Contents
Corporate Overview
Solutions and Systems Overview Nu Flow Advantages
Customers and Projects
Structural Pipe Lining Overview
Pipe Lining Process
Pull-in-Place Lining Benefits
Drain Lining Jobs Completed
Epoxy Pipe Lining Overview
Pipe Renewal and Coating Process
Epoxy Coating Benefits
Epoxy Lining Jobs Completed
Satisfied Customers
Resources
-
8/4/2019 Nu Flow Powerpoint Presentation
3/47
Corporate Overview
Headquarters: San Diego, California, USA
Manufacturing: Toronto, Ontario, Canada
Sales Offices: Atlanta, GA; Orange County, CA; San Diego, CA;
Sarasota, FL; Toronto, ON
Employees: 150+
Intellectual Property: 26 patents & licenses
Solution History: Epoxy coatings since 1987Structural pipe liners since 1998
Channels: Indirect: 250+ franchisees and licensees
Direct: National and regional account managers
Markets: Commercial, industrial, federal, municipal, residential
Customers: Owners and property managers of hotels, multi-unitresidential buildings, hospitals, schools, office buildings,
manufacturing facilities, utilities, municipal buildings,
military bases and ships, homes and more.
-
8/4/2019 Nu Flow Powerpoint Presentation
4/47
Mission Statement
Nu Flow will provide its cohesive network oflicensees and clients with unique, versatile
and affordable pipe lining solutions,
All Under One Roof.
We are achieving this goal daily withrigorous quality standards,
personable service andongoing R&D.
-
8/4/2019 Nu Flow Powerpoint Presentation
5/47
Corporate Offices
Targeted Location
Current LocationNu Flow, Toronto
Sales, Installations, R&D, Manufacturing and Corporate
Support Services
Nu Flow, Sarasota
Sales and Installations
Nu Flow, San Diego
Sales and Installations, Corporate Support Services
Nu Flow, Orange County
Sales and Installations
Nu Flow, Atlanta
Sales and Installations
Nu Flow Specialty Group
Installations, Anywhere at Anytime
-
8/4/2019 Nu Flow Powerpoint Presentation
6/47
Any PipeAnywhere
Pipe Renewal andCoating Solutions
Structural PipeLining Solutions
-
8/4/2019 Nu Flow Powerpoint Presentation
7/47
Solutions for All Systems
Drain and Sewer Rehabilitation Complete sanitary and sewer drain pipe
retrofit solution
Complete pipe liners for to 8 pipe
Spot repair liners for up to 36 pipe
In-building and underground sanitary
waste systems Sewer laterals
Vertical drain stacks
Roof drain and storm drain systems
Structural change of diameter products
Nu Flex Liner for multiple 45 and 90
bends Mini re-instator inline cutters
Pressurized System Lining Pipe restoration and epoxy coating
solution
Pipe lining for to 8 pipe
Potable hot and cold water pipes
Water mains and lateral service lines
HVAC, heating and cooling pipes
Fire suppression systems
Refrigerant system pipes
Process fluid pipes
Compressed air lines
Copper and nickel sanitary pipes
Custom Hybrid Solutions
Non-potable pressurized systems
-
8/4/2019 Nu Flow Powerpoint Presentation
8/47
Before and After
Epoxy CoatingsStructural Drain Liners
Galvanized Steel
Copper Pipe
Cast Iron Pipe
-
8/4/2019 Nu Flow Powerpoint Presentation
9/47
The Nu Flow Advantage
Traditional Pipe Repair Nu Flow Rehabilitation
Involves demolition to access pipes
Highly disruptive to tenants /
owners
Requires repair / reconstruction to
return property to original
condition
Not a long-term solution (problems
will return)
Not feasible for inaccessible pipes
Trenchless and no-dig solutions
Less disruptive and faster than
traditional pipe repair or
replacement
Avoids destruction of buildings,
hardscapes and landscapes and
associated reconstruction costs
Long-term solution to prevent
future problems
Solves the most challenging pipe
situations
-
8/4/2019 Nu Flow Powerpoint Presentation
10/47
Nu Flow Advantages
Roughly 50% of the cost of traditional pipe replacement
About 50% of the time vs traditional pipe replacement.
Able to provide a solution when pipe replacement is prohibitivelyexpensive/impossible.
Increases system efficiency and reduces energy costs for related pumps
and compressors
Minimal disruption to building occupants/ processes
Avoids destruction of buildings, hardscapes and landscapes and associatedreconstruction costs
Longer life expectancy than new pipes
Solves the most challenging pipe situations
Green benefit: 100% reuse of mechanical system (minimal waste)
-
8/4/2019 Nu Flow Powerpoint Presentation
11/47
Nu Flow Customers and Projects
GovernmentU.S. Army
U.S. NavyU.S. White House ComplexU.S. Capitol Building FountainsNASAWashington State CapitalSacramento Capital Offices
Healthcare & Life SciencesBonner General HospitalMorningside Assisted LivingGlaxoSmithKlineSudbury Regional Hospital
EducationClemson UniversityOregon State UniversityRancho Bernardo High SchoolSunset Elementary SchoolAshland High School
IndustrialATK Boeing Space Systems
Coca-ColaGeneral Motors
Lodging & Multi-Unit ResidentialCrowne Plaza HotelSt. Croix ClubWoodway Place Atrium CondominiumsPlymouth Harbor on Sarasota BayWashington Park Tower
OfficesCushman Wakefield (e.g. 125 Broad Street, NY)
Tishman Speyer (e.g. MetLife Building, NY)Irvine Company Office Properties
RetailWestfield MallLongs Drug Stores
-
8/4/2019 Nu Flow Powerpoint Presentation
12/47
Structural Pipe Lining
Nu Flow Pull-in-PlaceStructural Liners
In-Place Pipe RetrofittingUsing Trenchless and No-Dig Technology
in Buildings and Underground
-
8/4/2019 Nu Flow Powerpoint Presentation
13/47
Drain and Sewer Pipe Rehab
Usage of Drain/Sewer Pipe Lining Technology
Piping systems from 1 - 8 diameters above and below ground can be internally cleaned and epoxy lined.
Sewers Gas pipelines
Chemical / industrial pipelines Straight pipelines Pipelines with bends Circular pipes Non-circular pipes Pipelines with varying cross-section Pipelines with lateral connections Pipelines with deformation On-line replacement Pressure pipelines Man-entry pipelines
-
8/4/2019 Nu Flow Powerpoint Presentation
14/47
Pipe Lining Process
1. Identify the Problem by Sewer Camera
2. Clean the pipesThe first step is to clean out all roots and descale anycalcite, etc. in order to return the pipe back to itsoriginal functioning diameter. To do this we either jetthe lines or use pneumatic tools such as the scorpioncutter shown in the video above.
3. Install the linerThe length of liner needed is cut, a custom two partepoxy is mixed and poured in to permeate the feltliner. The saturated liner is then pulled in place, thebladder is inflated and the curing begins. Once theepoxy lining has cured, the bladder is extracted,
leaving a complete structural pipe within a pipe.
4. Insuring QualityTo insure that the job has been performed perfectly, acamera is done to inspect the work and you receive acopy of this as well.
-
8/4/2019 Nu Flow Powerpoint Presentation
15/47
Pull-in-Place Lining Benefits
Nu Flow offers truly no-dig technology saving the customer thousandsof dollars in labor and restoration
Seamless installation eliminates joints and increases flow
Nu Flow lining conforms to standard and non-standard pipe shape and
sizes from to 8" in diameter (controlled lengths 8- 36)
Molds to host pipe, stops leaks and root intrusion and can span voidpipe sections
Can be installed under slab concrete from existing drain connection
points and clean outs
Laterals accurately reinstated with CCTV camera (no digging)
-
8/4/2019 Nu Flow Powerpoint Presentation
16/47
Drain Lining Jobs Completed
Commercial Buildings
Government Buildings
Multi-Unit Residential Buildings
Hotels
Hospitals
Schools
Industrial Facilities
Churches
Municipal Sewer Systems
Residential Homes
-
8/4/2019 Nu Flow Powerpoint Presentation
17/47
Drain Stacks: Christian Care Communities
Location
Louisville, KY
Work PerformedCleaned and linedtwenty-one verticalsanitary drain stacksmade of 3 cast iron pipe.
-
8/4/2019 Nu Flow Powerpoint Presentation
18/47
Sanitary Drains: Trump Towers
Location
Brooklyn, New York
Work PerformedA 16 foot, 3 in diameter
drain, located under anelevator shaft was linedto stop leakage.
-
8/4/2019 Nu Flow Powerpoint Presentation
19/47
Roof Drains: Temple Emanu-El
Location
Manhattan, NY
Work PerformedClean and lined 10 roofdrains that were encasedin concrete pillars.
-
8/4/2019 Nu Flow Powerpoint Presentation
20/47
Roof Drains: EEOB
Location
Washington, DC
Work PerformedTwo 70 foot roof drains,each containing a double45 degree bend.
-
8/4/2019 Nu Flow Powerpoint Presentation
21/47
Floor Drains: Coca-Cola
Location
New York and Texas
Work PerformedCorroded cast iron floordrains were lined usinghigh heat and a customengineered corrosion
resistant epoxy.
-
8/4/2019 Nu Flow Powerpoint Presentation
22/47
Mainline: Shands Childrens Hospital
Location
Gainesville, FL
Work PerformedCleaned and relinedapproximately 250 feet of12 mainline pipe with
limited access.
-
8/4/2019 Nu Flow Powerpoint Presentation
23/47
Sewer Main: Mar-A-Lago Resort
Location
Palm Beach, FL
Work Performed300 feet of 6 sewer main
was lined.
-
8/4/2019 Nu Flow Powerpoint Presentation
24/47
Sanitary Drains: Nestle Factory
Location
Trenton, ON, Canada
Work PerformedLined over 100 feet of 6
cast iron pipe includingtwo 45 degree bends andone Y connection. All
pipe was encased inconcrete.
-
8/4/2019 Nu Flow Powerpoint Presentation
25/47
Sanitary Drains: General Motors
Location
Warren, Michigan
Work Performed100 feet of 8 sanitary
pipe was lined along withtwo lateral connections.
-
8/4/2019 Nu Flow Powerpoint Presentation
26/47
Other: GSF Grand Banks Oil Rig
LocationBelle Island, St. Johns
Work PerformedThe sounding pipe usedin manual watermeasurement was linedto repair a badly corroded
access point. Work wasperformed at Sea.
-
8/4/2019 Nu Flow Powerpoint Presentation
27/47
Sewer Main: Sarasota County
In 2003, Sarasota County wasforced to haul 1.4 milliongallons of excess ground waterthat had infiltrated their Sewagesystem at a single pump station.
Since lining that neighborhoodsmains and laterals the over flowproblem virtually disappeared.
The savings on overflow watertreatment is in the MILLIONS fora SINGLE PUMP STATION.
Sarasota County has between40 and 50 active pump stationsat any given time.
-
8/4/2019 Nu Flow Powerpoint Presentation
28/47
Epoxy Pipe Lining
Nu Flow Epoxy Coatings
In-Place Pipe RehabilitationUsing Trenchless and No-Dig Technology
in Buildings and Underground
-
8/4/2019 Nu Flow Powerpoint Presentation
29/47
Pressurized Pipe Solutions
Nu Flow offers truly no-dig technology saving the customer thousandsof dollars in labor and restoration versus a repipe
Nu Flow epoxy coatings for pipes from to 8" in diameter
Epoxy creates barrier between pipe and water extending the useful life
of the pipe system to an estimated 50 to 100 years
Smooth finish increases flow through pipes
Prevents corrosion, scaling and leaks
Can be installed from existing connection points to the pipe system
Prevents metals from leaching into drinking water
-
8/4/2019 Nu Flow Powerpoint Presentation
30/47
Pipe Renewal and Coating Solution
Usage of Pipe Renewal and Coating Solution
Piping systems from 8 diameters above and below ground can be internally
cleaned and coated with Nu Flows patented epoxy.
Potable water pipes*
Heating and cooling pipes Process water pipes Roof drain piping Pool supply/drain pipes
Compressed air lines
Galvanized, steel, copperand lead pipes
* Potable water systems require epoxies that are NSF-61 certified by the National Sanitation Foundation.
-
8/4/2019 Nu Flow Powerpoint Presentation
31/47
Pipe Renewal and Coating Process
1. Prepare pipesFaucets and fixtures are disconnected and usingthose existing connection points, the pipes aredrained and dried with heated air.
2. Clean the pipesUsing the same compressed air, the pipes are sandblasted to remove corrosion and rust and to preparethe inside of the pipes for epoxy coating.
3. Install the epoxyA patented two-part epoxy is mixed and blown intothe pipes using compressed air. Using valves to controlthe process, the epoxy is spread to an even layerthroughout the entire piping system.
4. Curing and reconnectionThe epoxy cures in 24 hours and the fixtures arereconnected and put back in service.
-
8/4/2019 Nu Flow Powerpoint Presentation
32/47
Epoxy Coating Benefits
Cost Saving and Convenience Less mess
Less time
Permanent solution to corrosion
Environmental Benefits Reduces landfill waste by not replacing pipe
Extends useful life of existing pipe systems
Health and Environmental Benefits
Eliminates harmful lead and heavy metal leaching Eliminates particulates at aerators and valves
-
8/4/2019 Nu Flow Powerpoint Presentation
33/47
Cost and Convenience
Cost effective and fast
Reduces downtime
Non-disruptive to occupants
Abatement minimized
Molds left undisturbed
Traditional RepairPipe Lining Repair
-
8/4/2019 Nu Flow Powerpoint Presentation
34/47
Epoxy Lining Jobs Completed
Commercial Buildings
Government Buildings
Multi-Unit Residential Buildings
Hotels
Hospitals
Schools
Industrial Facilities
Churches
Naval Vessels
Residential Homes
-
8/4/2019 Nu Flow Powerpoint Presentation
35/47
Potable & HVAC: Plymouth Harbor
Location
Sarasota, FL
Work PerformedComplete epoxy lining ofall hot and cold domesticlines, chilled watercooling lines and all the
sanitary drain lines.
i i i if i i
-
8/4/2019 Nu Flow Powerpoint Presentation
36/47
6-8 Hi-Rise Main: MetLife Building
Location
Manhattan, NY
Work Performed400 plus feet of 6 and
200 plus feet 8
galvanized pipe wasrehabilitated using the Nu
Flow in place piperestoration method.
-
8/4/2019 Nu Flow Powerpoint Presentation
37/47
Potable MURB: Washington Park Tower
Location
Seattle, WA
Work PerformedRestore galvanizeddomestic water system inthis 23-story luxury high-rise condominium
complex.
1 4 HVAC Ri 125 B d St t
-
8/4/2019 Nu Flow Powerpoint Presentation
38/47
1-4 HVAC Risers: 125 Broad Street
Location
Manhattan, NY
Work PerformedEpoxy lining of HVACrisers for this 40-storyhigh-rise with nodisruption to the daily
function of the offices ortenants.
P bl MURB B i l C d i i
-
8/4/2019 Nu Flow Powerpoint Presentation
39/47
Potable MURB: Bristol Condominiums
Location
Houston, TX
Work Performed
Restoration of the hot, cold
and hot recirculation linesfor all units. Pipe isgalvanized and all work isbeing performed withoutdisplacing residents.
P t bl MURB W d Pl
-
8/4/2019 Nu Flow Powerpoint Presentation
40/47
Potable MURB: Woodway Place
Location
Houston, TX
Work PerformedRestoration of the hot,cold and hot recirculationlines for all units. Pipewas galvanized and all
work was performedwithout the need todisplace residents.
4 HVAC ATK S S t
-
8/4/2019 Nu Flow Powerpoint Presentation
41/47
4 HVAC: ATK Space Systems
Location
San Diego, CA
Work Performed400 feet of 4 concrete
encased pipe was lined,repairing a leak andpreventing further
structural damage to thebuilding.
Fi S i F t D
-
8/4/2019 Nu Flow Powerpoint Presentation
42/47
Fire Suppression: Fort Drum
Location
Fort Drum, North Country
New York, 10th MountainDivision Aircraft Hanger
Work Performed
Lining of the AFF firesuppression deluge
system and the 100%AFFF distribution system.
W t Pi U it St t N
-
8/4/2019 Nu Flow Powerpoint Presentation
43/47
Waste Pipe: Unites States Navy
Location
Norfolk, VA
Work PerformedRestore copper andnickel waste anddischarge piping.
P t bl W lk Ti Sh R t
-
8/4/2019 Nu Flow Powerpoint Presentation
44/47
Potable: Welk Time Share Resort
Location
Escondido, CA
Work Performed
Complete cleaning andlining of all domesticwater lines in over 268
units. Pipe diametersranged from to 3
1 3 P t bl B G l H it l
-
8/4/2019 Nu Flow Powerpoint Presentation
45/47
1-3 Potable: Bonner General Hospital
Location
Sandpoint, ID
Work PerformedA 65 bed hospital withspecialty, diagnostic andemergency servicedepartments. All potable
lines were coated withepoxy.
S ti fi d Cli t
-
8/4/2019 Nu Flow Powerpoint Presentation
46/47
Satisfied Clients
Reso rces
http://www.tropicana.com/index.cfm?noHomeAnim=1http://images.google.com/imgres?imgurl=http://www.iboats.com/sites/southwestmarine/global_images/southwestlogo.jpg&imgrefurl=http://www.iboats.com/sites/southwestmarine/site_page_1664/&h=226&w=800&sz=53&hl=en&start=4&tbnid=1RYba8p9SyFMIM:&tbnh=40&tbnw=143&prev=/images?q=southwest+marine&gbv=2&svnum=10&hl=enhttp://images.google.com/imgres?imgurl=http://www.bearplugs.com/prodimg/ahc-10072.gif&imgrefurl=http://www.bearplugs.com/shop.php?category=13%2509%2509%2509%2509%2509%2509%2509%2509%2509&scategory=4&h=325&w=350&sz=59&hl=en&start=2&tbnid=yNXWyx80aMxq5M:&tbnh=111&tbnw=120&prev=/images?q=US+Navy&gbv=2&svnum=10&hl=enhttp://images.google.com/imgres?imgurl=http://www.ciadvertising.org/SA/fall_02/adv382j/steph/steph2/Project2pictures/coca-cola.jpg&imgrefurl=http://www.ciadvertising.org/SA/fall_02/adv382j/steph/steph2/new_page_11.htm&h=289&w=289&sz=13&hl=en&start=3&tbnid=4yQlY72vn87nJM:&tbnh=115&tbnw=115&prev=/images?q=coca+cola&gbv=2&svnum=10&hl=enhttp://images.google.com/imgres?imgurl=http://www.fromeuropewithlove.net/Pictures/nestle.gif&imgrefurl=http://www.fromeuropewithlove.net/no_more_nestle_good_life.htm&h=306&w=308&sz=9&hl=en&start=1&tbnid=ZxWNA0WXEGi86M:&tbnh=116&tbnw=117&prev=/images?q=nestle&gbv=2&svnum=10&hl=en -
8/4/2019 Nu Flow Powerpoint Presentation
47/47
Resources
www.nuflowtech.com
www.wqa.org
www.plumbingandhvac.ca
www.no-dig.com
www.nastt.org
www.trenchlessonline.com