![Page 1: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/1.jpg)
Conrail Freight Train Derailment
with Vinyl Chloride Release
1
Paulsboro, New Jersey
November 30, 2012
Paul L. Stancil, Investigator-in-Charge
![Page 2: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/2.jpg)
2
N
Tank Car 10:
DOT-105
Vinyl Chloride
Punctured
![Page 3: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/3.jpg)
3
Injuries and Damages
• Emergency responders and residents
exposed to vinyl chloride
• 28 residents treated at hospitals
• $451,000 equipment damage
• $30 million emergency response
![Page 4: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/4.jpg)
4
56 ft
Swing span
N
Mantua Creek
Paulsboro
Moveable Bridge
![Page 5: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/5.jpg)
5
Mantua Creek
Paulsboro
Moveable Bridge
Open
56 ft
March 2 - December 1
N
![Page 6: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/6.jpg)
6
Mantua Creek
Paulsboro
Moveable Bridge
March 2 – December 1
N
![Page 7: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/7.jpg)
7
Slide Lock Operation
![Page 8: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/8.jpg)
8
Slide Lock Operation
![Page 9: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/9.jpg)
Bridge Operation Problems
9
Nu
mb
er
of
Tro
ub
le T
ick
ets
Hurricane Sandy
Derailment
Oct. 29, 2012
Nov. 30, 2012
![Page 10: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/10.jpg)
10
Mantua Creek
November 29, 2012 - about 3:00 a.m.
Gap
N
East end
![Page 11: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/11.jpg)
11
N
Mantua Creek
November 29, 2012 - about 11:00 p.m.
Slide locks
partially engaged
Slide locks
unlocked
West end
East end
![Page 12: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/12.jpg)
12
N
Mantua Creek
November 30, 2012 - 6:52 a.m.
![Page 13: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/13.jpg)
13
Mantua Creek
November 30, 2012 - 7:02 a.m.
![Page 14: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/14.jpg)
14
37 inches
Punctured Tank Car
![Page 15: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/15.jpg)
Emergency Response
• Initial notification
• First responders staged in “hot zone”
• No respiratory protection used
• Unified command established
after 6 hours
15
![Page 16: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/16.jpg)
Investigative Hearing July 9-10, 2013
• Conrail bridge operations
• Initial emergency response
• Hazardous materials incident
management
• State and federal emergency
response actions
16
![Page 17: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/17.jpg)
Safety Issues
• Qualification of bridge inspectors
• Conrail safety management
• Hazardous materials communications
• Hazardous materials response protocols
• Firefighter training and qualifications
• Emergency planning and preparedness
• Rail corridor risk management
17
![Page 18: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/18.jpg)
Proposed Safety Recommendations
• U.S. Department of Transportation
• Federal Railroad Administration
• Consolidated Rail Corporation
• Association of American Railroads
• American Short Line and Regional Railroad
Association
• International Association of Fire Chiefs
• National Volunteer Fire Council
• New Jersey State Agencies
18
![Page 19: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/19.jpg)
Reiterated Recommendations
• Federal Railroad Administration
• Pipeline and Hazardous Materials
Safety Administration
19
![Page 20: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/20.jpg)
Investigation Team
• Paul Stancil Investigator-in-Charge
• James Southworth On-scene IIC
• Tim DePaepe Signals
• Rick Downs Emergency Response
• Muhamed El-Zoghbi Hazardous Materials and Emergency Response
• Joe Epperson Materials Laboratory
• Gena Evans Editor
• Cy Gura Track and Structures
20
![Page 21: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/21.jpg)
Investigation Team - continued
• Joe Gregor Electrical Engineering
• Steve Jenner Human Performance
• Cassandra Johnson Recorders
• Donald Kramer Materials Laboratory
• Matt Nicholson Investigative Hearing Officer
• Mike Richards Meteorology
• Ted Turpin Operations
• Dave Watson Mechanical
21
![Page 22: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/22.jpg)
Staff
22
• Bob Beaton
• Shannon Bennett
• Steve Blackistone
• Larry Bowling
• Alex Burkett
• Jennifer Cheek
• Stephanie Davis
• Antion Downs
• Ann Gawalt
• Georgetta Gregory
• Erik Grosof
• Richard Hipskind
• Mike Hiller
• Gary Helmer
• Mark Jones
• Nancy Mason
• Kelly Nantel
• Alice Park
• Ruben Payan
• Carl Schultheisz
• Joe Scott
• Eric Stolzenberg
• Christy Spangler
• Jane Terry
• John Vorderbrueggen
• Terry Williams
![Page 23: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/23.jpg)
Parties to the Investigation
• Consolidated Rail Corporation (Conrail)
• Federal Railroad Administration
• Brotherhood of Locomotive Engineers and Trainmen
• International Association of Sheet Metal, Air, Rail, and Transportation Workers
• TrinityRail
• State of New Jersey
23
![Page 24: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/24.jpg)
Conrail Operating Issues
24
Ted Turpin
![Page 25: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/25.jpg)
Safety Issue
Training and qualification of train crews
for moveable bridge inspection
25
![Page 26: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/26.jpg)
Conductor’s Training
• Inspected with an experienced conductor
four years earlier
• No formal training
• Had not inspected a bridge until accident
• Uncertain when slide locks were fully
engaged
• Answers did not demonstrate knowledge
26
![Page 27: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/27.jpg)
Physical Evidence on Bridge
27
No damage to components in circled areas
East end slide locks - locked
Direction of travel open
![Page 28: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/28.jpg)
Physical Evidence on Train
28
![Page 29: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/29.jpg)
Bridge Not Locked
• Inadequate training
• Uncertain answers
• No damage to slide locks
• Strike marks on wheels
• Erroneously determined locked
29
![Page 30: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/30.jpg)
Conrail Training
• No specific instructions for inspecting
moveable bridges
• No posters or other job aids
• Other crewmembers had no formal
training
• Manager confirmed no formal
instructions
30
![Page 31: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/31.jpg)
Conrail Training
• No written instructions in training
program
• Training comes from on-the-job
• Inspecting bridge random
31
![Page 32: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/32.jpg)
Conrail Training
• Conrail did not ensure inspections by
qualified employees
• Unstructured on-the-job training
• Did not prepare crews
32
![Page 33: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/33.jpg)
Conrail Postaccident Actions
• No permission to pass stop signals
• Crews notify dispatcher
• Dispatcher informs trouble desk
• Notify maintenance department
• No longer rely on operating crews
33
![Page 34: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/34.jpg)
FRA Safety Advisory
• Evaluate the design of moveable
bridges
• Evaluate operating rules for stop
signals
• Review the adequacy of all training
• Encouraged railroads to take
corrective action
34
![Page 35: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/35.jpg)
FRA Safety Advisory
• Operating employees could be
qualified
• Qualified employee was not defined
• No specific training was described
• FRA does not track implementation
• FRA does not enforce
35
![Page 36: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/36.jpg)
Existing Regulation for Passing over a
Broken Rail (49 CFR 213.7(d))
• Minimum experience
• Requires training with examinations
• Periodic requalification
• Establishes specific subjects
• Requires watching and be prepared to stop the train
• Enforceable by FRA
36
![Page 37: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/37.jpg)
37 37 37
Muhamed El-Zoghbi
Hazardous Materials Emergency
Response
![Page 38: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/38.jpg)
Issue Areas
• Hazardous Materials Communications
• Emergency Response Protocols
• Community Protective Action Measures
• Community Awareness Programs and
Emergency Response Planning
• Oversight of Emergency Operations Plans
• Hazardous Materials Routing and Risk Analysis
38
![Page 39: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/39.jpg)
Hazardous Materials Communications
• Responders need train consists to identify,
locate, and secure hazardous materials
• Train consist not immediately available to
responders at all times
• Conrail retained possession for 3.5 hours
39
![Page 40: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/40.jpg)
40
Position
in Train Tank
Car
Number Maximum
Quantity
Emergency
Contact
Number
Identity
of
Chemical
![Page 41: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/41.jpg)
Hazardous Materials Communications
• Instructions to crews may be contributing
to delays in emergency information
• Railroad emergency response information
inconsistent with and not as protective as
Emergency Response Guidebook
41
![Page 42: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/42.jpg)
Hazardous Waste Operations and
Emergency Response (HAZWOPER)
• Emergency responders knew uncontrolled hazardous materials release occurred
• OSHA HAZWOPER standard, 29 CFR 1910.120, requires:
- Site assessment
- Appropriate emergency operations
- Personal protective equipment
42
![Page 43: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/43.jpg)
43
Initial Command
Post
Potential Recommended
Initial Evacuation Areas
(Weather-dependent)
½ mile
![Page 44: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/44.jpg)
44
½ mile
50 yards
Breached
Tank Car
Initial Command Post location
![Page 45: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/45.jpg)
Hazardous Waste Operations and
Emergency Response (HAZWOPER)
• Responders exposed to vinyl chloride
• Other local and state agencies failed to
comply with HAZWOPER standard
• Citations for violations were issued
45
![Page 46: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/46.jpg)
Community Protective Action Measures
• Initial evacuation and shelter-in-place decisions based on erroneous reports
- Liquefied petroleum gas vs. vinyl chloride
- Vapor cloud reported “nontoxic”
• Inadequate measures to correct errors and misinformation
46
![Page 47: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/47.jpg)
• Fact-based decisions regarding
community exposure did not occur
• Estimate endangered area and
potential harm to community
• Determine concentrations of released
hazardous material within area
47
Community Protective Action Measures
![Page 48: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/48.jpg)
Example ALOHA Model
Red, orange, and yellow zones indicate where specific level of concern thresholds exceeded
48 Source: NOAA.gov
![Page 49: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/49.jpg)
Community Awareness Programs and
Emergency Response Planning
• Responders and community unfamiliar with
hazardous materials routinely transported
through Paulsboro
• Railroad community awareness is voluntary
• Communities unprepared for hazardous
materials transiting their neighborhoods
49
![Page 50: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/50.jpg)
50
180,000 lbs
100 lbs
Community Awareness Programs and
Emergency Response Planning
• Chlorine
- Fixed facility: 100 lbs (a cylinder) - Planning
required
- Rail: tank car (180,000 lbs) – No planning
required
• Fixed facility threshold planning quantities often
lower than quantities transported by rail
![Page 51: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/51.jpg)
• Emergency Operations Plans:
- Assign responsibility and set lines of authority
- Describe how people will be protected
- Identify resources for response
• In New Jersey - EOP recertification every 4 years
• Paulsboro EOP was 2 years past due
recertification
51
Oversight of Emergency Operations Plans (EOP)
![Page 52: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/52.jpg)
• State relies on counties to conduct reviews
• No audits or procedures to verify
capabilities
• Many municipalities are non-compliant
• Inadequate accountability for non-compliance
52
Oversight of Emergency Operations Plans (EOP)
![Page 53: NTSB Paulsboro Presentation](https://reader034.fdocuments.net/reader034/viewer/2022052302/58a5a3881a28ab1a628b478b/html5/thumbnails/53.jpg)
Routing and Risk Analysis
• Rail Corridor Risk Management System (RCRMS) software is inadequate for shortline railroads
• RCRMS does not assess risk when alternate routes are unavailable
• Conrail aware of shortcomings and failed to conduct thorough risk assessment
53