Transcript of ntpc
Industrial Summer Training atNTPC Badarpur
Anuj Kumar
Electronics & Communication
Introduction
10/31/11
Overview of NTPC
NTPC was set up in the central sector in the 1975.
NTPC has installed capacity of 29,394 MW. It plans to be a 75,000 MW company by 2017.
NTPC Badarpur station has also bagged ISO 9001/ ISO 14001 certification.
Today NTPC contributes more than 3 / 5th of the total power generation in India
Click to edit the outline text format
Second Outline Level Third Outline
LevelFourth
Outline Level Fifth
Outline Level
Sixth Outline Level
Seventh Outline Level
Eighth Outline Level
• Ninth Outline LevelClick to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
Overview of NTPC
NTPC Badarpur
Overview of BTPSBTPS MEETS MORE THAN 24% OF DELHI’S
ELECTRICITY CONSUMPTION
INSTALLED CAPACITY 720 MW
DERATED CAPACITY 705 MW (3x95 + 2x210MW)
OWNED BY GOVT. OF INDIA, MINISTRY OF POWER
BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978
NTPC adjudged as the 3rd best employer in India
NTPC Badarpur
BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.
The site construction activities started in 1968.
The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.
Basic Principle There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbine 3. Electric Generator
Electricity from Coal
C&I LABS
Control and Instrumentation Department has following labs: 1. Manometry Lab 2. Protection and Interlocks Lab 3. Automation Lab 4. Electronics Lab 5. Water Treatment Plant 6. Furnaces Safety Supervisory System Lab
OPERATION AND MAINTAINANCE
This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS
CONTROL & MONITORING MECHANISMS
There are basically two types of Problems faced in a Power Plant 1. Metallurgical 2. Mechanical
C&I Lab
In C&I Lab parameters to be monitored are: 1. Speed
2. Temperature
3. Current
4. Voltage
5. Pressure
6. Flow of Gases
7. Vibration
IT Role & Responsibility
– Maintenance Management – Materials & Contracts Management – Financial Accounting – Coal Monitoring & Accounting.– Operations & Generation Monitoring– Hospital Management– H R & TMS, T/S Management– Office Automation & communication.– E-Samadhan complaints Monitoring
• Why IT ? Materials : 30,000 + items
Transaction data. Master data Material and Service
Plant : 15,000 equipments Equipment master. Task list.
Employees : 1100 + Personal and payroll data. Finance : Accounting data. Operation : Plant parameters history data• Vendors: 5000 + vendors.
Satellite Communication Network
NTPC Hub StationAt CSES, Noida
RHQ:ERHQ, NRHQ,SRHQ,WRHQ
Tapovan Loharinagpala( ORDERED )
4/6 GHZ
4/6 GHZ( 512 kbps aggreagate )
2 GHZ/ 8 MBPS
THERMAL: Farakka,Unchahar,Kahalgaon, Korba, Ramagundam, Sipat, Simhadri,
Talcher (S), Talcher (T), Tanda, Barh
PMI,NOIDA
CC, SCOPENew Delhi
DADRI PROJECT
Engg.Office, NOIDA
GAS/HYDRO:Anta,Auriya,Faridabad, Gandhar, Kawas, Kayamkulam, Koldam,
2 mbps leased line
Rihand,
Vindhyachal
SingrauliOFC LINK
8 MBPS M/W Link
Awards
MOP’s Meritorious Productivity Award:
For calendar years 1987, 1988, 1990.
For financial years 92-93, 94-95 and 97-98
Received Bronze medal in 1998-99 and
Received Silver shield and certificate of
Meritorious performance for 2000-01.
Received Gold shield and Certificate for
outstanding performance three consecutive years
01-02 & 02-03 , 03-04. the awards were
presented by Hon’ble President of India and
Hon’ble power Minister on 24 August 2004.
Awards
Awards
Awards
o British safety award for 1988, 1994 and
1999.
o One employee bagged the Vishwakarma
Rashtriya Puraskar in 1994 from Ministry
of Labour. Six employees have been given
the same award for 1998.
o 6 BTPS employees were awarded under
Delhi Shramik Sujhao Yojna Puraskar’97 .
Another 8 employees have been awarded
under Delhi Shramik Sujhao Yojna
Puraskar’98 at Vigyan Bhawan on 20th
Aug’02 by Chief Minister of Delhi.
BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management
by Greentech foundation for 2003-04
– BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03
– BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04
– BTPS received golden peacock award for IT Innovations for 2003-04
BTPS received golden peacock award for IT innovations for 2003-04
Conclusion
The BTPS IT has come a long way from lagging to leading in IT enablement among NTPC power stations. IT Vision realized, making BTPS highly information enabled plant.
10/31/11
Reference• TRAINING REPORTS OF PAST YEARS AT
NALANDA LIBRARY
• INTERNET
• DOCUMENTS OF IT DEPARTMENT