018 15:05:00 2:11 0.00469417 MUs
103
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 3237 2060 KVA UNPLANNED 28‐06‐2018 07:52:00 28‐06‐2018 08:50:00 0:58 0.00132111 MUs
104
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK A‐PRAKASH VIHAR, BLOCK C‐KARAWAL NAGAR, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, PKT B‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PHASE I‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK B‐MAN SINGH NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 2799 800 KVA UNPLANNED 28‐06‐2018 10:17:00 28‐06‐2018 11:14:00 0:56 0.00189778 MUs
105 BLOCK A‐TUKMIRPUR, BLOCK F‐MUSTAFABAD (DAYALPUR) KWN 32 990 KVA UNPLANNED 28‐06‐2018 13:22:23 28‐06‐2018 13:37:20 0:14 0 MUs106 BLOCK A‐VINOD NAGAR EAST LNR 91 990 KVA UNPLANNED 14‐06‐2018 14:32:28 14‐06‐2018 15:20:01 0:47 0 MUs107 BLOCK A‐VINOD NAGAR EAST LNR 200 990 KVA UNPLANNED 14‐06‐2018 14:40:43 14‐06‐2018 15:28:47 0:48 0 MUs108 FAZALPUR‐MANDAWALI VILLAGE, BLOCK U‐CHANDER VIHAR LNR 131 630 KVA UNPLANNED 15‐06‐2018 09:56:01 15‐06‐2018 10:15:22 0:19 0 MUs109 BLOCK A‐MANDAWALI, BLOCK B‐VINOD NAGAR EAST LNR 63 990 KVA UNPLANNED 15‐06‐2018 10:02:09 15‐06‐2018 10:20:50 0:18 0 MUs110 BLOCK A‐PANDAV NAGAR, BLOCK D‐PANDAV NAGAR LNR 435 990 KVA UNPLANNED 15‐06‐2018 10:17:22 15‐06‐2018 10:30:22 0:13 0 MUs
111
BLOCK E‐GANESH NAGAR, GANESH NAGAR SOUTH‐INDRAPRASTHA EXTENSION, BLOCK D‐PANDAV NAGAR, J.J. COLONY‐RAVIDAS CAMP, BLOCK C‐GANESH NAGAR, BLOCK A‐GANESH NAGAR, PANDAV NAGAR BLOCK D‐GANESH NAGAR, BLOCK A‐PANDAV NAGAR LNR 4815 3240 KVA UNPLANNED 15‐06‐2018 15:18:00 15‐06‐2018 16:16:00 0:58 0.00228778 MUs
112
BLOCK E‐GANESH NAGAR, GANESH NAGAR SOUTH‐INDRAPRASTHA EXTENSION, BLOCK D‐PANDAV NAGAR, J.J. COLONY‐RAVIDAS CAMP, BLOCK C‐GANESH NAGAR, BLOCK A‐GANESH NAGAR, PANDAV NAGAR BLOCK D‐GANESH NAGAR, BLOCK A‐PANDAV NAGAR LNR 4815 3240 KVA UNPLANNED 15‐06‐2018 17:28:00 15‐06‐2018 17:50:00 0:22 0.00061111 MUs
113 BLOCK B‐VINOD NAGAR EAST, BLOCK B‐VINOD NAGAR WEST, BLOCK A‐VINOD NAGAR EAST LNR 1111 990 KVA UNPLANNED 26‐06‐2018 12:06:00 26‐06‐2018 12:30:20 0:24 0.00006667 MUs
114
BLOCK E‐LAKSHMI NAGAR, BLOCK G‐LAKSHMI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK F‐LALITA PARK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK C‐LALITA PARK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐LALITA PARK, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK B‐LAKSHMI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 3078 1620 KVA UNPLANNED 12‐06‐2018 15:56:31 12‐06‐2018 16:45:00 0:48 0.00244 MUs
115
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BANK ENCLAVE‐LAKSHMI NAGAR, BLOCK B‐PRIYADARSANI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, KRISHAN KUNJ‐LAKSHMI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, EAST END ENCLAVE‐LAKSHMI NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐VISHWAKARMA PARK, GYAN KUNJ‐WEST GURU ANGAD NAGAR, BLOCK M‐SHIV VIHAR, BLOCK B‐KUNDAN NAGAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK A‐GURU RAMDAS NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 4962 3600 KVA UNPLANNED 14‐06‐2018 03:43:34 14‐06‐2018 04:34:56 0:51 0.00255 MUs
116MOHAN PARK‐WEST GURU ANGAD NAGAR, BLOCK C‐GURU ANGAD NAGAR WEST, LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK F‐GURU ANGAD NAGAR WEST LNR 955 990 KVA UNPLANNED 16‐06‐2018 11:47:54 16‐06‐2018 12:07:00 0:19 0.00005278 MUs
117 BLOCK S1‐SCHOOL BLOCK LNR 770 990 KVA UNPLANNED 16‐06‐2018 12:36:55 16‐06‐2018 12:53:47 0:16 0.00004444 MUs
118BLOCK WA&O‐SHAKARPUR KHAS, BLOCK G‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, SHAKARPUR EXTN.‐SHAKARPUR KHAS, BLOCK R&A‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK H‐SHAKARPUR KHAS LNR 4491 3600 KVA UNPLANNED 17‐06‐2018 08:47:40 17‐06‐2018 09:25:00 0:37 0.000555 MUs
119
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCKM‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK F‐GURU ANGAD NAGAR WEST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1904 990 KVA UNPLANNED 19‐06‐2018 09:50:00 19‐06‐2018 10:17:55 0:27 0.000075 MUs
120 BLOCK M‐JAGAT RAM PARK LNR 65 990 KVA UNPLANNED 19‐06‐2018 10:25:57 19‐06‐2018 10:54:00 0:28 0.00007778 MUs
121
BHAGAT NAGAR‐DAYALPUR, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK D‐LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PUSTA‐LALITA PARK, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐LALITA PARK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1860 990 KVA UNPLANNED 20‐06‐2018 10:06:00 20‐06‐2018 10:32:35 0:26 0.00007222 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
122
BHAGAT NAGAR‐DAYALPUR, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK D‐LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PUSTA‐LALITA PARK, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐LALITA PARK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1860 990 KVA UNPLANNED 21‐06‐2018 13:15:00 21‐06‐2018 13:43:16 0:28 0.00007778 MUs
123
YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK S1‐SCHOOL BLOCK, FATEHPURI‐KUCHA HASIRAM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK S‐SCHOOL BLOCK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, GANESH NAGAR‐SHAKARPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI DEVELOPMENT AUTHORITY‐SCHOOL BLOCK, NEHRU ENCLAVE‐SCHOOL BLOCK, BHAGAT NAGAR‐DAYALPUR, BALI MARAN‐BARA DARI, BLOCK M‐SHIV VIHAR, VISHWAKARMA PARK‐LAKSHMI NAGAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, KATRA NAWAB‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIVVIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK D‐LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAI SARAK‐KATRA ASRAFI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 2219 2420 KVA UNPLANNED 24‐06‐2018 12:58:00 24‐06‐2018 15:08:00 2:10 0.00325 MUs
124
PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, BANK ENCLAVE‐LAKSHMI NAGAR, VISHWAKARMA PARK‐KISHAN KUNJ, VISHWAKARMA PARK‐LAKSHMI NAGAR, BLOCK J‐VISHWAKARMA PARK, KRISHNA KUNJ‐LAKSHMI NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, KISHAN KUNJ‐SHASTRI NAGAR, BLOCK F‐VISHWAKARMA PARK, RAMESH PARK‐LAKSHMI NAGAR, RAMESH PARK‐NARAYAN NAGAR LNR 5631 5090 KVA UNPLANNED 25‐06‐2018 03:30:30 25‐06‐2018 04:20:00 0:49 0.0015925 MUs
125
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK F‐GURU ANGAD NAGAR WEST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1856 990 KVA UNPLANNED 26‐06‐2018 11:55:00 26‐06‐2018 12:25:05 0:30 0.00008333 MUs
126
PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, BANK ENCLAVE‐LAKSHMI NAGAR, VISHWAKARMA PARK‐KISHAN KUNJ, BLOCK B‐GURU ANGAD NAGAR WEST, VISHWAKARMA PARK‐LAKSHMI NAGAR, BLOCK J‐VISHWAKARMA PARK, KRISHNA KUNJ‐LAKSHMI NAGAR, BLOCK N‐VISHWAKARMA PARK, KISHAN KUNJ‐SHASTRI NAGAR, RAMESH PARK‐LAKSHMI NAGAR, RAMESH PARK‐NARAYAN NAGAR, BLOCK F‐GURU ANGAD NAGAR WEST, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐VISHWAKARMA PARK LNR 5631 5090 KVA UNPLANNED 28‐06‐2018 01:50:34 28‐06‐2018 02:48:00 0:57 0.00095 MUs
127
BLOCK WA&O‐SHAKARPUR KHAS, BLOCK G‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK D‐LALITA PARK, BLOCKB‐VINOD NAGAR EAST, SHAKARPUR EXTN.‐SHAKARPUR KHAS, BLOCK R&A‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK H‐SHAKARPUR KHAS LNR 4491 3600 KVA UNPLANNED 28‐06‐2018 02:11:44 28‐06‐2018 03:09:00 0:57 0.002375 MUs
128LAKSHMI NAGAR BLOCK L, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK M‐JAGAT RAM PARK, BLOCK K‐JAGAT RAM PARK, BLOCK J‐LALITA PARK LNR 1214 990 KVA UNPLANNED 28‐06‐2018 14:06:00 28‐06‐2018 14:32:00 0:26 0.00007222 MUs
129 BLOCK G‐PREET VIHAR LNR 93 990 KVA UNPLANNED 14‐06‐2018 15:27:41 14‐06‐2018 15:54:00 0:26 0.00007222 MUs130 BLOCK F‐PREET VIHAR, BLOCK G‐PREET VIHAR LNR 88 990 KVA UNPLANNED 16‐06‐2018 10:25:00 16‐06‐2018 10:54:00 0:29 0.00008056 MUs131 BLOCK B‐SWASTHYA VIHAR, BLOCK A‐SWASTHYA VIHAR LNR 169 990 KVA UNPLANNED 19‐06‐2018 13:15:00 19‐06‐2018 13:44:35 0:29 0.00008056 MUs132 LIG/MIG RES/NON COMM AREA‐MOTHER DAIRY LNR 86 630 KVA UNPLANNED 16‐06‐2018 11:00:00 16‐06‐2018 11:29:14 0:29 0.00008056 MUs
133
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BHARAT GAS‐GAZIPUR VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TELCO LTD.‐GAZIPUR VILLAGE, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 441 400 KVA UNPLANNED 21‐06‐2018 18:20:00 21‐06‐2018 18:55:00 0:35 0.0004375 MUs
134
BLOCK A‐MOTHER DAIRY, KURMANCHAL NIKETAN‐MOTHER DAIRY, VIDHI APARTMENT‐MOTHER DAIRY, INDER PRASTHA APARTMENT‐MOTHER DAIRY, SAGAR SADAN‐MOTHER DAIRY, AZAD APARTMENT‐MOTHER DAIRY, BLOCK B‐MOTHER DAIRY, VRINDAVAN APARTMENT‐MOTHER DAIRY LNR 1197 6810 KVA UNPLANNED 24‐06‐2018 12:50:39 24‐06‐2018 14:25:00 1:34 0.00057444 MUs
135 BLOCK B‐MOTHER DAIRY LNR 70 400 KVA UNPLANNED 26‐06‐2018 12:20:00 26‐06‐2018 12:48:00 0:27 0.000075 MUs
136LIG/MIG RES/NON COMM AREA‐MOTHER DAIRY, SAGAR SADAN‐MOTHER DAIRY, ST. PETER CONVENT SCHOOL‐MOTHER DAIRY LNR 29 1660 KVA UNPLANNED 26‐06‐2018 22:56:32 26‐06‐2018 23:32:00 0:35 0.00005833 MUs
137 BLOCK B‐MOTHER DAIRY LNR 32 630 KVA UNPLANNED 27‐06‐2018 13:10:17 27‐06‐2018 13:25:04 0:14 0.00003889 MUs138 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 47 990 KVA UNPLANNED 27‐06‐2018 13:14:04 27‐06‐2018 13:28:13 0:14 0.00003889 MUs
139
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, FRIENDS APARTMENT‐MADHU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAYFAIR APPARTMENT‐MADHU VIHAR, ST.ANDREWS SOOTS SCHOOL‐MADHU VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, NAVKRANTI APPARTMENT‐MADHU VIHAR, RAMA KRISHNA VIHAR APARTMENT‐MADHU VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK D‐PREET VIHAR, TRILOK APPARTMENT‐MADHU VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, VIDHISA APPARTMENT‐MADHU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, VIKALP APPARTMENT‐MADHU VIHAR, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1114 4290 KVA UNPLANNED 28‐06‐2018 10:56:35 28‐06‐2018 11:45:47 0:49 0.00039472 MUs
140 BLOCK F‐PREET VIHAR, BLOCK G‐PREET VIHAR LNR 88 990 KVA UNPLANNED 28‐06‐2018 13:38:00 28‐06‐2018 14:03:09 0:25 0.00006944 MUs
141
C‐101 TO 104‐201 T‐CHILLA‐NAGARJUNA APPARTMENT‐ BLOCK C, OLD NOIDA AUTHORITY‐VASUNDHARA ENCLAVE YAMUNA FLOOD PLAINS, MAYUR VIHAR YAMUNA FLOOD PLAINS, CHILLA‐ A.I.I.M.S. APPARTMENT‐NEW ASHOK NAGAR, MAYUR PLACE‐MAYUR VIHAR, NEW ASHOK NAGAR MVR‐VASUNDHARA ENCLAVE MVR MVR 1 100 KVA UNPLANNED 15‐06‐2018 20:12:00 15‐06‐2018 20:57:00 0:45 0.0001375 MUs
142PRATAP NAGAR‐PHASE I, ACHARYA NIKETAN‐SHASHI GARDEN, PANDAV NAGAR MVR‐SHAKARPUR MVR, MANTOLA MOHALLA‐PAHAR GANJ, PHASE I‐MAYUR VIHAR MVR 2559 5970 KVA UNPLANNED 19‐06‐2018 17:12:00 19‐06‐2018 17:30:00 0:18 0.000525 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
143
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAYUR VIHAR EXTN., CL‐CHILLA SARDA BANGAR VILLAGE, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, MAYUR PLACE‐MAYUR VIHAR, PKT A‐BLOCK B MVR 1708 7670 KVA UNPLANNED 27‐06‐2018 18:15:00 27‐06‐2018 19:12:00 0:56 0.00108889 MUs
144SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, BLOCK B‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK E‐GAZIPUR DAIRY FARM, BHARAT GAS‐GAZIPUR VILLAGE, BLOCK A‐GAZIPUR DAIRY FARM MVR 451 1890 KVA UNPLANNED 27‐06‐2018 19:10:00 27‐06‐2018 20:23:00 1:13 0.00064889 MUs
145SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, BLOCK B‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK E‐GAZIPUR DAIRY FARM MVR 451 1890 KVA UNPLANNED 27‐06‐2018 22:20:00 27‐06‐2018 23:18:00 0:58 0.00070889 MUs
146SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, BLOCK B‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK E‐GAZIPUR DAIRY FARM, KALYAN VAS‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR MVR 519 1890 KVA UNPLANNED 29‐06‐2018 10:00:00 29‐06‐2018 10:50:00 0:49 0.00035389 MUs
147 BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 18‐HIMMATPURI MVR 873 1030 KVA UNPLANNED 18‐06‐2018 22:19:00 18‐06‐2018 23:43:00 1:24 0 MUs
148
BLOCK 20‐KALYAN PURI, BLOCK 36‐HIMMATPURI, BLOCK 7‐TRILOKPURI PHASE I, BLOCK 10‐TRILOKPURI PHASE I, BLOCK 12‐TRILOKPURI PHASE I, MAYUR VIHAR PHASE II, BLOCK 1‐TRILOKPURI PHASE I, BLOCK 15‐TRILOKPURI PHASE II, BLOCK 18‐KALYAN PURI, BLOCK 21‐KALYAN PURI, BLOCK 5‐TRILOKPURI PHASE I, BLOCK 9‐TRILOKPURI PHASE I, BLOCK 26‐HIMMATPURI, BLOCK 3‐TRILOKPURI PHASE I, BLOCK 24‐TRILOKPURI PHASE II, BLOCK 19‐KALYAN PURI, BLOCK 18‐HIMMATPURI, BLOCK 19‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 14‐TRILOKPURI PHASE II, BLOCK 17‐HIMMATPURI, BLOCK 11‐TRILOKPURI PHASE I, BLOCK 22‐HIMMATPURI, BLOCK 8‐TRILOKPURI PHASE I, BLOCK 23‐TRILOKPURI PHASE II, KALYAN PURI‐MAYUR VIHAR, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 4‐TRILOKPURI PHASE I, BLOCK 35‐HIMMATPURI, BLOCK D‐SHRI RAM COLONY MVR 9454 5890 KVA UNPLANNED 23‐06‐2018 13:53:38 23‐06‐2018 14:45:00 0:51 0.001445 MUs
149 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 12‐06‐2018 10:06:00 12‐06‐2018 10:50:00 0:44 0.00100222 MUs150 BLOCK E‐JAGATPURI EXTN., BLOCK A‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN. NNG 535 990 KVA UNPLANNED 16‐06‐2018 16:14:55 16‐06‐2018 16:48:26 0:33 0.00009167 MUs
151HARSH VIHAR SUB STATION‐POLICE FARM, POCKET A‐JJ COLONY, DEV PUBLIC SCHOOL‐CHITRAKOOT, AMIG FLATS‐POCKET A, GTB MIG FLATS‐POCKET F NNG 103 630 KVA UNPLANNED 23‐06‐2018 20:40:00 23‐06‐2018 21:35:00 0:54 0.000975 MUs
152
BLOCK E‐JAGATPURI EXTN., MCD SCHOOL‐BLOCK C3, BLOCK E‐GTB STAFF COLONY, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, TOILET‐GTB STAFF COLONY, ANUP VIHAR‐MANDOLI, BLOCK B3‐NAND NAGARI, SS SCHOOL‐BLOCK B5, PKT C3‐BLOCK C1, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK B4‐NAND NAGARI, BLOCK D‐JAGATPURI EXTN., BLOCK B2‐NAND NAGARI, TYPE B QUARTERS‐GTB STAFF COLONY, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, JYOTI COLONY‐BALBIR NAGAR, PKT C4‐BLOCK C1, BLOCK B6‐NAND NAGARI, BLOCK A‐JAGATPURI EXTN., BLOCK B1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, BLOCK D‐BLOCK C3, BLOCK B5‐NAND NAGARI, BLOCK B‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG NNG 9930 5220 KVA UNPLANNED 26‐06‐2018 07:16:00 26‐06‐2018 08:14:00 0:58 0.00286778 MUs
153 KACHI MANDIR‐BLOCK E4 NNG 406 630 KVA UNPLANNED 30‐06‐2018 12:35:42 30‐06‐2018 12:37:06 0:1 0.00000222 MUs
154
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐LALITA PARK, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 9494 2610 KVA UNPLANNED 25‐06‐2018 01:30:29 25‐06‐2018 04:00:00 2:29 0.0026075 MUs
155BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3958 400 KVA UNPLANNED 27‐06‐2018 05:53:00 27‐06‐2018 06:45:00 0:51 0.00079333 MUs
156BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐SEWA DHAM, BLOCK B‐EAST GOKUL PURI, SABOLI VILLAGE‐MANDOLI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI NNG 2417 3870 KVA UNPLANNED 28‐06‐2018 08:21:35 28‐06‐2018 09:17:00 0:55 0.00126806 MUs
157TYPE B QUARTERS‐GTB STAFF COLONY, JRD HOSPITAL‐GTB STAFF COLONY, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, BLOCK E‐GTB STAFF COLONY, TOILET‐GTB STAFF COLONY NNG 333 630 KVA UNPLANNED 21‐06‐2018 08:37:34 21‐06‐2018 09:35:00 0:57 0.00001583 MUs
158
BLOCK B‐KABIR NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 4475 2250 KVA UNPLANNED 14‐06‐2018 07:00:00 14‐06‐2018 07:58:00 0:58 0.00249722 MUs
159
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK C‐LALITA PARK, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, BHAJANPURA‐DAYALPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE NNG 9627 4590 KVA UNPLANNED 14‐06‐2018 10:56:34 14‐06‐2018 11:50:00 0:53 0.00138389 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
160
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK C‐LALITA PARK, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, BHAJANPURA‐DAYALPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE NNG 9627 4590 KVA UNPLANNED 16‐06‐2018 21:41:39 16‐06‐2018 22:35:00 0:53 0.0022525 MUs
161 BABA DA DARGA‐KARDAMPURI NNG 3 630 KVA UNPLANNED 21‐06‐2018 11:22:35 21‐06‐2018 11:24:17 0:1 0.00000222 MUs
162
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BABARPUR EXTN.‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK NSHIV VIHAR, BLOCK C‐KONDALI VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK M‐SHIV VIHAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE NNG 5365 3600 KVA UNPLANNED 22‐06‐2018 00:38:35 22‐06‐2018 01:36:00 0:57 0.00316667 MUs
163
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BABARPUR EXTN.‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK NSHIV VIHAR, BLOCK C‐KONDALI VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, CHHAJJUPUR‐BABAR PUR, BHAGAT NAGAR‐DAYALPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK M‐SHIV VIHAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE NNG 5365 3600 KVA UNPLANNED 22‐06‐2018 14:13:36 22‐06‐2018 15:08:00 0:54 0.00006 MUs
164 BLOCK M‐DURGA PURI, JAFFRABAD‐MAUJ PUR NNG 1451 990 KVA UNPLANNED 24‐06‐2018 08:39:11 24‐06‐2018 09:24:08 0:44 0.00011 MUs
165
BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIRNAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE NNG 11280 8230 KVA UNPLANNED 27‐06‐2018 20:28:33 27‐06‐2018 22:06:00 1:37 0.00398778 MUs
166 FYAZ GANJ‐NAWAB GANJ, NAWAB GANJ‐SADAR BAZAR, HATHI KHANA‐NAWAB GANJ PHG 4266 4000 KVA UNPLANNED 12‐06‐2018 07:28:31 12‐06‐2018 08:26:00 0:57 0.00150417 MUs
167
CHOWK NAI BASTI‐SADAR BAZAR, KABRISTAN‐SADAR BAZAR B G ROAD, MODEL BASTI‐SADAR BAZAR B G ROAD, BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD, SADAR BAZAR B G ROAD, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, SCHOOLAHATA KEDARA PHG 1791 2610 KVA UNPLANNED 24‐06‐2018 23:45:59 25‐06‐2018 00:20:00 0:34 0.00068944 MUs
168SADAR BAZAR B G ROAD, SADAR BAZAR ‐ RAM NAGAR, PHARI DHIRAJ‐SADAR BAZAR, FYAZ GANJ‐NAWAB GANJ, TELI WARA‐NAWAB GANJ PHG 4333 4000 KVA UNPLANNED 26‐06‐2018 07:18:00 26‐06‐2018 08:06:26 0:48 0.00076 MUs
169
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, TELI WARA‐NAWAB GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, FYAZ GANJ‐NAWAB GANJ, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, NAWAB GANJ‐SADAR BAZAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 5494 3810 KVA UNPLANNED 28‐06‐2018 09:57:34 28‐06‐2018 10:45:00 0:47 0.0010575 MUs
170 MANTOLA MOHALLA‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR PHG 61 990 KVA UNPLANNED 12‐06‐2018 22:47:02 12‐06‐2018 23:41:44 0:54 0.00015 MUs171 MANTOLA MOHALLA‐PAHAR GANJ, PHASE I‐MAYUR VIHAR PHG 324 630 KVA UNPLANNED 17‐06‐2018 16:28:16 17‐06‐2018 17:22:10 0:53 0.00014722 MUs
172
PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, KASERU WALAN‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, MANTOLA MOHALLA‐PAHAR GANJ, PAHAR GANJ PHG, NEW RATAN MARKET‐PANCHKUIAN ROAD RAILWAY COLONY, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, CHUNA MANDI‐PAHAR GANJ, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHORA KOTHI‐PAHAR GANJ, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 3140 3600 KVA UNPLANNED 20‐06‐2018 10:38:32 20‐06‐2018 11:31:59 0:53 0.00126611 MUs
173
PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK I‐ARAM BAGH, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, AMRIT KAUR MARKET‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, MANTOLA MOHALLA‐PAHAR GANJ, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, PKT R‐BLOCK D, ST. ANTONYS CHURCH SCHOOL‐ARYA NAGAR, GEETA COLONY, TYPE III HOUSE‐CHUNA MANDI, S.R.T. NAGAR‐ARYA NAGAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, CHUNA MANDI‐PAHAR GANJ, BLOCK H‐BHAGIRATHI VIHAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE‐CHANDNI CHOWK CCK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 5778 6570 KVA UNPLANNED 25‐06‐2018 15:57:30 25‐06‐2018 16:55:00 0:57 0.00383167 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
174
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SADAR BAZAR ‐ RAM NAGAR, SIMLA MANDI GOODTRAN‐RUI MANDI, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK T‐ARAM NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK J‐NABI KARIM, BLOCK N‐SHIV VIHAR, ARAM NAGAR‐SADAR BAZAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR B G ROAD, BLOCK MSHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, TELI WARA‐NAWAB GANJ, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 8138 5750 KVA UNPLANNED 14‐06‐2018 12:09:35 14‐06‐2018 12:56:00 0:46 0.00164833 MUs
175DDA FLATS‐MOTIA KHAN, BLOCK D‐MOTIA KHAN, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐AHATA KEDARA PHG 2341 2380 KVA UNPLANNED 28‐06‐2018 01:19:36 28‐06‐2018 03:06:00 1:46 0.00500556 MUs
176
BLOCK W‐WEST PATEL NAGAR, BLOCK H‐WEST PATEL NAGAR, RESTRICTED AREA MILITARY‐WEST PATEL NAGAR, BLOCK OWEST PATEL NAGAR, BLOCK N‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR, SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK Q‐WEST PATEL NAGAR, BLOCK A‐COTTAGE, BLOCK P‐WEST PATEL NAGAR, DTC FLATS‐SHADIPUR DEPOT, BLOCK U‐WEST PATEL NAGAR, BLOCK R‐WEST PATEL NAGAR, BLOCK T‐WEST PATEL NAGAR, PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR, BLOCK T‐BALJIT NAGAR PNR 3110 3370 KVA UNPLANNED 21‐06‐2018 09:33:34 21‐06‐2018 10:20:31 0:46 0.00081778 MUs
177
BLOCK 24‐WEST PATEL NAGAR, THAKKAR BAPA NAGAR‐DEV NAGAR, BLOCK 30‐WEST PATEL NAGAR, BLOCK 29‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR, BLOCK 28‐WEST PATEL NAGAR, PREM NAGAR‐BALJIT NAGAR, BLOCK T‐BALJIT NAGAR, BLOCK L‐WEST PATEL NAGAR PNR 5400 5940 KVA UNPLANNED 27‐06‐2018 21:43:33 27‐06‐2018 22:32:14 0:48 0.00169333 MUs
178 THAKKAR BAPA NAGAR‐BLOCK 16 PNR 540 990 KVA UNPLANNED 12‐06‐2018 18:21:26 12‐06‐2018 18:30:49 0:9 0.00002 MUs
179
BLOCK B‐PUNJABI BASTI, BLOCK 23B‐KAROL BAGH PNR, BLOCK 27B‐AJMAL KHAN PARK, BLOCK 25B‐AJMAL KHAN PARK, BLOCK 26B‐AJMAL KHAN PARK, THAN SINGH NAGAR‐ANAND PARBAT, THAKKAR BAPA NAGAR‐BLOCK 16, BABA FARID PURI‐PUNJABI BASTI, ANAND PARBAT, BLOCK A‐PUNJABI BASTI PNR 4014 6250 KVA UNPLANNED 25‐06‐2018 15:56:30 25‐06‐2018 16:48:19 0:51 0.00082167 MUs
180
BLOCK_8B‐DEV NAGAR, BLOCK 7B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, REHGAR PURA‐DEV NAGAR, BLOCK 1B‐DEV NAGAR, BLOCK B‐KUNDAN NAGAR, BLOCK D‐VIVEK VIHAR, KUNDAN NAGAR‐LAKSHMI NAGAR, VIVEK VIHAR BLOCK C, THAKKAR BAPA NAGAR‐DEV NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK_5B‐DEV NAGAR, BLOCK 3‐DEV NAGAR, BLOCK_2‐DEV NAGAR, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, BLOCK 6B‐DEV NAGAR PNR 8149 3600 KVA UNPLANNED 27‐06‐2018 07:56:35 27‐06‐2018 08:50:27 0:53 0.00064778 MUs
181
BLOCK_8B‐DEV NAGAR, BLOCK 7B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, REHGAR PURA‐DEV NAGAR, BLOCK 1B‐DEV NAGAR, BLOCK B‐KUNDAN NAGAR, BLOCK D‐VIVEK VIHAR, KUNDAN NAGAR‐LAKSHMI NAGAR, VIVEK VIHAR BLOCK C, THAKKAR BAPA NAGAR‐DEV NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK_5B‐DEV NAGAR, BLOCK 3‐DEV NAGAR, BLOCK_2‐DEV NAGAR, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, BLOCK 6B‐DEV NAGAR PNR 8149 3600 KVA UNPLANNED 27‐06‐2018 15:00:35 27‐06‐2018 15:24:00 0:23 0.00078583 MUs
182 ANAND PARBAT, NAI BASTI‐ANAND PARBAT PNR 298 630 KVA UNPLANNED 23‐06‐2018 10:55:07 23‐06‐2018 11:38:39 0:43 0.00011944 MUs183 BLOCK_34P‐KRISHNA NAGAR, BLOCK_35M‐BEADON PURA SRD 129 990 KVA UNPLANNED 12‐06‐2018 10:39:27 12‐06‐2018 11:16:51 0:37 0.00006167 MUs
184
BLOCK 57‐AJMAL KHAN PARK, BLOCK 61‐AJMAL KHAN PARK, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK 60‐AJMAL KHAN PARK, BLOCK 63‐AJMAL KHAN PARK, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, BLOCK A‐NATHU COLONY, BLOCK 15A‐KAROL BAGH, BLOCK 50‐AJMAL KHAN PARK, BLOCK_39‐NAIWALA, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK 52‐AJMAL KHAN PARK, BLOCK C‐LALITA PARK, BLOCK 53‐AJMAL KHAN PARK, AJMAL KHAN PARK SRD‐KAROL BAGH SRD SRD 5773 8820 KVA UNPLANNED 23‐06‐2018 09:02:00 23‐06‐2018 10:00:00 0:58 0.00164333 MUs
185 BLOCK_1A‐REHAGAR PURA, BLOCK_5A‐SAT NAGAR, BLOCK_10A‐BALMIKI COLONY SRD 357 990 KVA UNPLANNED 19‐06‐2018 13:01:32 19‐06‐2018 14:23:05 1:21 0.0001125 MUs186 BLOCK_14A‐KAROL BAGH WEST EXTENSION AREA SRD 25 990 KVA UNPLANNED 27‐06‐2018 12:03:58 27‐06‐2018 12:35:58 0:31 0.00003444 MUs
187
SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR SRD 540 990 KVA UNPLANNED 09‐06‐2018 02:12:00 09‐06‐2018 03:51:00 1:39 0 MUs
188BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST SRD 22 630 KVA UNPLANNED 26‐06‐2018 10:20:10 26‐06‐2018 10:52:11 0:32 0.00005333 MUs
189BLOCK_48‐KRISHNA NAGAR, BLOCK 4C‐OLD RAJENDRA NAGAR, BLOCK 4‐OLD RAJENDRA NAGAR, BLOCK_1A‐REHAGAR PURA, BLOCK 4‐KAROL BAGH SRD 21 630 KVA UNPLANNED 29‐06‐2018 10:30:35 29‐06‐2018 11:18:00 0:47 0.00006528 MUs
190
BLOCK 7‐OLD RAJENDRA NAGAR, BLOCK 4C‐OLD RAJENDRA NAGAR, BLOCK 56‐OLD RAJENDRA NAGAR, BLOCK 55‐OLD RAJENDRA NAGAR, BLOCK 24‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK 8A‐OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL‐OLD RAJENDRA NAGAR, BLOCK 6‐OLD RAJENDRA NAGAR, BLOCK 11‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 19‐OLD RAJENDRA NAGAR, BLOCK 25‐OLD RAJENDRA NAGAR, BLOCK 8OLD RAJENDRA NAGAR, BLOCK 17‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK 58‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR, BLOCK 26‐OLD RAJENDRA NAGAR, BLOCK 4‐OLD RAJENDRA NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK 20‐OLD RAJENDRA NAGAR, BLOCK 18‐OLD RAJENDRA NAGAR, BLOCK 16‐OLD RAJENDRA NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK 9‐OLD RAJENDRA NAGAR, BLOCK 13‐OLD RAJENDRA NAGAR, BLOCK 59OLD RAJENDRA NAGAR, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 4D‐OLD RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 12‐OLD RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA NAGAR, BLOCK 27‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR, BLOCK 53‐OLD RAJENDRA NAGAR, BLOCK 60‐OLD RAJENDRA NAGAR, BLOCK 4A‐OLD RAJENDRA NAGAR, BLOCK 54‐OLD RAJENDRA NAGAR, BLOCK 5‐OLD RAJENDRA NAGAR, BLOCK B3‐OLD RAJENDRA NAGAR SRD 5018 3870 KVA UNPLANNED 29‐06‐2018 19:37:37 29‐06‐2018 20:12:00 0:34 0.00061389 MUs
191
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, BLOCK A‐MAYUR VIHAR PHASE III, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, PKT B1‐MAYUR VIHAR PHASE III, PKT B3‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SHAHDARA JLM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT B2‐MAYUR VIHAR PHASE III, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT 1‐MAYUR VIHAR PHASE III, BLOCK B‐VIVEK VIHAR, PKT B4‐MAYUR VIHAR PHASE III, PKT B5‐MAYUR VIHAR PHASE III, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK B‐MOTHER DAIRY, PKT 6‐NEW KONDALI, PKT R‐BLOCK D, SEC C‐MAYUR VIHAR PHASE III, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, PKT B8‐MAYUR VIHAR PHASE III, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT VSE 8092 3150 KVA UNPLANNED 12‐06‐2018 16:40:31 12‐06‐2018 17:23:00 0:42 0.00103833 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
192
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DALLU PURA MVR‐VASUNDHARA ENCLAVE MVR, SEC D‐MAYUR VIHAR PHASE III, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DALLU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐KONDALI VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐KONDALI VILLAGE, BHAGAT NAGAR‐DAYALPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK B‐KONDALI EXTN., BLOCK F‐KONDALI VILLAGE, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE VSE 2057 2480 KVA UNPLANNED 22‐06‐2018 13:16:36 22‐06‐2018 13:45:00 0:28 0.00073889 MUs
193 HANUMAN MANDIR‐NEW ASHOK NAGAR, SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR VSE 677 4140 KVA UNPLANNED 16‐06‐2018 09:53:38 16‐06‐2018 10:19:00 0:25 0.00020139 MUs194 BLOCK A & B‐VASUNDHARA ENCLAVE VSE 1538 8470 KVA UNPLANNED 17‐06‐2018 05:18:39 17‐06‐2018 05:55:00 0:36 0.00076 MUs
195
CHILLA‐ TRAFIK BOOTH‐NEW ASHOK NAGAR, CHILLA‐ BLOCK B‐ ALLAHABAD APPARTMENT‐NEW ASHOK NAGAR, BLOCK A & B‐VASUNDHARA ENCLAVE, CHILLA‐ A.I.I.M.S. APPARTMENT‐NEW ASHOK NAGAR, DANIK JANYOG‐VASUNDHARA ENCLAVE VSE, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, NAV JAGRATI APPARTMENT‐VASUNDHARA ENCLAVE VSE, CAPITAL APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK A‐DALLU PURA VSE, PAVITRA APPARTMENT‐DALLU PURA VSE VSE 1439 3680 KVA UNPLANNED 24‐06‐2018 02:06:39 24‐06‐2018 02:28:00 0:21 0.0001925 MUs
196 NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA YVR 456 630 KVA UNPLANNED 16‐06‐2018 11:46:36 16‐06‐2018 12:28:31 0:41 0.00005694 MUs
197
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK M‐BRAHM PURI, BLOCK N‐SHIV VIHAR, BLOCK O‐BRAHM PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐BRAHM PURI, BLOCK C‐GHONDA, NORTH GHONDA, BHAGAT NAGAR‐DAYALPUR, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, BLOCK K‐BRAHM PURI, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ
SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐JHANDEWALAN, BLOCK H‐BHAGIRATHI VIHAR, JAFFRABAD‐MAUJ PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐BLOCK B YVR 11642 6210 KVA UNPLANNED 27‐06‐2018 00:26:32 27‐06‐2018 01:25:00 0:58 0.00249722 MUs
198
JAGJEET NAGAR‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK B‐SUBHASH MOHALLA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI, BLOCK C‐GHONDA YVR 6814 3960 KVA UNPLANNED 28‐06‐2018 02:25:39 28‐06‐2018 03:54:00 1:28 0.0044 MUs
199
JAGJEET NAGAR‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK B‐SUBHASH MOHALLA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI, BLOCK C‐GHONDA YVR 6814 3960 KVA UNPLANNED 28‐06‐2018 08:31:34 28‐06‐2018 09:14:36 0:43 0.001935 MUs
200 JAFFRABAD‐MAUJ PUR YVR 206 990 KVA UNPLANNED 08‐06‐2018 23:18:08 09‐06‐2018 00:03:15 0:45 0 MUs
201BLOCK B‐DURGA PURI, BLOCK B‐KONDALI VILLAGE, JAFFRABAD‐MAUJ PUR, BLOCK M‐DURGA PURI, BLOCK A‐KONDALI VILLAGE, CHAUHAN BANGAR‐JAFFRABAD YVR 3871 7010 KVA UNPLANNED 12‐06‐2018 00:36:00 12‐06‐2018 01:20:00 0:44 0.00281111 MUs
202
BLOCK U‐WELCOME COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐WELCOME COLONY, BLOCK A‐WELCOME COLONY, BLOCK S‐WELCOME COLONY, BLOCK P‐NEW SILAMPURI PHASE III, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK W‐WELCOME COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐WELCOME COLONY, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK I‐WELCOME COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK T‐WELCOME COLONY, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1637 990 KVA UNPLANNED 26‐06‐2018 19:01:44 26‐06‐2018 19:18:57 0:17 0.00004722 MUs
203 BLOCK D‐NEW SILAMPURI PHASE IV, BLOCK C‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 319 4580 KVA UNPLANNED 28‐06‐2018 17:28:38 28‐06‐2018 18:05:00 0:36 0.00117 MUs204 BLOCK D‐NEW SILAMPURI PHASE IV, BLOCK C‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 319 4580 KVA UNPLANNED 28‐06‐2018 19:19:38 28‐06‐2018 20:17:00 0:57 0.00079167 MUs
205
BLOCK A‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK N‐NEW SILAMPURI PHASE I, DSIDC COMPLEX‐SEELAMPUR YVR, BLOCK J‐SILAMPUR COLONY, JAFFRABAD‐MAUJ PUR, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐PANDAV NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK G‐SILAMPUR COLONY, BLOCK F‐PANDAV NAGAR, CHAUHAN BANGAR‐JAFFRABAD YVR 8232 3770 KVA UNPLANNED 14‐06‐2018 16:05:00 14‐06‐2018 17:04:00 0:58 0.00223944 MUs
206BLOCK B‐DURGA PURI, BLOCK B‐KONDALI VILLAGE, JAFFRABAD‐MAUJ PUR, BLOCK M‐DURGA PURI, BLOCK A‐KONDALI VILLAGE, CHAUHAN BANGAR‐JAFFRABAD YVR 4199 7010 KVA UNPLANNED 20‐06‐2018 18:49:33 20‐06‐2018 19:44:00 0:54 0.00255 MUs
207
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK T‐GAUTAM PURI, PKT R‐BLOCK D, GEETA COLONY, GOVT SARVODAY SCHOOL‐ZERO PUSTA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, MCD COLONY‐NEW KATWARA, BLOCK H‐BHAGIRATHI VIHAR, DELHI VIDHYUT BROAD‐ZERO PUSTA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 425 800 KVA UNPLANNED 23‐06‐2018 12:36:00 23‐06‐2018 13:30:00 0:54 0.001095 MUs
208
BLOCK A‐SILAMPUR COLONY, BLOCK J‐SILAMPUR COLONY, JAFFRABAD‐MAUJ PUR, BLOCK C‐SHASTRI PARK, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK N‐NEW SILAMPURI PHASE I, MANTOLA MOHALLA‐PAHAR GANJ, ZERO PUSTA‐USMAN PUR, PHASE I‐MAYUR VIHAR, BLOCK C‐NEW SILAMPURI PHASE II YVR 3162 6250 KVA UNPLANNED 24‐06‐2018 06:19:00 24‐06‐2018 07:00:00 0:40 0.00046667 MUs
209
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, GOVT SARVODAY SCHOOL‐ZERO PUSTA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 425 800 KVA UNPLANNED 24‐06‐2018 16:04:00 24‐06‐2018 17:02:00 0:58 0.00149833 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
210
BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK F‐ZERO PUSTA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA, GOVT SARVODAY SCHOOLZERO PUSTA, BLOCK C‐GHONDA PATTI, MCD COLONY‐NEW KATWARA, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK H‐GHONDA PATTI, BLOCK H‐ZERO PUSTA, BLOCK G‐ZERO PUSTA YVR 4551 3010 KVA UNPLANNED 25‐06‐2018 01:51:30 25‐06‐2018 02:48:00 0:56 0.0028 MUs
211
BLOCK A‐SILAMPUR COLONY, JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK N‐NEW SILAMPURI PHASE III, NEW SILAMPURI PHASE III, CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW SILAMPURI PHASE II YVR 9761 3240 KVA UNPLANNED 26‐06‐2018 04:19:31 26‐06‐2018 04:51:00 0:31 0 MUs
212BLOCK A‐SHASTRI PARK, KAILASH NAGAR YVR, YAMUNA VIHAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 105 400 KVA UNPLANNED 27‐06‐2018 07:37:33 27‐06‐2018 10:24:40 2:47 0.002505 MUs
213
BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK F‐ZERO PUSTA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA, GOVT SARVODAY SCHOOLZERO PUSTA, BLOCK C‐GHONDA PATTI, MCD COLONY‐NEW KATWARA, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK H‐GHONDA PATTI, BLOCK H‐ZERO PUSTA, BLOCK G‐ZERO PUSTA YVR 4553 3010 KVA UNPLANNED 28‐06‐2018 02:29:00 28‐06‐2018 05:21:00 2:52 0.00692778 MUs
214
NORTH GHONDA, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, VISHWAS NAGAR EXTN.‐SHAHDARA, MUNICIPAL CORPN SCHOOL‐SUBHASH VIHAR, NAYAGAON‐NEW KATWARA, BLOCK B‐SUBHASH MOHALLA, KACHI COLONY‐JAGJEET NAGAR, SUBHASH VIHAR‐YAMUNA VIHAR, JAGJEET NAGAR‐GHONDA, BLOCK B4‐YAMUNA VIHAR, MAUJ PUR COMPLEX 1, TIKONA PARK‐BHAJANPURA, BLOCK B5‐YAMUNA PUR (GONDA) BLOCK B, BLOCK E‐SUBHASH MOHALLA, VIJAY PARK‐YAMUNA VIHAR YVR 8520 5850 KVA UNPLANNED 14‐06‐2018 03:15:34 14‐06‐2018 03:36:00 0:20 0.00113889 MUs
215 KACHI COLONY‐JAGJEET NAGAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA YVR 261 630 KVA UNPLANNED 15‐06‐2018 08:29:17 15‐06‐2018 08:49:42 0:20 0.00005556 MUs
216 BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 569 990 KVA UNPLANNED 15‐06‐2018 18:34:37 15‐06‐2018 19:30:32 0:55 0.00015278 MUs217 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR YVR 1389 990 KVA UNPLANNED 17‐06‐2018 09:35:04 17‐06‐2018 10:10:00 0:34 0.00009444 MUs
218
BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐GARI MANDU, BLOCK D‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐GARI MANDU, BLOCK N‐SHIV VIHAR, BLOCK A‐GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BHAGAT NAGAR‐DAYALPUR, YAMUNA VIHAR YAMUNA FLOOD PLAINS, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐GHONDA PATTI, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 7528 4230 KVA UNPLANNED 22‐06‐2018 12:14:00 22‐06‐2018 13:10:00 0:56 0.00191333 MUs
219
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, ARVIND NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, BLOCK B‐GARI MANDU, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK D‐BHAJANPURA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, BLOCK A‐GHONDA PATTI, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK H‐GHONDA PATTI, TANKI ROAD‐C‐BLOCK BHAJANPURA, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, YAMUNA VIHAR YAMUNA FLOOD
PLAINS, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, GAUTAM VIHAR‐GHONDA, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK J‐KARTAR NAGAR, BLOCK C‐GHONDA PATTI, BLOCK A‐JHANDEWALAN, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, BLOCK E‐SUBHASH MOHALLA, JAFFRABAD‐MAUJ PUR, BLOCK H‐BRAHM PURI, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐BLOCK B YVR 11652 5460 KVA UNPLANNED 22‐06‐2018 13:33:36 22‐06‐2018 14:24:52 0:51 0.00137417 MUs
220 MAUJ PUR COMPLEX 1 YVR 13 990 KVA UNPLANNED 25‐06‐2018 09:21:12 25‐06‐2018 10:05:17 0:44 0.00012222 MUs
221BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 915 990 KVA UNPLANNED 25‐06‐2018 17:36:22 25‐06‐2018 17:37:54 0:1 0.00000278 MUs
222
NORTH GHONDA, BLOCK E‐SUBHASH MOHALLA, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK C‐GHONDA, SUBHASH VIHAR‐YAMUNA VIHAR YVR 5404 3010 KVA UNPLANNED 27‐06‐2018 07:37:35 27‐06‐2018 08:47:00 1:9 0.00222333 MUs
223
BLOCK B‐MANUJPUR, ADARSH MOHALLA‐MAUJPUR, BALI MARAN‐BARA DARI, BLOCK A‐CHANDRA LOK, BLOCK C12‐YAMUNA VIHAR, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, KATRA NAWAB‐CHANDNI CHOWK, KACHI COLONY‐JAGJEET NAGAR, BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, TOWN HILL‐KATRA NEEL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK B‐DURGA PURI, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 5040 4950 KVA UNPLANNED 27‐06‐2018 07:43:34 27‐06‐2018 08:40:00 0:56 0.00010889 MUs
224
BLOCK B‐MANUJPUR, ADARSH MOHALLA‐MAUJPUR, BALI MARAN‐BARA DARI, BLOCK A‐CHANDRA LOK, BLOCK C12‐YAMUNA VIHAR, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, KATRA NAWAB‐CHANDNI CHOWK, KACHI COLONY‐JAGJEET NAGAR, BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, TOWN HILL‐KATRA NEEL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK B‐DURGA PURI, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 5040 4950 KVA UNPLANNED 27‐06‐2018 20:16:34 27‐06‐2018 20:28:00 0:11 0.00017417 MUs
225
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, NORTH GHONDA, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, DR.
AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK A‐JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, JAFFRABAD‐MAUJ PUR, BLOCK C‐GHONDA, LIG/MIG RES/NON COMM AREA‐BLOCK B YVR 3385 630 KVA UNPLANNED 28‐06‐2018 01:48:00 28‐06‐2018 03:17:00 1:28 0.00205333 MUs
226
BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐GARI MANDU, BLOCK D‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐GARI MANDU, BLOCK N‐SHIV VIHAR, BLOCK A‐GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BHAGAT NAGAR‐DAYALPUR, YAMUNA VIHAR YAMUNA FLOOD PLAINS, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐GHONDA PATTI, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 7519 4230 KVA UNPLANNED 28‐06‐2018 13:20:00 28‐06‐2018 14:15:33 0:55 0.00183333 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage227 BLOCK B4‐YAMUNA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA YVR 1223 990 KVA UNPLANNED 29‐06‐2018 13:28:03 29‐06‐2018 13:53:10 0:25 0.00006944 MUs
228GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, TIS HAZARI SADAR BAZAR‐RAJENDRA MARKET, MAIN MARKET‐KATRA DHOBI, OLD DELHI RAILWAY STATION‐CHANDNI CHOWK CCK 1239 990 KVA UNPLANNED 12‐06‐2018 18:15:13 12‐06‐2018 19:07:01 0:51 0.0000425 MUs
229 CHABI GANJ‐MORI GATE, ZEENAT BARI‐MORI GATE, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE CCK 1053 990 KVA UNPLANNED 20‐06‐2018 17:06:00 20‐06‐2018 17:53:07 0:47 0.00005222 MUs
230ZEENAT BARI‐MORI GATE, KASHMIRI GATE‐MORI GATE, GOVT OF N C T OFFICE‐KASHMERE GATE, CHABI GANJ‐MORI GATE CCK 539 990 KVA UNPLANNED 21‐06‐2018 13:09:18 21‐06‐2018 13:48:37 0:39 0.00004333 MUs
231 CHABI GANJ‐MORI GATE, GOVT OF N C T OFFICE‐KASHMERE GATE CCK 116 990 KVA UNPLANNED 22‐06‐2018 13:01:33 22‐06‐2018 13:55:00 0:53 0.00002944 MUs232 CHABI GANJ‐MORI GATE, ZEENAT BARI‐MORI GATE, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE CCK 1053 990 KVA UNPLANNED 24‐06‐2018 12:22:35 24‐06‐2018 13:05:16 0:42 0.00002333 MUs
233GOVT OF N C T OFFICE‐KASHMERE GATE, ROHITASH NAGAR EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, MAIN MARKET‐KATRA DHOBI CCK 1059 990 KVA UNPLANNED 27‐06‐2018 17:21:51 27‐06‐2018 18:18:32 0:56 0.00003111 MUs
234 ROHITASH NAGAR EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GOVT OF N C T OFFICE‐KASHMERE GATE CCK 1059 990 KVA UNPLANNED 29‐06‐2018 11:36:32 29‐06‐2018 12:17:07 0:40 0.00004444 MUs
235
CHIPI WARA‐KUCHA ALAM, NAI SARAK‐JOGIWARA, OLD DELHI RAILWAY STATION‐CHANDNI CHOWK, CHAWRI BAZAR‐KHUSH DIL, MAIN BAZAR CHANDANI CHOWK‐SISGANJ, MOTIA MAHAL‐CHANDNI CHOWK, ROSHAN PURA‐CHANDNI CHOWK CCK 776 990 KVA UNPLANNED 24‐06‐2018 09:30:11 24‐06‐2018 11:00:00 1:29 0.00024722 MUs
236RAILWAY STATION‐CHANDNI CHOWK, AJMERI GATE‐CHANDNI CHOWK, LALKUAN BAZAR‐FRASH KHANA, MOSQUE‐LAL KUAN BAZAR CCK 3414 3600 KVA UNPLANNED 14‐06‐2018 11:55:00 14‐06‐2018 12:26:56 0:31 0.00056833 MUs
237 NAYA BAZAR‐CHANDNI CHOWK CCK 978 990 KVA UNPLANNED 14‐06‐2018 15:43:44 14‐06‐2018 16:34:46 0:51 0.00005667 MUs238 FATEHPURI‐KHARI BAOLI, NAYA BAZAR‐CHANDNI CHOWK CCK 409 990 KVA UNPLANNED 21‐06‐2018 11:04:35 21‐06‐2018 11:37:40 0:33 0.00003667 MUs
239LALKUAN BAZAR‐SIKRIWALAN‐ NEW HAUZ QAZI, AJMERI GATE‐CHANDNI CHOWK, KHARI BAWLI‐NAYA BANS‐ LAHORI GATE, LALKUAN BAZAR‐FRASH KHANA, MOSQUE‐LAL KUAN BAZAR CCK 2939 990 KVA UNPLANNED 28‐06‐2018 09:49:22 28‐06‐2018 10:09:13 0:19 0.00001056 MUs
240
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, UNION CLUB OF INDIA‐KATRA NEEL, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, DELHI VIDHYUT BOARD‐KATRA NEEL, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TOWN HILL‐KATRA NEEL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B CCK 411 990 KVA UNPLANNED 12‐06‐2018 12:16:19 12‐06‐2018 13:03:55 0:47 0.00005222 MUs
241 TOWN HILL‐KATRA NEEL, NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA CCK 1250 990 KVA UNPLANNED 12‐06‐2018 14:48:00 12‐06‐2018 15:39:25 0:51 0.00005667 MUs
242 TOWN HILL‐KATRA NEEL, NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA CCK 1250 990 KVA UNPLANNED 12‐06‐2018 16:40:00 12‐06‐2018 17:32:45 0:52 0.00005778 MUs
243 MAIN BAZAR CHANDANI CHOWK‐SISGANJ, DARIBA KALA‐KATRA MASHRU, NEW LAJPAT RAI MARKET‐CHANDNI CHOWK CCK 1109 990 KVA UNPLANNED 20‐06‐2018 23:20:04 21‐06‐2018 00:08:29 0:48 0.00002667 MUs244 DARIBA KALA‐KATRA MASHRU, NEW LAJPAT RAI MARKET‐CHANDNI CHOWK CCK 758 990 KVA UNPLANNED 26‐06‐2018 10:27:59 26‐06‐2018 11:24:49 0:56 0.00003111 MUs245 TOWN HILL‐KATRA NEEL CCK 99 990 KVA UNPLANNED 26‐06‐2018 11:43:02 26‐06‐2018 12:06:00 0:22 0.00001222 MUs
246 RED FORT‐CHANDNI CHOWK‐RED FORT, LIG/MIG RES/NON COMM AREA‐VIJAY GHAT, RED FORT‐VIJAY GHAT CCK 4 400 KVA UNPLANNED 28‐06‐2018 13:30:22 28‐06‐2018 14:26:00 0:55 0.00015278 MUs247 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 1231 990 KVA UNPLANNED 22‐06‐2018 10:45:51 22‐06‐2018 11:07:07 0:21 0.00001167 MUs
248 BLOCK 1‐RAM NAGAR, BLOCK B‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NEW MODERN SHAHDARA DGN 1144 990 KVA UNPLANNED 01‐06‐2018 00:26:09 01‐06‐2018 00:40:57 0:14 0 MUs249 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR DGN 1125 990 KVA UNPLANNED 12‐06‐2018 11:26:24 12‐06‐2018 12:07:23 0:40 0.00016667 MUs250 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR DGN 1125 990 KVA UNPLANNED 12‐06‐2018 17:02:26 12‐06‐2018 18:00:00 0:57 0.0002375 MUs251 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR DGN 1125 990 KVA UNPLANNED 12‐06‐2018 21:54:26 12‐06‐2018 22:30:00 0:35 0.00014583 MUs252 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR, BLOCK 1‐RAM NAGAR EXTN. DGN 1265 630 KVA UNPLANNED 12‐06‐2018 21:59:27 12‐06‐2018 22:30:00 0:30 0.000125 MUs253 DDA FLATS‐SILAMPUR DGN 110 630 KVA UNPLANNED 14‐06‐2018 12:27:00 14‐06‐2018 17:26:25 4:59 0.00124583 MUs
254SACHDEVA INDUSTRIES‐RAM NAGAR EAST, BLOCK B‐MANSAROWAR PARK, JINDAL BHAWAN‐RAM NAGAR EAST, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST DGN 477 990 KVA UNPLANNED 14‐06‐2018 14:09:22 14‐06‐2018 15:06:00 0:56 0.00015556 MUs
255 BLOCK 1‐RAM NAGAR, BLOCK B‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NEW MODERN SHAHDARA DGN 1144 990 KVA UNPLANNED 15‐06‐2018 03:17:26 15‐06‐2018 03:47:13 0:29 0.00000806 MUs256 BLOCK H‐MANSAROWAR PARK, DDA FLATS‐SILAMPUR DGN 443 630 KVA UNPLANNED 15‐06‐2018 08:20:00 15‐06‐2018 09:45:00 1:25 0.00044861 MUs257 RAM NAGAR‐SILAMPUR, DELHI JAL BOARD‐DDA FLATS DGN 852 990 KVA UNPLANNED 19‐06‐2018 22:44:03 19‐06‐2018 23:14:00 0:29 0.00012083 MUs258 BLOCK F‐SHRI RAM NAGAR, BLOCK B‐SHRI RAM NAGAR DGN 234 990 KVA UNPLANNED 19‐06‐2018 23:20:12 19‐06‐2018 23:44:41 0:24 0.0001 MUs259 RAM NAGAR‐SILAMPUR, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST DGN 164 990 KVA UNPLANNED 20‐06‐2018 13:08:33 20‐06‐2018 14:00:00 0:51 0.00026917 MUs260 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 2 630 KVA UNPLANNED 24‐06‐2018 10:33:07 24‐06‐2018 11:04:12 0:31 0.000155 MUs
261BLOCK B‐NEW MODERN SHAHDARA, BLOCK C‐NEW MODERN SHAHDARA, BLOCK B‐JAGAT PURI, BLOCK D‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI DGN 1382 990 KVA UNPLANNED 24‐06‐2018 23:14:00 25‐06‐2018 00:12:00 0:58 0.00025778 MUs
262ANUP VIHAR‐MANDOLI, GOVT SCHOOL NO‐2‐DDA FLATS, BLOCK 1‐RAM NAGAR, DELHI JAL BOARD‐DDA FLATS, BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR EXTN., SHAHDRA METRO STATION‐SHAHDARA DGN DGN 841 990 KVA UNPLANNED 25‐06‐2018 01:48:12 25‐06‐2018 02:38:56 0:50 0.00022222 MUs
263
BLOCK A‐MANSAROWAR PARK, BLOCK B‐SHRI RAM NAGAR, RAM NAGAR‐SILAMPUR, BLOCK E‐MANSAROWAR PARK, JINDAL BHAWAN‐RAM NAGAR EAST, DELHI JAL BOARD‐DDA FLATS, DELHI TRANSPORT‐WELCOME COLONY, BLOCK C‐NEW MODERN SHAHDARA, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK M‐SHRI RAM NAGAR, DAMODER PARK‐DILSHAD GARDEN, NEAR SHADARA RAILWAY GODOWN‐SHAHDARA DGN, INDIAN GAS‐SHAHDARA DGN, DWARKAPURI‐NAVIN SHAHDARA, BLOCK A‐NEW MODERN SHAHDARA, BLOCK J‐SHRI RAM NAGAR, DDA FLATS‐SILAMPUR, SANSAR COMPOUND‐DILSHAD GARDEN, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, KABUL NAGAR‐ROHITASH NAGAR, GOVT SCHOOL NO‐2‐DDA FLATS, SACHDEVA INDUSTRIES‐RAM NAGAR EAST, BLOCK F‐SHRI RAM NAGAR, BLOCK B‐NEW MODERN SHAHDARA, BLOCK H‐MANSAROWAR PARK, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK R‐PRATAP PURA, OLDANPUR‐NAVIN SHAHDARA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 7031 8460 KVA UNPLANNED 25‐06‐2018 23:50:28 26‐06‐2018 00:40:22 0:49 0.00381111 MUs
264
BLOCK H‐MANSAROWAR PARK, BLOCK A‐MANSAROWAR PARK, BLOCK B‐MANSAROWAR PARK, BLOCK F‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, BLOCK C‐MANSAROWAR PARK, RAM NAGAR‐SILAMPUR, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, BLOCK G‐MANSAROWAR PARK, BLOCK E‐MANSAROWAR PARK DGN 1902 630 KVA UNPLANNED 26‐06‐2018 21:50:00 26‐06‐2018 22:03:20 0:13 0.00005417 MUs
265 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 6 990 KVA UNPLANNED 28‐06‐2018 18:06:00 28‐06‐2018 18:40:00 0:33 0.000165 MUs266 FLORA DALE SECONDARY SCHOOL‐POCKET R, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 63 990 KVA UNPLANNED 29‐06‐2018 18:39:46 29‐06‐2018 19:12:21 0:32 0.00016889 MUs267 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 50 990 KVA UNPLANNED 12‐06‐2018 08:40:00 12‐06‐2018 11:44:34 3:4 0.00051111 MUs268 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 53 990 KVA UNPLANNED 12‐06‐2018 10:50:00 12‐06‐2018 11:47:47 0:57 0.00015833 MUs269 BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 5 990 KVA UNPLANNED 12‐06‐2018 15:14:04 12‐06‐2018 16:13:00 0:58 0.00016111 MUs270 PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA DGN 98 630 KVA UNPLANNED 12‐06‐2018 15:23:37 12‐06‐2018 15:58:32 0:34 0.00009444 MUs
271
MENTAL HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, DELHI JAL BOARD‐POCKET C, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK B‐ GROUP I FLATS‐POCKET B, RAJKIYA SARVODAYA BALVIDYALAYA‐POCKET C, DARGAH SHARIF‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 210 990 KVA UNPLANNED 12‐06‐2018 16:04:32 12‐06‐2018 17:03:00 0:58 0.00016111 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
272
GTB MIG FLATS‐POCKET D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, FLORA DALE SECONDARY SCHOOL‐POCKET R, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DGN 795 400 KVA UNPLANNED 12‐06‐2018 21:56:23 12‐06‐2018 22:45:00 0:48 0.00021333 MUs
273 JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY DGN 32 990 KVA UNPLANNED 14‐06‐2018 10:22:18 14‐06‐2018 11:32:59 1:10 0.00019444 MUs274 M.C.D. HOUSE‐POCKET B, GROUP 4‐POCKET B DGN 211 630 KVA UNPLANNED 14‐06‐2018 12:28:11 14‐06‐2018 14:05:45 1:37 0.00026944 MUs275 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 47 990 KVA UNPLANNED 14‐06‐2018 15:22:32 14‐06‐2018 17:19:42 1:57 0.00052 MUs276 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY, DDA FLATS‐BLOCK A, BLOCK D‐DILSHAD COLONY DGN 1019 990 KVA UNPLANNED 14‐06‐2018 23:40:59 15‐06‐2018 00:17:09 0:36 0.00015 MUs
277
DDA FLATS‐RAJIV NAGAR DGN, BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI, BLOCK K‐LEPROSY COLONY, BLOCK B‐PREM NAGAR DGN, BLOCK A‐RAJIV NAGAR DGN, BLOCK A‐PREM NAGAR DGN, GANDHI KUSTH ASHARAM‐LEPROSY COLONY, SHANTI KUSTH ASHRAM‐RAJIV NAGAR DGN, M.C.P. SCHOOL‐POCKET O DGN 580 630 KVA UNPLANNED 15‐06‐2018 03:13:27 15‐06‐2018 04:12:00 0:58 0.00024167 MUs
278 BLOCK B‐ GROUP I FLATS‐POCKET B DGN 58 750 KVA UNPLANNED 17‐06‐2018 08:03:19 17‐06‐2018 08:31:08 0:27 0.0001425 MUs279 PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA DGN 98 630 KVA UNPLANNED 19‐06‐2018 11:22:32 19‐06‐2018 11:57:47 0:35 0.00018472 MUs280 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 19‐06‐2018 12:15:46 19‐06‐2018 13:10:00 0:54 0.000285 MUs281 GOVT. DISPENCERY‐OLD SIMAPURI, BLOCK C‐OLD SIMAPURI, BLOCK E‐OLD SIMAPURI DGN 344 990 KVA UNPLANNED 19‐06‐2018 13:06:28 19‐06‐2018 13:34:16 0:27 0.0001425 MUs282 SIYARAM‐GHISA DGN 22 630 KVA UNPLANNED 19‐06‐2018 13:35:09 19‐06‐2018 14:20:00 0:44 0.00023222 MUs283 INDIRA CAMP‐JHILMIL INDUSTRIAL AREA DGN 41 1000 KVA UNPLANNED 19‐06‐2018 16:13:00 19‐06‐2018 17:03:14 0:50 0.00020833 MUs284 INDIRA CAMP‐JHILMIL INDUSTRIAL AREA DGN 41 1000 KVA UNPLANNED 22‐06‐2018 17:25:00 22‐06‐2018 17:50:00 0:24 0.00013333 MUs
285BLOCK G‐OLD SIMAPURI, BLOCK D‐OLD SIMAPURI, BLOCK J‐OLD SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURI, MCD‐OLD SIMAPURI, BLOCK H‐OLD SIMAPURI DGN 555 990 KVA UNPLANNED 22‐06‐2018 19:16:43 22‐06‐2018 20:00:00 0:43 0.00020306 MUs
286 BLOCK A‐NEW SIMAPURI, BLOCK B‐NEW SIMAPURI DGN 11 630 KVA UNPLANNED 22‐06‐2018 22:28:54 22‐06‐2018 22:57:20 0:28 0.00013222 MUs287 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK B‐MANSAROWAR PARK DGN 24 630 KVA UNPLANNED 22‐06‐2018 23:51:32 23‐06‐2018 00:39:10 0:47 0.00022194 MUs
288MIG FLATS‐POCKET F & E, HANSRAJ SCHOOL‐POCKET H, HANSRAJ PUBLIC SCHOOL‐POCKET F & E, LIG FLATS‐POCKET F & E, MCD OFFICE‐POCKET F & E DGN 54 990 KVA UNPLANNED 22‐06‐2018 23:56:52 23‐06‐2018 00:27:51 0:30 0.00015833 MUs
289 BLOCK J & K‐POCKET J&K DGN 46 630 KVA UNPLANNED 23‐06‐2018 00:16:58 23‐06‐2018 00:28:10 0:11 0.00005806 MUs290 BLOCK A‐DILSHAD COLONY DGN 402 630 KVA UNPLANNED 23‐06‐2018 00:53:48 23‐06‐2018 01:21:11 0:27 0.000135 MUs291 BLOCK F‐DILSHAD COLONY, BLOCK G‐DILSHAD COLONY DGN 195 990 KVA UNPLANNED 23‐06‐2018 17:20:33 23‐06‐2018 17:56:42 0:36 0.00015 MUs292 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 24‐06‐2018 10:41:43 24‐06‐2018 11:10:14 0:28 0.00014778 MUs293 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 24‐06‐2018 12:05:27 24‐06‐2018 12:24:41 0:19 0.00010028 MUs294 BLOCK F‐DILSHAD COLONY, BLOCK J‐DILSHAD COLONY DGN 651 990 KVA UNPLANNED 24‐06‐2018 16:53:27 24‐06‐2018 17:50:31 0:57 0.0002375 MUs295 BLOCK B‐DILSHAD COLONY, BLOCK A‐DILSHAD COLONY DGN 380 630 KVA UNPLANNED 24‐06‐2018 23:55:24 25‐06‐2018 00:54:00 0:58 0.00025778 MUs
296J.J.C.‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, BLOCK A‐NEW SIMAPURI, BLOCK B‐NEW SIMAPURI, BLOCK C1‐YAMUNA VIHAR, BLOCK D‐NEW SIMAPURI DGN 397 990 KVA UNPLANNED 25‐06‐2018 01:10:00 25‐06‐2018 02:00:11 0:50 0.00020833 MUs
297 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 737 630 KVA UNPLANNED 25‐06‐2018 08:00:30 25‐06‐2018 08:24:19 0:23 0.00009583 MUs
298 BLOCK J & K‐POCKET J&K, BLOCK G‐DILSHAD COLONY, BLOCK J‐DILSHAD COLONY, MCD OFFICE‐POCKET F & E DGN 170 630 KVA UNPLANNED 25‐06‐2018 14:32:44 25‐06‐2018 15:46:57 1:14 0.00020556 MUs299 M.C.D. HOUSE‐POCKET B, GROUP 4‐POCKET B DGN 211 630 KVA UNPLANNED 25‐06‐2018 20:23:10 25‐06‐2018 21:21:52 0:58 0.00024167 MUs300 M.C.D. HOUSE‐POCKET B, GROUP 4‐POCKET B DGN 211 630 KVA UNPLANNED 25‐06‐2018 21:43:21 25‐06‐2018 22:05:05 0:21 0.0000875 MUs301 DELHI JAL BOARD‐POCKET C, FACTORY‐DILSHAD GARDEN DGN 116 630 KVA UNPLANNED 27‐06‐2018 09:10:00 27‐06‐2018 10:04:00 0:54 0.000285 MUs302 GOVT. DISPENCERY‐OLD SIMAPURI, BLOCK C‐OLD SIMAPURI, BLOCK E‐OLD SIMAPURI DGN 344 990 KVA UNPLANNED 27‐06‐2018 14:07:10 27‐06‐2018 15:41:09 1:33 0.00049083 MUs
303 BLOCK C‐OLD SIMAPURI, BLOCK E‐OLD SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURI, BLOCK B‐OLD SIMAPURI DGN 41 990 KVA UNPLANNED 28‐06‐2018 11:16:56 28‐06‐2018 13:36:56 2:20 0.00015556 MUs
304
SHIV MANDIR‐NEW SIMAPURI, BLOCK E‐NEW SIMAPURI, BLOCK B‐DILSHAD COLONY, BLOCK G‐DILSHAD COLONY, BLOCK B‐OLD SIMAPURI, BLOCK F‐OLD SIMAPURI, JJC‐DILSHAD COLONY, SIMAPURI BUS DEPOT‐DILSHAD COLONY, BLOCK D‐NEW SIMAPURI, BLOCK D‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY, BLOCK J‐DILSHAD COLONY DGN 2717 630 KVA UNPLANNED 28‐06‐2018 12:07:34 28‐06‐2018 14:00:00 1:52 0.00077778 MUs
305 BLOCK C‐OLD SIMAPURI, BLOCK E‐OLD SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURI, BLOCK B‐OLD SIMAPURI DGN 204 990 KVA UNPLANNED 28‐06‐2018 17:25:08 28‐06‐2018 19:08:30 1:43 0.00057222 MUs306 MUKHRJI SCHOOL‐POCKET L, HANSRAJ SCHOOL‐POCKET H DGN 8 630 KVA UNPLANNED 28‐06‐2018 21:03:05 28‐06‐2018 21:33:45 0:30 0.00016667 MUs307 BLOCK A‐DILSHAD COLONY, BLOCK E‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 1770 630 KVA UNPLANNED 29‐06‐2018 11:06:00 29‐06‐2018 12:52:37 1:46 0.00058889 MUs
308INDIRA CAMP‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY, BLOCK B‐ GROUP I FLATS‐POCKET B DGN 440 990 KVA UNPLANNED 29‐06‐2018 16:41:42 29‐06‐2018 17:12:17 0:30 0.00008333 MUs
309 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 795 990 KVA UNPLANNED 12‐06‐2018 11:05:38 12‐06‐2018 11:39:14 0:33 0.00018333 MUs310 BLOCK A‐PRATAP PURA, ROHITASH NAGAR‐SILAMPUR DGN 1175 990 KVA UNPLANNED 12‐06‐2018 15:59:01 12‐06‐2018 16:35:55 0:36 0.00015 MUs311 FANCY APPARTMENT‐VASUNDHARA ENCLAVE VSE DGN 44 630 KVA UNPLANNED 14‐06‐2018 12:04:18 14‐06‐2018 13:01:57 0:57 0.000475 MUs312 BLOCK A‐PRATAP PURA, ROHITASH NAGAR‐SILAMPUR DGN 1175 990 KVA UNPLANNED 14‐06‐2018 13:04:27 14‐06‐2018 13:53:41 0:49 0.00013611 MUs313 BALBIR NAGAR EXTN.‐SILAMPUR DGN 1529 630 KVA UNPLANNED 14‐06‐2018 13:54:24 14‐06‐2018 14:27:40 0:33 0.00045833 MUs
314 GORAKH PARK WEST‐SILAMPUR, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 1236 990 KVA UNPLANNED 14‐06‐2018 17:27:02 14‐06‐2018 17:56:55 0:29 0.00012889 MUs
315SUBHASH PARK EXTN.‐GORAKH PARK, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 684 990 KVA UNPLANNED 14‐06‐2018 21:08:42 14‐06‐2018 21:40:00 0:31 0.00012917 MUs
316 BALBIR NAGAR EXTN.‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GORAKH PARK EAST‐SILAMPUR DGN 860 990 KVA UNPLANNED 15‐06‐2018 00:08:45 15‐06‐2018 00:45:34 0:36 0.00016 MUs317 BALBIR NAGAR EXTN.‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GORAKH PARK EAST‐SILAMPUR DGN 860 990 KVA UNPLANNED 15‐06‐2018 01:11:42 15‐06‐2018 01:59:10 0:47 0.00019583 MUs318 OLDANPUR‐NAVIN SHAHDARA DGN 562 630 KVA UNPLANNED 15‐06‐2018 04:16:00 15‐06‐2018 05:04:55 0:48 0.00021333 MUs319 BLOCK A‐PRATAP PURA DGN 274 990 KVA UNPLANNED 15‐06‐2018 11:34:45 15‐06‐2018 12:29:00 0:54 0.00012 MUs320 FANCY APPARTMENT‐VASUNDHARA ENCLAVE VSE DGN 44 630 KVA UNPLANNED 15‐06‐2018 15:18:33 15‐06‐2018 16:59:10 1:40 0.00069444 MUs321 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 248 990 KVA UNPLANNED 16‐06‐2018 16:02:29 16‐06‐2018 16:50:00 0:47 0.00010444 MUs322 KABUL NAGAR‐ROHITASH NAGAR DGN 154 630 KVA UNPLANNED 17‐06‐2018 01:26:43 17‐06‐2018 02:07:42 0:40 0.0002 MUs
323BLOCK X‐PRATAP PURA, BLOCK V‐PRATAP PURA, OLDANPUR‐NAVIN SHAHDARA, BLOCK Y‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK C‐PRATAP PURA DGN 740 990 KVA UNPLANNED 17‐06‐2018 17:04:18 17‐06‐2018 17:57:03 0:52 0.00021667 MUs
324 ROHITASH NAGAR EAST‐SILAMPUR DGN 91 990 KVA UNPLANNED 19‐06‐2018 10:00:15 19‐06‐2018 10:04:38 0:4 0.00002111 MUs325 BALBIR NAGAR EXTN.‐SILAMPUR DGN 1652 630 KVA UNPLANNED 19‐06‐2018 16:11:31 19‐06‐2018 16:48:54 0:37 0.00016444 MUs326 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1055 990 KVA UNPLANNED 20‐06‐2018 00:45:56 20‐06‐2018 01:10:06 0:24 0.00010667 MUs327 BALBIR NAGAR EXTN.‐SILAMPUR DGN 685 630 KVA UNPLANNED 20‐06‐2018 10:24:36 20‐06‐2018 11:14:49 0:50 0.00025 MUs328 BALBIR NAGAR EXTN.‐SILAMPUR DGN 685 630 KVA UNPLANNED 20‐06‐2018 12:34:00 20‐06‐2018 13:55:00 1:21 0.00045 MUs329 BALBIR NAGAR EXTN.‐SILAMPUR DGN 685 630 KVA UNPLANNED 20‐06‐2018 14:50:00 20‐06‐2018 15:32:19 0:42 0.00023333 MUs330 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 795 990 KVA UNPLANNED 21‐06‐2018 11:11:37 21‐06‐2018 11:56:00 0:44 0.00018333 MUs331 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1054 630 KVA UNPLANNED 21‐06‐2018 15:33:14 21‐06‐2018 16:29:00 0:55 0.00015278 MUs332 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1055 990 KVA UNPLANNED 22‐06‐2018 00:47:10 22‐06‐2018 01:17:36 0:30 0.00013333 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
333
BLOCK 1‐BALBIR NAGAR, ROHITASH NAGAR EAST‐SILAMPUR, BALBIR NAGAR EXTN.‐SILAMPUR, GORAKH PARK WEST‐SILAMPUR, AMBEDKAR NAGAR‐SHAHDARA, GORAKH PARK EAST‐SILAMPUR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR DGN 1283 630 KVA UNPLANNED 22‐06‐2018 01:19:43 22‐06‐2018 02:18:00 0:58 0.00024167 MUs
334
BLOCK A‐DILSHAD COLONY, BABARPUR WEST‐BABAR PUR, ROHITASH NAGAR EAST‐SILAMPUR, NEW JAFFRABAD‐GORAKH PARK, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK B‐GORAKH PARK, BLOCK A‐PRATAP PURA, SHIVAJI PARK‐BALBIR NAGAR, ARJUN NAGAR EAST‐SHAHDARA DGN 616 630 KVA UNPLANNED 22‐06‐2018 02:06:00 22‐06‐2018 02:48:47 0:42 0 MUs
335 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 2146 630 KVA UNPLANNED 22‐06‐2018 07:14:02 22‐06‐2018 07:28:32 0:14 0.00006222 MUs
336
BLOCK X‐PRATAP PURA, GOPAL K.OIL DEPO.‐PRATAP PURA, BLOCK H‐PRATAP PURA, OLDANPUR‐NAVIN SHAHDARA, BLOCK D‐PRATAP PURA, BLOCK C‐PRATAP PURA, BLOCK V‐PRATAP PURA, BLOCK A‐PRATAP PURA, BLOCK B‐PRATAP PURA, BLOCK Y‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 3718 2610 KVA UNPLANNED 22‐06‐2018 15:59:19 22‐06‐2018 16:33:24 0:34 0.00037778 MUs
337GORAKH PARK WEST‐SILAMPUR, BLOCK A‐PRATAP PURA, DDA MIG FLATS‐VIVEK VIHAR PHASE II, NEW JAFFRABAD‐GORAKH PARK DGN 1034 990 KVA UNPLANNED 23‐06‐2018 01:22:09 23‐06‐2018 02:48:00 1:25 0.000425 MUs
338 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1054 630 KVA UNPLANNED 23‐06‐2018 11:40:05 23‐06‐2018 12:20:00 0:39 0.00021667 MUs
339SUBHASH PARK EXTN.‐GORAKH PARK, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, KABUL NAGAR‐ROHITASH NAGAR, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 1192 990 KVA UNPLANNED 23‐06‐2018 16:57:21 23‐06‐2018 17:52:00 0:54 0.000225 MUs
340 PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK A‐PRATAP PURA DGN 205 990 KVA UNPLANNED 24‐06‐2018 08:05:00 24‐06‐2018 08:33:49 0:28 0.00014 MUs
341BLOCK X‐PRATAP PURA, DWARKAPURI‐NAVIN SHAHDARA, OLDANPUR‐NAVIN SHAHDARA, BLOCK C‐PRATAP PURA, BLOCK V‐PRATAP PURA, BLOCK Y‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 738 990 KVA UNPLANNED 25‐06‐2018 01:55:00 25‐06‐2018 02:39:14 0:44 0.00020778 MUs
342GORAKH PARK WEST‐SILAMPUR, SUBHASH PARK EXTN.‐GORAKH PARK, BLOCK A‐PRATAP PURA, SUBHASH PARK‐GORAKH PARK DGN 2177 990 KVA UNPLANNED 25‐06‐2018 05:46:54 25‐06‐2018 06:45:00 0:58 0.00024167 MUs
343 ROHITASH NAGAR EAST‐SILAMPUR, KABUL NAGAR‐ROHITASH NAGAR DGN 988 630 KVA UNPLANNED 25‐06‐2018 13:21:48 25‐06‐2018 13:54:10 0:32 0.00022222 MUs344 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1055 990 KVA UNPLANNED 26‐06‐2018 02:19:19 26‐06‐2018 02:45:43 0:26 0.00010833 MUs
345SUBHASH PARK EXTN.‐GORAKH PARK, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 1195 990 KVA UNPLANNED 26‐06‐2018 02:47:29 26‐06‐2018 03:08:27 0:20 0.00008333 MUs
346 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 2148 630 KVA UNPLANNED 26‐06‐2018 12:42:53 26‐06‐2018 13:35:00 0:52 0.00028889 MUs347 OLDANPUR‐NAVIN SHAHDARA DGN 11 990 KVA UNPLANNED 27‐06‐2018 11:15:36 27‐06‐2018 11:57:51 0:42 0.00022167 MUs348 OLDANPUR‐NAVIN SHAHDARA, BLOCK X‐PRATAP PURA, BLOCK Y‐PRATAP PURA DGN 278 990 KVA UNPLANNED 28‐06‐2018 19:58:36 28‐06‐2018 20:25:00 0:26 0.00013 MUs349 GORAKH PARK WEST‐SILAMPUR, BLOCK B‐GORAKH PARK, BLOCK A‐PRATAP PURA DGN 279 990 KVA UNPLANNED 29‐06‐2018 23:32:00 30‐06‐2018 00:24:00 0:51 0.00026917 MUs350 DARYA GANJ DRG 263 990 KVA UNPLANNED 02‐06‐2018 09:59:41 02‐06‐2018 10:50:19 0:50 0 MUs351 DARYA GANJ, HAPPY PUBLIC SCHOOL‐PARDA BAGH DRG 177 630 KVA UNPLANNED 02‐06‐2018 11:43:42 02‐06‐2018 12:29:58 0:46 0 MUs352 LIG/MIG RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUM DRG 0 400 KVA UNPLANNED 05‐06‐2018 11:54:03 05‐06‐2018 12:25:15 0:31 0 MUs353 DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR DRG 255 990 KVA UNPLANNED 12‐06‐2018 11:49:53 12‐06‐2018 12:03:22 0:13 0.00002167 MUs354 DARYA GANJ DRG 362 990 KVA UNPLANNED 12‐06‐2018 11:54:36 12‐06‐2018 12:18:40 0:24 0.00005333 MUs355 DARYA GANJ DRG 20 990 KVA UNPLANNED 15‐06‐2018 11:19:54 15‐06‐2018 11:30:30 0:10 0.00001667 MUs356 BALMIKI BASTI‐FEROJ SHAH KOTLA STADIU DRG 110 630 KVA UNPLANNED 15‐06‐2018 13:14:46 15‐06‐2018 13:41:34 0:26 0.00002889 MUs357 DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR DRG 91 990 KVA UNPLANNED 15‐06‐2018 13:42:19 15‐06‐2018 14:14:42 0:32 0.00003556 MUs
358DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR, ZAKIR HUSAINP.G. EVENING COLLAGE‐SKD BASTI DRG 254 990 KVA UNPLANNED 21‐06‐2018 12:06:00 21‐06‐2018 13:20:00 1:13 0.00014194 MUs
359DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR DRG 813 990 KVA UNPLANNED 23‐06‐2018 13:55:57 23‐06‐2018 14:16:10 0:20 0.00002222 MUs
360 PATODI HOUSE‐CHANDNI CHOWK, MTNL TELEPHONE EXCHANGE‐PATODI HOUSE, DARYA GANJ DRG 78 990 KVA UNPLANNED 26‐06‐2018 12:25:20 26‐06‐2018 13:24:46 0:59 0.00009833 MUs361 DARYA GANJ, CHAWRI BAZAR‐CHANDNI CHOWK DRG 18 990 KVA UNPLANNED 26‐06‐2018 14:58:20 26‐06‐2018 15:45:47 0:47 0.00007833 MUs362 DARYA GANJ DRG 95 990 KVA UNPLANNED 27‐06‐2018 12:04:34 27‐06‐2018 13:01:13 0:56 0.00009333 MUs363 BALMIKI BASTI‐FEROJ SHAH KOTLA STADIU DRG 32 630 KVA UNPLANNED 27‐06‐2018 12:21:08 27‐06‐2018 13:02:52 0:41 0.00006833 MUs364 DARYA GANJ DRG 34 990 KVA UNPLANNED 27‐06‐2018 13:24:15 27‐06‐2018 13:49:50 0:25 0.00004167 MUs365 DARYA GANJ DRG 119 990 KVA UNPLANNED 28‐06‐2018 10:45:27 28‐06‐2018 11:36:51 0:51 0.000085 MUs366 DARYA GANJ DRG 44 990 KVA UNPLANNED 29‐06‐2018 16:34:49 29‐06‐2018 17:16:48 0:41 0.00006833 MUs
367KUCHA PATI RAM‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, BRIJ MARKITING PKT LTD‐CHAWRI BAZAR, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1416 990 KVA UNPLANNED 12‐06‐2018 13:08:24 12‐06‐2018 14:03:23 0:54 0.00006 MUs
368 KUCHA PATI RAM‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1223 400 KVA UNPLANNED 14‐06‐2018 11:38:24 14‐06‐2018 12:39:40 1:1 0.00010167 MUs
369
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DRG 1306 990 KVA UNPLANNED 15‐06‐2018 02:00:42 15‐06‐2018 05:56:47 3:56 0.00026222 MUs
370COMMUNITY CENTRE‐JAMA MASZID, EVERGREEN PUBLICATION‐KALA MAHAL, GARIG MOSQUE‐JAMA MASZID, MOTHER DAIRY‐NETAJI SUBHASH MARG, CHANDANI MAHAL‐CHANDNI CHOWK, MOTIA MAHAL‐CHANDNI CHOWK DRG 693 990 KVA UNPLANNED 20‐06‐2018 12:30:37 20‐06‐2018 14:20:37 1:50 0.00012222 MUs
371
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIVVIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, DELHI POLICE BHAVAN‐PAHARI BHOJLA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DRG 2059 990 KVA UNPLANNED 21‐06‐2018 13:08:29 21‐06‐2018 14:00:00 0:51 0.00005667 MUs
372 KUCHA PATI RAM‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1224 400 KVA UNPLANNED 23‐06‐2018 00:40:00 23‐06‐2018 01:08:25 0:28 0.00006222 MUs
373EVERGREEN PUBLICATION‐KALA MAHAL, MOTHER DAIRY‐NETAJI SUBHASH MARG, CHRISTAN COLONY‐KHABAS PURA, GOVT SENIOR SECONDARY SCHOOL‐KALA MAHAL DRG 122 990 KVA UNPLANNED 23‐06‐2018 11:12:35 23‐06‐2018 11:31:12 0:18 0.00002 MUs
374KUCHA PATI RAM‐CHANDNI CHOWK, CHANDANI MAHAL‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, HAUZ QAZI‐CHANDNI CHOWK, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1223 400 KVA UNPLANNED 23‐06‐2018 14:08:42 23‐06‐2018 14:56:11 0:47 0.00005222 MUs
375
KUCHA PATI RAM‐CHANDNI CHOWK, EVERGREEN PUBLICATION‐KALA MAHAL, CHANDANI MAHAL‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR, HAUZ QAZI‐CHANDNI CHOWK, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1223 400 KVA UNPLANNED 24‐06‐2018 11:59:20 24‐06‐2018 12:54:38 0:55 0.00006111 MUs
376
KUCHA PATI RAM‐CHANDNI CHOWK, EVERGREEN PUBLICATION‐KALA MAHAL, CHANDANI MAHAL‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, DAV PUBLIC SCHOOL‐KALA MASZID, HAUZ QAZI‐CHANDNI CHOWK, CHAWRI BAZAR‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR DRG 777 990 KVA UNPLANNED 24‐06‐2018 13:29:20 24‐06‐2018 14:08:00 0:38 0.00004222 MUs
377KUCHA PATI RAM‐CHANDNI CHOWK, SITARAM BAZAR‐CHANDNI CHOWK, BRIJ MARKITING PKT LTD‐CHAWRI BAZAR, MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1416 990 KVA UNPLANNED 25‐06‐2018 13:31:01 25‐06‐2018 14:14:25 0:43 0.00004778 MUs
378 DARYA GANJ, CHANDANI MAHAL‐CHANDNI CHOWK DRG 14 990 KVA UNPLANNED 25‐06‐2018 15:25:31 25‐06‐2018 16:08:23 0:42 0.00007 MUs
379KUCHA PATI RAM‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, BINDRABAN UDYOG‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 126 990 KVA UNPLANNED 26‐06‐2018 13:35:24 26‐06‐2018 14:19:07 0:43 0.00004778 MUs
380KUCHA PATI RAM‐CHANDNI CHOWK, SITARAM BAZAR‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 283 990 KVA UNPLANNED 26‐06‐2018 15:00:46 26‐06‐2018 15:54:36 0:53 0.00005889 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
381PATODI HOUSE‐CHANDNI CHOWK, KUCHA PATI RAM‐CHANDNI CHOWK, BRIJ MARKITING PKT LTD‐CHAWRI BAZAR, MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1416 990 KVA UNPLANNED 26‐06‐2018 16:09:41 26‐06‐2018 17:17:52 1:8 0.00007556 MUs
382 PATODI HOUSE‐CHANDNI CHOWK, CHRISTAN COLONY‐KHABAS PURA DRG 571 990 KVA UNPLANNED 28‐06‐2018 02:27:44 28‐06‐2018 03:06:00 0:38 0 MUs
383
PATODI HOUSE‐CHANDNI CHOWK, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, CHANDANI MAHAL‐CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, CHRISTAN COLONY‐KHABAS PURA, PKT A‐BLOCK B DRG 1591 990 KVA UNPLANNED 28‐06‐2018 02:32:32 28‐06‐2018 03:55:00 1:22 0 MUs
384PATODI HOUSE‐CHANDNI CHOWK, ARYA ANATHALAYA‐KALA MAHAL, COMMUNITY CENTRE‐JAMA MASZID, CHANDANI MAHAL‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, DARYA GANJ DRG 101 990 KVA UNPLANNED 29‐06‐2018 12:42:04 29‐06‐2018 13:46:22 1:4 0.00010667 MUs
385 BIHARI COLONY‐SHAHDARA JLM 20 990 KVA UNPLANNED 15‐06‐2018 13:28:43 15‐06‐2018 14:23:51 0:55 0.00038194 MUs
386 AMBEDKAR NAGAR‐SHAHDARA, JAWALA NAGAR‐SHAHDARA, BLOCK A‐VIVEK VIHAR, NEW VISWAS NAGAR‐SHAHDARA JLM 97 990 KVA UNPLANNED 22‐06‐2018 01:02:39 22‐06‐2018 01:59:00 0:56 0.00077778 MUs
387BIHARI COLONY‐SHAHDARA, TELIBARA‐SHAHDARA, MAHARAM NAGAR‐SHAHDARA, OLDANPUR‐NAVIN SHAHDARA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BHOLA NATH NAGAR‐SHAHDARA JLM 691 990 KVA UNPLANNED 23‐06‐2018 01:58:23 23‐06‐2018 02:44:58 0:46 0.00019167 MUs
388 JAWALA NAGAR‐SHAHDARA JLM 1550 990 KVA UNPLANNED 23‐06‐2018 04:45:00 23‐06‐2018 05:33:29 0:48 0.00006667 MUs389 BHOLA NATH NAGAR‐SHAHDARA, MAHARAM NAGAR‐SHAHDARA JLM 403 990 KVA UNPLANNED 23‐06‐2018 09:37:53 23‐06‐2018 10:28:17 0:50 0.00006944 MUs390 BHOLA NATH NAGAR‐SHAHDARA, SHALIMAR PARK‐SHAHDARA, SUNDER PARK‐SHAHDARA JLM 118 990 KVA UNPLANNED 24‐06‐2018 13:04:18 24‐06‐2018 18:46:00 5:41 0.00473611 MUs
391
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SUNDER PARK‐SHAHDARA, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, VISHWAS NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B JLM 672 990 KVA UNPLANNED 25‐06‐2018 00:35:13 25‐06‐2018 01:30:49 0:55 0.00007639 MUs
392 BIHARI COLONY‐SHAHDARA JLM 762 630 KVA UNPLANNED 26‐06‐2018 01:45:00 26‐06‐2018 03:35:00 1:50 0.00015278 MUs393 VISHWAS NAGAR, SUNDER PARK‐SHAHDARA JLM 425 400 KVA UNPLANNED 29‐06‐2018 10:35:00 29‐06‐2018 12:13:00 1:37 0.00026944 MUs
394BIHARI COLONY‐SHAHDARA, SHALIMAR PARK‐SHAHDARA, BHOLA NATH NAGAR‐SHAHDARA, EAST ROHTASH NAGAR‐SHAHDARA JLM 1138 990 KVA UNPLANNED 29‐06‐2018 23:50:26 30‐06‐2018 00:13:34 0:23 0.00003194 MUs
395 VISHWAS NAGAR‐SHAHDARA, VISHWAS NAGAR JLM 204 630 KVA UNPLANNED 30‐06‐2018 00:40:15 30‐06‐2018 02:18:51 1:38 0.00157889 MUs396 PUSHPANJALI‐ANAND VIHAR JLM 10 990 KVA UNPLANNED 15‐06‐2018 03:21:01 15‐06‐2018 04:10:59 0:49 0.00068056 MUs397 AGCR ENCLAVE‐ANAND VIHAR JLM 60 990 KVA UNPLANNED 20‐06‐2018 04:20:51 20‐06‐2018 05:19:01 0:58 0.00032222 MUs398 BLOCK D‐ANAND VIHAR, J J COLONY‐ANAND VIHAR JLM 397 990 KVA UNPLANNED 23‐06‐2018 12:49:16 23‐06‐2018 18:05:13 5:15 0.0004375 MUs399 BLOCK E‐JHILMIL COLONY BLOCK E, ESI HOSPITAL‐JHILMIL COLONY BLOCK C JLM 440 990 KVA UNPLANNED 19‐06‐2018 00:58:57 19‐06‐2018 02:30:00 1:31 0.00012639 MUs400 ESI HOSPITAL‐JHILMIL COLONY BLOCK C JLM 113 990 KVA UNPLANNED 25‐06‐2018 23:50:00 26‐06‐2018 03:49:00 3:59 0.00033194 MUs401 BLOCK B‐SURAJMAL VIHAR JLM 8 990 KVA UNPLANNED 28‐06‐2018 06:00:34 28‐06‐2018 06:36:00 0:35 0.00019444 MUs402 BLOCK B‐SURAJMAL VIHAR JLM 404 990 KVA UNPLANNED 28‐06‐2018 13:00:00 28‐06‐2018 13:55:00 0:54 0.00015 MUs403 JHEEL‐JHEEL KHURENJA KRN 20 630 KVA UNPLANNED 12‐06‐2018 07:02:26 12‐06‐2018 10:47:00 3:44 0.00018667 MUs404 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 9‐GANDHI NAGAR KRN 416 990 KVA UNPLANNED 12‐06‐2018 11:22:13 12‐06‐2018 12:14:00 0:51 0.0000425 MUs
405RANI GARDEN‐GEETA COLONY, BLOCK 12‐GEETA COLONY, BLOCK 18‐GEETA COLONY, BLOCK 15‐GEETA COLONY, BLOCK 13‐GEETA COLONY, SAROJINI PARK‐GEETA COLONY KRN 1069 990 KVA UNPLANNED 14‐06‐2018 11:58:35 14‐06‐2018 12:40:00 0:41 0.00028472 MUs
406 BLOCK 9‐GANDHI NAGAR KRN 104 990 KVA UNPLANNED 21‐06‐2018 10:31:00 21‐06‐2018 10:50:03 0:19 0.00001056 MUs407 BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, KAILASH NAGAR SOUTH KRN 410 990 KVA UNPLANNED 23‐06‐2018 09:30:51 23‐06‐2018 10:27:00 0:56 0.00018667 MUs408 BLOCK 16‐GEETA COLONY KRN 12 400 KVA UNPLANNED 25‐06‐2018 10:01:04 25‐06‐2018 10:35:00 0:33 0.00004583 MUs
409BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA RIVER, BLOCK 9‐GANDHI NAGAR, BLOCK 10‐GANDHI NAGAR, BLOCK 9‐GANDHI NAGAR KRN 2001 990 KVA UNPLANNED 27‐06‐2018 21:05:00 27‐06‐2018 22:01:28 0:56 0.00074667 MUs
410LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 5‐GEETA COLONY, BLOCK 9‐GANDHI NAGAR, KAILASH NAGAR SOUTH KRN 127 990 KVA UNPLANNED 28‐06‐2018 11:49:16 28‐06‐2018 12:20:25 0:31 0.00001722 MUs
411LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 2‐GEETA COLONY, BLOCK 8A‐GEETA COLONY, BLOCK 8‐GEETA COLONY, BLOCK 1A‐GEETA COLONY KRN 462 990 KVA UNPLANNED 29‐06‐2018 11:52:04 29‐06‐2018 12:42:00 0:49 0 MUs
412 BLOCK 2‐GEETA COLONY, BLOCK 8‐GEETA COLONY KRN 554 630 KVA UNPLANNED 30‐06‐2018 11:55:50 30‐06‐2018 12:26:00 0:30 0.00025 MUs413 BLOCK E‐JAGATPURI, NEW GOVIND PURA‐JAGATPURI, BLOCK D‐JAGATPURI KRN 1067 990 KVA UNPLANNED 12‐06‐2018 12:20:00 12‐06‐2018 14:16:17 1:56 0.00012889 MUs414 BLOCK B‐JAGATPURI KRN 114 990 KVA UNPLANNED 12‐06‐2018 17:17:00 12‐06‐2018 18:14:00 0:56 0.00004667 MUs415 BLOCK A‐BALDEV PARK EAST, BLOCK D‐SOUTH ANARKALI COLONY KRN 250 990 KVA UNPLANNED 14‐06‐2018 15:25:02 14‐06‐2018 16:23:00 0:57 0.00003167 MUs
416BLOCK D‐JAGATPURI, BLOCK B‐JAGATPURI, BLOCK D‐SOUTH ANARKALI COLONY, BLOCK F‐BALDEV PARK EAST, BLOCK A‐BALDEV PARK EAST KRN 1614 990 KVA UNPLANNED 15‐06‐2018 01:30:03 15‐06‐2018 02:14:30 0:44 0.00012222 MUs
417BLOCK A‐JAGATPURI EXTN., BLOCK B‐JAGATPURI, RADHE SHYAM PARK‐SWASTHYA VIHAR, BRIJ PURI‐SWASTHYA VIHAR, KHUREJI KHAS‐SWASTHYA VIHAR, OLD BRIJPURI‐SWASTHYA VIHAR KRN 903 990 KVA UNPLANNED 21‐06‐2018 02:12:00 21‐06‐2018 02:54:39 0:42 0.000525 MUs
418BLOCK A‐NEW LAYALPUR COLONY, BLOCK E‐CHANDAR NAGAR, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK D‐RAM NAGAR, SHIVPURI‐JAGATPURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, CHANDER NAGAR‐KRISHNA NAGAR KRN 264 990 KVA UNPLANNED 21‐06‐2018 14:58:00 21‐06‐2018 19:44:22 4:46 0.00015889 MUs
419LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐JAGATPURI, RASHID MARKET‐JAGATPURI, BALDEV PARK‐JAGATPURI, NEW GOVIND PURA‐JAGATPURI, SHIVPURI‐JAGATPURI KRN 1381 990 KVA UNPLANNED 22‐06‐2018 23:17:37 23‐06‐2018 00:45:48 1:28 0.00102667 MUs
420BLOCK E‐ANARKALI COLONY NORTH, BLOCK A‐ANARKALI COLONY NORTH, BLOCK D‐AJIT NAGAR, BLOCK D‐SOUTH ANARKALI COLONY, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, BLOCK K‐JAGATPURI KRN 472 990 KVA UNPLANNED 23‐06‐2018 00:50:00 23‐06‐2018 02:49:06 1:59 0.00082639 MUs
421
BLOCK D‐SOUTH ANARKALI COLONY, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, OLD BRIJPURI‐SWASTHYA VIHAR, NEW GOVIND PURA‐JAGATPURI, BLOCK B‐SUBHASH MOHALLA, BALDEV PARK‐JAGATPURI, BLOCK D‐JAGATPURI, BLOCK B‐JAGATPURI, BLOCK F‐BALDEV PARK EAST, BLOCK E‐SUBHASH MOHALLA, RADHE SHYAM PARK EXTN.SWASTHYA VIHAR, BLOCK B5‐YAMUNA PUR (GONDA) BLOCK B, BLOCK E‐SUBHASH MOHALLA KRN 4966 990 KVA UNPLANNED 23‐06‐2018 01:06:12 23‐06‐2018 02:20:34 1:14 0.00049333 MUs
422BLOCK D‐JAGATPURI, BLOCK B‐JAGATPURI, BLOCK D‐SOUTH ANARKALI COLONY, BLOCK F‐BALDEV PARK EAST, BLOCK A‐BALDEV PARK EAST KRN 1613 990 KVA UNPLANNED 23‐06‐2018 05:55:06 23‐06‐2018 06:15:33 0:20 0.00013889 MUs
423BRIJ PURI‐SWASTHYA VIHAR, KHUREJI KHAS‐SWASTHYA VIHAR, BLOCK B‐JAGAT PURI, OLD BRIJPURI‐SWASTHYA VIHAR, BLOCK C‐BRIJ PURI KRN 364 990 KVA UNPLANNED 24‐06‐2018 02:10:42 24‐06‐2018 03:00:59 0:50 0.00006944 MUs
424 KHUREJI KHAS‐SWASTHYA VIHAR, BLOCK A‐JAGATPURI EXTN., RASHID MARKET‐JAGATPURI KRN 125 990 KVA UNPLANNED 25‐06‐2018 02:53:16 25‐06‐2018 03:42:10 0:48 0.00013333 MUs
425
YAMUNA RIVER‐KRISHNA NAGAR YAMUNA FLOOD PLAINS, BLOCK B‐JAGATPURI, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, BLOCK J‐JAGATPURI, KAILASH NAGAR SOUTH, BLOCK H‐JAGATPURI, BLOCK K‐JAGATPURI, BLOCK B‐JAGATPURI KRN 499 990 KVA UNPLANNED 25‐06‐2018 13:06:00 25‐06‐2018 13:31:56 0:25 0.00003472 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
426 GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR, DHARAM PURA‐KAILASH NAGAR KRN 1012 990 KVA UNPLANNED 02‐06‐2018 12:37:00 02‐06‐2018 19:24:00 6:47 0 MUs
427 GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR, DHARAM PURA‐KAILASH NAGAR KRN 0 990 KVA UNPLANNED 11‐06‐2018 10:35:00 11‐06‐2018 12:28:48 1:53 0 MUs428 YAMUNA RIVER‐KAILASH NAGAR KRN 2 990 KVA UNPLANNED 14‐06‐2018 17:19:00 14‐06‐2018 19:06:00 1:47 0.00005944 MUs
429 GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR, DHARAM PURA‐KAILASH NAGAR KRN 0 990 KVA UNPLANNED 18‐06‐2018 12:00:00 18‐06‐2018 17:43:00 5:43 0 MUs
430
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, RAGHUVIR PURA‐SHANKAR NAGAR, RAGHUVIR PURA‐KANTI NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 5‐TRILOKPURIPHASE I, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D,GEETA COLONY, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KRN 0 2610 KVA UNPLANNED 20‐06‐2018 11:15:00 20‐06‐2018 14:29:00 3:14 0 MUs
431 OLD SEELAMPUR KRN 950 990 KVA UNPLANNED 28‐06‐2018 05:30:00 28‐06‐2018 06:01:59 0:31 0.000155 MUs
432LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, WEST AZAD NAGAR, SHANKAR NAGAR‐AZAD NAGAR, BLOCK A‐KRISHNA NAGAR, BLOCK X‐RAJGARH COLONY KRN 678 990 KVA UNPLANNED 16‐06‐2018 12:06:19 16‐06‐2018 13:00:00 0:53 0.00014722 MUs
433 BLOCK D‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR, WEST AZAD NAGAR KRN 887 990 KVA UNPLANNED 19‐06‐2018 01:35:00 19‐06‐2018 07:53:00 6:18 0.00315 MUs
434
BLOCK 2A‐GEETA COLONY, BLOCK 12‐GEETA COLONY, JHEEL‐JHEEL KHURENJA, BLOCK 8‐KAROL BAGH WEST EXTENSION AREA, MAHILA COLONY‐SEELAMPUR, RAMA KRISHNA MISSION FREE T.B. CLINIC‐BLOCK 18, BLOCK X‐RAJGARH COLONY, SANDHA RAMA SCHOOL‐BLOCK 18, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, CHAND MOHALLA‐RAJGARH COLONY, BLOCK C‐RADHEPURI EXTENSION, MCD ADARSH SCHOOL‐BLOCK 18, BLOCK_15‐KAROL BAGH WEST EXTENSION AREA KRN 1325 630 KVA UNPLANNED 19‐06‐2018 14:36:00 19‐06‐2018 16:23:41 1:47 0.00095111 MUs
435 BLOCK C‐KANTI NAGAR NORTH BLOCK C, BLOCK A‐KRISHNA NAGAR KRN 187 630 KVA UNPLANNED 22‐06‐2018 16:45:00 22‐06‐2018 17:42:00 0:56 0.00003111 MUs
436BLOCK E‐KRISHNA NAGAR, WEST AZAD NAGAR, BLOCK B‐GHONDALI, SHANKAR NAGAR WEST‐AZAD NAGAR, AZAD NAGAR EAST, SHANKAR NAGAR EXTN‐AZAD NAGAR, BLOCK A‐KRISHNA NAGAR KRN 2197 990 KVA UNPLANNED 23‐06‐2018 03:25:00 23‐06‐2018 05:02:54 1:37 0.00134722 MUs
437OLD SEELAMPUR, AZAD NAGAR EAST, WEST AZAD NAGAR, RAGHUVIR PURA‐SHANKAR NAGAR, SHANKAR NAGAR WEST‐AZAD NAGAR KRN 101 990 KVA UNPLANNED 23‐06‐2018 11:18:17 23‐06‐2018 13:15:55 1:57 0.000065 MUs
438SHANKAR NAGAR EXTN‐AZAD NAGAR, WEST AZAD NAGAR, RAGHUVIR PURA‐SHANKAR NAGAR, SHANKAR NAGAR‐AZAD NAGAR KRN 1105 990 KVA UNPLANNED 28‐06‐2018 01:00:00 28‐06‐2018 01:59:00 0:58 0.00038667 MUs
439 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN. KRN 202 990 KVA UNPLANNED 14‐06‐2018 10:31:55 14‐06‐2018 11:10:00 0:38 0.00002111 MUs440 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN. KRN 158 990 KVA UNPLANNED 14‐06‐2018 13:14:11 14‐06‐2018 14:40:42 1:26 0.00004778 MUs441 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN. KRN 158 990 KVA UNPLANNED 14‐06‐2018 18:15:04 14‐06‐2018 19:25:00 1:9 0.00003833 MUs
442LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, CHANDER NAGAR‐KRISHNA NAGAR, CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN. KRN 886 990 KVA UNPLANNED 15‐06‐2018 13:24:00 15‐06‐2018 13:50:00 0:26 0.00001444 MUs
443 JHEEL‐JHEEL KHURENJA, BLOCK A‐KRISHNA NAGAR, BLOCK X‐RAJGARH COLONY KRN 619 630 KVA UNPLANNED 19‐06‐2018 13:43:00 19‐06‐2018 15:06:00 1:22 0.00047833 MUs
444BLOCK D‐BALDEV PARK EAST, CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., BLOCK 13‐GEETA COLONY KRN 202 990 KVA UNPLANNED 23‐06‐2018 11:57:00 23‐06‐2018 12:49:39 0:52 0.00002889 MUs
445
BLOCK J‐KRISHNA NAGAR EAST, BLOCK A‐KRISHNA NAGAR EAST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK J‐KRISHNA NAGAR EAST, BLOCK B‐KRISHNA NAGAR EAST, KRISHNA NAGAR EAST BLOCK B‐RADHEPURI, BLOCK F‐KRISHNA NAGAR, KRISHNA NAGAR EAST BLOCK D‐RADHEPURI, JHEEL‐KRISHNA NAGAR BLOCK B KRN 1622 990 KVA UNPLANNED 30‐06‐2018 09:41:01 30‐06‐2018 10:06:00 0:24 0.0001 MUs
446 BLOCK 13‐GEETA COLONY KRN 63 630 KVA UNPLANNED 27‐06‐2018 11:56:24 27‐06‐2018 12:50:00 0:53 0.00002944 MUs
447
BLOCK 2A‐GEETA COLONY, BLOCK C‐GOKUL PURI, JHEEL‐JHEEL KHURENJA, PKT A‐BLOCK C, BLOCK F‐GANGA VIHAR, MAHILA COLONY‐SEELAMPUR, BLOCK B‐GOKUL PURI, BLOCK X‐RAJGARH COLONY, BLOCK E‐GANGA VIHAR, PKT B‐BLOCK C, BLOCK D‐GOKUL PURI, BLOCK A‐GOKUL PURI, PKT G‐BLOCK A, PKT G‐BLOCK C, PKT B‐BLOCK A, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT C‐BLOCK C, BLOCK B‐GANGA VIHAR, PKT A‐BLOCK A, CHAND MOHALLA‐RAJGARH COLONY KWN 7291 3600 KVA UNPLANNED 08‐06‐2018 10:50:00 08‐06‐2018 11:54:00 1:4 0 MUs
448 PKT R‐BLOCK D KWN 508 990 KVA UNPLANNED 12‐06‐2018 14:40:00 12‐06‐2018 15:36:41 0:56 0.00003111 MUs
449LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI KWN 1869 630 KVA UNPLANNED 14‐06‐2018 17:05:20 14‐06‐2018 19:17:46 2:12 0.0022 MUs
450
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 14‐06‐2018 22:01:08 14‐06‐2018 22:56:46 0:55 0.00154306 MUs
451
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 15‐06‐2018 23:41:00 16‐06‐2018 01:00:00 1:19 0.00219444 MUs
452LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI KWN 1869 630 KVA UNPLANNED 18‐06‐2018 10:22:57 18‐06‐2018 10:28:29 0:5 0 MUs
453 JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR KWN 1413 0 KVA UNPLANNED 19‐06‐2018 08:58:51 19‐06‐2018 11:25:19 2:26 0.00020278 MUs454 TUNDA NAGAR‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 184 425 KVA UNPLANNED 19‐06‐2018 13:27:04 19‐06‐2018 14:25:00 0:57 0.000475 MUs
455
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK F‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK C‐MAN SINGH NAGAR, BLOCK E‐BRIJ PURI, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK B‐MAN SINGH NAGAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK G‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, BLOCK C‐BRIJ PURI, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 6008 2520 KVA UNPLANNED 19‐06‐2018 19:57:00 19‐06‐2018 20:44:00 0:47 0 MUs
456PKT G‐BLOCK A, PKT A‐BLOCK C, BLOCK F‐GANGA VIHAR, PKT G‐BLOCK C, PKT C‐BLOCK C, BLOCK B‐GANGA VIHAR, BLOCK E‐GANGA VIHAR KWN 3390 990 KVA UNPLANNED 20‐06‐2018 12:29:39 20‐06‐2018 13:25:00 0:55 0.00015278 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
457
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK E‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, BLOCK C & D‐INDIRA VIHAR, BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 20‐06‐2018 12:31:15 20‐06‐2018 13:26:00 0:54 0.000225 MUs
458 BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK D‐OLD MUSTAFABAD, BLOCK B‐OLD MUSTAFABAD KWN 113 630 KVA UNPLANNED 22‐06‐2018 04:25:18 22‐06‐2018 05:24:00 0:58 0.00032222 MUs
459
BLOCK C‐GOKUL PURI, PKT A‐BLOCK C, BLOCK F‐GANGA VIHAR, BLOCK B‐GOKUL PURI, BLOCK E‐GANGA VIHAR, PKT B‐BLOCK C, BLOCK D‐GOKUL PURI, BLOCK A‐GOKUL PURI, PKT G‐BLOCK A, PKT G‐BLOCK C, PKT B‐BLOCK A, PKT C‐BLOCK C, PKT A‐BLOCK A, BLOCK B‐GANGA VIHAR KWN 7215 3600 KVA UNPLANNED 22‐06‐2018 14:40:55 22‐06‐2018 15:11:24 0:30 0.00058333 MUs
460
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIVVIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 1380 1260 KVA UNPLANNED 22‐06‐2018 16:15:56 22‐06‐2018 16:40:00 0:24 0.00053333 MUs
461BLOCK B‐MUSTAFABAD (DAYALPUR), BLOCK B‐MAN SINGH NAGAR, BLOCK D‐OLD MUSTAFABAD, BLOCK B‐OLD MUSTAFABAD KWN 113 630 KVA UNPLANNED 23‐06‐2018 07:25:18 23‐06‐2018 08:15:00 0:49 0.00027222 MUs
462
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, BLOCK F‐BHAGIRATHI VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK B‐MAN SINGH NAGAR, BLOCK B‐OLD MUSTAFABAD, BLOCK G‐BHAGIRATHI VIHAR, BLOCK E‐BHAGIRATHI VIHAR, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, BHAGIRATHI VIHAR KWN 3250 630 KVA UNPLANNED 25‐06‐2018 10:48:43 25‐06‐2018 11:44:00 0:55 0.00030556 MUs
463 JOHRI ENCLAVE‐BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 25‐06‐2018 12:03:09 25‐06‐2018 13:05:20 1:2 0.00051667 MUs464 BLOCK C‐MAN SINGH NAGAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 25‐06‐2018 16:23:10 25‐06‐2018 16:40:00 0:16 0.00008889 MUs
465
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 1344 1260 KVA UNPLANNED 26‐06‐2018 13:45:00 26‐06‐2018 14:40:00 0:54 0.0012 MUs
466
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 27‐06‐2018 05:57:08 27‐06‐2018 06:55:00 0:57 0.00079167 MUs
467
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK P‐SHIV VIHAR, BLOCK B‐CHAMAN PARK, AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, SHIV VIHAR, BLOCK C‐KARAWAL NAGAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 27‐06‐2018 07:50:47 27‐06‐2018 09:00:00 1:9 0.00095833 MUs
468 LAXMI GARDEN‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 486 0 KVA UNPLANNED 27‐06‐2018 09:15:15 27‐06‐2018 10:15:00 0:59 0.00024583 MUs
469
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIVVIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 1380 1260 KVA UNPLANNED 27‐06‐2018 14:30:00 27‐06‐2018 14:54:00 0:24 0.0006 MUs
470
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, MUSTAFABAD‐MUNGA NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C & D‐INDIRA VIHAR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK B‐MAN SINGH NAGAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK B‐INDIRA VIHAR, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 1380 1260 KVA UNPLANNED 28‐06‐2018 02:04:08 28‐06‐2018 04:02:00 1:57 0.00325 MUs
471 PKT R‐BLOCK D, BLOCK M‐NEHRU VIHAR, PKT M‐BLOCK D KWN 2125 990 KVA UNPLANNED 30‐06‐2018 13:26:41 30‐06‐2018 14:25:48 0:59 0.00032778 MUs
472
BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK O‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR KWN 1882 0 KVA UNPLANNED 12‐06‐2018 09:23:53 12‐06‐2018 10:03:30 0:39 0.0001625 MUs
473 BLOCK CN‐MANGALAM VIHAR KWN 277 0 KVA UNPLANNED 12‐06‐2018 13:35:07 12‐06‐2018 14:04:45 0:29 0.00016111 MUs
474
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NEW CHAUHAN PUR, PKT 1‐BLOCK A, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 3B‐SADAT PUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK B‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK A‐NEHRU VIHAR, BLOCK 1D‐SADAT PUR, BLOCK 2C‐SADAT PUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK A‐MUSTAFABAD (DAYALPUR), PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SADAT PUR, BLOCK 1B‐SADAT PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK 5B‐SADAT PUR KWN 1280 990 KVA UNPLANNED 14‐06‐2018 10:36:37 14‐06‐2018 11:36:51 1:0 0.0005 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
475
BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, BLOCK E‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK I‐BHAGAT SINGH COLONY, BLOCK C‐SADAT PUR, BLOCK C‐KARAWAL NAGAR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, BLOCK C‐BHAGAT SINGH COLONY, PKT B‐BLOCK B, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐KHAJURI KHAS, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK D‐WEST KARAWAL NAGAR, BLOCK D‐DLF ANKUR VIHAR, WEST KARAWAL NAGAR KWN 5685 1660 KVA UNPLANNED 20‐06‐2018 23:00:00 20‐06‐2018 23:50:02 0:50 0.000625 MUs
476BLOCK I‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK B‐BHAGAT SINGH COLONY KWN 467 630 KVA UNPLANNED 22‐06‐2018 14:51:43 22‐06‐2018 15:18:39 0:26 0.00007222 MUs
477
BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐PREM VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 1547 990 KVA UNPLANNED 22‐06‐2018 21:51:42 22‐06‐2018 22:39:16 0:47 0.00026111 MUs
478
BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, BLOCK CN‐MANGALAM VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐PATEL VIHAR, BLOCK F‐SHIV VIHAR, SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 852 0 KVA UNPLANNED 23‐06‐2018 10:40:00 23‐06‐2018 11:30:49 0:50 0.00020833 MUs
479
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐RAMA GARDEN, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, BLOCK A‐NEW CHAUHAN PUR, BLOCK E‐PRAKASH VIHAR, BLOCK E‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐PRAKASH VIHAR, BLOCK I‐BHAGAT SINGH COLONY, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, BLOCK C‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK B‐NEW CHAUHAN PUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, BLOCK C‐DLF ANKUR VIHAR, GEETA COLONY, BLOCK B‐BHAGAT SINGH COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, NANK MILK PLANT‐PRAKASH VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGIRATHI VIHAR, BLOCK B‐PRAKASH VIHAR, BLOCK D‐DLF ANKUR VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 9014 5860 KVA UNPLANNED 25‐06‐2018 09:13:00 25‐06‐2018 09:51:18 0:38 0.00105556 MUs
480
BLOCK C‐GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR, GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR KWN 1499 990 KVA UNPLANNED 25‐06‐2018 11:57:22 25‐06‐2018 12:55:00 0:57 0.000475 MUs
481
BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐GOVIND VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐PREM VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 1547 990 KVA UNPLANNED 25‐06‐2018 16:28:52 25‐06‐2018 17:17:32 0:48 0.0004 MUs
482
FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR KWN 861 1620 KVA UNPLANNED 25‐06‐2018 19:27:00 25‐06‐2018 20:02:21 0:35 0.00029167 MUs
483 BHAGIRATHI VIHAR, BHARAT‐AMBEDKAR NAGAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 1705 0 KVA UNPLANNED 25‐06‐2018 22:34:58 25‐06‐2018 23:20:27 0:45 0.000375 MUs
484
BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐PREM VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 1547 990 KVA UNPLANNED 25‐06‐2018 22:59:32 25‐06‐2018 23:55:00 0:55 0.00030556 MUs
485
PKT B‐BLOCK B, PKT EA‐BLOCK B, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐NEW CHAUHAN PUR, BLOCK C‐SHERPUR, PKT A‐BLOCK E, BLOCK 3A‐SADAT PUR, BLOCK D‐WEST KARAWAL NAGAR, PKT D‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT B‐BLOCK A, BLOCK H‐SHIV VIHAR, PKT G‐BLOCK A, BLOCK C‐KARAWAL NAGAR, BLOCK B‐KARAWAL NAGAR (DEHROTI), PKT E‐BLOCK A KWN 937 0 KVA UNPLANNED 26‐06‐2018 06:38:13 26‐06‐2018 07:18:30 0:40 0.00022222 MUs
486
PKT EA‐BLOCK B, ARVIND NAGAR‐GHONDA, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK C‐JAI PRAKASH NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK C‐GHONDA PATTI, BLOCK B‐DAYALPUR, GHONDA PATTI, BLOCK 3A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 1B‐SADAT PUR, BLOCK H‐GHONDA PATTI, PKT B‐BLOCK A, BLOCK B‐KARAWAL NAGAR (DEHROTI) KWN 1252 630 KVA UNPLANNED 26‐06‐2018 13:48:05 26‐06‐2018 14:45:00 0:56 0.00062222 MUs
487
FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR KWN 862 1620 KVA UNPLANNED 26‐06‐2018 18:30:00 26‐06‐2018 19:08:48 0:38 0.00095 MUs
488
BLOCK R‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK C‐PATEL VIHAR, BLOCK A‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, BLOCK C‐PRAKASH VIHAR, BLOCK B‐PATEL VIHAR, BLOCK B‐BHAGAT SINGH COLONY KWN 1941 2415 KVA UNPLANNED 27‐06‐2018 05:53:07 27‐06‐2018 06:40:00 0:46 0.00127778 MUs
489
BLOCK R‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK C‐PATEL VIHAR, BLOCK A‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, PKT E‐BLOCK A, BLOCK C‐PRAKASH VIHAR, BLOCK B‐PATEL VIHAR, BLOCK B‐BHAGAT SINGH COLONY KWN 1941 2415 KVA UNPLANNED 27‐06‐2018 07:40:00 27‐06‐2018 08:19:39 0:39 0.00054167 MUs
490
BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK B‐SHIV VIHAR, BLOCK Q‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐PATEL VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR KWN 1882 0 KVA UNPLANNED 27‐06‐2018 14:44:52 27‐06‐2018 15:37:56 0:53 0.00022083 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
491
BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, BLOCK E‐BHAGAT SINGH COLONY, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK A‐PRAKASH VIHAR, BLOCK I‐BHAGAT SINGH COLONY, BLOCK C‐SADAT PUR, BLOCK C‐KARAWAL NAGAR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, BLOCK C‐BHAGAT SINGH COLONY, PKT B‐BLOCK B, BHAGAT NAGAR‐DAYALPUR, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐KHAJURI KHAS, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK K‐WEST KARAWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK D‐WEST KARAWAL NAGAR, BLOCK D‐DLF ANKUR VIHAR, WEST KARAWAL NAGAR, BLOCK C‐BHAGAT SINGH COLONY KWN 5690 1660 KVA UNPLANNED 27‐06‐2018 22:06:00 27‐06‐2018 23:03:00 0:56 0.00046667 MUs
492
PKT R‐BLOCK A, BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK A‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, SHIV VIHAR, BLOCK T‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR KWN 1882 0 KVA UNPLANNED 27‐06‐2018 23:04:59 27‐06‐2018 23:37:01 0:32 0.00044444 MUs
493PKT B‐BLOCK B, PKT EA‐BLOCK B, PKT D‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT B‐BLOCK A, PKT A‐BLOCK E, PKT G‐BLOCK A, BLOCK 3A‐SADAT PUR, PKT E‐BLOCK A KWN 937 0 KVA UNPLANNED 28‐06‐2018 05:54:09 28‐06‐2018 07:21:41 1:27 0.0003625 MUs
494BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, PKT D‐SHIV VIHAR, BLOCK C‐HARIJAN BASTI, BLOCK A‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT Y‐SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 857 0 KVA UNPLANNED 28‐06‐2018 07:37:07 28‐06‐2018 08:30:00 0:52 0.00021667 MUs
495
PKT R‐BLOCK A, BLOCK M‐SHIV VIHAR, BLOCK C‐HARIJAN BASTI, BLOCK O‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 1882 0 KVA UNPLANNED 28‐06‐2018 09:23:37 28‐06‐2018 09:59:22 0:35 0.00014583 MUs
496
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NEW CHAUHAN PUR, PKT 1‐BLOCK A, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 3B‐SADAT PUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK B‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK 1D‐SADAT PUR, BLOCK 2C‐SADAT PUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK A‐MUSTAFABAD (DAYALPUR), PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SADAT PUR, BLOCK 1B‐SADAT PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK 5B‐SADAT PUR KWN 1316 990 KVA UNPLANNED 28‐06‐2018 11:43:07 28‐06‐2018 12:37:08 0:54 0.000225 MUs
497
BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐PREM VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 1547 990 KVA UNPLANNED 28‐06‐2018 14:07:39 28‐06‐2018 15:00:00 0:52 0.00021667 MUs
498
BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, BLOCK 3A‐SADAT PUR, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK C‐SADAT PUR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, PKT B‐BLOCK B, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐KHAJURI KHAS, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK A‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR, BLOCK F‐SADAT PUR, WEST KARAWAL NAGAR KWN 5690 1660 KVA UNPLANNED 28‐06‐2018 14:57:54 28‐06‐2018 15:50:15 0:52 0.00021667 MUs
499
PKT R‐BLOCK A, BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK A‐SHIV VIHAR, BLOCK D‐OLD MUSTAFABAD, BLOCK DSHIV VIHAR, PKT W‐BLOCK A, BLOCK H‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, PKT X‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK B‐SHIV VIHAR, BLOCK B‐PREM VIHAR, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, PKT A‐BLOCK B, BLOCK S‐SHIV VIHAR KWN 1882 0 KVA UNPLANNED 28‐06‐2018 18:26:17 28‐06‐2018 19:35:00 1:8 0.00028333 MUs
500
PKT C‐BLOCK E, PKT A‐BLOCK E, BLOCK D‐WEST KARAWAL NAGAR, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR, PKT D‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐SADAT PUR, SHIV VIHAR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E KWN 1584 0 KVA UNPLANNED 29‐06‐2018 16:28:34 29‐06‐2018 17:30:00 1:1 0.00025417 MUs
501 BLOCK CN‐MANGALAM VIHAR KWN 277 0 KVA UNPLANNED 29‐06‐2018 18:40:00 29‐06‐2018 19:36:00 0:56 0.00023333 MUs
502
PKT B‐BLOCK B, PKT EA‐BLOCK B, BLOCK E‐SADAT PUR, BLOCK C‐SHERPUR, BLOCK H‐WEST KARAWAL NAGAR, PKT A‐BLOCK E, BLOCK 3A‐SADAT PUR, BLOCK A‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR, PKT D‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT B‐BLOCK A, WEST KARAWAL NAGAR, PKT G‐BLOCK A, PKT E‐BLOCK A KWN 937 0 KVA UNPLANNED 30‐06‐2018 16:05:27 30‐06‐2018 16:34:01 0:28 0.00011667 MUs
503LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 1063 630 KVA UNPLANNED 12‐06‐2018 01:08:16 12‐06‐2018 02:05:00 0:56 0.00015556 MUs
504
BLOCK B‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK G‐NEHRU VIHAR, BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK E‐INDIRA VIHAR, BLOCK D‐SHIV VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK C‐PREM VIHAR, BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK U‐SHIV VIHAR, BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK F‐NEHRU VIHAR, BLOCK B‐NEW CHAUHAN PUR, BLOCK A‐KHAJURI KHAS, PKT A‐BLOCK B, BLOCK F‐MUSTAFABAD (DAYALPUR), BLOCK C‐TUKMIRPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK F‐SADAT PUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, BLOCK F‐SHIV VIHAR, GEETA COLONY, BLOCK A‐PREM VIHAR, BLOCK C2‐NEW CHAUHAN PUR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK D‐OLD MUSTAFABAD, BLOCK A‐BABU NAGAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK B‐TUKMIRPUR, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK D‐PREM VIHAR, BLOCK D‐TUKMIRPUR, BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NEHRU VIHAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAJANPURA‐DAYALPUR, BLOCK N‐SHIV VIHAR, BLOCK B‐MUSTAFABAD (DAYALPUR), KWN 10576 5530 KVA UNPLANNED 12‐06‐2018 06:27:37 12‐06‐2018 07:40:00 1:12 0.0026 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage505 BLOCK B‐CHANDU NAGAR KWN 433 630 KVA UNPLANNED 12‐06‐2018 12:06:57 12‐06‐2018 12:46:21 0:39 0.00021667 MUs
506
PKT B‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐TUKMIRPUR, BLOCK D‐TUKMIRPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 668 0 KVA UNPLANNED 12‐06‐2018 15:11:58 12‐06‐2018 15:35:20 0:23 0.00019167 MUs
507 BLOCK B‐NEHRU VIHAR, BLOCK F‐NEHRU VIHAR, BLOCK Z‐NEHRU VIHAR KWN 896 990 KVA UNPLANNED 12‐06‐2018 16:09:36 12‐06‐2018 16:52:03 0:42 0.00029167 MUs508 BLOCK C‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY KWN 997 630 KVA UNPLANNED 14‐06‐2018 12:13:45 14‐06‐2018 12:55:56 0:42 0.00035 MUs
509BLOCK B‐GARI MANDU, MAUJ PUR COMPLEX 1, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK E‐SUBHASH MOHALLA, BLOCK C‐KABIR NAGAR KWN 1379 400 KVA UNPLANNED 15‐06‐2018 12:25:00 15‐06‐2018 12:54:34 0:29 0.00008056 MUs
510
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 3237 2060 KVA UNPLANNED 15‐06‐2018 21:08:00 15‐06‐2018 21:51:01 0:43 0.00131389 MUs
511LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 412 630 KVA UNPLANNED 16‐06‐2018 17:37:29 16‐06‐2018 18:31:20 0:53 0.00022083 MUs
512 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 173 0 KVA UNPLANNED 17‐06‐2018 20:48:50 17‐06‐2018 21:40:49 0:51 0.0002125 MUs513 BLOCK B‐CHANDU NAGAR KWN 433 630 KVA UNPLANNED 19‐06‐2018 00:45:51 19‐06‐2018 01:10:30 0:24 0.00013333 MUs
514
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, BLOCK A‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 3236 2060 KVA UNPLANNED 19‐06‐2018 18:40:00 19‐06‐2018 19:24:49 0:44 0.00097778 MUs
515
PKT A3‐BLOCK E, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, PKT A‐BLOCK E, PKT A4‐BLOCK E, BLOCK F‐WEST KARAWAL NAGAR, BLOCK E‐BHAGAT SINGH COLONY, BLOCK I‐BHAGAT SINGH COLONY, BLOCK C‐SADAT PUR, BLOCK C‐KARAWAL NAGAR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, BLOCK E‐SONIA VIHAR EXTENSION, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK A‐KHAJURI KHAS, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐KHAJURI KHAS, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK K‐WEST KARAWAL NAGAR, BLOCK H‐BHAGAT SINGH COLONY, BLOCK D‐DLF ANKUR VIHAR, BLOCK A‐SHRI RAM COLONY, WEST KARAWAL NAGAR, BLOCK D‐SHRI RAM COLONY KWN 1030 630 KVA UNPLANNED 19‐06‐2018 22:50:00 19‐06‐2018 23:47:00 0:56 0.00186667 MUs
516
PKT C‐BLOCK E, BLOCK E‐SADAT PUR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, PKT A3‐BLOCK E, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK F & G‐BHAGAT SINGH COLONY, PKT A‐BLOCK E, BLOCK B‐KHAJURI KHAS, BLOCK D‐WEST KARAWAL NAGAR, PKT A4‐BLOCK E, BLOCK H‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK I‐BHAGAT SINGH COLONY, WEST KARAWAL NAGAR, BLOCK C‐SADAT PUR, BLOCK C‐KARAWAL NAGAR, BLOCK D‐SHRI RAM COLONY, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK KWN 1030 630 KVA UNPLANNED 19‐06‐2018 23:58:26 20‐06‐2018 00:20:26 0:22 0.00134444 MUs
517
BLOCK E‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SONIA VIHAR EXTENSION, PKT Y‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK B‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 1353 0 KVA UNPLANNED 21‐06‐2018 01:10:00 21‐06‐2018 06:55:00 5:45 0.00095833 MUs
518 BLOCK F‐NEHRU VIHAR, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR KWN 62 630 KVA UNPLANNED 21‐06‐2018 12:10:52 21‐06‐2018 13:00:29 0:49 0.00040833 MUs519 BLOCK F‐NEHRU VIHAR, PKT A‐BLOCK A, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR KWN 62 630 KVA UNPLANNED 22‐06‐2018 11:33:37 22‐06‐2018 13:28:35 1:54 0.00015833 MUs
520 BLOCK A‐KHAJURI KHAS, PKT H‐BLOCK E, BLOCK D‐KHAJURI KHAS, BLOCK I‐KHAJURI KHAS EXTN., BLOCK C‐KHAJURI KHAS KWN 1404 630 KVA UNPLANNED 23‐06‐2018 23:20:58 24‐06‐2018 00:03:51 0:42 0.00023333 MUs521 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 19 400 KVA UNPLANNED 25‐06‐2018 21:40:05 25‐06‐2018 22:35:00 0:54 0.00045 MUs
522LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐MUSTAFABAD (DAYALPUR), BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK A‐MUSTAFABAD (DAYALPUR) KWN 730 0 KVA UNPLANNED 26‐06‐2018 00:53:19 26‐06‐2018 01:39:45 0:46 0.00038333 MUs
523
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 389 400 KVA UNPLANNED 26‐06‐2018 12:40:00 26‐06‐2018 13:30:00 0:49 0.00197361 MUs
524LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, CHAUHAN PATTI‐VIJAY VIHAR KWN 222 630 KVA UNPLANNED 26‐06‐2018 18:07:04 26‐06‐2018 18:50:00 0:42 0 MUs
525PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK 4A‐SADAT PUR, BLOCK 5C‐SADAT PUR, BLOCK 3A‐SADAT PUR, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK KWN 1650 990 KVA UNPLANNED 26‐06‐2018 23:40:00 27‐06‐2018 00:29:36 0:49 0.00013611 MUs
526LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY KWN 1030 630 KVA UNPLANNED 27‐06‐2018 06:15:00 27‐06‐2018 09:02:03 2:47 0.00231944 MUs
527LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK B‐KHAJURI KHAS, BLOCK D‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY KWN 1030 630 KVA UNPLANNED 27‐06‐2018 10:43:00 27‐06‐2018 11:42:00 0:58 0.00128889 MUs
528 BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 521 630 KVA UNPLANNED 27‐06‐2018 14:02:39 27‐06‐2018 15:26:53 1:24 0.00042 MUs
529
JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, BLOCK C‐MAN SINGH NAGAR, BLOCK B‐JOHRI PUR, BLOCK D‐OLD MUSTAFABAD, BLOCK C‐BHAGIRATHI VIHAR, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK B‐MAN SINGH NAGAR, BHAGIRATHI VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐INDIRA VIHAR, BLOCK C‐KARAWAL NAGAR KWN 355 630 KVA UNPLANNED 28‐06‐2018 00:16:12 28‐06‐2018 02:38:54 2:22 0.00059167 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
530
BLOCK D‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐NEHRU VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A1‐MUNGA NAGAR, BLOCK 9‐GANDHI NAGAR, BLOCK B‐CHANDU NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK C‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 7550 3870 KVA UNPLANNED 28‐06‐2018 01:32:28 28‐06‐2018 02:20:06 0:47 0.001175 MUs
531LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 19 400 KVA UNPLANNED 28‐06‐2018 12:16:00 28‐06‐2018 14:40:00 2:24 0 MUs
532 BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 521 630 KVA UNPLANNED 29‐06‐2018 10:56:40 29‐06‐2018 11:40:01 0:43 0.00017917 MUs
533
YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK B‐GARI MANDU, CLOCK C‐BIHARIPUR, BLOCK A‐SONIA VIHAR EXTENSION, BLOCK D‐TUKMIRPUR, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, JAGJEET NAGAR‐GHONDA, BADARPUR KHADAR, BLOCK B‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, LIG/MIG RES/NON COMM AREA‐SABHEPUR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK E‐SUBHASH MOHALLA, BLOCK CKABIR NAGAR KWN 3208 2330 KVA UNPLANNED 29‐06‐2018 23:46:00 30‐06‐2018 01:43:46 1:57 0 MUs
534
LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, PKT B‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PHASE I‐SHIV VIHAR, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK B‐MAN SINGH NAGAR, BLOCK E‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK A‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐KARAWAL NAGAR, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 1717 0 KVA UNPLANNED 30‐06‐2018 11:34:20 30‐06‐2018 12:31:00 0:56 0.00031111 MUs
535
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK C‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐KHAJURI KHAS, BLOCK D‐SHRI RAM COLONY, BLOCK B‐SHRI RAM COLONY KWN 7538 5570 KVA UNPLANNED 30‐06‐2018 19:19:07 30‐06‐2018 19:39:57 0:20 0.00044444 MUs
536 GANESH NAGAR SOUTH‐INDRAPRASTHA EXTENSION LNR 1605 630 KVA UNPLANNED 15‐06‐2018 23:25:14 15‐06‐2018 23:50:29 0:25 0.00006944 MUs537 BLOCK B‐VINOD NAGAR EAST, BLOCK B‐VINOD NAGAR WEST, BLOCK A‐VINOD NAGAR EAST LNR 1110 990 KVA UNPLANNED 25‐06‐2018 13:15:00 25‐06‐2018 13:55:26 0:40 0.00011111 MUs538 FAJALPUR‐MANDAWALI, BLOCK H‐MANDAWALI VILLAGE LNR 573 400 KVA UNPLANNED 25‐06‐2018 15:41:27 25‐06‐2018 16:15:55 0:34 0.00009444 MUs539 FAJALPUR‐MANDAWALI, BLOCK H‐MANDAWALI VILLAGE LNR 574 400 KVA UNPLANNED 26‐06‐2018 13:02:37 26‐06‐2018 14:00:00 0:57 0.00031667 MUs
540
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIVVIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, FAZALPUR‐MANDAWALI VILLAGE, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐MANDAWALI VILLAGE, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐VINOD NAGAR EAST LNR 2164 990 KVA UNPLANNED 28‐06‐2018 11:42:00 28‐06‐2018 12:25:00 0:42 0.00011667 MUs
541 BLOCK C‐PANDOW NAGAR, BLOCK D‐PANDAV NAGAR LNR 141 990 KVA UNPLANNED 30‐06‐2018 17:45:38 30‐06‐2018 18:20:12 0:34 0.00014167 MUs542 YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, VISHWAKARMA PARK‐LAKSHMI NAGAR LNR 14 400 KVA UNPLANNED 12‐06‐2018 01:01:32 12‐06‐2018 01:21:13 0:19 0.00002639 MUs
543 BLOCK A‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, GANESH NAGAR‐SHAKARPUR KHAS LNR 1544 990 KVA UNPLANNED 12‐06‐2018 15:30:00 12‐06‐2018 16:00:00 0:29 0.00008056 MUs
544BLOCK M‐JAGAT RAM PARK, BLOCK K‐JAGAT RAM PARK, BLOCK J‐LALITA PARK, BLOCK J‐VISHWAKARMA PARK, BLOCK N‐VISHWAKARMA PARK, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, RAMESH PARK‐LAKSHMI NAGAR LNR 1566 990 KVA UNPLANNED 15‐06‐2018 01:44:45 15‐06‐2018 02:40:05 0:55 0.00022917 MUs
545
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GURU ANGAD NAGAR WEST, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, BLOCK N‐SHIV VIHAR, BLOCK J‐LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK C‐LALITA PARK, GYAN KUNJ‐WEST GURU ANGAD NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, MOHAN PARK‐WEST GURU ANGAD NAGAR, PKT R‐BLOCK D, GEETA COLONY, BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK A‐GURU RAMDAS NAGAR, LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1608 990 KVA UNPLANNED 21‐06‐2018 01:50:08 21‐06‐2018 02:23:14 0:33 0.0000275 MUs
546BLOCK E‐LALITA PARK, BLOCK E‐LAKSHMI NAGAR, BLOCK A‐SWASTHYA VIHAR, BLOCK F‐LALITA PARK, BLOCK B‐SWASTHYA VIHAR, BLOCK A‐PREET VIHAR, BLOCK C‐LALITA PARK, BLOCK E‐PREET VIHAR LNR 1203 990 KVA UNPLANNED 22‐06‐2018 23:37:03 23‐06‐2018 00:50:00 1:12 0.0002 MUs
547 BLOCK WA&O‐SHAKARPUR KHAS, BLOCK WA‐SHAKARPUR KHAS, GANESH NAGAR‐SHAKARPUR KHAS LNR 1032 630 KVA UNPLANNED 23‐06‐2018 18:14:24 23‐06‐2018 18:30:17 0:15 0.0000625 MUs
548BLOCK E‐LALITA PARK, BLOCK F‐LALITA PARK, BLOCK E‐LAKSHMI NAGAR, BLOCK B‐LAKSHMI NAGAR, BLOCK C‐LALITA PARK, BANK ENCLAVE‐LAKSHMI NAGAR LNR 1203 990 KVA UNPLANNED 25‐06‐2018 10:00:21 25‐06‐2018 10:42:00 0:41 0.00011389 MUs
549SHAKARPUR EXTN.‐SHAKARPUR KHAS, BLOCK S1‐SCHOOL BLOCK, GANESH NAGAR‐SHAKARPUR KHAS, DELHI DEVELOPMENT AUTHORITY‐SCHOOL BLOCK LNR 875 990 KVA UNPLANNED 26‐06‐2018 12:33:46 26‐06‐2018 13:32:00 0:58 0.00016111 MUs
550
BLOCK D‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, GANESH NAGAR‐SHAKARPUR KHAS, BLOCK J‐VISHWAKARMA PARK, SHAKARPUR EXTN.‐SHAKARPUR KHAS, EAST END ENCLAVE‐LAKSHMI NAGAR, BLOCK R&A‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK A‐GANESH NAGAR, BLOCK C‐LALITA PARK LNR 1544 990 KVA UNPLANNED 28‐06‐2018 06:38:36 28‐06‐2018 08:31:00 1:52 0.00031111 MUs
551GYAN KUNJ‐WEST GURU ANGAD NAGAR, BLOCK A‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, GANESHNAGAR‐SHAKARPUR KHAS LNR 1544 990 KVA UNPLANNED 30‐06‐2018 16:08:42 30‐06‐2018 16:54:00 0:45 0.000125 MUs
552GYAN KUNJ‐WEST GURU ANGAD NAGAR, MOHAN PARK‐WEST GURU ANGAD NAGAR, BLOCK F‐GURU ANGAD NAGAR WEST LNR 853 990 KVA UNPLANNED 30‐06‐2018 17:29:07 30‐06‐2018 17:44:45 0:15 0.0000625 MUs
553 BHARTI COLONY‐NIRMAN VIHAR LNR 110 990 KVA UNPLANNED 15‐06‐2018 10:50:00 15‐06‐2018 11:22:14 0:32 0.00008889 MUs
554 BLOCK B‐SWASTHYA VIHAR, DEFENCE ENCLAVE‐SWASTHYA VIHAR, BLOCK E‐PREET VIHAR, BLOCK A‐SWASTHYA VIHAR LNR 27 630 KVA UNPLANNED 22‐06‐2018 23:38:59 23‐06‐2018 01:00:00 1:21 0.000225 MUs555 BLOCK F‐PREET VIHAR, BLOCK G‐PREET VIHAR LNR 88 990 KVA UNPLANNED 25‐06‐2018 15:58:09 25‐06‐2018 17:06:00 1:7 0.00018611 MUs
556 PARK END‐GAGAN VIHAR, NEW RAJDHANI ENCLAVE‐GAGAN VIHAR, NEW RAJDHANI ENCLAVE BLOCK C‐GAGAN VIHAR LNR 90 630 KVA UNPLANNED 26‐06‐2018 12:45:00 26‐06‐2018 13:43:00 0:58 0.00016111 MUs557 BLOCK G‐PREET VIHAR LNR 93 990 KVA UNPLANNED 26‐06‐2018 14:03:49 26‐06‐2018 15:25:00 1:21 0.000225 MUs558 BLOCK G‐PREET VIHAR LNR 93 990 KVA UNPLANNED 26‐06‐2018 16:19:27 26‐06‐2018 17:15:00 0:55 0.00015278 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage559 BLOCK G‐PREET VIHAR, BLOCK E‐PREET VIHAR LNR 122 630 KVA UNPLANNED 29‐06‐2018 14:46:30 29‐06‐2018 15:43:30 0:56 0.00023333 MUs560 PARK END‐GAGAN VIHAR LNR 49 630 KVA UNPLANNED 29‐06‐2018 17:19:06 29‐06‐2018 17:46:23 0:27 0.0000225 MUs
561 PARK END‐GAGAN VIHAR, NEW RAJDHANI ENCLAVE‐GAGAN VIHAR, NEW RAJDHANI ENCLAVE BLOCK C‐GAGAN VIHAR LNR 127 630 KVA UNPLANNED 30‐06‐2018 12:52:47 30‐06‐2018 14:46:00 1:53 0.00031389 MUs
562
GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK B‐VIVEK VIHAR, BLOCK B‐MOTHER DAIRY, ISBT‐ISBT ANAND VIHAR, PKT B‐CHITRAKOOT, SHAHDARA JLM LNR 68 1630 KVA UNPLANNED 10‐06‐2018 20:37:00 10‐06‐2018 20:51:00 0:14 0 MUs
563 MANDAWALI FAZALPUR BLOCK B‐JOSHI COLONY, MANDAWALI FAZALPUR BLOCK A‐JOSHI COLONY LNR 252 630 KVA UNPLANNED 15‐06‐2018 22:49:03 15‐06‐2018 23:13:14 0:24 0.00002 MUs564 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 47 990 KVA UNPLANNED 26‐06‐2018 15:06:00 26‐06‐2018 15:55:55 0:49 0.00013611 MUs565 BLOCK B‐NEW ASHOK NAGAR VSE MVR 2 400 KVA UNPLANNED 12‐06‐2018 01:33:50 12‐06‐2018 03:29:12 1:55 0.00031944 MUs566 PRATAP NAGAR‐PHASE I MVR 1086 630 KVA UNPLANNED 12‐06‐2018 00:39:57 12‐06‐2018 01:23:28 0:43 0.00009556 MUs567 PKT 1‐ DDA FLATS‐PHASE I MVR 128 630 KVA UNPLANNED 14‐06‐2018 03:17:45 14‐06‐2018 04:09:47 0:52 0.00014444 MUs568 PANDAV NAGAR MVR‐SHAKARPUR MVR, SAMASPUR‐PANDAV NAGAR, BLOCK F‐PANDAV NAGAR MVR 1073 630 KVA UNPLANNED 15‐06‐2018 11:32:41 15‐06‐2018 12:06:00 0:33 0.00006417 MUs569 CL‐CHILLA SARDA BANGAR VILLAGE, HIMMAT PURI‐CHILLA VILLAGE MVR 220 990 KVA UNPLANNED 22‐06‐2018 02:35:57 22‐06‐2018 04:20:00 1:44 0.00017333 MUs570 BLOCK E‐PANDAV NAGAR, PATPAR GANJ‐SHASHI GARDEN, SHASHI GARDEN‐MAYUR VIHAR MVR 197 630 KVA UNPLANNED 23‐06‐2018 11:43:30 23‐06‐2018 15:11:09 3:27 0.00046 MUs
571SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, BLOCK B‐GAZIPUR DAIRY FARM, BLOCK E‐GAZIPUR DAIRY FARM, KALYAN VAS‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR MVR 352 630 KVA UNPLANNED 12‐06‐2018 08:34:03 12‐06‐2018 12:42:41 4:8 0.00006889 MUs
572 BLOCK G‐VINOD NAGAR EAST, BLOCK F‐VINOD NAGAR EAST, BLOCK E‐VINOD NAGAR EAST MVR 1743 630 KVA UNPLANNED 19‐06‐2018 00:22:27 19‐06‐2018 00:54:45 0:32 0.00007111 MUs
573
BLOCK 20‐KALYAN PURI, BLOCK 17‐KALYAN PURI, BLOCK 14‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR, BLOCK 18‐KALYAN PURI, BLOCK 21‐KALYAN PURI, BLOCK F‐CHANDAR NAGAR, BLOCK 12‐KALYAN PURI, PATPAR GANJ‐SHASHI GARDEN, BLOCK 16‐KALYAN PURI MVR 298 630 KVA UNPLANNED 21‐06‐2018 01:26:11 21‐06‐2018 02:53:50 1:27 0.00016917 MUs
574
MAYUR VIHAR EXTN., BLOCK G‐VINOD NAGAR EAST, BLOCK F‐PANDAV NAGAR, BLOCK E‐VINOD NAGAR EAST, BLOCK C‐VINOD NAGAR EAST, BLOCK B‐VINOD NAGAR EAST, MAYUR VIHAR PHASE II, BLOCK F‐VINOD NAGAR EAST, PHASE I‐MAYUR VIHAR, BLOCK A‐VINOD NAGAR EAST, KHICHRIPUR RESETTLEMENT COLONY‐KHICHARIPUR MVR 341 630 KVA UNPLANNED 22‐06‐2018 23:08:42 23‐06‐2018 00:16:44 1:8 0 MUs
575
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, MAYUR VIHAR PHASE II, GEETA COLONY, PKT F‐MAYUR VIHAR PHASE II, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT A‐MAYUR VIHAR PHASE II, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B MVR 829 630 KVA UNPLANNED 23‐06‐2018 00:31:11 23‐06‐2018 01:26:07 0:54 0.000075 MUs
576
BLOCK 20‐KALYAN PURI, BLOCK 19‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR, BLOCK 18‐KALYAN PURI, BLOCK 21‐KALYAN PURI, AMBEDKAR AWAS KALYAN SAMITI‐GHAROLI KONDLI, AMBEDKAR CAMP‐KALYAN PURI, BLOCK 12‐KALYAN PURI, BLOCK 1‐KALYAN PURI, PATPAR GANJ‐SHASHI GARDEN MVR 325 400 KVA UNPLANNED 23‐06‐2018 01:13:59 23‐06‐2018 03:06:44 1:52 0.00015556 MUs
577
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK 10‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, KHICHARIPUR‐GAZIPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B MVR 862 400 KVA UNPLANNED 26‐06‐2018 01:25:21 26‐06‐2018 01:45:00 0:19 0.00001056 MUs
578
BLOCK 20‐KALYAN PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 14‐KALYAN PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, KHICHARIPUR‐GAZIPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐VINOD NAGAR EAST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 21‐KALYAN PURI, KALYAN VAS‐KALYAN PURI, BLOCK 18‐KALYAN PURI, BLOCK 16‐KALYAN PURI, BLOCK 17‐KALYAN PURI, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK C‐VINOD NAGAR EAST, AMBEDKAR CAMP‐KALYAN PURI, PKT R‐BLOCK D, GEETA COLONY, BLOCK 12‐KALYAN PURI, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, KALYAN PURI‐MAYUR VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B MVR 5415 3870 KVA UNPLANNED 27‐06‐2018 13:47:00 27‐06‐2018 14:11:00 0:24 0.00089333 MUs
579BLOCK 4‐TRILOKPURI PHASE I, BLOCK 5‐TRILOKPURI PHASE I, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 3‐TRILOKPURI PHASE I MVR 521 990 KVA UNPLANNED 13‐06‐2018 00:43:05 13‐06‐2018 02:23:33 1:40 0 MUs
580BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR, BLOCK 22‐HIMMATPURI, BLOCK 21‐HIMMATPURI MVR 802 990 KVA UNPLANNED 15‐06‐2018 01:50:03 15‐06‐2018 02:45:00 0:54 0.00015 MUs
581BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, BLOCK 21‐HIMMATPURI, BLOCK 16‐HIMMATPURI MVR 1294 990 KVA UNPLANNED 15‐06‐2018 18:55:35 15‐06‐2018 22:22:48 3:27 0.000115 MUs
582BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR, BLOCK 22‐HIMMATPURI, BLOCK 21‐HIMMATPURI MVR 802 990 KVA UNPLANNED 15‐06‐2018 22:54:46 15‐06‐2018 23:18:21 0:23 0.00006389 MUs
583BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, BLOCK 21‐HIMMATPURI, BLOCK 16‐HIMMATPURI MVR 1288 990 KVA UNPLANNED 21‐06‐2018 10:11:04 21‐06‐2018 10:54:24 0:43 0.00005972 MUs
584
BLOCK 14‐TRILOKPURI PHASE II, BLOCK 29‐HIMMATPURI, BLOCK 28‐HIMMATPURI, BLOCK 10‐TRILOKPURI PHASE I, BLOCK 4‐TRILOKPURI PHASE I, BLOCK 20‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR, BLOCK 12‐TRILOKPURI PHASE I, BLOCK 19‐HIMMATPURI, BLOCK 1‐TRILOKPURI PHASE I MVR 485 990 KVA UNPLANNED 22‐06‐2018 02:00:54 22‐06‐2018 02:17:31 0:16 0 MUs
585
BLOCK 33‐HIMMATPURI, MAYUR VIHAR EXTN., BLOCK 24‐TRILOKPURI PHASE II, BLOCK 36‐HIMMATPURI, BLOCK 10‐TRILOKPURI PHASE I, MAYUR VIHAR PHASE II, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 29‐HIMMATPURI, BLOCK 25‐TRILOKPURI PHASE II, BLOCK 28‐HIMMATPURI, BLOCK 23‐TRILOKPURI PHASE II, BLOCK 34‐HIMMATPURI, BLOCK 35‐HIMMATPURI, BLOCK 27‐HIMMATPURI, BLOCK 21‐HIMMATPURI MVR 371 990 KVA UNPLANNED 22‐06‐2018 22:57:58 23‐06‐2018 00:17:10 1:19 0.00010972 MUs
586BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 18‐HIMMATPURI MVR 1154 990 KVA UNPLANNED 23‐06‐2018 02:15:49 23‐06‐2018 02:35:23 0:19 0.00002639 MUs
587BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 21‐HIMMATPURI, BLOCK 16‐HIMMATPURI MVR 1288 990 KVA UNPLANNED 23‐06‐2018 11:37:16 23‐06‐2018 12:17:55 0:40 0.00008889 MUs
588 HIMMATPURI‐MAYUR VIHAR, BLOCK 20‐HIMMATPURI MVR 420 990 KVA UNPLANNED 26‐06‐2018 23:36:55 26‐06‐2018 23:59:21 0:22 0.00001222 MUs
589BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 18‐HIMMATPURI MVR 1158 990 KVA UNPLANNED 27‐06‐2018 11:07:50 27‐06‐2018 11:51:00 0:43 0.00011944 MUs
590
BLOCK 11‐TRILOKPURI PHASE I, BLOCK 8‐TRILOKPURI PHASE I, BLOCK 7‐TRILOKPURI PHASE I, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 10‐TRILOKPURI PHASE I, BLOCK 2‐TRILOKPURI PHASE I, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 13‐TRILOKPURI PHASE II MVR 169 990 KVA UNPLANNED 28‐06‐2018 00:34:57 28‐06‐2018 03:17:29 2:42 0.000045 MUs
591 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 09‐06‐2018 17:31:09 09‐06‐2018 18:30:00 0:58 0 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
592
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐MANDOLI EXTN., BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXTPUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐MANDOLI EXTN., HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1493 3010 KVA UNPLANNED 09‐06‐2018 17:45:03 09‐06‐2018 19:39:56 1:54 0 MUs
593 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 09‐06‐2018 22:52:10 09‐06‐2018 23:02:22 0:10 0 MUs
594BLOCK B1‐NAND NAGARI, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI NNG 831 990 KVA UNPLANNED 12‐06‐2018 00:39:14 12‐06‐2018 01:31:41 0:52 0.00014444 MUs
595
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK C‐LALITA PARK, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 9458 2610 KVA UNPLANNED 12‐06‐2018 22:00:00 12‐06‐2018 22:50:00 0:49 0.00204167 MUs
596 DELHI JAL BOARD MIG FLATS‐POCKET A NNG 355 400 KVA UNPLANNED 19‐06‐2018 11:25:37 19‐06‐2018 11:53:34 0:27 0.000075 MUs
597
BLOCK B1‐NAND NAGARI, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK O‐SUNDER NAGRI, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI NNG 829 990 KVA UNPLANNED 20‐06‐2018 17:29:18 20‐06‐2018 18:06:00 0:36 0.0001 MUs
598SABOLI EXTN.‐MANDOLI, MCD SCHOOL‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 21‐06‐2018 07:47:52 21‐06‐2018 08:05:03 0:17 0.0002125 MUs
599 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 22‐06‐2018 15:23:34 22‐06‐2018 15:38:55 0:15 0.000125 MUs600 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 22‐06‐2018 16:54:05 22‐06‐2018 17:23:20 0:29 0.0003625 MUs
601 SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 23‐06‐2018 09:45:38 23‐06‐2018 10:18:46 0:33 0.00045833 MUs602 BLOCK A‐MANDOLI VILLAGE NNG 113 990 KVA UNPLANNED 23‐06‐2018 13:50:53 23‐06‐2018 14:45:00 0:54 0.000225 MUs
603SABOLI EXTN.‐MANDOLI, MCD SCHOOL‐SABOLI COLONY, BLOCK K‐ANUP VIHAR, SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 24‐06‐2018 13:23:34 24‐06‐2018 14:14:44 0:51 0.00028333 MUs
604BLOCK A‐SEWA DHAM, BLOCK C‐HARSH VIHAR, BLOCK C‐SEWA DHAM, BLOCK B‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐HARSH VIHAR, SABOLI COLONY‐MANDOLI NNG 1696 0 KVA UNPLANNED 24‐06‐2018 13:52:41 24‐06‐2018 14:38:29 0:45 0.0005625 MUs
605 RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, POCKET B‐GURU TEG BAHADUR ENCLAVE NNG 694 990 KVA UNPLANNED 26‐06‐2018 01:14:54 26‐06‐2018 02:06:00 0:51 0.00014167 MUs
606
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐MANDOLI EXTN., BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐MANDOLI EXTN., HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1529 3010 KVA UNPLANNED 27‐06‐2018 06:41:36 27‐06‐2018 08:28:33 1:46 0.00294444 MUs
607 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 27‐06‐2018 07:10:38 27‐06‐2018 08:08:00 0:57 0.00158333 MUs
608
BLOCK D‐HARSH VIHAR, SABOLI EXTN.‐MANDOLI, BLOCK A‐BANK COLONY, BLOCK A‐MANDOLI EXTN., BLOCK K‐ANUP VIHAR, BLOCK E‐SEWA DHAM, SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, BLOCK E‐MEET NAGAR, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 27‐06‐2018 09:41:30 27‐06‐2018 10:36:17 0:54 0.0003 MUs
609
BLOCK D‐HARSH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐SEWA DHAM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GTB MIG FLATS‐POCKET F, BHAGAT NAGAR‐DAYALPUR, BLOCK A‐MANDOLI EXTN., BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BHARAT MATA MANDIRJJ COLONY, BLOCK A‐HARSH VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐MANDOLI EXTN., BLOCK C‐HARSH VIHAR, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1529 3010 KVA UNPLANNED 27‐06‐2018 10:19:15 27‐06‐2018 11:11:11 0:51 0.00028333 MUs
610
BLOCK H‐SEWA DHAM, BLOCK D‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, BLOCK A‐BANK COLONY, BLOCK C‐AMAR COLONY, BLOCK B‐HARSH VIHAR, BLOCK A‐SEWA DHAM, BLOCK E‐RAJIV NAGAR, BLOCK A‐SEWA DHAM, BLOCK C‐HARSH VIHAR, HARSH VIHAR SUB STATION‐POLICE FARM NNG 1266 0 KVA UNPLANNED 27‐06‐2018 10:26:06 27‐06‐2018 11:19:16 0:53 0.00029444 MUs
611ANUP VIHAR‐MANDOLI, BLOCK B‐ANUP VIHAR, BLOCK A‐ANUP VIHAR, BLOCK C‐ANUP VIHAR, BLOCK K‐ANUP VIHAR, BLOCK D‐ANUP VIHAR, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI NNG 3231 0 KVA UNPLANNED 27‐06‐2018 16:42:13 27‐06‐2018 17:35:27 0:53 0.00029444 MUs
612SABOLI EXTN.‐MANDOLI, MCD SCHOOL‐SABOLI COLONY, BLOCK A‐MANDOLI EXTN., SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 28‐06‐2018 01:12:11 28‐06‐2018 01:44:50 0:32 0.0004 MUs
613SABOLI EXTN.‐MANDOLI, SABOLI EXTN.‐MANDOLI, SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, BLOCK A‐MANDOLI VILLAGE, SABOLI VILLAGE‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 28‐06‐2018 09:12:39 28‐06‐2018 09:43:16 0:30 0.00016667 MUs
614 GTB MIG FLATS‐POCKET F NNG 240 630 KVA UNPLANNED 28‐06‐2018 13:06:47 28‐06‐2018 14:00:00 0:53 0.00022083 MUs
615
MCD SCHOOL‐CHITRAKOOT, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK B‐MOTHER DAIRY, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK E‐JYOTI NAGAR EAST, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, INDIRA GANDHI STADIUM‐AJMERI GATE, PKT A‐CHITRAKOOT, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK B‐VIVEK VIHAR, HARSH VIHAR SUB STATION‐POLICE FARM, ISBT‐ISBT ANAND VIHAR, PKT B‐CHITRAKOOT NNG 2433 3890 KVA UNPLANNED 08‐06‐2018 11:35:32 08‐06‐2018 12:25:16 0:49 0 MUs
616BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3958 400 KVA UNPLANNED 09‐06‐2018 17:33:08 09‐06‐2018 18:30:00 0:56 0 MUs
617BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 1571 4540 KVA UNPLANNED 09‐06‐2018 17:35:08 09‐06‐2018 18:35:00 0:59 0 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
618
BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3431 2250 KVA UNPLANNED 09‐06‐2018 17:36:03 09‐06‐2018 18:34:00 0:57 0 MUs
619BLOCK D‐MEET NAGAR, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK A‐AMAR COLONY NNG 1139 630 KVA UNPLANNED 12‐06‐2018 07:51:39 12‐06‐2018 08:48:00 0:56 0.00015556 MUs
620BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 1571 4540 KVA UNPLANNED 12‐06‐2018 12:50:00 12‐06‐2018 14:46:09 1:56 0.00161111 MUs
621BLOCK D‐MEET NAGAR, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK A‐AMAR COLONY NNG 1139 630 KVA UNPLANNED 13‐06‐2018 22:37:53 13‐06‐2018 23:31:01 0:53 0.00014722 MUs
622 BLOCK A‐MEET NAGAR, BLOCK A‐AMAR COLONY NNG 379 630 KVA UNPLANNED 14‐06‐2018 11:08:03 14‐06‐2018 12:06:00 0:57 0.00031667 MUs623 BLOCK A‐MEET NAGAR, BLOCK A‐AMAR COLONY NNG 379 630 KVA UNPLANNED 14‐06‐2018 13:39:33 14‐06‐2018 14:36:00 0:56 0.00023333 MUs
624
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, BLOCK D‐ASHOK NAGAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 3086 990 KVA UNPLANNED 15‐06‐2018 12:23:14 15‐06‐2018 13:05:00 0:41 0.00022778 MUs
625BLOCK A‐NATHU PURA, BLOCK B‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK C‐DURGA PURI, BLOCK E‐NATHU PURA NNG 1191 990 KVA UNPLANNED 17‐06‐2018 23:20:40 18‐06‐2018 00:11:23 0:50 0.00013889 MUs
626BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3959 400 KVA UNPLANNED 19‐06‐2018 11:55:02 19‐06‐2018 12:50:00 0:54 0.00075 MUs
627
BLOCK D‐MEET NAGAR, BLOCK A‐KABIR NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, G.B.SSS SCHOOL‐GOKUL PURI NNG 1572 4540 KVA UNPLANNED 19‐06‐2018 13:28:30 19‐06‐2018 14:25:46 0:57 0.00079167 MUs
628SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK E‐MEET NAGAR NNG 90 400 KVA UNPLANNED 20‐06‐2018 10:54:41 20‐06‐2018 11:46:00 0:51 0.000425 MUs
629
BLOCK C1‐NEW ASHOK NAGAR, BLOCK A‐NATHU PURA, BLOCK E‐NEW ASHOK NAGAR, BLOCK B‐ASHOK NAGAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK E‐JYOTI NAGAR EAST, BLOCK E‐NATHU PURA NNG 360 630 KVA UNPLANNED 21‐06‐2018 00:26:23 21‐06‐2018 01:24:00 0:57 0.00015833 MUs
630 BLOCK A‐EAST GOKUL PURI, BLOCK B‐EAST GOKUL PURI NNG 292 630 KVA UNPLANNED 22‐06‐2018 15:58:54 22‐06‐2018 16:36:26 0:37 0.00020556 MUs631 BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 729 990 KVA UNPLANNED 22‐06‐2018 16:04:43 22‐06‐2018 16:58:26 0:53 0.00011778 MUs
632
BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐UTTARANCHAL COLONY, BLOCK E‐UTTARANCHAL COLONY, BLOCK E1‐NAND NAGARI, BLOCK C‐MEET NAGAR, BLOCK A‐UTTARANCHAL COLONY, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR NNG 3430 2250 KVA UNPLANNED 22‐06‐2018 23:23:28 23‐06‐2018 00:20:00 0:56 0.00077778 MUs
633BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, PKT A‐CHITRAKOOT, BLOCK A‐AMAR COLONY, BLOCK D‐ASHOK NAGAR, BLOCK A‐MEET NAGAR NNG 1140 630 KVA UNPLANNED 23‐06‐2018 01:40:00 23‐06‐2018 02:30:00 0:49 0.00013611 MUs
634 BLOCK A‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 92 630 KVA UNPLANNED 23‐06‐2018 10:56:22 23‐06‐2018 11:37:26 0:41 0.00022778 MUs
635
BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 776 630 KVA UNPLANNED 23‐06‐2018 23:16:13 23‐06‐2018 23:55:39 0:39 0.00010833 MUs
636SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK E‐MEET NAGAR NNG 90 400 KVA UNPLANNED 24‐06‐2018 10:46:02 24‐06‐2018 11:34:40 0:48 0.0004 MUs
637BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI NNG 116 990 KVA UNPLANNED 24‐06‐2018 14:23:03 24‐06‐2018 15:06:32 0:43 0.00017917 MUs
638BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI NNG 116 990 KVA UNPLANNED 25‐06‐2018 10:05:40 25‐06‐2018 10:20:10 0:14 0.00019444 MUs
639
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐ASHOK NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1020 630 KVA UNPLANNED 25‐06‐2018 10:26:32 25‐06‐2018 11:20:07 0:53 0.00029444 MUs
640
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, BLOCK E‐ASHOK NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK C‐LALITA PARK, BLOCK C‐DURGA PURI, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, BHAJANPURA‐DAYALPUR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 9230 4590 KVA UNPLANNED 26‐06‐2018 00:03:19 26‐06‐2018 00:45:30 0:42 0.000525 MUs
641
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐NATHU COLONY, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1775 990 KVA UNPLANNED 26‐06‐2018 01:18:39 26‐06‐2018 01:49:19 0:30 0.00016667 MUs
642
BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3431 2250 KVA UNPLANNED 26‐06‐2018 11:40:00 26‐06‐2018 12:35:00 0:54 0.00075 MUs
643 BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 729 990 KVA UNPLANNED 26‐06‐2018 13:20:00 26‐06‐2018 14:17:55 0:57 0.00015833 MUs
644
BLOCK M‐DURGA PURI, BLOCK A‐KABIR NAGAR, BLOCK F‐DURGA PURI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK M‐DURGA PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, MANSAROVAR PARK‐DURGA PURI, BLOCK C‐DURGA PURI, BLOCK E‐JYOTI NAGAR EAST, BLOCK A‐MEET NAGAR NNG 1179 990 KVA UNPLANNED 26‐06‐2018 14:18:19 26‐06‐2018 15:15:00 0:56 0.00015556 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
645BLOCK D‐MEET NAGAR, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK F‐DURGA PURI, BLOCK A‐AMAR COLONY, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK A‐MEET NAGAR NNG 1139 630 KVA UNPLANNED 26‐06‐2018 14:20:03 26‐06‐2018 15:18:00 0:57 0.00015833 MUs
646BLOCK D‐MEET NAGAR, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, SABOLI EXTN.‐MANDOLI, BLOCK A‐AMAR COLONY, BLOCK D‐ASHOK NAGAR, BLOCK A‐MEET NAGAR NNG 1139 630 KVA UNPLANNED 26‐06‐2018 18:03:53 26‐06‐2018 20:02:00 1:58 0.00032778 MUs
647
BLOCK A‐NATHU COLONY, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK 63‐AJMAL KHAN PARK, BLOCK C‐LALITA PARK, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR NNG 2309 990 KVA UNPLANNED 27‐06‐2018 09:39:03 27‐06‐2018 10:34:12 0:55 0.00022917 MUs
648
BLOCK H‐SEWA DHAM, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, SEWA DHAM‐MANDOLI, SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, RAJEEV NAGAR‐SEWA DHAM, G.B.SSS SCHOOL‐GOKUL PURI NNG 90 400 KVA UNPLANNED 27‐06‐2018 11:20:26 27‐06‐2018 12:06:00 0:45 0.00025 MUs
649BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 1571 4540 KVA UNPLANNED 28‐06‐2018 03:41:54 28‐06‐2018 04:14:21 0:32 0.00026667 MUs
650
BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3431 2250 KVA UNPLANNED 28‐06‐2018 04:20:46 28‐06‐2018 05:16:00 0:55 0.0006875 MUs
651BLOCK L‐SUNDER NAGRI, BLOCK A‐EAST GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK E‐UTTARANCHAL COLONY, G.B.SSS SCHOOL‐GOKUL PURI NNG 49 630 KVA UNPLANNED 28‐06‐2018 13:08:36 28‐06‐2018 14:06:00 0:57 0.0002375 MUs
652 DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT NNG 192 630 KVA UNPLANNED 28‐06‐2018 14:37:51 28‐06‐2018 15:00:56 0:23 0.00009583 MUs653 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI NNG 292 630 KVA UNPLANNED 28‐06‐2018 15:08:23 28‐06‐2018 16:51:33 1:43 0.00057222 MUs654 PKT B‐CHITRAKOOT, PKT A‐CHITRAKOOT NNG 246 630 KVA UNPLANNED 28‐06‐2018 22:42:53 29‐06‐2018 00:10:00 1:27 0.00024167 MUs
655BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR NNG 116 990 KVA UNPLANNED 29‐06‐2018 09:52:00 29‐06‐2018 10:16:41 0:24 0.00033333 MUs
656
BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK D‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, POCKET A‐JJ COLONY, SABOLI VILLAGE‐MANDOLI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR NNG 116 990 KVA UNPLANNED 29‐06‐2018 13:18:55 29‐06‐2018 13:56:54 0:37 0.00020556 MUs
657 PKT B‐CHITRAKOOT NNG 90 630 KVA UNPLANNED 29‐06‐2018 14:00:58 29‐06‐2018 14:46:00 0:45 0.00025 MUs
658BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI NNG 116 990 KVA UNPLANNED 30‐06‐2018 12:33:28 30‐06‐2018 13:28:42 0:55 0.00030556 MUs
659 BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4716 5260 KVA UNPLANNED 04‐06‐2018 23:48:26 05‐06‐2018 00:41:18 0:52 0 MUs
660 BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4716 5260 KVA UNPLANNED 05‐06‐2018 01:37:56 05‐06‐2018 01:58:56 0:20 0 MUs661 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 616 990 KVA UNPLANNED 14‐06‐2018 09:08:43 14‐06‐2018 10:06:00 0:57 0.00015833 MUs
662BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT NNG 5349 4060 KVA UNPLANNED 19‐06‐2018 11:30:00 19‐06‐2018 15:45:00 4:15 0 MUs
663 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR NNG 1146 990 KVA UNPLANNED 20‐06‐2018 17:06:28 20‐06‐2018 18:01:21 0:54 0.0003 MUs664 BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR NNG 788 630 KVA UNPLANNED 21‐06‐2018 01:15:19 21‐06‐2018 01:34:52 0:19 0.00005278 MUs665 BLOCK B‐DURGA PURI, BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR NNG 830 990 KVA UNPLANNED 21‐06‐2018 15:05:41 21‐06‐2018 16:00:00 0:54 0.00015 MUs
666
OLD SEELAMPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR,RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGE NNG 2513 990 KVA UNPLANNED 22‐06‐2018 12:41:08 22‐06‐2018 13:39:35 0:58 0.00016111 MUs
667
OLD SEELAMPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR,BLOCK A‐MEET NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGE NNG 2513 990 KVA UNPLANNED 22‐06‐2018 17:12:45 22‐06‐2018 18:10:00 0:57 0.00079167 MUs
668
BHAGAT NAGAR‐DAYALPUR, BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIVVIHAR, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, CHHAJJUPUR‐BABAR PUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1161 630 KVA UNPLANNED 22‐06‐2018 20:10:40 22‐06‐2018 20:51:30 0:40 0.00011111 MUs
669
BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK 1‐BALBIR NAGAR, BABARPUR WEST‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, CHHAJJUPUR‐BABAR PUR, BLOCK C‐KABIR NAGAR NNG 984 400 KVA UNPLANNED 22‐06‐2018 23:25:08 23‐06‐2018 00:35:36 1:10 0.00019444 MUs
670
BLOCK H‐JYOTI NAGAR, BLOCK B‐KABIR NAGAR, BLOCK B‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR, BLOCK J‐JYOTI NAGAR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR EXTN.‐BABAR PUR, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR NNG 352 990 KVA UNPLANNED 23‐06‐2018 01:22:38 23‐06‐2018 02:20:00 0:57 0.00015833 MUs
671
OLD SEELAMPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGE NNG 2513 990 KVA UNPLANNED 23‐06‐2018 12:42:57 23‐06‐2018 13:34:56 0:51 0.00014167 MUs
672BLOCK H‐JYOTI NAGAR, PKT S‐BLOCK C, PKT A‐BLOCK A, BLOCK B‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR, BLOCK J‐JYOTI NAGAR, BLOCK D‐JYOTI NAGAR, PKT H‐BLOCK D, PKT C‐BLOCK B NNG 780 990 KVA UNPLANNED 24‐06‐2018 23:01:23 24‐06‐2018 23:55:05 0:53 0.00014722 MUs
673
OLD SEELAMPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGE NNG 2513 990 KVA UNPLANNED 25‐06‐2018 13:27:44 25‐06‐2018 14:09:16 0:41 0.00022778 MUs
674 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR NNG 1148 990 KVA UNPLANNED 26‐06‐2018 14:44:07 26‐06‐2018 15:33:09 0:49 0.00013611 MUs
675
BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1188 990 KVA UNPLANNED 27‐06‐2018 15:13:41 27‐06‐2018 16:11:00 0:57 0.0002375 MUs
676
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIVVIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1188 990 KVA UNPLANNED 28‐06‐2018 17:07:03 28‐06‐2018 18:06:00 0:58 0.00024167 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
677
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, CHHAJJUPUR‐BABAR PUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1161 630 KVA UNPLANNED 28‐06‐2018 21:30:00 28‐06‐2018 22:25:00 0:54 0.00015 MUs
678 BLOCK B‐DURGA PURI, BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR NNG 830 990 KVA UNPLANNED 29‐06‐2018 09:54:33 29‐06‐2018 10:32:26 0:37 0.00020556 MUs679 BLOCK A‐JAGATPURI EXTN., BLOCK D‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI NNG 930 630 KVA UNPLANNED 30‐06‐2018 10:36:54 30‐06‐2018 11:26:00 0:49 0.00013611 MUs680 HATHI KHANA‐NAWAB GANJ, FYAZ GANJ‐NAWAB GANJ PHG 122 990 KVA UNPLANNED 12‐06‐2018 09:16:09 12‐06‐2018 10:08:18 0:52 0.00007222 MUs681 SADAR BAZAR B G ROAD PHG 117 400 KVA UNPLANNED 15‐06‐2018 10:53:05 15‐06‐2018 11:28:56 0:35 0.00009722 MUs682 PHARI DHIRAJ‐SADAR BAZAR, SADAR BAZAR B G ROAD PHG 169 990 KVA UNPLANNED 17‐06‐2018 10:38:34 17‐06‐2018 11:11:05 0:32 0.00008889 MUs
683SADAR BAZAR B G ROAD, CHOWK NAI BASTI‐SADAR BAZAR, PHARI DHIRAJ‐SADAR BAZAR, FYAZ GANJ‐NAWAB GANJ, DDA POLICE QTRS.‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR ‐ RAM NAGAR, TELI WARA‐NAWAB GANJ PHG 1120 990 KVA UNPLANNED 21‐06‐2018 13:11:56 21‐06‐2018 13:35:17 0:23 0.00006389 MUs
684
CHOWK NAI BASTI‐SADAR BAZAR, KABRISTAN‐SADAR BAZAR B G ROAD, MODEL BASTI‐SADAR BAZAR B G ROAD, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, BLOCK T‐AHATA KEDARA, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD, SADAR BAZAR B G ROAD, NAWAB GANJ‐SADAR BAZAR PHG 540 990 KVA UNPLANNED 22‐06‐2018 12:32:02 22‐06‐2018 13:09:59 0:37 0.00005139 MUs
685 NAWAB GANJ‐SADAR BAZAR PHG 288 990 KVA UNPLANNED 22‐06‐2018 12:36:08 22‐06‐2018 12:44:39 0:8 0.00001111 MUs
686 CHOWK NAI BASTI‐SADAR BAZAR, SADAR BAZAR ‐ RAM NAGAR, PHARI DHIRAJ‐SADAR BAZAR, SADAR BAZAR B G ROAD PHG 930 990 KVA UNPLANNED 23‐06‐2018 14:12:26 23‐06‐2018 14:47:51 0:35 0.00009722 MUs
687
CHOWK NAI BASTI‐SADAR BAZAR, KABRISTAN‐SADAR BAZAR B G ROAD, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR BG ROAD, MODEL BASTI‐SADAR BAZAR B G ROAD, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS, AMRIT KAUR MARKET‐PAHAR GANJ PHG 840 990 KVA UNPLANNED 24‐06‐2018 18:06:00 24‐06‐2018 18:56:00 0:49 0.00013611 MUs
688 PHARI DHIRAJ‐SADAR BAZAR, TELI WARA‐NAWAB GANJ PHG 29 400 KVA UNPLANNED 26‐06‐2018 08:43:09 26‐06‐2018 09:31:54 0:48 0.00016 MUs
689CHOWK NAI BASTI‐SADAR BAZAR, KABRISTAN‐SADAR BAZAR B G ROAD, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR BG ROAD, MODEL BASTI‐SADAR BAZAR B G ROAD, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS PHG 840 990 KVA UNPLANNED 26‐06‐2018 14:08:16 26‐06‐2018 14:16:36 0:8 0.00001111 MUs
690 SADAR BAZAR B G ROAD PHG 117 400 KVA UNPLANNED 27‐06‐2018 13:45:31 27‐06‐2018 13:54:45 0:9 0.000025 MUs
691SADAR BAZAR B G ROAD, ARAM NAGAR‐SADAR BAZAR, BLOCK A‐ARAM BAGH, SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR ‐ RAM NAGAR, NAWAB GANJ‐SADAR BAZAR, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR PHG 77 630 KVA UNPLANNED 29‐06‐2018 02:12:09 29‐06‐2018 02:16:00 0:3 0.00000833 MUs
692 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ PHG 65 990 KVA UNPLANNED 12‐06‐2018 11:09:33 12‐06‐2018 12:46:53 1:37 0.00013472 MUs693 MULTANI DHANDA‐SADAR BAZAR PHG 89 630 KVA UNPLANNED 12‐06‐2018 16:13:05 12‐06‐2018 17:02:47 0:49 0.00013611 MUs694 MANTOLA MOHALLA‐PAHAR GANJ, KASERU WALAN‐PAHAR GANJ PHG 68 990 KVA UNPLANNED 12‐06‐2018 19:14:35 12‐06‐2018 20:00:00 0:45 0.000125 MUs695 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, CHUNA MANDI‐PAHAR GANJ PHG 85 990 KVA UNPLANNED 12‐06‐2018 22:18:52 12‐06‐2018 23:06:00 0:47 0.00013056 MUs
696
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK D‐MOTIA KHAN, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, DDA FLATS‐MOTIA KHAN, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 1337 990 KVA UNPLANNED 14‐06‐2018 01:51:51 14‐06‐2018 02:47:00 0:55 0.00015278 MUs
697
CHUNA MANDI‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 1363 990 KVA UNPLANNED 14‐06‐2018 03:20:00 14‐06‐2018 03:35:41 0:15 0.00004167 MUs
698 MANTOLA MOHALLA‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ PHG 811 990 KVA UNPLANNED 14‐06‐2018 14:22:21 14‐06‐2018 15:06:00 0:43 0.00005972 MUs699 BLOCK III‐ARAM BAGH, BLOCK II‐ARAM BAGH PHG 146 990 KVA UNPLANNED 15‐06‐2018 01:34:16 15‐06‐2018 01:53:40 0:19 0.00005278 MUs700 BLOCK L‐RAM NAGAR, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR PHG 168 990 KVA UNPLANNED 15‐06‐2018 23:52:27 16‐06‐2018 01:05:48 1:13 0.00010139 MUs701 BLOCK L‐RAM NAGAR, S.R.T. NAGAR‐ARYA NAGAR PHG 444 990 KVA UNPLANNED 16‐06‐2018 13:53:05 16‐06‐2018 15:34:00 1:40 0.00027778 MUs
702SHEELA HOTEL‐ARYA NAGAR, LEGEND HOTEL‐ARYA NAGAR, ST. ANTONYS CHURCH SCHOOL‐ARYA NAGAR, MANTOLA MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 114 990 KVA UNPLANNED 16‐06‐2018 16:02:50 16‐06‐2018 16:27:13 0:24 0.00006667 MUs
703 MULTANI DHANDA‐SADAR BAZAR PHG 129 990 KVA UNPLANNED 20‐06‐2018 00:12:56 20‐06‐2018 00:33:09 0:20 0.00005556 MUs
704
CHUNA MANDI‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 1374 990 KVA UNPLANNED 20‐06‐2018 16:44:28 20‐06‐2018 17:11:46 0:27 0.000075 MUs
705CHUNA MANDI‐PAHAR GANJ, TYPE III HOUSE‐CHUNA MANDI, MIG FLATS‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR GANJ PHG 390 990 KVA UNPLANNED 21‐06‐2018 12:53:43 21‐06‐2018 13:30:31 0:36 0.0001 MUs
706 DOCTOR'S APPARTMENT‐VASUNDHARA ENCLAVE VSE, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN PHG 1 400 KVA UNPLANNED 23‐06‐2018 02:17:10 23‐06‐2018 03:15:00 0:57 0.00015833 MUs
707BLOCK L‐RAM NAGAR, BLOCK A‐AMAR NAGAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE‐CHANDNI CHOWK CCK, BANGALA SAHIB ROAD‐PANCHKUIAN ROAD RAILWAY COLONY PHG 71 990 KVA UNPLANNED 24‐06‐2018 14:45:11 24‐06‐2018 16:00:00 1:14 0.00020556 MUs
708 BLOCK L‐RAM NAGAR, MULTANI DHANDA‐SADAR BAZAR, PAHAR GANJ PHG, S.R.T. NAGAR‐ARYA NAGAR PHG 168 990 KVA UNPLANNED 25‐06‐2018 05:33:25 25‐06‐2018 06:06:22 0:32 0.00008889 MUs
709
CHUNA MANDI‐PAHAR GANJ, BLOCK A‐AMAR NAGAR, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, BLOCK D‐MOTIA KHAN, MULTANI DHANDA‐SADAR BAZAR, BLOCK K‐ARAM NAGAR, SHEELA HOTELARYA NAGAR, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, TYPE III HOUSE‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 1363 990 KVA UNPLANNED 25‐06‐2018 11:06:00 25‐06‐2018 11:35:57 0:29 0.00008056 MUs
710 BLOCK L‐RAM NAGAR, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR, ARAM NAGAR‐SADAR BAZAR PHG 168 990 KVA UNPLANNED 25‐06‐2018 15:50:30 25‐06‐2018 16:37:49 0:47 0.00006528 MUs
711 DDA FLATS‐MOTIA KHAN, MULTANI DHANDA‐SADAR BAZAR, BLOCK K‐ARAM NAGAR, BLOCK C‐AMAR NAGAR PHG 89 630 KVA UNPLANNED 25‐06‐2018 19:12:18 25‐06‐2018 19:41:18 0:29 0.00008056 MUs
712CHUNA MANDI‐PAHAR GANJ, BLOCK B‐ARAM BAGH, TYPE III HOUSE‐CHUNA MANDI, MIG FLATS‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR GANJ PHG 566 990 KVA UNPLANNED 26‐06‐2018 10:48:42 26‐06‐2018 11:36:00 0:47 0.00006528 MUs
713
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SANT NIRANKARI SCHOOL‐MOTIA KHAN, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, DDA FLATS‐MOTIA KHAN, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, R.G. COMPLEX‐MOTIA KHAN, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 734 990 KVA UNPLANNED 27‐06‐2018 12:40:31 27‐06‐2018 13:15:00 0:34 0.00009444 MUs
714 KASERU WALAN‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ PHG 1141 630 KVA UNPLANNED 27‐06‐2018 15:39:21 27‐06‐2018 16:16:00 0:36 0.0001 MUs715 SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR PHG 87 400 KVA UNPLANNED 12‐06‐2018 12:49:18 12‐06‐2018 13:20:42 0:31 0.00004306 MUs716 SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR PHG 218 400 KVA UNPLANNED 12‐06‐2018 15:08:58 12‐06‐2018 15:57:06 0:48 0.00006667 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage717 SADAR BAZAR ‐ RAM NAGAR PHG 447 990 KVA UNPLANNED 22‐06‐2018 12:11:41 22‐06‐2018 12:45:12 0:33 0.00004583 MUs
718
BHAGAT NAGAR‐DAYALPUR, PHARI DHIRAJ‐SADAR BAZAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK T‐AHATA KEDARA, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 879 990 KVA UNPLANNED 23‐06‐2018 11:29:44 23‐06‐2018 12:13:56 0:44 0.00012222 MUs
719 BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR PHG 1432 990 KVA UNPLANNED 29‐06‐2018 11:56:49 29‐06‐2018 12:32:45 0:35 0.00009722 MUs720 BLOCK 30‐WEST PATEL NAGAR, BLOCK T‐BALJIT NAGAR PNR 85 990 KVA UNPLANNED 14‐06‐2018 14:28:58 14‐06‐2018 15:12:46 0:43 0.00023889 MUs721 BLOCK 35‐RAMJAS SPORTS COMPLEX, CLOSED FACTORY‐FARIDPURI, RAJASTHAN COLONY‐FARIDPURI PNR 853 400 KVA UNPLANNED 16‐06‐2018 16:21:36 16‐06‐2018 17:50:00 1:28 0.00122222 MUs722 BABA FARID PURI‐PUNJABI BASTI, BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 1789 990 KVA UNPLANNED 20‐06‐2018 11:54:49 20‐06‐2018 12:44:56 0:50 0.00027778 MUs
723BLOCK E‐WEST PATEL NAGAR, BLOCK B‐WEST PATEL NAGAR, BLOCK Z‐WEST PATEL NAGAR, BLOCK G‐COTTAGE, BLOCK C‐WEST PATEL NAGAR, BLOCK D‐WEST PATEL NAGAR PNR 656 630 KVA UNPLANNED 21‐06‐2018 11:16:00 21‐06‐2018 12:26:00 1:10 0.00068056 MUs
724
BLOCK A‐COTTAGE, BLOCK P‐WEST PATEL NAGAR, BLOCK U‐WEST PATEL NAGAR, BLOCK T‐WEST PATEL NAGAR, BLOCK F‐PUNJABI BASTI, PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR, PREM NAGAR‐BALJIT NAGAR, BLOCK T‐BALJIT NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 1327 990 KVA UNPLANNED 22‐06‐2018 10:15:05 22‐06‐2018 10:41:31 0:26 0.00014444 MUs
725SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR, BLOCK 29‐WEST PATEL NAGAR, BLOCK 11‐WEST PATEL NAGAR, BLOCK 25‐EAST PATEL NAGAR, PREM NAGAR‐BALJIT NAGAR, BLOCK T‐BALJIT NAGAR PNR 1789 990 KVA UNPLANNED 22‐06‐2018 23:11:07 22‐06‐2018 23:30:59 0:19 0.00006333 MUs
726
BLOCK 38‐WEST PATEL NAGAR, BLOCK 26‐WEST PATEL NAGAR, BLOCK 23‐WEST PATEL NAGAR, BLOCK 35‐WEST PATEL NAGAR, BLOCK 25‐WEST PATEL NAGAR, BLOCK T‐FARIDPURI, BLOCK 37‐WEST PATEL NAGAR, BLOCK 34‐WEST PATEL NAGAR PNR 1014 990 KVA UNPLANNED 23‐06‐2018 06:06:00 23‐06‐2018 06:33:49 0:27 0.00009 MUs
727
BLOCK 38‐WEST PATEL NAGAR, BLOCK 26‐WEST PATEL NAGAR, BLOCK 23‐WEST PATEL NAGAR, BLOCK 35‐WEST PATEL NAGAR, BLOCK 25‐WEST PATEL NAGAR, BLOCK T‐FARIDPURI, BLOCK 37‐WEST PATEL NAGAR, BLOCK 34‐WEST PATEL NAGAR PNR 1014 990 KVA UNPLANNED 23‐06‐2018 06:57:32 23‐06‐2018 12:40:48 5:43 0.00114333 MUs
728BLOCK J‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR, SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK T‐PANJABI BASTI, BLOCK A‐COTTAGE, BLOCK T‐BALJIT NAGAR PNR 971 990 KVA UNPLANNED 25‐06‐2018 11:07:33 25‐06‐2018 12:00:00 0:52 0.00017333 MUs
729BLOCK F‐PUNJABI BASTI, BLOCK 33‐WEST PATEL NAGAR, BLOCK T‐PANJABI BASTI, BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16 PNR 1622 990 KVA UNPLANNED 25‐06‐2018 14:11:02 25‐06‐2018 15:06:00 0:54 0.00018 MUs
730
SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK 33‐WEST PATEL NAGAR, BLOCK T‐PANJABI BASTI, BLOCK 30‐WEST PATEL NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, CHETAN BASTI‐ BLOCK J‐NEHRU NAGAR, BLOCK F‐PUNJABI BASTI, BLOCK T‐BALJIT NAGAR PNR 1622 990 KVA UNPLANNED 25‐06‐2018 16:18:35 25‐06‐2018 16:57:56 0:39 0.00010833 MUs
731BLOCK A‐COTTAGE, BLOCK P‐WEST PATEL NAGAR, BLOCK U‐WEST PATEL NAGAR, BLOCK T‐WEST PATEL NAGAR, PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR, BLOCK T‐BALJIT NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 1327 990 KVA UNPLANNED 26‐06‐2018 10:47:17 26‐06‐2018 11:26:00 0:38 0.00012667 MUs
732 BLOCK T‐BALJIT NAGAR, KARAMPURA INDUSTRIES‐BALJIT NAGAR, SHADIPUR DEPOT‐BALJIT NAGAR PNR 3073 1390 KVA UNPLANNED 26‐06‐2018 12:45:39 26‐06‐2018 13:22:58 0:37 0 MUs733 SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK T‐BALJIT NAGAR PNR 971 990 KVA UNPLANNED 28‐06‐2018 13:30:48 28‐06‐2018 14:06:00 0:35 0.00019444 MUs734 BLOCK 6B‐DEV NAGAR, KHALSA NAGAR‐DEV NAGAR PNR 985 990 KVA UNPLANNED 12‐06‐2018 13:27:01 12‐06‐2018 14:06:44 0:39 0.00015167 MUs
735BLOCK B‐PUNJABI BASTI, BLOCK 26B‐AJMAL KHAN PARK, BLOCK 24B‐AJMAL KHAN PARK, THAN SINGH NAGAR‐ANAND PARBAT, BLOCK A‐PUNJABI BASTI PNR 1391 630 KVA UNPLANNED 14‐06‐2018 11:50:01 14‐06‐2018 12:29:47 0:39 0.00050917 MUs
736 BLOCK B‐PUNJABI BASTI, BABA FARID PURI‐PUNJABI BASTI, THAKKAR BAPA NAGAR‐BLOCK 16 PNR 1027 990 KVA UNPLANNED 21‐06‐2018 11:07:34 21‐06‐2018 11:55:08 0:47 0.00026111 MUs
737
BLOCK 7B‐DEV NAGAR, BLOCK 12A‐KAROL BAGH, BLOCK_1‐DEV NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK 3‐DEV NAGAR, BLOCK B‐KUNDAN NAGAR, KHALSA NAGAR‐DEV NAGAR, BLOCK 4‐KAROL BAGH, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK 6B‐DEV NAGAR PNR 1175 990 KVA UNPLANNED 27‐06‐2018 08:50:00 27‐06‐2018 11:27:18 2:37 0.00087222 MUs
738
BLOCK 7B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, BLOCK 1B‐DEV NAGAR, BLOCK_5B‐DEV NAGAR, BLOCK B‐KUNDAN NAGAR, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK 6B‐DEV NAGAR, BLOCK_10B‐DEV NAGAR PNR 2089 990 KVA UNPLANNED 28‐06‐2018 14:19:09 28‐06‐2018 15:30:00 1:10 0.000875 MUs
739 ANAND PARBAT PNR 230 990 KVA UNPLANNED 21‐06‐2018 08:40:32 21‐06‐2018 09:37:34 0:57 0.00015833 MUs
740
BLOCK A‐NATHU COLONY, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK 63‐AJMAL KHAN PARK, BLOCK C‐LALITA PARK, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR SRD 2309 990 KVA UNPLANNED 02‐06‐2018 10:55:52 02‐06‐2018 11:05:34 0:9 0 MUs
741
BLOCK_1A‐REHAGAR PURA, BLOCK 12A‐KAROL BAGH, BLOCK_21K‐KRISHNA NAGAR, BLOCK_1A‐REHAGAR PURA, BLOCK_6‐KAROL BAGH WEST EXTENSION AREA, BLOCK_20C‐KRISHNA NAGAR, BLOCK_19C‐KRISHNA NAGAR, BLOCK_30B‐KRISHNA NAGAR, RAMA KRISHNA MISSION FREE T.B. CLINIC‐BLOCK 18, BLOCK_3H‐KRISHNA NAGAR, BLOCK 15A‐KAROL BAGH, BLOCK_17A‐KAROL BAGH WEST EXTENSION AREA, BLOCK 13‐KAROL BAGH SRD 480 400 KVA UNPLANNED 19‐06‐2018 17:30:21 19‐06‐2018 18:12:14 0:41 0 MUs
742
SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR SRD 540 990 KVA UNPLANNED 09‐06‐2018 13:14:00 09‐06‐2018 13:34:00 0:20 0 MUs
743BLOCK 20‐OLD RAJENDRA NAGAR, BLOCK 18‐OLD RAJENDRA NAGAR, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 19‐OLD RAJENDRA NAGAR, BLOCK 8‐OLD RAJENDRA NAGAR, BLOCK 21‐OLD RAJENDRA NAGAR SRD 440 990 KVA UNPLANNED 20‐06‐2018 14:36:58 20‐06‐2018 15:03:52 0:26 0.00003611 MUs
744
BLOCK 16‐OLD RAJENDRA NAGAR, BLOCK 9‐OLD RAJENDRA NAGAR, BLOCK 8‐OLD RAJENDRA NAGAR, BLOCK 8A‐OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR SRD 1498 630 KVA UNPLANNED 27‐06‐2018 12:00:48 27‐06‐2018 12:40:29 0:39 0.00027083 MUs
745
MAYUR VIHAR PHASE III, PKT A 2‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, PKT B7‐MAYUR VIHAR PHASE III, 3RD RD & PKT A 2‐MAYUR VIHAR PHASE III, PKT B8‐MAYUR VIHAR PHASE III, PKT A3‐MAYUR VIHAR PHASE III, MAYUR VIHAR PHASE III, PKT B7 & B6‐MAYUR VIHAR PHASE III, PHASE I‐MAYUR VIHAR VSE 0 3410 KVA UNPLANNED 01‐06‐2018 12:45:00 01‐06‐2018 13:01:00 0:15 0 MUs
746 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 12‐06‐2018 17:47:17 12‐06‐2018 17:54:55 0:7 0.00000972 MUs
747
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, BLOCK A‐MAYUR VIHAR PHASE III, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, PKT B1‐MAYUR VIHAR PHASE III, PKT B3‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SHAHDARA JLM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT B2‐MAYUR VIHAR PHASE III, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT 1‐MAYUR VIHAR PHASE III, BLOCK B‐VIVEK VIHAR, PKT B4‐MAYUR VIHAR PHASE III, PKT B5‐MAYUR VIHAR PHASE III, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK B‐MOTHER DAIRY, PKT 6‐NEW KONDALI, PKT R‐BLOCK D, SEC C‐MAYUR VIHAR PHASE III, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, PKT B8‐MAYUR VIHAR PHASE III, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT VSE 8092 3150 KVA UNPLANNED 12‐06‐2018 18:02:58 12‐06‐2018 18:40:00 0:37 0.00185 MUs
748 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 15‐06‐2018 08:21:28 15‐06‐2018 10:06:00 1:44 0.00028889 MUs749 BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR PHASE III VSE 780 0 KVA UNPLANNED 22‐06‐2018 16:29:42 22‐06‐2018 16:55:23 0:25 0.00006944 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
750MAYUR VIHAR PHASE III, BLOCK B‐MAYUR VIHAR PHASE III, LAHORE APPARTMENT‐DALLU PURA VSE, BLOCK A‐MAYUR VIHAR PHASE III, BLOCK_G1/A‐KONDALI GHAROLI SECTOR G, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 23‐06‐2018 23:47:04 24‐06‐2018 00:05:36 0:18 0.00015 MUs
751BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 27‐06‐2018 08:05:55 27‐06‐2018 10:03:55 1:58 0.00098333 MUs
752MAYUR VIHAR PHASE III, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR PHASE III, PKT B6‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 27‐06‐2018 23:26:07 28‐06‐2018 02:20:56 2:54 0.00096667 MUs
753BLOCK B‐MAYUR VIHAR PHASE III, AMBEDKAR AWAS KALYAN SAMITI‐GHAROLI KONDLI, BLOCK B‐AMBEDKAR AWAS KALYAN SAMITI, SEC D‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 236 990 KVA UNPLANNED 28‐06‐2018 06:28:15 28‐06‐2018 07:14:09 0:45 0.000025 MUs
754 BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, GHAROLI KONDLI, BLOCK A‐MAYUR VIHAR PHASE III VSE 2145 0 KVA UNPLANNED 28‐06‐2018 19:56:51 28‐06‐2018 20:58:25 1:1 0.00013556 MUs755 BLOCK B1‐NEW ASHOK NAGAR VSE 174 400 KVA UNPLANNED 14‐06‐2018 16:16:32 14‐06‐2018 16:41:37 0:25 0.00005556 MUs756 BLOCK A‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR VSE 762 990 KVA UNPLANNED 25‐06‐2018 23:20:20 25‐06‐2018 23:31:45 0:11 0.00006111 MUs
757
CHILLA‐ TRAFIK BOOTH‐NEW ASHOK NAGAR, BLOCK C1‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, CHILLA‐NAGARJUNA APPARTMENT‐ BLOCK E‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, BLOCK A‐NEW ASHOK NAGAR, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK C2‐NEW ASHOK NAGAR VSE 35 990 KVA UNPLANNED 28‐06‐2018 17:09:07 28‐06‐2018 22:17:37 5:8 0.00051333 MUs
758BLOCK C2‐NEW KONDALI, BLOCK C3‐NEW KONDALI, BLOCK C4‐NEW KONDALI, PARADISE APPARTMENT‐MOTHER DAIRY, BLOCK C‐NEW KONDALI, BLOCK C1‐NEW KONDALI VSE 425 630 KVA UNPLANNED 07‐06‐2018 17:40:56 07‐06‐2018 18:03:45 0:22 0 MUs
759
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐DALLU PURA VSE, DHARMSHILA CANCER HOSPITAL & RESEARCH HOSPITAL‐DALLU PURA VSE, DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE, BLOCK A‐DALLU PURA VSE, BLOCK A‐KONDALI EXTN. VSE 440 630 KVA UNPLANNED 22‐06‐2018 13:00:24 22‐06‐2018 13:41:25 0:41 0.00022778 MUs
760 PKT 3‐NEW KONDALI, PKT 2‐NEW KONDALI, PKT 4‐NEW KONDALI, PKT 6‐NEW KONDALI, PKT 1‐NEW KONDALI VSE 1003 630 KVA UNPLANNED 26‐06‐2018 22:44:12 26‐06‐2018 23:15:13 0:31 0.00001722 MUs761 BLOCK V‐GHONDA PATTI CHAUHAN, GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN YVR 1259 990 KVA UNPLANNED 11‐06‐2018 23:58:01 12‐06‐2018 00:47:05 0:49 0.00013611 MUs
762BLOCK C‐BHAJANPURA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK H‐GHONDA PATTI, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA YVR 4129 990 KVA UNPLANNED 12‐06‐2018 06:06:00 12‐06‐2018 06:53:00 0:47 0.00013056 MUs
763 BLOCK E‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA YVR 703 990 KVA UNPLANNED 12‐06‐2018 10:42:28 12‐06‐2018 11:07:20 0:24 0.00006667 MUs764 ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR YVR 477 990 KVA UNPLANNED 12‐06‐2018 21:40:00 13‐06‐2018 01:06:00 3:26 0.00068667 MUs765 NAYAGAON‐NEW KATWARA, BLOCK L‐BRAHM PURI, BLOCK F‐BRAHM PURI YVR 1832 400 KVA UNPLANNED 14‐06‐2018 01:34:20 14‐06‐2018 02:26:54 0:52 0.00028889 MUs766 BLOCK P‐BRAHM PURI, NAYAGAON‐NEW KATWARA, BLOCK F‐BRAHM PURI YVR 1462 400 KVA UNPLANNED 14‐06‐2018 09:32:47 14‐06‐2018 10:09:45 0:36 0.0003 MUs767 BLOCK V‐GHONDA PATTI CHAUHAN, GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN YVR 1259 990 KVA UNPLANNED 15‐06‐2018 12:05:04 15‐06‐2018 12:34:48 0:29 0.00008056 MUs768 NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA YVR 456 630 KVA UNPLANNED 15‐06‐2018 13:17:36 15‐06‐2018 14:24:48 1:7 0.00009306 MUs
769LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK C‐JAI PRAKASH NAGAR, ARVIND NAGAR‐GHONDA, GHONDA PATTI YVR 1255 990 KVA UNPLANNED 17‐06‐2018 13:26:40 17‐06‐2018 14:25:00 0:58 0.00016111 MUs
770GAMRI‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK B2‐YAMUNA VIHAR, BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI, GAUTAM VIHAR‐GHONDA, BLOCK C‐GHONDA YVR 1259 990 KVA UNPLANNED 19‐06‐2018 23:05:50 19‐06‐2018 23:38:34 0:32 0.00015111 MUs
771 KACHI COLONY‐JAGJEET NAGAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA YVR 1202 990 KVA UNPLANNED 20‐06‐2018 12:32:20 20‐06‐2018 13:27:54 0:55 0.00015278 MUs
772GAMRI‐GHONDA, BLOCK B2‐YAMUNA VIHAR, BLOCK A‐GHONDA PATTI, BLOCK B‐KARTAR NAGAR, BLOCK C‐JAI PRAKASH NAGAR, BLOCK J‐KARTAR NAGAR, BLOCK D‐BHAJANPURA YVR 1270 990 KVA UNPLANNED 20‐06‐2018 22:37:50 20‐06‐2018 23:26:20 0:48 0.00013333 MUs
773 BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA YVR 445 990 KVA UNPLANNED 21‐06‐2018 11:25:06 21‐06‐2018 12:20:00 0:54 0.00015 MUs
774
LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐BHAJANPURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐GHONDA PATTI, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐GHONDA PATTI, BLOCK H‐BHAGIRATHI VIHAR, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK D‐BHAJANPURA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1576 990 KVA UNPLANNED 21‐06‐2018 12:41:38 21‐06‐2018 13:30:00 0:48 0.00006667 MUs
775LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK L‐BRAHM PURI, BLOCK H‐BRAHM PURI, BLOCK I‐BRAHM PURI, BLOCK F‐BRAHM PURI YVR 1410 990 KVA UNPLANNED 21‐06‐2018 13:15:48 21‐06‐2018 13:46:17 0:30 0.00008333 MUs
776 BLOCK P‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK R‐BRAHM PURI YVR 951 990 KVA UNPLANNED 22‐06‐2018 00:28:49 22‐06‐2018 01:12:11 0:43 0.00011944 MUs
777BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA YVR 2795 990 KVA UNPLANNED 22‐06‐2018 01:59:04 22‐06‐2018 02:39:22 0:40 0.00011111 MUs
778
BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, BLOCK B2‐YAMUNA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, BLOCK D‐BHAJANPURA YVR 1849 990 KVA UNPLANNED 22‐06‐2018 03:36:08 22‐06‐2018 05:05:40 1:29 0.00024722 MUs
779BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐BHAJANPURA, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA YVR 833 990 KVA UNPLANNED 22‐06‐2018 11:41:51 22‐06‐2018 12:06:00 0:24 0.00006667 MUs
780
BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, BLOCK D‐BHAJANPURA YVR 833 990 KVA UNPLANNED 22‐06‐2018 17:30:28 22‐06‐2018 18:24:29 0:54 0.0003 MUs
781
BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, BLOCK C10 MAHANAGAR STAFF UNION‐COMMUNITY CENTRE YAMUNA VIHAR BLOCK C, BLOCK D‐BHAJANPURA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1876 990 KVA UNPLANNED 22‐06‐2018 20:01:46 22‐06‐2018 20:34:55 0:33 0.00018333 MUs
782GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI YVR 1160 990 KVA UNPLANNED 22‐06‐2018 23:30:48 22‐06‐2018 23:47:09 0:16 0.00004444 MUs
783
BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1876 990 KVA UNPLANNED 23‐06‐2018 01:17:57 23‐06‐2018 02:04:07 0:46 0.00012778 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
784
GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI, BLOCK B‐BRAHM PURI, BLOCK C1‐YAMUNA VIHAR YVR 1160 990 KVA UNPLANNED 23‐06‐2018 03:11:50 23‐06‐2018 04:04:03 0:52 0.00014444 MUs
785 CHAUHAN BANGAR‐JAFFRABAD YVR 346 630 KVA UNPLANNED 23‐06‐2018 10:41:33 23‐06‐2018 11:40:00 0:58 0.00016111 MUs
786
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIVVIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐GHONDA PATTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐GHONDA PATTI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 747 990 KVA UNPLANNED 23‐06‐2018 12:38:50 23‐06‐2018 13:31:35 0:52 0.00014444 MUs
787LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK V‐GHONDA PATTI CHAUHAN YVR 1208 990 KVA UNPLANNED 23‐06‐2018 13:35:06 23‐06‐2018 14:33:00 0:57 0.00015833 MUs
788LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NORTH GHONDA, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK V‐GHONDA PATTI CHAUHAN YVR 1208 990 KVA UNPLANNED 23‐06‐2018 15:31:38 23‐06‐2018 16:25:00 0:53 0.00029444 MUs
789GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK H‐BRAHM PURI YVR 1259 990 KVA UNPLANNED 23‐06‐2018 17:35:53 23‐06‐2018 18:16:21 0:40 0.00023333 MUs
790GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI YVR 1160 990 KVA UNPLANNED 24‐06‐2018 00:32:12 24‐06‐2018 00:48:16 0:16 0.00004444 MUs
791GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 1294 990 KVA UNPLANNED 24‐06‐2018 07:17:21 24‐06‐2018 07:34:31 0:17 0.00004722 MUs
792GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI YVR 1160 990 KVA UNPLANNED 24‐06‐2018 07:23:53 24‐06‐2018 08:16:09 0:52 0.00014444 MUs
793 GAMRI‐GHONDA, BLOCK T‐GAUTAM PURI, BLOCK A‐GHONDA PATTI YVR 1270 990 KVA UNPLANNED 25‐06‐2018 11:04:49 25‐06‐2018 18:02:45 6:57 0.00115833 MUs
794
BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐BHAJANPURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BHAGAT NAGAR‐DAYALPUR, GHONDA PATTI CHAUHAN, BLOCK B3‐YAMUNA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK D‐BHAJANPURA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1875 990 KVA UNPLANNED 25‐06‐2018 14:32:42 25‐06‐2018 15:20:00 0:47 0.00013056 MUs
795 GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK H‐BRAHM PURI YVR 1259 990 KVA UNPLANNED 26‐06‐2018 11:34:47 26‐06‐2018 12:34:00 0:59 0.00031139 MUs
796
BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1875 990 KVA UNPLANNED 26‐06‐2018 16:03:30 26‐06‐2018 16:42:33 0:39 0.00010833 MUs
797
BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1875 990 KVA UNPLANNED 27‐06‐2018 12:22:56 27‐06‐2018 13:03:25 0:40 0.00024444 MUs
798 GAMRI‐GHONDA, BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK J‐KARTAR NAGAR, BLOCK A‐GHONDA PATTI YVR 1257 990 KVA UNPLANNED 27‐06‐2018 14:07:34 27‐06‐2018 15:06:27 0:58 0.00030611 MUs
799
BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK B‐GARI MANDU, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 801 990 KVA UNPLANNED 27‐06‐2018 15:38:08 27‐06‐2018 16:25:51 0:47 0.00033944 MUs
800BLOCK B‐MANUJPUR, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 1294 990 KVA UNPLANNED 28‐06‐2018 13:46:13 28‐06‐2018 14:18:47 0:32 0.00017778 MUs
801GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 1294 990 KVA UNPLANNED 28‐06‐2018 16:46:41 28‐06‐2018 17:16:16 0:29 0.00008056 MUs
802 GAMRI‐GHONDA, BLOCK C‐GHONDA PATTI, BLOCK J‐KARTAR NAGAR, BLOCK A‐GHONDA PATTI YVR 1257 990 KVA UNPLANNED 29‐06‐2018 12:20:30 29‐06‐2018 13:52:02 1:31 0.00025278 MUs
803GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 1294 990 KVA UNPLANNED 29‐06‐2018 17:34:04 29‐06‐2018 18:06:55 0:32 0.00020444 MUs
804LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK V‐GHONDA PATTI CHAUHAN YVR 1208 990 KVA UNPLANNED 29‐06‐2018 20:33:29 29‐06‐2018 22:20:00 1:46 0.00061833 MUs
805 JAFFRABAD‐MAUJ PUR YVR 1422 990 KVA UNPLANNED 02‐06‐2018 02:16:00 02‐06‐2018 02:45:00 0:29 0 MUs806 CHAUHAN BANGAR‐JAFFRABAD YVR 224 990 KVA UNPLANNED 12‐06‐2018 01:42:12 12‐06‐2018 02:40:00 0:57 0.00019 MUs807 CHAUHAN BANGAR‐JAFFRABAD YVR 224 990 KVA UNPLANNED 12‐06‐2018 11:51:30 12‐06‐2018 12:57:21 1:5 0.00018056 MUs
808BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 779 990 KVA UNPLANNED 12‐06‐2018 20:25:00 12‐06‐2018 21:03:15 0:38 0.00012667 MUs
809
SUBHASH PARK‐GORAKH PARK, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV YVR 2555 990 KVA UNPLANNED 12‐06‐2018 20:26:00 12‐06‐2018 20:36:00 0:10 0.00056944 MUs
810BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 779 990 KVA UNPLANNED 14‐06‐2018 00:39:00 14‐06‐2018 09:30:28 8:51 0.001475 MUs
811
SUBHASH PARK‐GORAKH PARK, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV YVR 1371 990 KVA UNPLANNED 14‐06‐2018 12:00:09 14‐06‐2018 12:34:25 0:34 0.00009444 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
812
SUBHASH PARK‐GORAKH PARK, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV YVR 2555 990 KVA UNPLANNED 14‐06‐2018 13:04:35 14‐06‐2018 13:29:08 0:24 0.00033333 MUs
813 JAFFRABAD‐MAUJ PUR YVR 754 990 KVA UNPLANNED 14‐06‐2018 16:53:47 14‐06‐2018 17:21:57 0:28 0.00007778 MUs814 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 995 990 KVA UNPLANNED 15‐06‐2018 12:40:02 15‐06‐2018 12:51:52 0:11 0.00003056 MUs815 JAFFRABAD‐MAUJ PUR YVR 1422 990 KVA UNPLANNED 17‐06‐2018 18:31:26 17‐06‐2018 19:00:20 0:28 0.00007778 MUs816 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 778 990 KVA UNPLANNED 19‐06‐2018 21:23:27 19‐06‐2018 21:54:11 0:30 0.00008333 MUs
817
SUBHASH PARK‐GORAKH PARK, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV YVR 2554 990 KVA UNPLANNED 20‐06‐2018 13:48:19 20‐06‐2018 15:47:29 1:59 0.00165278 MUs
818 JAFFRABAD‐MAUJ PUR YVR 319 400 KVA UNPLANNED 20‐06‐2018 23:06:48 20‐06‐2018 23:47:35 0:40 0.00011111 MUs819 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1348 630 KVA UNPLANNED 21‐06‐2018 13:28:42 21‐06‐2018 14:20:00 0:51 0.00014167 MUs
820BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, DELHI TRANSPORT‐WELCOME COLONY, BLOCK A‐WELCOME COLONY YVR 1276 990 KVA UNPLANNED 22‐06‐2018 12:47:22 22‐06‐2018 13:47:01 0:59 0.00016389 MUs
821 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 982 990 KVA UNPLANNED 22‐06‐2018 16:00:26 22‐06‐2018 16:19:39 0:19 0.00005278 MUs
822BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, DELHI TRANSPORT‐WELCOME COLONY, BLOCK A‐WELCOME COLONY YVR 1276 990 KVA UNPLANNED 22‐06‐2018 23:20:58 22‐06‐2018 23:33:08 0:12 0.00003333 MUs
823BLOCK U‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, BLOCK I‐WELCOME COLONY, MAUJ PUR COMPLEX 1, BLOCK X‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV YVR 1351 990 KVA UNPLANNED 23‐06‐2018 22:45:05 23‐06‐2018 23:35:22 0:50 0.00013889 MUs
824 JAFFRABAD‐MAUJ PUR YVR 785 630 KVA UNPLANNED 25‐06‐2018 11:47:35 25‐06‐2018 12:55:00 1:7 0.00018611 MUs
825BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 996 990 KVA UNPLANNED 26‐06‐2018 15:16:39 26‐06‐2018 17:03:01 1:46 0.00029444 MUs
826 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR YVR 381 990 KVA UNPLANNED 26‐06‐2018 16:39:13 26‐06‐2018 17:30:00 0:50 0.00030556 MUs827 SUBHASH PARK‐GORAKH PARK YVR 164 630 KVA UNPLANNED 27‐06‐2018 12:27:50 27‐06‐2018 13:25:00 0:57 0.00030083 MUs828 SUBHASH PARK‐GORAKH PARK YVR 98 630 KVA UNPLANNED 27‐06‐2018 15:19:13 27‐06‐2018 16:21:42 1:2 0.00037889 MUs829 SUBHASH PARK‐GORAKH PARK, BLOCK T‐AHATA KEDARA YVR 93 400 KVA UNPLANNED 28‐06‐2018 20:17:19 28‐06‐2018 21:00:38 0:43 0.00017917 MUs830 SUBHASH PARK‐GORAKH PARK, BLOCK T‐AHATA KEDARA YVR 93 400 KVA UNPLANNED 28‐06‐2018 22:18:00 28‐06‐2018 23:16:00 0:58 0.00016111 MUs831 SUBHASH PARK‐GORAKH PARK YVR 192 630 KVA UNPLANNED 29‐06‐2018 15:46:37 29‐06‐2018 16:40:00 0:53 0.00014722 MUs832 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR YVR 381 990 KVA UNPLANNED 30‐06‐2018 10:19:36 30‐06‐2018 11:03:45 0:44 0.00012222 MUs833 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 31 990 KVA UNPLANNED 12‐06‐2018 16:24:49 12‐06‐2018 17:22:00 0:57 0.00015833 MUs
834LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐SILAMPUR COLONY, BLOCK J‐SILAMPUR COLONY, JHUGI‐NEW SILAMPURI PHASE I YVR 994 400 KVA UNPLANNED 14‐06‐2018 01:39:20 14‐06‐2018 01:59:13 0:19 0.00015833 MUs
835LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, BLOCK T‐GAUTAM PURI YVR 580 400 KVA UNPLANNED 14‐06‐2018 05:22:38 14‐06‐2018 05:44:18 0:21 0.00005833 MUs
836NEW USMANPUR‐NEW KATWARA, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA YVR 1177 990 KVA UNPLANNED 14‐06‐2018 13:08:55 14‐06‐2018 14:04:39 0:55 0.00015278 MUs
837NEW USMANPUR‐NEW KATWARA, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA YVR 713 990 KVA UNPLANNED 15‐06‐2018 07:03:17 15‐06‐2018 07:26:01 0:22 0.00006111 MUs
838 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 840 630 KVA UNPLANNED 19‐06‐2018 15:05:24 19‐06‐2018 15:22:52 0:17 0.00004722 MUs
839LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐GARI MANDU, JAFFRABAD‐MAUJ PUR, BLOCK B‐SHASTRI PARK, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 1239 630 KVA UNPLANNED 20‐06‐2018 15:09:00 20‐06‐2018 16:04:51 0:55 0.00045833 MUs
840 MCD COLONY‐NEW KATWARA YVR 136 400 KVA UNPLANNED 20‐06‐2018 16:48:45 20‐06‐2018 17:11:02 0:22 0.00006111 MUs841 BLOCK A‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK J‐SILAMPUR COLONY YVR 765 990 KVA UNPLANNED 20‐06‐2018 23:02:45 20‐06‐2018 23:12:49 0:10 0.00002778 MUs
842BLOCK A‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK G‐SILAMPUR COLONY YVR 724 630 KVA UNPLANNED 21‐06‐2018 12:37:54 21‐06‐2018 13:29:53 0:51 0.00028333 MUs
843 MCD COLONY‐NEW KATWARA YVR 136 400 KVA UNPLANNED 22‐06‐2018 00:42:34 22‐06‐2018 01:12:41 0:30 0.00008333 MUs
844LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, MCD COLONY‐NEW KATWARA YVR 479 630 KVA UNPLANNED 23‐06‐2018 23:46:32 24‐06‐2018 00:26:53 0:40 0.00011111 MUs
845 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK R‐BRAHM PURI, BLOCK T‐GAUTAM PURI YVR 1251 990 KVA UNPLANNED 24‐06‐2018 13:19:28 24‐06‐2018 13:46:26 0:26 0.00022389 MUs846 BLOCK J‐SILAMPUR COLONY YVR 62 400 KVA UNPLANNED 25‐06‐2018 11:17:52 25‐06‐2018 11:59:19 0:41 0.00011389 MUs847 BLOCK C‐SHASTRI PARK YVR 157 400 KVA UNPLANNED 25‐06‐2018 11:59:43 25‐06‐2018 12:54:27 0:54 0.00015 MUs848 BLOCK C‐SHASTRI PARK YVR 157 400 KVA UNPLANNED 26‐06‐2018 12:57:50 26‐06‐2018 13:40:33 0:42 0.00022167 MUs849 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 878 630 KVA UNPLANNED 26‐06‐2018 14:45:19 26‐06‐2018 15:40:00 0:54 0.00015 MUs
850
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 700 990 KVA UNPLANNED 27‐06‐2018 11:47:51 27‐06‐2018 12:32:21 0:44 0.00012222 MUs
851NEW USMANPUR‐NEW KATWARA, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA YVR 713 990 KVA UNPLANNED 27‐06‐2018 18:05:04 27‐06‐2018 19:04:00 0:58 0.00016111 MUs
852 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 882 630 KVA UNPLANNED 27‐06‐2018 23:11:40 27‐06‐2018 23:38:23 0:26 0.00007222 MUs853 ZERO PUSTA‐USMAN PUR YVR 161 400 KVA UNPLANNED 30‐06‐2018 11:01:48 30‐06‐2018 12:09:23 1:7 0.00018611 MUs854 VIJAY PARK‐YAMUNA VIHAR, BLOCK C11‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 1795 990 KVA UNPLANNED 12‐06‐2018 10:42:49 12‐06‐2018 11:11:00 0:28 0.00007778 MUs
855BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR YVR 1311 990 KVA UNPLANNED 12‐06‐2018 17:02:02 12‐06‐2018 18:00:53 0:58 0.00048333 MUs
856 MAUJ PUR COMPLEX 1, VIJAY PARK‐YAMUNA VIHAR YVR 1292 990 KVA UNPLANNED 12‐06‐2018 18:21:53 12‐06‐2018 19:11:53 0:49 0.00013611 MUs857 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 14‐06‐2018 13:14:15 14‐06‐2018 13:50:25 0:36 0.0001 MUs
858
ADARSH MOHALLA‐MAUJPUR, JAGJEET NAGAR‐GHONDA, BALI MARAN‐BARA DARI, TOWN HILL‐KATRA NEEL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW KATWARA, KATRA NAWAB‐CHANDNI CHOWK, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 3100 990 KVA UNPLANNED 14‐06‐2018 15:24:29 14‐06‐2018 17:55:00 2:30 0.00041667 MUs
859 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 14‐06‐2018 15:33:59 14‐06‐2018 16:32:00 0:58 0.00016111 MUs860 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 14‐06‐2018 17:07:00 14‐06‐2018 19:00:00 1:53 0.00037667 MUs
861BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐BHAJANPURA, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK D‐BHAJANPURA YVR 1692 630 KVA UNPLANNED 14‐06‐2018 17:30:00 14‐06‐2018 18:22:35 0:52 0.00021667 MUs
862 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 14‐06‐2018 19:59:27 14‐06‐2018 23:42:36 3:43 0.00061944 MUs
863TOWN HILL‐KATRA NEEL, MAUJ PUR COMPLEX 1, KATRA NAWAB‐CHANDNI CHOWK, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, BALI MARAN‐BARA DARI YVR 94 990 KVA UNPLANNED 14‐06‐2018 21:30:00 14‐06‐2018 23:20:18 1:50 0.00036667 MUs
864TOWN HILL‐KATRA NEEL, MAUJ PUR COMPLEX 1, KATRA NAWAB‐CHANDNI CHOWK, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, BALI MARAN‐BARA DARI YVR 94 990 KVA UNPLANNED 14‐06‐2018 23:59:57 15‐06‐2018 00:19:27 0:19 0.00005278 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage865 KACHI COLONY‐JAGJEET NAGAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA YVR 261 630 KVA UNPLANNED 15‐06‐2018 00:48:35 15‐06‐2018 01:28:02 0:39 0.00010833 MUs
866 BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 569 990 KVA UNPLANNED 15‐06‐2018 01:01:14 15‐06‐2018 02:00:46 0:59 0.00016389 MUs867 MAUJ PUR COMPLEX 1, VIJAY PARK‐YAMUNA VIHAR YVR 1292 990 KVA UNPLANNED 15‐06‐2018 01:57:40 15‐06‐2018 02:15:21 0:17 0.00004722 MUs
868 BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 569 990 KVA UNPLANNED 15‐06‐2018 02:52:18 15‐06‐2018 10:15:43 7:23 0.00123056 MUs869 BLOCK C4‐YAMUNA VIHAR YVR 911 990 KVA UNPLANNED 15‐06‐2018 07:01:07 15‐06‐2018 08:27:55 1:26 0.00023889 MUs
870MAUJ PUR COMPLEX 1, BLOCK B‐DURGA PURI, JAFFRABAD‐MAUJ PUR, BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR YVR 1757 1980 KVA UNPLANNED 15‐06‐2018 09:24:27 15‐06‐2018 10:29:41 1:5 0.00036111 MUs
871 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 15‐06‐2018 10:48:28 15‐06‐2018 11:35:00 0:46 0.00012778 MUs
872BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐BHAJANPURA, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK D‐BHAJANPURA YVR 1692 630 KVA UNPLANNED 15‐06‐2018 16:50:18 15‐06‐2018 17:45:00 0:54 0.00015 MUs
873 BLOCK C4‐YAMUNA VIHAR YVR 911 990 KVA UNPLANNED 15‐06‐2018 18:29:54 15‐06‐2018 19:12:52 0:42 0.00011667 MUs
874BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐BHAJANPURA, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK D‐BHAJANPURA YVR 1692 630 KVA UNPLANNED 16‐06‐2018 15:24:03 16‐06‐2018 16:01:58 0:37 0.00020556 MUs
875 JAFFRABAD‐MAUJ PUR YVR 583 990 KVA UNPLANNED 19‐06‐2018 14:54:30 19‐06‐2018 15:25:26 0:30 0.00008333 MUs876 MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR YVR 452 990 KVA UNPLANNED 19‐06‐2018 23:55:43 20‐06‐2018 00:29:16 0:33 0.00018333 MUs
877LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAYAGAON‐NEW KATWARA, BLOCK B‐SUBHASH MOHALLA, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 1867 990 KVA UNPLANNED 20‐06‐2018 11:11:57 20‐06‐2018 12:24:39 1:12 0.0002 MUs
878BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C9‐YAMUNA VIHAR, BLOCK B5‐YAMUNA PUR (GONDA) BLOCK B, BLOCK C1‐YAMUNA VIHAR YVR 197 630 KVA UNPLANNED 20‐06‐2018 12:17:10 20‐06‐2018 13:14:00 0:56 0.00015556 MUs
879 JAFFRABAD‐MAUJ PUR YVR 583 990 KVA UNPLANNED 20‐06‐2018 16:23:53 20‐06‐2018 16:41:08 0:17 0.00004722 MUs880 VIJAY PARK‐YAMUNA VIHAR YVR 649 990 KVA UNPLANNED 20‐06‐2018 16:37:01 20‐06‐2018 17:07:04 0:30 0.00008333 MUs
881GHONDA PATTI, BLOCK 36‐HIMMATPURI, NEW JAFFRABAD‐GORAKH PARK, PKT 3‐PHASE I, BLOCK B‐GARI MANDU, BLOCK35‐HIMMATPURI, JAFFRABAD‐MAUJ PUR, BLOCK H‐GHONDA PATTI, BLOCK D‐BHAJANPURA YVR 1144 990 KVA UNPLANNED 20‐06‐2018 17:57:00 20‐06‐2018 18:45:05 0:48 0.00032 MUs
882BLOCK C2‐YAMUNA VIHAR, JAGJEET NAGAR‐GHONDA, BLOCK B2‐YAMUNA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW KATWARA, JAFFRABAD‐MAUJ PUR, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR YVR 261 630 KVA UNPLANNED 21‐06‐2018 00:31:59 21‐06‐2018 01:02:09 0:30 0.00008333 MUs
883
BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, NORTH GHONDA, BLOCK B‐SUBHASH MOHALLA, BHAJANPURA‐DAYALPUR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK C‐GHONDA, SUBHASH VIHAR‐YAMUNA VIHAR YVR 791 400 KVA UNPLANNED 22‐06‐2018 01:43:35 22‐06‐2018 02:25:20 0:41 0.00011389 MUs
884 BLOCK B‐DURGA PURI, JAFFRABAD‐MAUJ PUR, BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR YVR 1304 990 KVA UNPLANNED 22‐06‐2018 12:54:39 22‐06‐2018 13:35:40 0:41 0.00034167 MUs
885 BLOCK C8‐YAMUNA VIHAR, BLOCK C10 MAHANAGAR STAFF UNION‐COMMUNITY CENTRE YAMUNA VIHAR BLOCK C YVR 441 990 KVA UNPLANNED 22‐06‐2018 17:04:40 22‐06‐2018 18:04:37 0:59 0.00016389 MUs
886MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, ADARSH MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, BABARPUR WEST‐BABAR PUR, VIJAY PARK‐YAMUNA VIHAR YVR 1388 990 KVA UNPLANNED 22‐06‐2018 22:49:34 22‐06‐2018 23:40:00 0:50 0.00013889 MUs
887BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 908 990 KVA UNPLANNED 23‐06‐2018 02:52:22 23‐06‐2018 03:14:07 0:21 0.00005833 MUs
888BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C3‐YAMUNA VIHAR, BLOCK B2‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C9‐YAMUNA VIHAR, BLOCK C1‐YAMUNA VIHAR YVR 1602 630 KVA UNPLANNED 23‐06‐2018 03:28:06 23‐06‐2018 04:08:50 0:40 0.00011111 MUs
889NORTH GHONDA, BLOCK E‐SUBHASH MOHALLA, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA YVR 2194 630 KVA UNPLANNED 23‐06‐2018 10:14:46 23‐06‐2018 10:58:10 0:43 0.00023889 MUs
890 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR YVR 1388 990 KVA UNPLANNED 23‐06‐2018 11:01:20 23‐06‐2018 11:34:05 0:32 0.00017778 MUs891 NORTH GHONDA, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 791 400 KVA UNPLANNED 23‐06‐2018 12:56:53 23‐06‐2018 13:50:00 0:53 0.00014722 MUs
892MAUJ PUR COMPLEX 1, NORTH GHONDA, JAFFRABAD‐MAUJ PUR, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, BLOCK B‐SUBHASH MOHALLA, VIJAY PARK‐YAMUNA VIHAR YVR 427 990 KVA UNPLANNED 23‐06‐2018 13:45:00 23‐06‐2018 14:13:02 0:28 0.00023333 MUs
893
ADARSH MOHALLA‐MAUJPUR, BALI MARAN‐BARA DARI, TOWN HILL‐KATRA NEEL, MAUJ PUR COMPLEX 1, JAFFRABAD‐MAUJ PUR, BLOCK Z‐WELCOME COLONY, BLOCK J‐KARTAR NAGAR, KATRA NAWAB‐CHANDNI CHOWK, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, VIJAY PARK‐YAMUNA VIHAR YVR 1680 1980 KVA UNPLANNED 23‐06‐2018 15:50:40 23‐06‐2018 16:50:00 0:59 0.00032778 MUs
894
NORTH GHONDA, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, MAUJ PUR COMPLEX 1, BLOCK B‐SUBHASH MOHALLA, BLOCK C9‐YAMUNA VIHAR, VIJAY PARK‐YAMUNA VIHAR, SUBHASH VIHAR‐YAMUNA VIHAR, BLOCK C1‐YAMUNA VIHAR YVR 1535 990 KVA UNPLANNED 23‐06‐2018 21:16:08 23‐06‐2018 21:51:33 0:35 0.00018472 MUs
895ADARSH MOHALLA‐MAUJPUR, NORTH GHONDA, MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, BLOCK E‐SUBHASH MOHALLA, VIJAY PARK‐YAMUNA VIHAR YVR 1388 990 KVA UNPLANNED 23‐06‐2018 22:41:45 23‐06‐2018 23:35:00 0:53 0.00014722 MUs
896MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, ADARSH MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 1388 990 KVA UNPLANNED 24‐06‐2018 03:02:25 24‐06‐2018 03:59:07 0:56 0.00015556 MUs
897 MAUJ PUR COMPLEX 1, JAFFRABAD‐MAUJ PUR YVR 884 990 KVA UNPLANNED 24‐06‐2018 11:53:48 24‐06‐2018 12:27:16 0:33 0.00017417 MUs898 BLOCK B4‐YAMUNA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA YVR 1223 990 KVA UNPLANNED 24‐06‐2018 12:05:59 24‐06‐2018 12:41:35 0:35 0.00020417 MUs899 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 2333 990 KVA UNPLANNED 24‐06‐2018 19:16:45 24‐06‐2018 19:50:16 0:33 0.00017417 MUs
900BLOCK C2‐YAMUNA VIHAR, BLOCK C‐BHAJANPURA, BLOCK C3‐YAMUNA VIHAR, BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR YVR 24 400 KVA UNPLANNED 25‐06‐2018 00:42:00 25‐06‐2018 01:40:00 0:58 0.00033833 MUs
901LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 1867 990 KVA UNPLANNED 25‐06‐2018 02:23:13 25‐06‐2018 03:40:00 1:16 0.00044333 MUs
902 MAUJ PUR COMPLEX 1 YVR 1646 990 KVA UNPLANNED 25‐06‐2018 10:21:42 25‐06‐2018 11:21:37 0:59 0.00016389 MUs903 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR YVR 1388 990 KVA UNPLANNED 25‐06‐2018 11:03:24 25‐06‐2018 12:02:07 0:58 0.00016111 MUs904 MAUJ PUR COMPLEX 1, JAFFRABAD‐MAUJ PUR YVR 452 990 KVA UNPLANNED 25‐06‐2018 23:00:28 25‐06‐2018 23:55:00 0:54 0.00015 MUs
905BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, JAFFRABAD‐MAUJ PUR, BLOCK C9‐YAMUNA VIHAR, BLOCK C1‐YAMUNA VIHAR YVR 1774 630 KVA UNPLANNED 26‐06‐2018 14:35:37 26‐06‐2018 15:28:20 0:52 0.00014444 MUs
906 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 3511 1980 KVA UNPLANNED 26‐06‐2018 15:48:55 26‐06‐2018 16:34:53 0:45 0.000275 MUs
907LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 1869 990 KVA UNPLANNED 27‐06‐2018 13:15:51 27‐06‐2018 14:05:35 0:49 0.00031306 MUs
908BLOCK C3‐YAMUNA VIHAR, BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 756 990 KVA UNPLANNED 28‐06‐2018 07:52:34 28‐06‐2018 08:32:12 0:39 0.00010833 MUs
909MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPUR, NORTH GHONDA, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 452 990 KVA UNPLANNED 28‐06‐2018 18:01:50 28‐06‐2018 18:38:15 0:36 0.0001 MUs
910JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW KATWARA, TANKI ROAD‐C‐BLOCK BHAJANPURA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 1869 990 KVA UNPLANNED 28‐06‐2018 18:04:51 28‐06‐2018 18:38:29 0:33 0.00009167 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
911
ADARSH MOHALLA‐MAUJPUR, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW KATWARA, JAFFRABAD‐MAUJ PUR, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR, BLOCK F‐BRAHM PURI YVR 1869 990 KVA UNPLANNED 30‐06‐2018 00:30:00 30‐06‐2018 01:05:57 0:35 0.00009722 MUs
912 BLOCK D‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR, WEST AZAD NAGAR KRN 887 990 KVA UNPLANNED 19‐06‐2018 00:10:00 19‐06‐2018 00:12:00 0:2 0 MUs
913
LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, ARVIND NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, BLOCK B‐GARI MANDU, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK D‐BHAJANPURA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, BLOCK A‐GHONDA PATTI, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK H‐GHONDA PATTI, TANKI ROAD‐C‐BLOCK BHAJANPURA, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, YAMUNA VIHAR YAMUNA FLOOD
PLAINS, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, GAUTAM VIHAR‐GHONDA, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK J‐KARTAR NAGAR, BLOCK C‐GHONDA PATTI, BLOCK A‐JHANDEWALAN, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, BLOCK E‐SUBHASH MOHALLA, JAFFRABAD‐MAUJ PUR, BLOCK H‐BRAHM PURI, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 11652 5460 KVA UNPLANNED 22‐06‐2018 15:10:00 22‐06‐2018 15:15:00 0:5 0 MUs
914 BLOCK CN‐MANGALAM VIHAR KWN 277 0 KVA UNPLANNED 26‐06‐2018 10:06:00 26‐06‐2018 10:17:00 0:11 0 MUs
915BLOCK C‐KHAJURI KHAS, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, BLOCK A‐KHAJURI KHAS, PKT A‐BLOCK B, BLOCK B‐KHAJURI KHAS, BLOCK C‐BRIJ PURI, BLOCK C‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 1454 2880 KVA UNPLANNED 20‐06‐2018 17:57:00 20‐06‐2018 18:52:00 0:54 0.0006 MUs
916 INDER PRASTHA APARTMENT‐MOTHER DAIRY LNR 67 630 KVA UNPLANNED 24‐06‐2018 14:37:00 24‐06‐2018 14:40:00 0:3 0 MUs917 BLOCK 26‐HIMMATPURI, BLOCK 36‐HIMMATPURI MVR 109 990 KVA UNPLANNED 26‐06‐2018 09:30:00 26‐06‐2018 09:52:11 0:22 0.00000611 MUs
918
BLOCK H‐SEWA DHAM, BLOCK D‐HARSH VIHAR, BLOCK A‐BANK COLONY, BLOCK B‐SEWA DHAM, BLOCK D‐HARIJAN BASTI EAST EXTN., NEW MANDOLI INDUSTRIAL AREA, BLOCK A‐MANDOLI VILLAGE, BLOCK C‐HARSH VIHAR, HARSH VIHAR SUB STATION‐POLICE FARM NNG 0 400 KVA UNPLANNED 12‐06‐2018 12:20:00 12‐06‐2018 12:49:04 0:29 0.00032222 MUs
919
MCD SCHOOL‐BLOCK C3, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐LALITA PARK, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 9491 2610 KVA UNPLANNED 25‐06‐2018 05:45:00 25‐06‐2018 06:30:43 0:45 0 MUs
920BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK E‐UTTARANCHAL COLONY NNG 1360 0 KVA UNPLANNED 19‐06‐2018 22:30:00 19‐06‐2018 23:06:00 0:36 0.0001 MUs
921 INDUSTRIAL AREA‐ANAND PARBHAT PNR 0 990 KVA UNPLANNED 27‐06‐2018 03:20:00 27‐06‐2018 03:45:20 0:25 0 MUs
922
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B VSE 438 630 KVA UNPLANNED 21‐06‐2018 10:02:11 21‐06‐2018 10:42:37 0:40 0.00001111 MUs
923 PKT A1‐MAYUR VIHAR PHASE III VSE 356 630 KVA UNPLANNED 21‐06‐2018 14:44:52 21‐06‐2018 15:26:59 0:42 0.00001167 MUs924 BLOCK B‐AMBEDKAR AWAS KALYAN SAMITI, SEC D‐MAYUR VIHAR PHASE III VSE 236 990 KVA UNPLANNED 22‐06‐2018 14:15:00 22‐06‐2018 14:55:01 0:40 0 MUs
925BLOCK C1‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, BLOCK A‐NEW ASHOK NAGAR VSE 1157 990 KVA UNPLANNED 29‐06‐2018 10:42:00 29‐06‐2018 11:22:57 0:40 0.00008889 MUs
926
BLOCK A‐SILAMPUR COLONY, BLOCK J‐SILAMPUR COLONY, JAFFRABAD‐MAUJ PUR, BLOCK C‐SHASTRI PARK, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK N‐NEW SILAMPURI PHASE I, MANTOLA MOHALLA‐PAHAR GANJ, ZERO PUSTA‐USMAN PUR, PHASE I‐MAYUR VIHAR, BLOCK C‐NEW SILAMPURI PHASE II YVR 3165 6250 KVA UNPLANNED 29‐06‐2018 09:00:00 29‐06‐2018 09:28:33 0:28 0 MUs
927LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NORTH GHONDA, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 2556 630 KVA UNPLANNED 28‐06‐2018 13:22:43 28‐06‐2018 14:07:11 0:44 0.00036667 MUs
928 GROUP I FLATS‐JANTA FLATS‐PKT A DGN 130 630 KVA PLANNED 15‐06‐2018 09:00:00 15‐06‐2018 15:10:00 6:10 0.00154167 MUs929 INDIRA GANDHI STADIUM‐AJMERI GATE DRG 0 0 KVA PLANNED 09‐06‐2018 13:25:00 09‐06‐2018 15:18:36 1:53 0.00031389 MUs930 CHRISTAN COLONY‐KHABAS PURA, CHANDANI MAHAL‐CHANDNI CHOWK DRG 535 990 KVA PLANNED 10‐06‐2018 12:06:00 10‐06‐2018 12:30:44 0:24 0.00006667 MUs
931
PATODI HOUSE‐CHANDNI CHOWK, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, CHANDANI MAHAL‐CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DRG 2921 990 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 11:56:59 2:50 0 MUs
932 GOVIND BALLABH PANT HASPITAL‐LN JPN COLONY DRG 0 0 KVA PLANNED 02‐06‐2018 12:06:00 02‐06‐2018 13:49:50 1:43 0 MUs933 BLOCK D‐JHILMIL COLONY BLOCK D, BLOCK E‐JHILMIL COLONY BLOCK E JLM 401 630 KVA PLANNED 04‐06‐2018 10:06:00 04‐06‐2018 11:43:46 1:37 0.00026944 MUs934 BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH KRN 173 990 KVA PLANNED 19‐06‐2018 09:00:00 19‐06‐2018 10:45:41 1:45 0.00072917 MUs935 OLD SEELAMPUR KRN 326 630 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 09:52:03 0:52 0.00011556 MUs
936BLOCK K‐JAGATPURI, YAMUNA RIVER‐KRISHNA NAGAR YAMUNA FLOOD PLAINS, SHANKAR NAGAR EXTN‐AZAD NAGAR, BLOCK B‐KRISHNA NAGAR BLOCK B KRN 0 630 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 12:55:00 3:55 0.00019583 MUs
937 BLOCK B‐MAHALAXMI ENCLAVE, BLOCK C‐GOVIND VIHAR, BLOCK A‐BABU NAGAR KWN 86 990 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 12:13:00 3:13 0.00117944 MUs938 BLOCK B‐GANGA VIHAR KWN 259 630 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 11:16:18 2:16 0.00113333 MUs939 BLOCK D‐OLD MUSTAFABAD, BLOCK H‐OLD MUSTAFABAD KWN 173 630 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 10:46:04 1:46 0.00058889 MUs940 BLOCK C‐PATEL VIHAR KWN 130 0 KVA PLANNED 18‐06‐2018 09:00:00 18‐06‐2018 11:59:00 2:59 0.00074583 MUs
941BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL NAGAR (DEHROTI) KWN 492 630 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 11:15:10 2:15 0.001125 MUs
942 BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR KWN 259 990 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 11:47:42 2:47 0.00139167 MUs943 MUSTAFABAD‐MUNGA NAGAR KWN 0 0 KVA PLANNED 03‐06‐2018 14:06:00 03‐06‐2018 14:55:46 0:49 0.00027222 MUs
944YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREASABHEPUR KWN 86 630 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 12:05:00 3:5 0.00051389 MUs
945 BLOCK D‐NEHRU VIHAR, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR KWN 173 630 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 10:12:38 1:12 0.0004 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage946 BLOCK E‐GANESH NAGAR, BLOCK B‐GANESH NAGAR LNR 173 990 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 14:25:32 5:25 0.00180556 MUs
947
PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BANK ENCLAVE‐LAKSHMI NAGAR, BLOCK J‐VISHWAKARMA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, KRISHAN KUNJ‐LAKSHMI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐VISHWAKARMA PARK, BLOCK M‐SHIV VIHAR, BLOCK B‐KUNDAN NAGAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK A‐GURU RAMDAS NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 7174 2970 KVA PLANNED 08‐06‐2018 10:06:00 08‐06‐2018 16:50:00 6:44 0 MUs
948
YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCK K‐JAGAT RAM PARK, BLOCK WA‐SHAKARPUR KHAS, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK F‐LALITA PARK, BLOCK A‐LALITA PARK, EAST END ENCLAVE‐LAKSHMI NAGAR, BLOCK C‐LALITA PARK, BLOCK J & K‐NARAYAN NAGAR, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK F‐GURU ANGAD NAGAR WEST LNR 173 990 KVA PLANNED 14‐06‐2018 09:06:00 14‐06‐2018 11:57:15 2:51 0.00095 MUs
949 SHANKAR VIHAR‐SWASTHYA VIHAR LNR 86 990 KVA PLANNED 18‐06‐2018 09:35:00 18‐06‐2018 12:24:55 2:49 0.00046944 MUs950 BLOCK F‐PREET VIHAR, BLOCK G‐PREET VIHAR LNR 86 990 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 12:49:00 3:49 0.00063611 MUs951 BLOCK C‐PREET VIHAR, BHARTI COLONY‐NIRMAN VIHAR LNR 173 990 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 12:54:51 3:54 0.0013 MUs
952 BLOCK H‐SEWA DHAM, BLOCK D‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, BLOCK C‐HARSH VIHAR, BLOCK B‐HARSH VIHAR NNG 259 0 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 12:30:00 3:30 0.00175 MUs953 BLOCK C‐SUNDER NAGRI NNG, BLOCK B‐HARSH VIHAR, BLOCK H‐PREM NAGAR NNG NNG 86 990 KVA PLANNED 13‐06‐2018 10:00:00 13‐06‐2018 11:57:00 1:57 0.000325 MUs
954BLOCK A‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 90 400 KVA PLANNED 01‐06‐2018 09:00:00 01‐06‐2018 12:09:07 3:9 0.00105 MUs
955 BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4716 5260 KVA PLANNED 18‐06‐2018 10:30:00 18‐06‐2018 12:12:00 1:42 0 MUs956 BABA DA DARGA‐KARDAMPURI NNG 86 990 KVA PLANNED 20‐06‐2018 10:30:00 20‐06‐2018 12:00:00 1:30 0.00025 MUs957 JYOTI COLONY‐BALBIR NAGAR NNG 86 400 KVA PLANNED 20‐06‐2018 10:30:00 20‐06‐2018 11:06:00 0:36 0.0001 MUs958 BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR NNG 354 400 KVA PLANNED 14‐06‐2018 11:40:00 14‐06‐2018 12:02:12 0:22 0.00009167 MUs959 CHOWK NAI BASTI‐SADAR BAZAR, PHARI DHIRAJ‐SADAR BAZAR, SADAR BAZAR B G ROAD PHG 259 990 KVA PLANNED 07‐06‐2018 09:00:00 07‐06‐2018 11:56:00 2:56 0.00097778 MUs960 SADAR BAZAR B G ROAD PHG 259 990 KVA PLANNED 18‐06‐2018 09:00:00 18‐06‐2018 13:00:00 4:0 0.00133333 MUs961 FYAZ GANJ‐NAWAB GANJ, PHARI DHIRAJ‐SADAR BAZAR PHG 65 990 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 12:00:00 2:54 0.00024167 MUs962 NAYA MOHALLA‐KISHAN GANJ RS, SIMLA MANDI GOODTRAN‐RUI MANDI, SADAR BAZAR B G ROAD PHG 15 990 KVA PLANNED 13‐06‐2018 10:06:00 13‐06‐2018 11:47:00 1:41 0.00014028 MUs963 HATHI KHANA‐NAWAB GANJ, SADAR BAZAR B G ROAD PHG 7 990 KVA PLANNED 15‐06‐2018 10:06:00 15‐06‐2018 11:59:41 1:53 0.00015694 MUs964 FYAZ GANJ‐NAWAB GANJ, NAWAB GANJ‐SADAR BAZAR, SADAR BAZAR ‐ RAM NAGAR PHG 259 990 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 11:48:27 2:48 0.00093333 MUs965 NAWAB GANJ‐SADAR BAZAR PHG 259 400 KVA PLANNED 18‐06‐2018 09:00:00 18‐06‐2018 11:55:59 2:55 0.00097222 MUs966 MANTOLA MOHALLA‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ PHG 259 630 KVA PLANNED 08‐06‐2018 09:00:00 08‐06‐2018 11:15:16 2:15 0.00075 MUs967 CHUNA MANDI‐PAHAR GANJ, MSC‐ARAM NAGAR, MANTOLA MOHALLA‐PAHAR GANJ PHG 259 990 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 11:44:24 2:44 0.00091111 MUs968 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ PHG 65 990 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 11:44:27 2:38 0.00021944 MUs969 MANTOLA MOHALLA‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR PHG 259 990 KVA PLANNED 19‐06‐2018 09:00:00 19‐06‐2018 11:02:44 2:2 0.00067778 MUs970 MANTOLA MOHALLA‐PAHAR GANJ PHG 259 990 KVA PLANNED 19‐06‐2018 09:00:00 19‐06‐2018 12:00:38 3:0 0.001 MUs971 ARAM NAGAR‐SADAR BAZAR PHG 65 630 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 11:58:36 2:52 0.00023889 MUs972 BLOCK 24‐WEST PATEL NAGAR, BLOCK 16‐WEST PATEL NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 517 6570 KVA PLANNED 18‐06‐2018 12:23:00 18‐06‐2018 14:10:00 1:47 0 MUs973 BLOCK H‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 155 990 KVA PLANNED 13‐06‐2018 09:06:00 13‐06‐2018 10:32:38 1:26 0.00028667 MUs974 THAKKAR BAPA NAGAR‐BLOCK 16 PNR 259 990 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 10:19:53 1:19 0.00043889 MUs975 BLOCK_39A‐NAIWALA, BLOCK_49A‐NAIWALA SRD 259 990 KVA PLANNED 09‐06‐2018 09:00:00 09‐06‐2018 10:20:00 1:19 0.00087778 MUs
976
BLOCK T‐ASHOKA PAHARI, BLOCK 25B‐AJMAL KHAN PARK, BLOCK_48D‐NAIWALA, BLOCK 8‐KAROL BAGH WEST EXTENSION AREA, BLOCK_46‐BEADON PURA, BLOCK_34P‐KRISHNA NAGAR, BLOCK_27F‐NAIWALA, RAMA KRISHNA MISSION FREE T.B. CLINIC‐BLOCK 18, BLOCK_49A‐NAIWALA, BLOCK 51‐AJMAL KHAN PARK PNR, BLOCK_39‐NAIWALA, BLOCK_26I‐BEADON PURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK_24N‐BEADON PURA, BLOCK 52‐AJMAL KHAN PARK, LIBERTY CINEMA‐KAROL BAGH PNR, AJMAL KHAN PARK SRD‐KAROL BAGH SRD, BLOCK 29‐NAIWALA, BLOCK_47‐BEADON PURA, BLOCK 57‐AJMAL KHAN PARK, BLOCK 59‐KAROL BAGH PNR, BLOCK_37J‐BEADON PURA, BLOCK 21B‐KAROL BAGH PNR, BLOCK_45‐KRISHNA NAGAR, MOHALLA SUBHASH NAGAR‐NAIWALA, BLOCK 23B‐KAROL BAGH PNR, BLOCK_28C‐NAIWALA, BLOCK 50‐AJMAL KHAN PARK, BLOCK_35M‐BEADON PURA, BLOCK_14A‐KAROL BAGH WEST EXTENSION AREA, BLOCK_39A‐NAIWALA, BLOCK 51‐AJMAL KHAN PARK SRD, BLOCK_15‐KAROL BAGH WEST EXTENSION AREA SRD 6613 8550 KVA PLANNED 04‐06‐2018 09:30:00 04‐06‐2018 10:45:00 1:15 0 MUs
977 KAROL BAGH TERMINAL SLUM‐JHANDEWALAN, BLOCK_35M‐BEADON PURA SRD 259 990 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 11:41:57 2:41 0.00089444 MUs978 BLOCK_24N‐BEADON PURA SRD 259 990 KVA PLANNED 18‐06‐2018 09:00:00 18‐06‐2018 11:55:54 2:55 0.00097222 MUs979 BLOCK_2A‐SAT NAGAR, BLOCK_1A‐REHAGAR PURA, BLOCK_5A‐SAT NAGAR SRD 78 990 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 10:47:59 1:41 0.00016833 MUs
980WEST KAROL BAGH‐CENTRAL RIDGE RESERVED FOREST, BLOCK T‐ASHOKA PAHARI, BLOCK_28C‐NAIWALA, JHANDEWALAN FATTED FACTORY COMPLEX, RAMA KRISHNA MISSION FREE T.B. CLINIC‐BLOCK 18 SRD 521 3960 KVA PLANNED 01‐06‐2018 10:02:00 01‐06‐2018 14:48:00 4:46 0 MUs
981BLOCK_11A‐BALMIKI COLONY, BLOCK 12A‐KAROL BAGH, BLOCK_13A‐BALMIKI COLONY, BLOCK_10A‐BALMIKI COLONY, BLOCK 38‐OLD RAJENDRA NAGAR, BLOCK 16A‐KAROL BAGH, BLOCK_6A‐SAT NAGAR SRD 388 630 KVA PLANNED 05‐06‐2018 09:00:00 05‐06‐2018 13:04:54 4:4 0.00040667 MUs
982 BLOCK_12D‐KRISHNA NAGAR, BLOCK_19C‐KRISHNA NAGAR, BLOCK_31‐KRISHNA NAGAR, BLOCK 5‐KAROL BAGH SRD 259 990 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 11:40:00 2:40 0.00155556 MUs983 BLOCK_49A‐NAIWALA SRD 259 630 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 10:09:56 1:9 0.00067083 MUs984 BLOCK 28‐OLD RAJENDRA NAGAR SRD 647 990 KVA PLANNED 19‐06‐2018 09:00:00 19‐06‐2018 11:33:51 2:33 0.002125 MUs
985
BLOCK 32‐OLD RAJENDRA NAGAR, BLOCK 38‐OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL‐OLD RAJENDRA NAGAR, BLOCK 30‐OLD RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 29‐OLD RAJENDRA NAGAR SRD 517 630 KVA PLANNED 16‐06‐2018 09:06:00 16‐06‐2018 11:51:02 2:45 0.00183333 MUs
986
BLOCK 16‐OLD RAJENDRA NAGAR, BLOCK 9‐OLD RAJENDRA NAGAR, BLOCK 8‐OLD RAJENDRA NAGAR, BLOCK 17‐OLD RAJENDRA NAGAR, BLOCK 8A‐OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR SRD 1735 630 KVA PLANNED 01‐06‐2018 09:00:00 01‐06‐2018 12:18:28 3:18 0.002475 MUs
987 BLOCK 38‐OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL‐OLD RAJENDRA NAGAR SRD 225 630 KVA PLANNED 04‐06‐2018 09:00:00 04‐06‐2018 12:55:58 3:55 0.00130556 MUs
988
NORTH EXTENSION AREA‐ BLOCK B‐OLD RAJENDRA NAGAR, JANKI DEVI COLLEGE‐CENTRAL RIDGE RESERVED FOREST, WEST KAROL BAGH‐CENTRAL RIDGE RESERVED FOREST, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK B3‐OLD RAJENDRA NAGAR SRD 504 630 KVA PLANNED 04‐06‐2018 09:00:00 04‐06‐2018 13:33:39 4:33 0.00379167 MUs
989
BLOCK 19‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK 25‐OLD RAJENDRA NAGAR, BLOCK 24‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK 60‐OLD RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA NAGAR SRD 350 990 KVA PLANNED 08‐06‐2018 09:00:00 08‐06‐2018 12:21:04 3:21 0.00111667 MUs
Sr. No. Area Affected DivisionNumber of Consumers
AffectedNoCapacity of Distribution
Transformer (in KVA).Whether Planned or Unplanned
Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage
990
PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, PART II‐ DDA COMPLEX‐NEW RAJENDRA NAGAR, N.P.L. STAFF QTRS.‐NEW RAJENDRA NAGAR, PART I‐ BLOCK H‐NEW RAJENDRA NAGAR, N.P.L. STAFF QTRS.‐PART II‐BLOCK G, PART I‐ BLOCK C‐NEW RAJENDRA NAGAR SRD 472 990 KVA PLANNED 11‐06‐2018 09:06:00 11‐06‐2018 11:31:07 2:25 0.00120833 MUs
991BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA NAGAR, BLOCK B3‐OLD RAJENDRA NAGAR SRD 259 990 KVA PLANNED 15‐06‐2018 09:00:00 15‐06‐2018 11:36:16 2:36 0.00086667 MUs
992 PKT B7 & B6‐MAYUR VIHAR PHASE III VSE 173 400 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 16:06:23 7:6 0.00236667 MUs993 BLOCK C‐RAJBIR COLONY, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK C‐KONDALI VILLAGE VSE 173 990 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 12:24:44 3:24 0.00113333 MUs
994
BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SEC D‐MAYUR VIHAR PHASE III, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐KONDALI VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, BLOCK F‐KONDALI VILLAGE, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE VSE 797 990 KVA PLANNED 22‐06‐2018 11:30:00 22‐06‐2018 13:29:40 1:59 0.00049583 MUs
995 BLOCK B1‐NEW ASHOK NAGAR VSE 940 400 KVA PLANNED 14‐06‐2018 11:06:00 14‐06‐2018 13:34:49 2:28 0.00032889 MUs
996BLOCK A & B‐VASUNDHARA ENCLAVE, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK C1‐NEW ASHOK NAGAR, BLOCK E‐NEW ASHOK NAGAR, BLOCK C2‐NEW ASHOK NAGAR, SUBHASH PARK‐GORAKH PARK VSE 872 990 KVA PLANNED 15‐06‐2018 11:06:00 15‐06‐2018 14:34:56 3:28 0 MUs
997
MAYUR VIHAR PHASE III, BLOCK C1‐NEW ASHOK NAGAR, BLOCK A‐NEW ASHOK NAGAR, BLOCK B‐NEW ASHOK NAGAR VSE, SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR, HANUMAN MANDIR‐NEW ASHOK NAGAR, BLOCK B1‐NEW ASHOK NAGAR, NEW ASHOK NAGAR VSE‐VASUNDHARA ENCLAVE VSE VSE 109 1390 KVA PLANNED 25‐06‐2018 09:06:00 25‐06‐2018 12:16:00 3:10 0.00453889 MUs
998 BLOCK B‐GARI MANDU, BLOCK C‐JAI PRAKASH NAGAR, BLOCK J‐KARTAR NAGAR, WEST GHONDA YVR 86 630 KVA PLANNED 18‐06‐2018 09:06:00 18‐06‐2018 14:14:54 5:8 0.00085556 MUs999 GHONDA PATTI CHAUHAN YVR 86 990 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 14:58:59 5:52 0.00097778 MUs
1000BLOCK B‐GARI MANDU, BLOCK C‐GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, KACHI COLONY‐JAGJEET NAGAR YVR 86 990 KVA PLANNED 18‐06‐2018 09:06:00 18‐06‐2018 15:32:12 6:26 0.00107222 MUs
1001 WEST GHONDA, BLOCK D‐BHAJANPURA YVR 86 990 KVA PLANNED 20‐06‐2018 09:06:00 20‐06‐2018 14:00:56 4:54 0.00081667 MUs
1002 BLOCK B‐SUBHASH MOHALLA, BLOCK C‐JAI PRAKASH NAGAR, ARVIND NAGAR‐GHONDA, BLOCK D‐BHAJANPURA YVR 86 990 KVA PLANNED 20‐06‐2018 09:06:00 20‐06‐2018 14:01:37 4:55 0.00081944 MUs1003 BLOCK D‐AJMERI GATE, DELHI GOVT. STAFF FLATS‐PRESS ENCLAVE YVR 837 990 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 13:38:00 4:32 0.00151111 MUs1004 BLOCK P‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK R‐BRAHM PURI YVR 951 990 KVA PLANNED 20‐06‐2018 11:06:00 20‐06‐2018 16:06:42 5:0 0.00166667 MUs1005 BLOCK A‐GHONDA PATTI, GAMRI‐GHONDA YVR 130 990 KVA PLANNED 13‐06‐2018 09:06:00 13‐06‐2018 13:32:59 4:26 0.00110833 MUs
1006BLOCK B‐SUBHASH MOHALLA, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, WEST GHONDA YVR 130 990 KVA PLANNED 15‐06‐2018 09:06:00 15‐06‐2018 14:03:47 4:57 0.0012375 MUs
1007 BLOCK P‐BRAHM PURI, NAYAGAON‐NEW KATWARA YVR 130 990 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 15:06:18 6:0 0.0015 MUs
1008
GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, JAFFRABAD‐MAUJ PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI YVR 2419 990 KVA PLANNED 25‐06‐2018 09:06:00 25‐06‐2018 17:50:01 8:44 0.00145556 MUs
1009 NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, BLOCK C‐JAI PRAKASH NAGAR YVR 173 630 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 15:04:54 6:4 0.00202222 MUs1010 NAYAGAON‐NEW KATWARA YVR 173 400 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 15:05:28 6:5 0.00202778 MUs1011 JAGJEET NAGAR‐GHONDA, NAYAGAON‐NEW KATWARA YVR 86 400 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 13:44:32 4:38 0.00077222 MUs1012 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 86 630 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 13:51:30 4:45 0.00079167 MUs
1013LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA, WEST GHONDA YVR 2194 630 KVA PLANNED 15‐06‐2018 14:56:00 15‐06‐2018 17:07:40 2:11 0 MUs
1014BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, BLOCK D‐BHAJANPURA YVR 173 990 KVA PLANNED 15‐06‐2018 09:00:00 15‐06‐2018 13:06:00 4:6 0.00136667 MUs